UGBA 3133 Construction Contract Administration II Week 1 -3 Introduction to CCA II

June 9, 2018 | Author: Zechary Kar Seong | Category: Documents


Comments



Description

UGBA 3133 Construction Contract Administration II

Week 1 - 3

Introduction to CCA II Topic 1: Parties involved in construction 

roles and responsibilities / obligations of contracting parties

Contract Documents

1/25/2018



contents and their significance



proper documentation Presentation

page 2

Introduction to CCA II (cont’d) Topic 2: Pre-construction Documentation 

letter of intent and letter of award



earnest money, performance bond and insurance

1/25/2018



preparation of contract documents



site possession



work programme

Presentation

page 3

Introduction to CCA II (cont’d) Topic 3: Contract Documentation and Arising Disputes

1/25/2018



instructions & variations



various contractual claims



payment issues



determination



nominated sub-contractors

Presentation

page 4

References  westlawasia.com (UTAR subscribed online database)  Harban, Singh, K. S. (2002) Engineering and Construction Contracts ManagementCommencement & Administration. Selangor: Lexis Nexis  Harban, Singh, K. S. (2002) Engineering and Construction Contracts Management-Post Commencement Practices. Selangor: Lexis Nexis 1/25/2018

Presentation

page 5

Valuation Coursework  40% –

Assignment give out (30%) week 3



CNY break week 5



Test (10%) week 8 Submission of group assignment week 9 Submission of individual assignment week 10

– –

Final examination  60%  1/25/2018

Tutorial starts week 3 Presentation

page 6

Construction Industry Stakeholders Building Owner (Client)

Quantity Surveyor

Project

Engineer

Architect

1/25/2018

Material Suppliers

Design Team

Builder

SubContractor

Equipment Hirer

Local Authority Presentation

page 7

Roles & Responsibilities

Sutcliffe Appellant v Thackrah and Others Respondents [1974] 2 W.L.R. 295 

1/25/2018

Multi functional role of an administrator

Presentation

page 8

Roles & Responsibilities (cont’d)

PB Malaysia Sdn Bhd v Samudra (M) Sdn Bhd [2009] 1 AMR 555  

1/25/2018

Designers’ role Builders’ role

Presentation

page 9

Roles & Responsibilities (cont’d)

An Architect’s Liability; Case VII ZR 120/89 [1992] E.C.C. 377 Cotton v Wallis [1955] 1 W.L.R. 1168 

1/25/2018

Negligence in supervision

Presentation

page 10

Roles & Responsibilities (cont’d)

Steven Phoa Cheng Loon & 72 Ors v Highland Properties Sdn Bhd & 9 Ors [2000] 3 AMR 3567      

1/25/2018

Employers’ role Administrators’ role Designers’ role Builders’ role Local authorities’ role Neighbours’ role

Presentation

page 11

Roles & Responsibilities (cont’d)

Porter v Tottenham Urban DC [1915] 1 K.B. 776  

1/25/2018

Site possession Site access

Presentation

page 12

Roles & Responsibilities (cont’d)

Daya CMT Sdn Bhd v Yuk Tung Construction Sdn Bhd [2016] AMEJ 1487 

1/25/2018

Contractors to proceed regularly and diligently

Presentation

page 13

Roles & Responsibilities (cont’d)

Ronald Hill v Norside Limited [2012] WL 6774487 

1/25/2018

Responsibility of Main Contractor over the construction site

Presentation

page 14

Copyright © 2024 DOKUMEN.SITE Inc.