Home
Login
Register
Search
Home
Smpl Ppds s4hana 1610
Smpl Ppds s4hana 1610
May 20, 2018 | Author: Anonymous lBNggfUBy | Category:
Scheduling (Production Processes)
,
Business Process
,
Enterprise Resource Planning
,
Sap Se
,
Supply Chain Management
DOWNLOAD
Share
Report this link
Comments
Description
Whitepaper CUSTOMERDocument Version: 2.9 – 2017-12-11 Simplification List for Production Planning and Detailed Scheduling SAP S/4HANA 1610 Copyright/Legal Notice © 2016 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company. The information contained herein may be changed without prior notice. Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors. National product specifications may vary. These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP or SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies. Please see www.sap.com/corporate-en/legal/copyright/index.epx for additional trademark information and notices. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 2 © 2016 SAP SE or an SAP affiliate company. All rights reserved. Introduction These are words or characters that you enter in the system exactly as they appear in the documentation. and names of installation. screen titles. This includes file and directory names and their paths. Example Output on the screen. F 2 or E N T E R . pushbuttons labels. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Introduction © 2016 SAP SE or an SAP affiliate company. names of variables and parameters. messages. and key concepts of a programming language when they are surrounded by body text. All rights reserved. These include field names. menu paths. menu names. SELECT and INCLUDE. table names. Textual cross-references to other documents. 3 . These include report names. source text. EXAMPLE Technical names of system objects. Example Emphasized words or expressions. EXAMPLE Keys on the keyboard. Angle brackets indicate that you replace these words and characters with appropriate entries to make entries in the system. and menu options. for example. Example Exact user entry. transaction codes. upgrade and database tools. program names. <Example> Variable user entry. for example.Typographic Conventions Type Style Description Example Words or characters quoted from the screen. 3 2017-05-09 Additional information included 2.Document History Version Date Change 1.0 2017-02-03 Minor updates and some additional information included 2. All rights reserved.6 2017-09-19 Further details added to simplification items 2. with section 2.4 2017-08-07 Further detailing of simplification items.9 and 2.7 2017-10-16 Minor updates to sections 2.0 2016-10-27 Initial Delivery 2.25 2.1 2017-03-01 Further minor updates and additional information included 2.2 2017-04-18 Further detailing of simplification items 2.8 2017-12-06 Minor updates.5 2017-08-11 Corrections and minor updates to simplification items 2.24 CUSTOMER Simplification List for Production Planning and Detailed Scheduling 4 © 2016 SAP SE or an SAP affiliate company. Introduction .9 2017-12-11 Minor updates in section 2.27 added 2. with additional information included 2. ...................4............................. 12 2......... 15 2..........................................3.................... 10 2.....................................2 General Topics for the Simplification List.......2 Business Process Related Information ..........2.................2 Simulative Planning with Models in PP/DS ..................................................... 8 1...................................4............ 13 2....................................... 14 2.2.......................................................................................................... 9 1.........................2 Business Process Related Information .....1 Description ..... 10 2..........................................2 Business Process Related Information ......................................................................................................................................................................................................2 Business Process Related Information .. 14 2................................................ Resource Creation only in PP/DS .................................................................... 11 2.................................. 14 2............................1......... 14 2.... 16 2.................................. 11 2...................................3 Production Process Model (PPM) in PP/DS .9 Integration of gATP (including Multilevel ATP and CTP) in PP/DS ..............2...........................................................................................................1 Purpose of the Document ... 10 2.....................1 Description ............................................. 10 2..................... 12 2......................6...............................................................8...................................1 Description .........................................................................................................2 Business Process Related Information .....................................................................................................3 Recommendations .....3 Recommendations ...........................................3 Recommendations ............ 10 2............................................................9...1 Description .............2 Business Process Related Information ...................1 Description ................................. 13 2.......................................... 14 2.................................................7............................................................................5....... 12 2......8...............5 MRP Based Detailed Scheduling (MRP DS) .......................................................8 PP/DS Functions Relying on DP or SNP Inputs ..........3 Recommendations ........2.......................3 Recommendations .................................................2..............................................................3 Recommendations ......7.............................. 13 2.... 15 2...2 Business Process Related Information ..................................2........................................................................................................... 5 ................................................................... 12 2.3..........................6....................................................... Planner’s Home Page............................................................................................................ 16 2.... 13 2............... 15 2....8.......................1 Description ....................................3 Recommendations ..... 11 2.. 16 Simplification List for Production Planning and Detailed Scheduling CUSTOMER Introduction © 2016 SAP SE or an SAP affiliate company...... 15 2.....................................................................................................................................3 Recommendations ............ 9 1........................................4 Location-Product............................................ Side Panel..................... 11 2............................................................................. 14 2........................ 12 2..............................................................5.................................... 8 1........................5...................1 Description .........6............................2 Business Process Related Information .....2 Business Process Related Information .................................1 PP/DS for SAP S/4HANA is not a central planning hub ......................................3 Recommendations ..................................3 Recommendations ............................................................ 13 2..............1 Description ..................................................................4.. 10 2.......................... 10 2............................................................................... 9 1..1.....................Contents 1 Introduction ...........................................................7 Enhanced Product Planning................................. 12 2.....9..9.................................2 Business Process Related Information ..............1 Description ... Search Factsheets ..............................................6 Planning and Scheduling in PP/DS for Materials Relevant to PP/DS ....... All rights reserved............................................................................................................................................................................ 16 2.................. 13 2..........................................................................3.............7..........................................1 Description ............................................1.......................................... 9 2 Simplification List ................................................................................ .....................................................17.........................................21 Interactive Sourcing in Active Versions .....................................................21 2.........2 Business Process Related Information ........................... 17 2............. 17 2.............................................................19.....................................................................16 ESOA and XI support .......................................................... 22 2.................... 17 2............ 20 2...................................................11.......22 ATP Check Conversion Indicator for Material..........10............................18 2......................................................2 Business Process Related Information .............................21 2.................................................................................................3 Recommendations ............................................................................................. 20 2...........2 Business Process Related Information ...... 22 2.................................................... Introduction ..19 MRP2 Heuristic ...........................17 Performance Monitor .................................... 23 2........................................21......................................................18..........................................11.........19..........................................3 Recommendations ....................................15........15..................................................20 Configurable Products ................................18 2...........................2 Business Process Related Information ............................................21 2....................20.................................................................................16.........19 2.......................................................................2................1 Description ..............1 Description ..............................................................................12...13.......2 Business Process Related Information ...... 20 2.....3 Recommendations ................3 Recommendations .........................18.................21 2......................................................3 Recommendations .............................................................................1 Description ........................................................................................................................................................................1 Description ...............18 2...................19 2............................................................................17..........................................................................................................2 Business Process Related Information .............................................................14...................................................................................................10............................................. 17 2..........................10 Capable to Match (CTM) and Order Creation using PP/DS Optimizer .15 Data Replication for PP/DS Analytics .............................16.............................................................22.................14 Data Sources................................................................12.............................................. 22 2......................................2 Business Process Related Information ....................3 Recommendations ........... 22 2........................12 Product Memo and Order Notes .......19 2......18 2.....................12.................. 22 2..........................14............................................................................................19 2.................21 2........................ 20 2........13.....3 Recommendations .............................18 2..................17..............3 Recommendations .............................................................................................11..................................................... 17 2............... 20 2......................................................21 2......................................... 20 2........................................................................................................................14.....................................................................................3 Recommendations .........................1 Description ..................... 17 2.........................................................13..........2 Business Process Related Information . 23 2..............................................................1 Description ..........................................21...................3 Recommendations ......19 2...20.........................3 Recommendations .........................................................1 Description ...................................................................................................................... 23 CUSTOMER Simplification List for Production Planning and Detailed Scheduling 6 © 2016 SAP SE or an SAP affiliate company............. 17 2..............19 2......................................1 Description ................1 Description ....16................................13 Sort Profiles for Fixed Pegging Heuristics and Order Conversion ..........................20.....................19...................................................................................... All rights reserved........................................................ 22 2..........................................................................................................................................................1 Description ..................................................3 Recommendations .18 2.............................. 20 2....................................... 23 2.......21.........................................................................18..............................................................2 Business Process Related Information ....... 23 2.............................................................................................15.............................1 Description ....... 22 2...............................................................................18 Max-Constraints is a Soft Constraint ...... 20 2.... 23 2...........................................18 2......................10.............................................................1 Description .................................................................................2 Business Process Related Information ...............2 Business Process Related Information ..............2 Business Process Related Information ..............................................................1 Description .... 23 2.............................................21 2.......11 CIF Customer Exits and Inbound BAdIs ........21 2....... ......................26 2....24 2....................................................1 Description ..............1 Description ..........2 Business Process Related Information ............................................... 25 2............... 27 Simplification List for Production Planning and Detailed Scheduling CUSTOMER Introduction © 2016 SAP SE or an SAP affiliate company.......................................................... 2...27 Extensibility with Engineering Workbench and Freely Defined Attributes ....................23 Real Safety Stock Requirements .....................................24 2...................... Monthly and User-Defined Consumption Modes ............................................................26 2............................................. 25 2..............................1 Description ......27..3 Recommendations ..........25.............................26 Minimum Passing Amount for Continuous I/O Pegging and Duration of Time Interval for Concurrent Pegging ..............27.................................................................................3 Recommendations .........3 Recommendations ...25 Priority of Product ........................................................................................................ 25 2....................................................24 Weekly..23............................................... All rights reserved...................24 2...................24 2...............2 Business Process Related Information ........................................................................................................ 25 2..............................2 Business Process Related Information ........24 2..........................................................................................26..............................................................................26 2......................26 2...................................................................................................25.................3 Recommendations ........1 Description ............................................. 25 2...........1 Description ...............................................................26 2............................................................................................................................. 7 ...26 2......................2 Business Process Related Information ...........3 Recommendations ................................................23.............................24.........26.......................................................25......... 25 2.........26 2...............26.......................................................22..................3 Recommendations ......................................2 Business Process Related Information ....24............................................23.............. 27 2..............27...........................................2 Business Process Related Information ...............................................................................................................................24..... 25 2.............................24 2....................22................................................................ and procurement. Note The Simplification List for PP/DS for S/4HANA is edition/release dependent. It is not however. • Optimize and plan the resource schedule and the order dates/times in detail. SPP. 1. gATP. Introduction . you can use PP/DS for S/4HANA to plan critical products. MSP. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 8 © 2016 SAP SE or an SAP affiliate company. a legal successor of the PP/DS component from the SAP SCM Server. All rights reserved. SNP. PP/DS for SAP S/4HANA is no longer bundled with other SAP APO components. such as products with long replenishment lead times or products that are produced on bottleneck resources.1 Purpose of the Document The purpose of this document is to help you understand the differences between the PP/DS component from the SAP SCM Server and PP/DS for SAP S/4HANA 1610 Edition. • Increase on-time delivery performance. and is directly a part of SAP S/4HANA. You can use PP/DS for SAP S/4HANA to: • Create procurement proposals for in-house production or external procurement to cover product requirements. Above all. SNC or CTM. taking product and capacity constraints into account. through better coordination of resources. a new list will be made available. By using PP/DS for S/4HANA. or components part of the SAP SCM Server such as DP.1 Introduction Production Planning and Detailed Scheduling (PP/DS) for SAP S/4HANA is a next-generation product running on SAP S/4HANA. For future releases. Data migration and customer code migration from the PP/DS component from the SAP SCM Server is not supported by the standard solution. • Increase the throughput of products and reduce the stock costs. PP/DS for SAP S/4HANA helps you plan production within a plant. you can create executable production plans that let you: • Reduce lead times. production. In this collection we are focusing on PP/DS for SAP S/4HANA 1610 Edition. you can understand how your implementation needs to be adapted (based on SAP Notes). For example.2. Note The recommendations and SAP Notes are formulated in a manner corresponding to a standard customer architecture and may differ depending on the real System Landscape in place. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Introduction © 2016 SAP SE or an SAP affiliate company. 1.2 Business Process Related Information Here. custom code migration or data migration. All rights reserved. SAP will provide information regarding applications/functional areas related to the PP/DS for SAP S/4HANA 1610 delivery related simplifications. you can see what the simplification item means for the related business processes. with a short explanation about the technical change. with business processes. 1.2 General Topics for the Simplification List Through this document.3 Recommendations Here. 9 .1 Description The Simplification List is structured into different applications/functional areas related to PP/DS for SAP S/4HANA.1. You will see the following information provided for each simplification item: • Description • Business Process Related Information • Recommendations 1.2.2. For further information regarding DP.8 and 2. refer sections 2.3 Recommendations If you still want to plan and schedule production for different back-end systems in one PP/DS instance.1.2. 2. The downside of using different models was that you always had to assign master data instances to models.1. use the PP/DS hub deployment option.1 PP/DS for SAP S/4HANA is not a central planning hub 2. such as DP. All rights reserved.1 Description Simulation in the PP/DS component from the SAP SCM Server required management of models and planning versions. 2. SNP and gATP. Simplification List . models allowed different versions of master data.2 Simulative Planning with Models in PP/DS 2. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 10 © 2016 SAP SE or an SAP affiliate company. where PP/DS was used as a central planning hub.2 Simplification List 2.9. 2. PP/DS for SAP S/4HANA does not serve as a central planning hub for several connected ERP systems.1.1 Description The plan you create in PP/DS for SAP S/4HANA is executed in the same SAP S/4HANA system. while planning versions allowed simulation of optimistic or pessimistic demand forecasts. For example. SNP and gATP.2 Business Process Related Information This change impacts business processes with integration points to PP/DS. 2. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company. there is nothing to do. If you used just one model in the past. PPMs were an alternative representation of BOM and routing data.3 Production Process Model (PPM) in PP/DS 2. PDS is the only format of BOM and routing data used in PP/DS for SAP S/4HANA. PPMs will still be supported in an SCM-APO system running side-by-side with an SAP S/4HANA system. If you used models with different sets of resources to determine a set of resources that can best process the required activities. 11 . make version dependent changes to master data instances. If you used several models. Use active model with planning versions other than '000' for simulative planning. check the business reasons for the different models. we avoid data redundancy and data duplication for source of supply for in-house production. 2. which are no longer supported. Transaction not available in /SAPAPO/SCC07 Supply Chain Engineer SAP S/4HANA 1610 /SAPAPO/SCC02 Supply Chain Cockpit Transaction affected in /SAPAPO/MVM Model and Version Management SAP S/4HANA 1610 Note Only active models are supported in PP/DS for SAP S/4HANA.2.2 Business Process Related Information Master data instances are always valid for all simulation versions.1 Description Adhering to one of the basic design principles of SAP S/4HANA. You can however. In the PP/DS component from the SAP SCM Server. then you should use the material’s MRP controllers instead Models can still be defined in an SCM-APO system running side-by-side with an SAP S/4HANA system. then you should use planning version-dependent capacities instead. If you used models to differentiate areas of responsibilities.3.2. 2. Thus. All rights reserved.3 Recommendations Planning versions other than '000' are typically used for simulative planning. 3 Recommendations All PPMs will be ignored. you created local/dummy materials in SCM-APO.4..2 Business Process Related Information The differences between PDS and PPM are specified in SAP Note 1079959. Use transaction CURTOADV_CREATE to create PDS for all production versions of materials that are going to be planned in PP/DS for SAP S/4HANA. Resource Creation only in PP/DS 2. This can be achieved by creating materials and resources in SAP S/4HANA and transferring them to PP/DS for SAP S/4HANA master data. Enable required customization to send different resource types and resource categories to PP/DS for SAP S/4HANA.3 Recommendations With an SCM-APO system running side-by-side with an SAP S/4HANA system. calendar resources etc.2 Business Process Related Information Local creation of location product or resource is no longer required. 2. 2. All rights reserved. you create and change master data only on the ECC end. 2. 2. preventing redundant functionality. This would be required to transfer handling unit.4 Location-Product. The transaction CURTOADV_CREATE uses simplified integration. Use report /SAPAPO/COPY_RESOURCE_HU to create Handling Resource for Storage Location and subcontracting MRP areas. This follows the basic design principle for SAP S/4HANA.3.4. The motivation for master data creation and change in SAP S/4HANA alone is to reduce data and process duplication.1 Description Adhering to one of the basic design principles of SAP S/4HANA.2. you should create materials in SAP S/4HANA and make them PP/DS-relevant. Instead. Simplification List . Creation of Location-Products and Resources that only exist in PP/DS is no longer supported in PP/DS for SAP S/4HANA. This would be still supported with an SCM-APO system running side-by-side with an SAP S/4HANA system.3. which is to provide one functionality for one objective.4. and does not require an integration model to be created. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 12 © 2016 SAP SE or an SAP affiliate company. To facilitate simplification of CIF. then it has to be planned using PP/DS heuristics (which typically runs in MRP Live). the detailed scheduling scenario with MRP running in the ERP and scheduling being performed in PP/DS is no longer supported with PP/DS for SAP S/4HANA. need to be planned and scheduled in PP/DS. This would be still supported with an SCM-APO system running side-by-side with an SAP S/4HANA system. the heuristic SAP_PP_MRPDS - MRP-Based Det. All rights reserved.2 Business Process Related Information Objects and configuration related to MRP-based detailed scheduling (for example. that is.5.2.6 Planning and Scheduling in PP/DS for Materials Relevant to PP/DS 2.3 Recommendations Check and adapt the needed customizing and master data to support planning and scheduling in PP/DS for SAP S/4HANA. MRP-based DS needed special logic in ECC CIF Outbound to create Planned Orders in APO without PDS. 2. 13 .1 Description While using MRP Live.5. If a material is scheduled using PP/DS for SAP S/4HANA.5.1 Description In an SCM-APO system running side-by-side with an SAP S/4HANA system.5 MRP Based Detailed Scheduling (MRP DS) 2. 2. the materials relevant to PP/DS for S/4HANA. 2. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company.6. Scheduling: Order Network) are not available. materials made Advanced Planning-relevant. 7.2 Business Process Related Information While using MRP Live. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 14 © 2016 SAP SE or an SAP affiliate company.6.3 Recommendations Adjust data modelling and settings as needed to plan and schedule Advanced Planning-relevant materials (materials relevant to PP/DS) directly in PP/DS for SAP S/4HANA. 2. Side Panel based data analytics are no longer supported by PP/DS for SAP S/4HANA. 2. Planner’s Home Page.1 Description Web Dynpro based user interface including Enhanced Product Planning. 2.7 Enhanced Product Planning. Side Panel.3 Recommendations There are no recommendations for this item.7. you could plan materials relevant to PP/DS in the ERP system. you can plan PP/DS-relevant materials only using PP/DS heuristics. factsheets delivered for HANA based search in SCM is also not supported 2.2. With the PP/DS component from the SAP SCM Server. Simplification List .6. Planner’s home page. In addition. This is no longer supported.2 Business Process Related Information There is no business process related information for this item. Search Factsheets 2.7. All rights reserved. Deployment (for example.8. Planning area dependent features like Capacity Reservation. Consider using heuristic SAP_PP_LLC .Individual Conversion SNP --> PP/DS.SNP --> PP/DS Conversion for Many Prods. SAP_SNP_LLC .2. Investigate available alternatives for mixed resources. Integrated business planning (IBP) will be the future solution for demand planning and sales and operations planning.Stage-Numbering Algorithm for PP/DS instead of SAP_PP_020 . PP/DS for SAP S/4HANA can use the integrated forecasts or demands for planning. DP and all functions integrating SNP. SAP_SNP_SNGL . Planning Area. PP/DS for SAP S/4HANA will use forecasts or demands from SAP S/4HANA for planning. 15 .8. All rights reserved. Forecasts or demands need to be created in or transferred to SAP S/4HANA.PP/DS Deployment Multiple Products and SAP_DEPL_SNG . Vendor-Managed Inventory (VMI) and Transport Load Builder (TLB) are not supported. Characteristics-Based Forecasting and time-dependent safety stock will also not be supported.1 Description SNP and DP are not a part of PP/DS for SAP S/4HANA. Also. heuristics SAP_DEPL_MUL .PP/DS Deployment Single Product).3 Recommendations Investigate alternative business processes or use an SCM-APO system running side-by-side with an SAP S/4HANA system. SNP.2 Business Process Related Information SNP to PP/DS integration (for example. DP and PP/DS will still be supported in an SCM- APO system running side-by-side with an SAP S/4HANA system. values and Forecast Consumption for sales orders and for characteristics-based forecasts while planning with characteristics for CDP and CBF) are no longer supported. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company.Stage- Numbering Algorithm.8 PP/DS Functions Relying on DP or SNP Inputs 2. heuristics SAP_PP_023 - Propagation of descriptive char.8. PP/DS functions that are relying on SNP or DP inputs are no longer supported. SNP to PP/DS conversion is not supported. 2.Stage-Numbering Algorithm for SNP). 2. Mixed Resources. Customer consignment stocks that is not relevant for PP/DS processes and is also not available. heuristics SAP_SNP_MULT . CVC and Descriptive Characteristics (for example. PP/DS for SAP S/4HANA no longer supports integration to these components but will integrate with the ATP check in SAP S/4HANA.1 Description gATP.9 Integration of gATP (including Multilevel ATP and CTP) in PP/DS 2. 2.Planning Shortage Quantities for CTP). In addition.Interactive CTP Heuristic and SAP_PP_CTP .9. Simplification List . business process relying on ATP check for planned orders that are not integrated to PP orders. All rights reserved. However. This requires the orders in liveCache to have the same components as those of the PP orders for a consistent result. 5 (Multilevel ATP Check) and 7 (Length-Based Planning Procedure) will not be supported. Heuristics related to CTP processes are not available (SAP_CTP_DLG . In this case. integration to advanced ATP will not check with orders present in liveCache. integration is also available during planned order conversion. along with Multilevel ATP and CTP. but PP orders instead. given appropriate customizing settings. is not relevant for PP/DS for SAP S/4HANA. A characteristics-based product availability check. In addition. adapt orders other than planned orders on the basis that advanced ATP executes an ATP check during conversion anyway. Standard PP planning procedures 3 (Cover Dependent Requirements Immediately).Planning shortage quantities is also not supported in standard. or having different order parameters from liveCache orders for ATP check will be affected. dealing with the logistical mapping of goods traffic. If you are using PP/DS for SAP S/4HANA.2. used in combination with characteristics-dependent planning (CDP) is not supported. will still be supported in an SCM-APO system running side-by-side with an SAP S/4HANA system.2 Business Process Related Information gATP or CTP check during sales order creation is no longer supported by PP/DS for SAP S/4HANA. is not a part of PP/DS for SAP S/4HANA. External Plant. 2. ATP Check for Planned Orders for RPM Products is supported for component check during order conversion for PP/DS for SAP S/4HANA. gATP. along with Multilevel ATP and CTP. The heuristics SAP_PP_003 . However multilevel planning can be used without CTP process using custom specified planning procedures and heuristics.9.9. Adapt business processes and customizing to use advanced ATP or use an SCM-APO system running side-by-side with an SAP S/4HANA system. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 16 © 2016 SAP SE or an SAP affiliate company. the integration of PP/DS for SAP S/4HANA with advanced ATP allows checking component availability for planned and production/process orders. Due to this reason. used with Cross-System Flow of Goods.3 Recommendations SAP recommends the planning to be done in planning run. classes. classes. CTM will still be supported in an SCM-APO system running side-by-side with an SAP S/4HANA system. inventory-managed manufacturer parts.11. 2. 2. 2. characteristics and classification need to be adapted for PP/DS for SAP S/4HANA.11.3 Recommendations Implement a business process with an MRP run creating planned orders and a subsequent PP/DS optimizer scheduling the planned orders. which also created planned orders.2 Business Process Related Information PP/DS optimizers in PP/DS for SAP S/4HANA do not create planned orders.10 Capable to Match (CTM) and Order Creation using PP/DS Optimizer 2.10. 2. 17 . used by CTM.10. such as additional customer fields or default values for PP/DS products. Also. is no longer available in PP/DS for SAP S/4HANA. The CTM run.1 Description PP/DS optimizers in PP/DS for SAP S/4HANA only schedule planned and production orders. SMOD_APOCF31. CIF exit BAdIs like SMOD_APOCF005.2 Business Process Related Information Customer data mapping on CIF. All rights reserved. A heuristics run is needed to create planned orders first.11 CIF Customer Exits and Inbound BAdIs 2.1 Description CIF customer exits as well as CIF inbound BAdIs related to product. characteristics and classification are affected. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company.2. is no longer supported by SAP S/4HANA. which deals with interchangeable. Form-Fit-Function (FFF).10. SMOD_APOCF32 and SMOD_APOCF035 are not supported. All rights reserved. 2. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 18 © 2016 SAP SE or an SAP affiliate company. refer SAP Note 2393581. 2. For information regarding the SCM Extensibility Feature for SCM Related Fields in Product Master and data mapping. SMOD_APOCF001).13 Sort Profiles for Fixed Pegging Heuristics and Order Conversion 2.1 Description Fix pegging and order conversion could use custom sort profiles to control the sequence in which the algorithm act on a list of orders.11. This feature was used based on gATP. PP/DS Product Master is a re-direct view reading from standard Material Master tables.12.1 Description Product memos and order notes could be maintained specific to the PP/DS component from the SAP SCM Server. 2. Mapping for existing fields or default values cannot be changed.13.3 Recommendations Adapt related CIF exit implementation and data mapping in BAdIs (for example.12.12 Product Memo and Order Notes 2.3 Recommendations You can merge the product memos in the PP/DS component from the SAP SCM Server with ERP material memos. Discard order notes-specific information.2 Business Process Related Information Product memos and order notes maintained specific to the PP/DS component from the SAP SCM Server are no longer available in PP/DS for SAP S/4HANA.12. and is not available to use in PP/DS for SAP S/4HANA. Simplification List . 2.2. 3 Recommendations Review the custom sort order profile.14. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company.14.2 Business Process Related Information Data sources derived from extractors in the PP/DS area are no longer supported and are not considered as state of the art in SAP S/4HANA.14 Data Sources 2. 2. Consider alternate data sources available in SAP S/4HANA. the data sources that were available for SCM BASIS are not supported with PP/DS for SAP S/4HANA. 2. 19 .14. 2.13. and adjust the business process and master data to adapt to use standard sort profile. 2.1 Description Data sources will no longer be supported in PP/DS for SAP S/4HANA. All rights reserved.2. or consider using BAdI /SAPAPO/RRP_FIXPEG.3 Recommendations Review the business process involving data sources.13. The following data sources exclusively used by PP/DS will be impacted: 0APO_PPS_CDS_01 APO >BW: Extraction of Due Delivery Schedules/Confirmations 0APO_PP/DS_OPERATION_01 APO >BW: Transaction Data Operations 01 0APO_PP/DS_ORDER_01 APO >BW: Transaction Data Orders 01 0APO_PP/DS_PROD_CUST_01 APO >BW: Transaction Data Order Assignments 01 0APO_PP/DS_RESCAPREQ_01 APO >BW: Transaction Data Resources 01 In addition to these.2 Business Process Related Information You cannot use custom sort order for fixed pegging and order conversion. 16.15. 2. 2. All rights reserved.16. 2.2 Business Process Related Information Use of equipment resource XI services for production resource.1 Description ESOA and XI support will not be available for PP/DS for SAP S/4HANA. 2.2 Business Process Related Information Supply Chain Info Center uses data replication for PP/DS analytics.15.16 ESOA and XI support 2. and is no longer supported in SAP S/4HANA.1 Description Data replication for PP/DS analytics is no longer supported in PP/DS for SAP S/4HANA.3 Recommendations Check the usage and consider using the resource BAPIs. Simplification List .2.15 Data Replication for PP/DS Analytics 2.16. 2.15. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 20 © 2016 SAP SE or an SAP affiliate company.3 Recommendations There are no recommendations for this item. 2 Business Process Related Information Dynamic pegging will not fail due to constraint violations.18. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company. In addition to this.2 Business Process Related Information Performance monitoring and statistics for PP/DS optimizer are affected.17. 2. All rights reserved. 2. 2. 2.1 Description Max-constraints is a soft constraint.3 Recommendations Scheduling in the graphical planning board will seem slightly different for production planners who are used to working with max-constraints as a hard constraint.2. The system issues an alert if the constraint is violated but does not enforce it during planning. 2.18 Max-Constraints is a Soft Constraint 2.17.18. Timely receipts will be used and the timeframe (earliness and lateness) a receipt could be pegged in is set to maximum.1 Description The APO Performance Monitor will not be available in PP/DS for SAP S/4HANA. This makes scheduling much more predictable.18. 21 .17.17 Performance Monitor 2. the use of total receipts and stock for pegging quantities is defaulted to false.3 Recommendations Use optimization logs for the analysis. it is theoretically possible to treat configurable products as non-configurable products in planning. 2. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 22 © 2016 SAP SE or an SAP affiliate company.2 Business Process Related Information There is no business process related information for this item.20. immediately)) is not supported by PP/DS on SAP S/4HANA.Product planning (Plan comp.20 Configurable Products 2. This does not work well in real life planning. The result was that without considering alternatives like increased capacity. 2. The MRP2-heuristic planned materials including uncovered components in order to make sure the plan was feasible. very many orders were moved into the future time due to minor constraint violations. All rights reserved. 2.1 Description The MRP2-heuristic (SAP_MRP_002 .3 Recommendations Investigate material planning using MRP Planning run.19.20. 2.2. and the rest of SAP S/4HANA.2 Business Process Related Information There is no business process related information for this item.1 Description Configurable products are always configurable products both in PP/DS for SAP S/4HANA. in a case where all optional components are planning-irrelevant. In SAP APO. Simplification List .19.19.19 MRP2 Heuristic 2. This option is not available in PP/DS for SAP S/4HANA. For example. 2. All rights reserved. In SAP APO it was possible to control the ATP check during conversion of orders at a material master level as well. 2. 2. 2.1 Description Interactive sourcing profile cannot be maintained in active version in PP/DS for SAP S/4HANA.1 Description ATP check during conversion of orders can be only controlled globally in PP/DS for SAP S/4HANA. if affected.21 Interactive Sourcing in Active Versions 2.21.3 Recommendations There are no recommendations for this item.21.22. However this is possible in simulation versions.3 Recommendations Adapt your data modelling. 23 .21.2 Business Process Related Information Interactively choose sourcing options from alternate locations is currently not possible in active version. However this can be maintained and used in simulative versions. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company.20.2.22 ATP Check Conversion Indicator for Material 2. 22. the Virtual Safety Stock Elements option is used to cover unexpectedly high requirements.3 Recommendations Adapt the usage of safety stock option to virtual safety stock elements. Simplification List .2 Business Process Related Information As mentioned in the description. you can see what quantity is covered immediately by safety stock and what is delayed. unlike the Real Safety Stock Requirements option.22. 2.23. under Global Parameters and Default Values in PP/DS customizing.23.3 Recommendations Adapt business processes to configure ATP check globally during conversion of orders. 2. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 24 © 2016 SAP SE or an SAP affiliate company.Create Safety Stock in SAP liveCache is not supported. which helps resolve delays or problems in production. In case of a delayed receipt.23 Real Safety Stock Requirements 2. This will impact pegging of safety stock elements. and on the checking control on plant and order type level under Availability Check customizing.23.2. 2. an option used to cover unexpectedly high requirements is the only safety stock method supported in PP/DS for SAP S/4HANA. Heuristic SAP_PP_018 .1 Description Virtual Safety Stock Elements. All rights reserved. 2. This is planning-focused.2 Business Process Related Information The ATP check in PP/DS for SAP S/4HANA is based on customizing. The Real Safety Stock Requirements option is currently not supported by PP/DS for SAP S/4HANA. Monthly and User-Defined Consumption Modes 2.Backward/Forward Consumption • 3 . 2. it was possible to define product priority in Product Master. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company. In PP/DS for SAP S/4HANA it is only possible to inherit the priority of a sales order in case of make-to- order.25. instead of weekly or monthly consumption modes. monthly and user-defined consumption modes in Product Master. and you cannot influence priority in case of make-to-stock strategy. Evaluate the possibility of using the period-based consumption mode. 25 .Forward Consumption Only • 5 .1 Description It was possible to define weekly.24.24. All rights reserved. which takes into account forecast periods.25.24 Weekly.25 Priority of Product 2. 2.Backward Consumption Only • 2 .3 Recommendations Use one of the consumption modes supported by PP/DS for SAP S/4HANA along with consumption periods to define the consumption timeframe. 2.24.2.1 Description In SAP APO.Period-Based Consumption 2.2 Business Process Related Information It was earlier possible to determine the priority of an order or schedule line either from requirements or from products.2 Business Process Related Information The following consumption modes are supported by PP/DS for SAP S/4HANA: • 1 . 26. 2.26. In addition.25. it was possible to use fixed freely defined attributes for products and location extensibility. 2.3 Recommendations There are no recommendations for this item.1 Description It was possible to split the receipt elements in factors of the value specified in Minimum Passing Amount and by setting Conti IO Pegging indicator.1 Description With SAP APO. It was also possible to have Pegging with overlapping requirements or overlapping receipts by setting Concurr. Pegging indicator and specifying the duration of a time interval in the location product master. Also. All rights reserved.26. pegging with overlapping requirements or overlapping receipts is no longer possible.27 Extensibility with Engineering Workbench and Freely Defined Attributes 2. CUSTOMER Simplification List for Production Planning and Detailed Scheduling 26 © 2016 SAP SE or an SAP affiliate company. 2. it was possible to use engineering workbench for extending various PP/DS-relevant business objects like products and locations.26 Minimum Passing Amount for Continuous I/O Pegging and Duration of Time Interval for Concurrent Pegging 2.27. 2.3 Recommendations Adapt your business processes to inherit the priority of an order or schedule line from requirements. Simplification List .2.2 Business Process Related Information Split of receipt elements into maintain minimum passing amount is not possible. 27 .27.2 Business Process Related Information Extensibility of customer fields using Engineering Workbench and extensibility using freely defined attributes for PP/DS objects like product and locations are affected. 2.2.27.3 Recommendations There are no recommendations for this item. Simplification List for Production Planning and Detailed Scheduling CUSTOMER Simplification List © 2016 SAP SE or an SAP affiliate company. All rights reserved. www. SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. Please see http://www.com/corporate-en/legal/copyright/index.sap. sap. All other product and service names mentioned are the trademarks of their respective companies. . All rights reserved.epx#trademark for additional trademark information and notices. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company.com/contactsap © 2016 SAP SE or an SAP affiliate company.
Report "Smpl Ppds s4hana 1610"
×
Please fill this form, we will try to respond as soon as possible.
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
Copyright © 2024 DOKUMEN.SITE Inc.