DESIGN PACKSmartfren LTE Project Site Design Pack Site ID Site Name ZTE_3465 Srondol Site Type Outdoor&GF Tower Type Angular Tower Document NO. Ed. Date PROJECT: SMARTFREN LTE PROJECT THE EAST BUILDING 26-27th FLOOR JL. LINGKAR MEGA KUNINGAN KAV. E3-2. NO.1 JAKARTA 12950 TEL:021-2994 2000 FAX:021-2994 2002 PT. SMART Telecom JL. H. AGUS SALIM 45 KEBON SIRIH – MENTENG JAKARTA PUSAT TEL:021-31922255 FAX:021-3162519 CONTRACT NO: Documentation Identification: Document No. DESIGN PACK Company Prepared by ZTE Checked by Smartfren Title Name Signature Approved by Smartfren Site Name: Site ID: Total Pages: Edition: This document is exclusively property of ZTE and shall not be used copied or comm to the third party without its prior authorization. Document NO. Ed. TABLE OF CONTENT DESIGN PACK 1. PROPOSED SOLUTION 1.1 Site Information 1.2 Site Model Summary 1.3 Proposed RAN Solution 1.4 Proposed LTE Antenna&Feeder System 1.5 Infran & Power Equipment Information 1.6 Proposed Mini CME 2. MAIN EQUIPMENT BOM Date INSTALLATION AUXILIARY MATERIALS 4. Power Supply requirements V.3. BILL OF QUANTITY OF MINI CME 5. SITE DESIGN DRAWING APPENDIX I Standard Environmental Requirement I. Temperature and Humidity Requirement APPENDIX II Detailed Design Drawings . Floor loading requirement III. Grounding System IV. General Requirement II. SIGN PACK en LTE Project Design Pack . Date .Page ARTFREN LTE PROJECT PT. AGUS SALIM 45 KEBON SIRIH – MENTENG JAKARTA PUSAT TEL:021-31922255 FAX:021-3162519 Document No. SMART Telecom JL. H. Total Pages: Edition: ZTE and shall not be used copied or communicated ation. LE OF CONTENT Page . . New power system M6-1: TDD+FDD. New power system M12-1: FDD only.1 Site Information No. New power system M11-1: TDD+FDD. Reuse power system M12-2: FDD only. For SAMSUNG Outdoor. For CBTS12 Outdoor M10-1: TDD+FDD. For CBTS12 Indoor. For New site on tower M3: FDD only.1. 1 2 Items Information ZTE_3465 Srondol Site ID Site Name 3 Site Address 4 5 6 7 Site Ownership Region Morphology Class Longitude(E): 8 Latitude(N): 9 10 Site Type Building Height 11 12 13 14 15 16 17 18 19 Tower/Pole Type Equipment Room Type Room Demension Existing BTS Equipment/Type Existing Power Equipment PLN Connection Capacity Generator Set Capacity Air Conditioner Qty and capacity Environment Alarm System Tower provider Suburban Outdoor&GF Angular Tower Outdoor 1. Reuse power system M8-2: TDD+FDD. New power system M9: TDD+FDD. For New site on 17m pole M2: TDD only. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Site Model Description M1: TDD only. For BS8800. For SAMSUNG Outdoor. For SAMSUNG Indoor.2 Site Model Summary No. For BS8800. For New site on tower M4: TDD+FDD. For BS8900. For BS8906E M8-1: TDD+FDD. Reuse power system M6-2: TDD+FDD. PROPOSED SOLUTION Site ID: ZTE_3465 Site Name: Srondol Location: 1. Reuse power system M10-2: TDD+FDD. New power system M13-1: FDD only. For BS8900. New power system M7: TDD+FDD. Reuse power system M5-2: TDD+FDD. For New site on tower M5-1: TDD+FDD. For CBTS12 Indoor. For SAMSUNG Indoor. Reuse power system M13-2: FDD only. For BS8900. For BS8900. Reuse power system M11-2: TDD+FDD. For BS8800. New power system BS8900 . For BS8800. For CBTS12 Indoor. For SAMSUNG Indoor. For CBTS12 Outdoor M17-1: FDD only. For SAMSUNG Indoor. For SAMSUNG Outdoor. New power system M19: TDD only. For Indoor DAS(Distribution Antenna System) M20: FDD only. Reuse power system M18-2: FDD only. New power system M18-1: FDD only. For Pico . Reuse power system M15-2: FDD only.21 22 23 24 25 26 27 28 29 30 31 M14: FDD only. Reuse power system M17-2: FDD only. For SAMSUNG Outdoor. For BS8906E M15-1: FDD only. Shooting site solution M21: TDD only. New power system M16: FDD only. For CBTS12 Indoor. 4 Proposed LTE Antenna&Feeder System 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Item Antenna Type Qty of Antennas Port of Antenna Height (m. of RRU DC Power Cable Length(m)for TDD DC Power Cable Length(m)for FDD Sector-1 850M&2300MHZ Dual-Band 1 4 40 0 5 3 Fiber 36 R8964&R8862A(T+F) 1 36 36 1.1. Proposed Items Proposed Information . 1 Items Tower structural analysis 2 Tower structural statement from Consultant 3 4 5 6 7 8 9 10 11 12 13 Pole structural analysis/design Building structural analysis Power System Solution Proposed DC System Type Add Rectifier Moudle Proposed new battery for new PS Battery replacement Proposed DCPD Box or Subrack Transmission Solution Proposed IPRAN Installation New added Power Loading(MAX) Information Need No need Need Replacement Battery 8 Blocks Only ZXDU68 S301 2*30A Reused Reused DCPD Subrack Dark Fiber In Existing 19"Rack 2890W 1.5 Infra & Power Equipment Information No.6 Proposed Mini CME No.3 Proposed RAN Solution No.AGL) Azimuth Machanical Tilt Electrical Tilt Antenna Jumper Length(m) for TDD Antenna Jumper Length(m) for FDD Feeder Type Feeder/Fiber Length RRU Type Qty. 1 2 3 4 5 6 7 8 9 10 Proposed Items Proposed Solution Proposed Rack Proposed BBU type Proposed BBU Installation RRU Type For TDD RRU Qty For TDD RRU Type For FDD RRU Qty For FDD Proposed ANT type Proposed DCPD6 Proposed Information M5-2 BC8910+PC8910 BS8300(TDD+FDD) In BC8910 R8964 3 R8862A 3 3*Dual-Band 6 ports(CVV65CSX-M) Yes 1. 1 2 3 4 5 6 7 8 9 10 11 12 Proposed equipment foundation? Poposed Antenna mounting Type Poposed Antenna mounting Qty Poposed RRU mounting Type Poposed RRU mounting Qty Porposed Cable Tray-Type1 Length of cable tray type1 Porposed Cable Tray-Type2 Length of cable tray type2 BC+PC installation type Porposed Grounding Bar Qty Porposed new feeder window? Yes Mounting to Monopole-3000mm 3 Sharing ANT mounting 0 No need 0 Indoor cable tray(width 40cm) 0 Up&Down installation 1 Yes . automatically generate Smartfren.xxx°) format With(xx.Concrete room.xxx°) format Outdoor&GF Angular Tower Outdoor m em m stem em BS8900 Linked to cover page.Tower provider.CBTS12.SAMSUNG M1 M2 M3 M4 M5-1 M5-2 M6-1 M6-2 M7 M8-1 M8-2 M9 M10-1 M10-2 M11-1 M11-2 M12-1 M12-2 M13-1 M13-2 . Other operators Denseurban. automatically generate Linked to cover page.Information ZTE_3465 Srondol Tower provider Suburban Tips Linked to cover page.BS8900.Suburban. Rural With(xx. automatically generate Shelter. automatically generate Fill with building height if it is Rooftop site Linked to cover page. Outdoor (mm) (HxWxD) BS8800.Urban.BS8906E. m em m M14 M15-1 M15-2 M16 M17-1 M17-2 M18-1 M18-2 M19 M20 M21 . LL. Box will be installed on wall. No need. subrack in 19" rack IPRAN.Proposed Information M5-2 BC8910+PC8910 BS8300(TDD+FDD) In BC8910 R8964 3 R8862A 3 -Band 6 ports(CVV65CSX-M) Yes Tips Choose a Model Automatically generate according to Model Automatically generate according to Model Automatically generate according to Model Automatically generate according to Model Automatically generate according to Model Automatically generate according to Model Automatically generate according to Model Automatically generate according to Model Sector-2 Sector-3 850MHZ Single-Band 2300MHZ Single-Band 1 4 40 120 1 4 40 240 5 3 Fiber 36 R8964(TDD) 1 36 40 5 3 Fiber 36 R8964&R8864A(T+F) 1 40 40 Information Need No need Need cement Battery 8 Blocks Only ZXDU68 S301 2*30A Reused Reused DCPD Subrack Dark Fiber In Existing 19"Rack 2890W Proposed Information Sector-4 Tips Need. Need.Dark Fiber. Existing 5928 Automatically generate according to Model Tips . No need.MW. No need. Need. Yes unting to Monopole-3000mm 3 Sharing ANT mounting 0 No need 0 oor cable tray(width 40cm) 0 Up&Down installation 1 Yes 8 types of cab tray 8 types of cab tray Including tower grounding bar and main grouding bar . MAIN EQUIPMENT BOM Site ID: ZTE_3465 Site Name: Srondol Location: 2.2.1 RAN Equipment BOM . 2 Power Equipment BOM .2. .2.3 Transmission Equipment BOM(if have) Pls comment there is no ZTE transmission equipment if the site do not have indeed. . . . do not have indeed. . . 80m<length<=140m) ODCPD (for 10mm2 power cable.50m<length<=80m) 2 core shielded power cable(10mm2. transfer box) Grounding Cable(16mm2) Copper Thumber 0-16 mm2 Filter(For FDD RRU) Installation Grounding Cable(16mm2) .red) 16 mm2 PVC cable jacket of blove(From S301 to Battery. Side by side installation need 2) DC Blue Power Cable (From Rec to BC8910 .blue) 35 mm2PVC cable jacket of Kelly(Grounding cable for S301.16mm2) DC Black GND Cable (From Rec to BC8910 . INSTALLATION AUXILIARY MATERIALS Site ID: ZTE_3465 Site Name: Srondol Location: Item ZXDU48 Outdoor Rack Installation 25 mm2 outdoor red power cable(From DC Power system to ZXDU48 Rack) 25 mm2 outdoor blue power cable(From DC Power system to ZXDU48 Rack) 16mm2 PVC cable jacket of Kelly(Grouding cable of ZXDU48 Rack) Copper Thumber 0-16 mm2 ZXDU48 H002 Installation 6 mm2 outdoor black power cable(From ACDB to H002) 16 mm2 PVC cable jacket of Kelly(Grouding cable of ZXDU48 Rack) Copper Thumber 0-16 mm2 DCPD BOX (Or DCPD subrack)Installation 50 mm2 outdoor red power cable(From DC Power system to DCPD BOX) 50 mm2 outdoor blue power cable(From DC Power system to DCPD BOX) S301 Installation 3*16mm2+1core PVC cable jacket of black(From ACDB to S301) 16 mm2 PVC cable jacket of gules(From S301 to Battery.yellow-green) Copper Thumber 0-35 mm2 BC8910+PC8910 Installation Base Frame (BC+PC Up&Down installation need 1 base.75m<length<=115m) 2 core shielded power cable(10mm2.16mm2) Grounding cable for BC8910+PC8910 or 19" Rack(16mm2) Copper Thumber 0-16 mm2 DCPD6 Installation 16 mm2 outdoor red power cable(From DC Power system to DCPD6) 16 mm2 outdoor blue power cable(From DC Power system to DCPD6) BBU Installation New Indoor 19" rack(Frame) BC8181A(Wall-mounted box) BBU power cable R8964 (TDD RRU) Installation Qty. length<=75m) 2 core shielded power cable(6mm2.115m<length<=200m) Grounding Cable(16mm2) Copper Thumber 0-16 mm2 R8862A (FDD RRU) Installation Qty. of R8964 2 core shielded power cable(4mm2. length<=50m) 2 core shielded power cable(6mm2.3. of R8862A 2 core shielded power cable(4mm2. Fiber Outdoor fiber(5m) Outdoor fiber(10m) Outdoor fiber(20m) Outdoor fiber(25m) Outdoor fiber(30m) Outdoor fiber(35m) Outdoor fiber(40m) Outdoor fiber(45m) Outdoor fiber(50m) Outdoor fiber(60m) Outdoor fiber(70m) Outdoor fiber(80m) Outdoor fiber(90m) Outdoor fiber(100m) Outdoor fiber(115m) Outdoor fiber(145m) Outdoor fiber(160m) Outdoor fiber(175m) Outdoor fiber(190m) Outdoor fiber(205m) Outdoor fiber(220m) Outdoor fiber(235m) Outdoor fiber(250m) Outdoor fiber(280m) Outdoor fiber(310m) Outdoor fiber(350m) Jumper/Feeder/Adpter 1/2" Jumper.more than 10m 7/8" feeder 5/4" feeder Feeder Window RF Antenna Single-Band 4 ports(HWXX-6516DS1-VTM) Single-Band 4 ports(LDXX-6515DS-VTM) Dual-Band 6 ports(CVV65CSX-M) Single-Band 2 ports(CMAX-DM30-CPUSEi) GPS Antenna GPS feeder cable GPS Mounting RF Antenna Mounting Mounting on wall 3000mm Mounting to angular tower leg 3000mm(Colocated with existing CDMA) Mounting to angular tower leg 3000mm(New Colocated site) Mounting to tubular tower leg 3000mm Mounting to Monopole 3000mm Mounting to Minipole 3000mm 3m Rooftop pole .10m 1/2" Jumper.2m 1/2" Jumper.5m 1/2" Jumper.1m 1/2" Jumper.8m 1/2" Jumper.3m 1/2" Jumper. 6m Rooftop pole RRU Mounting Mounting on wall 1000mm Mounting to angular tower leg 1000mm(New Colocated site) Mounting to tubular tower leg 1000mm Mounting to Monopole 1000mm Cable Tray Indoor cable tray (width 40 cm) Indoor cable tray (width 60 cm) Outdoor-GF-Horizontal cable tray(width 40 cm) Outdoor-GF-Vertical cable tray (width 40 cm) Outdoor-RT-Horizontal cable tray(width 20 cm) Outdoor-RT-Horizontal cable tray(width 30 cm) Outdoor-RT-Horizontal cable tray(width 40 cm) Outdoor-RT-Support Pipe Soft Pipe( For Indoor) Metal flexible piple(For Outdoor) PVC Pipe (Diameter-25mm) PVC Duck Steel Pipe (Diameter-25mm ) Others Grounding Bar 50 mm2 grounding cable (Interconnect grounding cable to MGB.exclude main equipment configured grounding cable) .exclude main equipment configured grounding cable) 70 mm2 grounding cable (Interconnect grounding cable to MGB. Unit Length(m) Qty m m m pcs 8 8 10 1 1 1 10 10 1 1 m m pcs m m m m m m pcs pcs m m m m m m pcs pcs m pcs m m m m pcs set m m m pcs m pcs m 1 36 3 3 36 3 3 . 5m 10m 20m 25m 30m 35m 40m 45m 50m 60m 70m 80m 90m 100m 115m 145m 160m 175m 190m 205m 220m 235m 250m 280m 310m 350m m m m m m m m m m pcs pcs pcs pcs pcs m pcs pcs pcs pcs pcs pcs pcs pcs 6 1 6 3 5 6 12 3 15 1 3 . pcs pcs pcs pcs pcs m m m m m m m m 3 3 1 1 m m m m m pcs 1 m 20 1 m 60 1 . including accessories site type RT/HRB Pole foundation/counterweight: reinforcement concrete K-225 Slump 12 ± 2 Mechanical & Electrical (ME) PLN upgrade MCB 3P replacement of ACPDB Main Power Cable NYFGBY 4x16 mm Main Power Cable NYFGBY 3x10 mm Main Power Cable NYY 3x10 mm Cable Tray (indoor & outdoor) & Feeder Entry Point 1 Horizontal Cable Tray Outdoor type (width 30 cm) with clamp. 2 rows 14 holes M8 Ceramic Isolator for MGB. BILL OF QUANTITY OF MINI CME Site ID: ZTE_3465 Site Name: Srondol Location: SN A 1 2 3 4 B 1 2 3 4 5 C Items Tower Structure & RT Pole Mounting Antenna Sectoral+RRU+GPS and its accessories Erection all material mention at point 1 above. finishing with hotdipped galvanized 2 3 4 Vertical/Tower Cable Tray Outdoor type . finishing with hotdipped galvanized Tray Indoor (width 40 cm) incl. Pole. all accessories required) .4. out door type. accessories. EGB & IGB (incl. powder coating 5 Cable tray (width 20 cm. galvanized) for Roof Top including accessories) 7 8 9 10 11 D 1 2 3 4 5 6 7 E 1 Cable tray (width 40 cm. out door type. powder coating Tray Indoor (width 60 cm) incl. support to FEP and other accessories. galvanized) for Roof Top including accessories) 6 Cable tray (width 30 cm.if required (width 30 cm) with clamp and other accessories. galvanized) for Roof Top including accessories) Support & accessories for cable tray outdoor Feeder Entry Point (8 hole 4") Feeder Entry Point (12 hole 4") Feeder Entry Point (16 hole 4") Outdoor Cabinet & Tower & Pole Foundation Soil Excavation Sand Layer Stone Mansory Soil backfilled Concrete Pad and Stair (K-175) Plastering & Painting Support outdoor cable tray Concrete Foundation (K-175) 2 3 4 Grouding System BC 50mm2 to interconnect to existing site Main Grounding Box All Aluminum Alloy Cable(AAAC) 70mm2 Down Conductor/EGB Interconnect MGB / Main Grounding Bar (Steel Galvanized) 300x100x10 mm. out door type.incl. accessories. 3/4" (ex. Nuts. cable shoe & Label). Termination Box / Main Control box (inside 40x40x50 cm) with pad lock (as per design dwg) PVC pipe cable duct dia. ex: bolt.5 6 7 8 Stainless Cable Scone (incl. all accessories required. Clipsal) for indoor ring shelter and buried AAAC Bimetallic connector . 73 0 m3 VA pcs m' m' m' 0 m 3 m m' m' m' m' m' Ls pcs pcs pcs 0 0 3 0 0 0 m3 m3 m3 m3 m3 m2 m3 m 20 m 60 pcs 1 pcs 2 .Unit Qty Kg Kg Kg 190.73 190. pcs pcs m pcs s . d) Breakthroughs in walls and ceilings should be completed as per floor layout plans. which has been separately spelled out in preceding paragraphs. The requirements have been mention consideration of responsibility. especially the equipment room. c) Doors and windows as per requirement should be available and must be dust proof and lockable. g) To prevent subsequent accumulation of dust a separate room should be available for storage an equipment. Grounding System a) b) The ground resistance of the base station should be less than 5 ohm. General Requirement a) Construction/modification should be completed in all respects as per layout plans. Floor loading requirement a) b) c) Floor loading for BTS Floor loading for Rectifier Floor loading for Microwave 300kg/m2 350kg/m2 100kg/m2 III. Facility for load transportation into the building or elevator with a weight capacity of 600kg shou available.APPENDIX I Standard Environmental Requirement The standard requirements are listed in the following to ensure ZTE implementation for smooth execu trouble-free operation and maintenance of the BTS station. Temperature and Humidity Requirement a) b) Working temperature: -5°C ~+45°C Relative humidity: 15%~85% . h) i) Protection against lightning stroke for the building/tower has to be provided. Power Supply requirements 380V (3phs) AC commercial power supply with a tolerance of ±10% or 220V (1-phase) AC acceptable. II. I.5. b) 50 Hz frequency with a tolerance of ±5Hz c) Wave-shape with a tolerance of distortion <5% a) V. e) Room lightings. The engineering requires the ground resistance to be as small as possible IV. should be available in a clean condition. b) All walls and ceilings should be properly painted and finished. power supply switches and sockets should be provided according to the requiremen f) All rooms. E1 and IP port connection Transport Equipment(Switch. back. DETAILED DESIGN DRAWINGS Site ID: ZTE_3465 Site Name: Srondol Location: SN DRAWING LIST 1 Site Map(detail address.etc) front view ODF (Optical Distribution Frame) view Fiber Optical Entry Port View EAS/E-Guard-DDF-BTS/MW Connection sketch map FEP view Antenna placement Information RRU placement information . PCM cable and other cables route drawing and table Rectifier and battery system front view DCPDB front view Rectifier and DCPDB MCB allocation BTS front view Transmission rack front view Mux front view DDF.grs. IF cable. side) 9 Outdoor BTS canopy-cage drawing 10 Fence detail drawing 11 Electrical layout 12 Equipments layout 13 Indoor cable tray layout 14 External Grounding system layout 15 Detail grounding pit and grounding bar drawing 16 Internal Grounding system 17 Electrical and Equipment grounding connectivity 18 Internal shelter/outdoor BTS canopy section drawing 19 KWH meter pole and foundation drawing 20 KWH meter internal front view and SLD 21 ACPDB internal front view 22 ACPDB SLD 23 DC Fan front.Router.6. side and back view 24 Air conditioner position lay out 25 EAS/E-Guard front view 26 EAS/E-Guard connectivity 27 Block Diagram 28 AC and DC Power Cable route drawing and table 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Feeder cable.siteidsite name) 2 Site Layout 3 Tower/Pole foundation drawing 4 Pole drawing 5 Tower strengthening drawing 6 Antenna bracket and mounting drawing 7 Shelter/outdoor BTS foundation drawing 8 Shelter/outdoor BTS canopy-cage view (front.PTN. Note:For new site.for existing site.just provide had confirmed with smartfren CME team.if no need.put N . 0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 NA NA NA NA NA NA NA .0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 NA NA NA NA NA NA NA NA NA NA 1.0 1.0 1.0 1.0 1.0 1.REVISIONS 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1. if no need.put N/A .existing site.