Home
Login
Register
Search
Home
Schaku Coupler - ICF Des..
Schaku Coupler - ICF Des..
April 4, 2018 | Author: Sumit Shyamal | Category:
Screw
,
Mechanical Engineering
,
Railway
,
Transport
,
Nature
DOWNLOAD
Share
Report this link
Comments
Description
ICF design Passenger Coaches of Indian Railwaysicfbogie Hanger Block Brake Gear Bushes Hytrel Washer PVC Rexine Silent Block: Anchor Link Bogie & U/ Gear: EMU Upholstery IRS-R-19 of 1993 (Part II) Adhesive PVC fixing Corrosion Repair ICF Steel ICF Bogie Frame Repair 08/12 Schaku Coupler RDSO C-7602: 12/92 Coach Basics Air Spring Air Spring 180 KN Performance Air Spring Failure Head Stock Repair: 12/10 IRS Specifications Corrosion Repair: EMU Wheel Failure analysis LHB Wheel shelling Rubber Components Schaku Coupler Air Spring Fitment ICF-LHB Air Spring Maintenance ICF Dichotomy AS FIBA Performance 180 KN Vendor Manuals Bearing Maintenance Bearing Check Sheet EMU Bearings Periodicity of Inspection Body Construction Contact Corrosion Repair ICF HCR Video Head Stock Repair: 12/10 ICF Bogie Frame Repair 08/12 Inspection: UnderfFrame RDSO C-7602: 12/92 RDSO CMI CK302: 04/03 Sole Bar Cutting Disclaimer Drawings Originally designed by M/s Scharfenburgkupplung, GmbH, Germany , Semi-Permanent Couplers are used on the EMU stock of Indian Railways. It consists of following main components; Sl 1 2 3 4 Component Draw and buff gear Bearing bracket with support Centering device Air pipe couplings for main air reservoir pipe and brake pipe 5 6 Intermediate tube Adjustable cup sleeve SK-756 SK-198 [for semipermanent coupler End ‘A’ and End ‘B SK-754 SK-755 40.586.01.01(2) 40.317.13(2) 40.1000.10(2) Drawing No SK-752 SK-753 Reference Drawing No 40.586.06 (2) 40.588.07(2) In Semi permanent couplers the coupling is done manually and the two couplers after being aligned are secured by means of an adjustable cup ICF RCF RDSO Electrical Air Conditioning Alternator Batteries Cables Carriage Fan Earthing Electrical Power Supply ERRU Lightening Power Supply Installation in Electrical Traction Train Lightening EMU Maintainance Activities of EMU POH Bogie & U/ Gear: EMU Corrosion Repair: EMU EMU Drawings EMU maintenance & Schedules HCC EMU Bogie(Pneumatic) Maintenance Periodicity MSU (Motor Suspension Unit) Operation of EMU Traction Gear BG EMU BHEL Forged Components Hanger Block Helical Springs History Interiors Berth Construction Flooring Lavatory Mouldings Partition Sunmica Windows LHB Basics Comparison ICF Vs LHB Earthing Device LHB Air Brake LHB Coaches Maintenance Instructions Air Brake with BMBC Bio Toilet AMC BMBC Buffing Gear sleeve joint. During the process of manual coupling the air pipe connections between the two coaches are also established automatically. The pivoted joints between the coupler and the coaches is designed and constructed in such a way that even in case of maximum difference in level, the coaches are capable of negotiating all track curves and of passing through points of change of gradient occurring during service. This coupler fulfills all other operational requirements. SALIENT FEATURES OF ESCORTS SEMI-PERMANENT 1. Semi-permanent coupler can take up a compressed load of 100 tons and tensile load of 70 tons. 2. The dynamic absorption capacity of the rubber draft gear of these couplers is 800 m-kg. 3. Due to rigid connection of this coupler there exists negligible play between them in coupling position and hence no appreciable wear and tear during train operation. 4. Due to rigid and stress transmitting mechanical connection between the coaches by fitting semi-permanent couplers, protection to the coach and the load against undue impacts is secured. 5. Due to high draft capacity incorporated in semi-permanent couplers, it allows coaches to buffer at higher speeds (from 3 km/hr to 15 km/hr) without any damage to the coach and the load. 6. The interlocking arrangement of these couplers prevents to some extent the mounting or telescoping of the coaches when involved in accidents. 7. As the fulcrum of these couplers is located far in the rear of the coach, coupler side displacements in curves and consequently the transverse forces acting on the wheel flanges are kept minimum .This reduces the wear of the wheel flanges and minimizes the chances of derailment. 8. As the coupling links of semi-permanent couplers form a parallelogram with equilibrium of forces, unintentional disengagement of coaches due to shocks is rendered impossible. 9. The design and construction of the pivoted joint between these couplers and coach permits vertical deflection of ±75mm and horizontal deflection of 284 mm or 13º on either side and as a consequence enables the coaches to couple up at all track curves and also on points of change of gradient even at maximum height difference between the two coaches. ShakuCoupler 587.04 (3)] . no [40. drg. the air pipe coupling (item 2). Ref. [40. Air Pipe Coupling SK-198.(0)] The semi-permanent coupler End ‘A’ consists of the intermediate tube (item 1).586. no. drg. the draw and buff gear (item 3) bearing bracket with support (item 4) and adjustable cup sleeve (item 5). Ref. SK-750.CBC Passenger Coach Coupling of CBC Draw Gear Helical Springs PVC Laying Roller Bearing Manuals Air Brake :Knorr Coach Manual Dampers Material Check Sheets Brake Block Hanger BSS Hanger Buffing Pads Draw Gear Pads Guide Bush HPPA Bush Hytrel Front Cover Hytrel Washer Nylon Bush Phenolic Bush Rubber Washer Silent Block Center Pivot Silent Block Old Presentations Air Brake System Bio Diesel Brake Binding Prevention CTRB Maintenance FIAT Bogie ICF BOGIE New Developments: Coaching Screw Coupling Rail Vehicle Dynamics 1 :Introduction 10: Noise & Vibration 11 :Active Suspension 12 :Simulation 13 :Filed Testing 14 :Roller Rigs 15 :Scale Testing 2 :History of Rail Wheel Dynamics 3 :Running Gear 4: Rail Wheel Contact 5: Tribilogy of Rail Wheel 6: Track Issues 7: Gauging Issues 8: Derailment Semi-permanent coupler End ‘A” as per drg. . spring (item 3).9: Longitudinal Train Dynamics RDSO SMI Rubber Components Schaku Coupler Adjustable Cup Sleeve Air Pipe Coupling articulation Bearing Bearing Bracket with support Centering Device centering Devvice Check Sheet Coupler Photos Draw & Buff Gear Fork Eye Front Plate Sub Assembly Intermediate Tube Sub Assembly Leaf Spring Sub Assembly Lubrication Preventive Maintenance Rear Plate Sub Assembly Rubber Spring Plate Semi-permanent coupler End ‘A” Trager Carrier Sub Assembly Yoke Sub Assembly Slide Show Bogie Details Bogie Details1 Details of ICF Coach Hytrel Washer Specifications Adhesive PVC fixing CDTS IRS Specifications IS: Specs Modular Toilet PU foam PVC Steel Sub-Assemblies Air Brake Anchor Link asssembly Bogie Frame Buffing Gear Draw Gear Primary Suspension Rolling Gear Secondary Suspension The welded assembly of air pipe coupling (item 6) is fastened to the intermediate tube by means of six hexagonal head screws (item 13). The air pipe coupling consists of sleeve (item 4). the sealing rings provide a leak proof connection since these remain under the effect of the springs (item 3). are inserted as a whole from the front side into the welded socket and are installed in position by turning the sleeve by about 90° thus catching the two dogs in the welded socket. With this arrangement it is very simple to replace the worn out components without expensive fitting work. The elbows R3/4” and R1” have been provided for establishing permanent connection with the pneumatic pipe lines. The sealing ring (item 1) projects above the center of the coupling and at the time of coupling it is pressed against the sealing ring of the opposite coupler. After the coupler is coupled.. {40. the yoke (4). drg. Lubrication of the articulation bearing is effected with the help of a grease nipple in the bearing bolt. When fitting . The cup sleeve joints. The compressive forces acting are transmitted to the rubber spring (9) .8).586. The tractive forces are transmitted through the cup sleeve joint (1. At the end of the compression stroke of 56 mm. Ref. when fitting the coupler is put through the bore of the articulation bearing (11) in the fork eye (5) and secured.06(2)] The rubber spring (9) of the draw & buff gear has an energy absorption capacity of about 800 M– Kg . (1. The connection to the bearing bracket with support. and the draw and buff gear is therefore capable of protecting the coach under frame to a large extent against impact stresses. no.Toilets Biological Toilet CDTS Green Toilet Vacuum Toilet Upgraded Material Brake Beam Hanger Brake Gear Bushes Compreg DSU Hytrel Washer PVC Recron Rexine Silent Block: Anchor Link SS Air Brake Pipes Sumica Upholstery Videos AXLE PULLEY BOGIE BASICS I BOGIE BASICS II Welding Wheel Cast Vs Forged Cast Wheel = 120 KmPH Fatigue crack initiation IRS-R-19 of 1993 (Part II) LHB Wheel shelling PreInspection: Wheel Rail Wheel Interaction Rail Wheel Interaction: Tunouts Rail Wheel Tribilogy RCF:Rolling Contact Fatigue Residual Stress in Cast Wheels Wheel Defect Wheel Failure analysis Wheel Grazing Wheel Slide Protection Draw and Buff Gear SK-752. arranged on the coaches is effected by the bearing bolt which. The articulation bearing fitted in the fork eye permits the lateral and the vertical displacement as well as twisting around the longitudinal axis of the coupler. the rear plate (3) . 8) connect the draw & buff gear with the intermediate tube . the rear plate of the yoke supports itself upon the fork eye. the rubber spring and the two allen screws (16) to the fork eye . 588. Arranged in the carrier subassy. Bearing Bracket with Support SK-753. Please refer attached drawing. The thrust piece (6) . drg. and to keep the coupler in its horizontal position between the coaches.the coupler into the coach. care must be taken to ensure that the collar of the articulation bearing (11) in the fork eye (5) is located at the top side.07(2) The bearing bracket with support serves the function of transmitting the traction and impact forces from the coupler to the coach under-frame structure. which supports the coupler. no [40. Ref. (1) there is the leaf spring. . After loosening the hexagonal nut. After effecting this adjustment. The carrier is screwed on the bearing bolt (11). which passes through the articulation bearing in the fork eye of the draw & buff gear and is housed in the bearing bracket (10). (15) it is possible to adjust the precise coupler height by the aid of the hexagonal head screw. The bushes (3&4) and other bearing spots are greased.is guided in two slots in the carrier. which is a part of the coach under frame. the hexagonal nut must be again firmly tightened. Under the draw & buff gear there is the holder (2) for the leaf spring (9). A slide plate (7) protects the bearing surface of the leaf spring from excessive wear. Adjustable Cup Sleeve to drg. It consists of a pair of cup sleeves (item 1) which can be radially moved over the spindle (item 2) with the help of the handle (item 5). The centering carrier (item 13) serves as abutment for the spindle and prevents the two couplers from getting twisted. The bolt (item 6) retains the two-cup sleeve halves in the vertical plane. . The winged nut (item 4) secures the spindle (item 2) against working loose. Ref drg. The centering pin (item 14) helps to self center the coupler while coupling to ensure maintain of coupling line. no [40-317-13(2)] The adjusting cup sleeve joint has the function to transmit the tractive forces from one semi-permanent coupler to the other and to facilitate rapid coupling and uncoupling. SK-755. no. Please refer attached drawing. The bolt (13) serves for fixing the forked head (8) to the draw & buff gear. it is fitted to the coach structure.2) the spring pot (6) and the spring plate (4). The shackle welded on the locking piece (5) takes up a bolt for fixing the centering device to the coach.1000. The spring casing is closed by screwing on the locking piece (5) and a spring ring (12) prevents it from working loose. the centering device can be altered in its length. it is hinged on the draw & buff gear. . A Tee head (3) guided in the spring pot (6) and the spring plate (4) establishes the connections to the forked head (8). After loosening the hexagonal nuts (11). On the other side. After adjusting the coupler in its correct central position.Centering Device SK-756.no [40. The centering device consists of a spring casing (7) for the two compression spring (1. Ref drg. the hexagonal nuts (11) must be again firmly tightened.10(2)] The centering device has the function to retain the couplings in their position at centreline between the coaches and to retract them into this central position after every side displacement. On one side. bearing bracket with support.Description of Semi-permanent Coupler End ‘B’ as per drg. SK-849 [40-588-(0)] Outer end coupler consist of draw and buff gear. bearing bracket with support.587-(0)] The Semi permanent coupler End-B differs from the End-A to drawing no. SK-751.) and draw hook . Ref. no [40. draw and buff gear. Outer End Coupler as per drg. centering device(sub assy. adjustable cup sleeve and centering device please see drawing for Semi –permanent coupler End-A. 40-586-(0) in respect of the centering carrier and air pipe couplings only. For intermediate tube. drg. b) Check the condition of split pin fitted in between bearing bolt and carrier sub-assy. 3 Adjustable Cup Sleeve a) Check the condition of cup sleeve these should not be loose. inside Bearing Bracket. c) Check the condition of Hex.8 C11 x 200 x 180 (which holds the leaf spring) Threaded portion of carrier sub-assy. If found loose. b) Check the gap between intermediate tube and the periphery of cup sleeve if gap abnormal attend same by replacing the pair of cup sleeve. c) Check the fitment condition of Fork Eye Sub-assy. these should not be loosen. If found deformed or missing should replace. to hold the leaf spring. The Fork Eye should be in its proper place and if any abnormality is the coupler should removed. d) Check the condition of Polyamide bush if found too much deformed remove the coupler and provide the polyamide bush. offended and then refitted. If split pin found deformed or missing replace them. 2 Upper and Lower Cup Sleeve a) Check the condition of Upper and Lower Cup Sleeve.. 4 Bearing bracket with support a) Check the condition of split pins fitted on the carrier sub-assy. . Type / Brand of Lubricants Servogem (RR-3) . same should be attended.do Molykote paste Servogem (RR-3) do do do -do-doPeriodicity of Lubrication 6 months 6 months POH POH & every 6 months in car sheds 6 months 6 months 6 months 6 months POH POH Lubrication spots I II III IV V VI VII VIII Preventive maintenance 1 Draw and Buff Gear a) Check the split pin 10x70 of both the Allen Screws.Lubrication of Coupler Components Sl 1 2 3 4 5 6 7 8 9 10 Description of the Component Adjustable cup sleeve Hole in Centering Carrier Bush on Rear Plate Bearing bolt and Articulation Bearing Leaf Spring Front pin of Centering Carrier Spindle of Adjustable cup sleeveBolt of Adjustable cup sleeve Pin 31.do . Screw M16x180 then should not be loose and should have firm fitment. b) The gap between periphery of intermediate tube and collar of cup sleeve should be observed if gap found too abnormal same should be attended by replacing the cup sleeve. if found deformed or missing replace it. b) The Draw & Buff gear should not be too loose in side the yoke sub-assy. Hd. drg. SK-770. SK-767. Fork Eye Sub Assy.06. drg. Yoke to drg. Length of the unstressed spring should not go below 256. Ref. and the diameter 22H 11 in the shackle is to be checked by the aid of the limit snap gauge to drg. The rubber material is to be checked visually for its perfect condition. no [40-586-06-04(2)] a) The internal diameter 138 mm and 47 mm are to be checked by means of the limit gauge to drg. eg:. In case length of the under stressed spring goes below 256. 40-SK-2551. no [40-586-06-03(4)] The inner diameter 30 mm of the guide is to be checked by means of the limit gauge 40-SK2551-7. 4. 6 Greasing of Articulation bearing As mentioned in the lubrication scheme please ensure to lubricate the articulation bearing every 6 months 1. 40-SK-2551-1. 7 steel plate and 1 each front and rear plate. If limit gauge passes. Ref. drg. Ref. 47mm and 135mm with the help of bore gauge. drg.no breakage. Check this slack with the help of filler gauge. no [40. no [40-586-06-02(4)] The external tube diameter 138 mm is to be checked by means of the limit snap gauge to drg. If wear is more than 252 mm do not use the yoke sub assy. The slack between inner ring and outer ring should not be more than 0. SK-833. 5. . rear plate and rubber spring plates along with separating plate is fitted should be checked. Ref. b) Check dia. cracks chip off of rubber. 7. Sub-assy. condemn the yoke.8 mm. Sk-784. no [40-SK-1837(1)] consisting of 6 rubber springs. no. drg. head screw if found loose or missing attend / replace them. SK-781.6(4).6 mm. Front Plate to drg.5 inside which front plate. Ref. Ref. Note:. drg. b) The internal distance 249. Note:. no [40-SK-1960(3)] The diameter 80 mm is to be checked by means of the limit gauge to 40-SK-2551-9(4). SK-758. 40-SK-2551-01 as explained in drawings and if found within limit . no [13-128-15(3)] and drg.Since Yoke sub assembly is load bearing component and working under strainious condition and absorbs shocks during tensile and compressive load it should be replaced after 9-10 years of service irrespective of its condition 6. Rubber spring to drg. same can be used otherwise condemn the cup sleeve whichever is defective or worn out excessively. same should be maintained by replacing the old rubber spring plate with new one. Sub-assy. SK-343. Ref. Sub-assy.5 Support Sub-assy. Rear Plate to drg. Cup Sleeve (Upper and Lower) to drg. drg. a) Check all four hex.586. drg.8mm. 40-SK-2551-5.Since Fork Eye sub assembly is load bearing component it should be replaced after 10 years of service irrespective of its condition 2. 3.05](2)] a) Check the dimension 30 mm by means of the limit snap gauge to drg. Articulation bearing to drg. 40-SK-2551-8. no [40-586-06-01(4)] The cup sleeves are to be checked with the help of profile master gauge of drg. SK-757. no. b) Check the condition of slide plate if found worn out replace it. Ref. 06. Forked head to drg. There should not be any visible cracks or damage. 9. Leaf Spring Complete. no [ 40-524-07-4(4)]. Check the Allen Screws with NO GO gauge SK 338. The check should be done at least 3-4 different places on the shank Note:.Since the Leaf Spring is a load bearing component to avoid fatigue it should be replaced after 5-6 years of service irrespective of its condition 13. The upper and lower bushes should be replaced during the every P. drg. Ref. no. SK-312. no [40-586-07-03(4)] The external diameter 80 mm is to be checked by means of the limit and snap gauge to drg. 40 SK-2551-11. 11. the slide plate has to be replaced. Pair of Cup sleeves to drg.3(4)] The external diameter of the bolt is to be checked by means of snap gauge to drg.Since the Allen Screw is a major load bearing component it should be replaced after 5-6 years of service irrespective of its condition. Slide Plate to drg.Since the Bearing Bolt is a major are load bearing component it should be replaced after 5-6 years of service irrespective of its condition. 14. SK-197. drg. SK-341. 10. 40-SK-2551-12 Note:.O. SK-802. condemn the carrier sub assy. no [40-524-07-03(4)] and Leaf Spring Complete to Ref. In case of wear exceeding 3 mm. no [40-1000-10-D1(4)] The hole dia 22 mm is to be checked by means of limit gauge to drg. 40-SK-2551-10(4). drg. no. no [40-524-07-4(4)] The thickness of 10 mm hylam sheet is to be checked by means of a vernier caliper. Slide plate should be replaced during the every POH. Ref. SK-797. no [ 40. no [40-317. drg. Ref. drg.586. 40-SK-2551-1(4) . SK-753. Ref. no 40-588-07(2. Ref. 2.13-1(3)] The pair of cup sleeves is to be checked by means of profile master gauge to drg. drg.Since the Leaf Springs are load bearing component to avoid fatigue it should be replaced after 5-6 years of service irrespective of its condition.H. no [40-5241-07-06(3)] In case of wear of more than 2 mm on the top leaf it has to be replaced. Sub-assy.SK-2551-6. SK-800. Bearing Bracket to drg. Bearing Bolt to drg. drg. Ref. Sub-assy. no 40-524-07-06(3) The hole dia 32 mm is to be checked by means of limit gauge to drg. Note:. drg. In case the profile of any one of cupsleeve is not correct. 40-SK-2551-01 as explained in the drawing. drg.if no-gauge is not passing use the allen screw. 16. drg. Ref. 40. Ref. SK-821. Ferrozell Bush (upper) to drg. Ref. If limit gauge passes. Bolt SK –765. Note:. no [40-524-07-3(4)] and bush (lower) to drg. 15. drg. 12. Carrier to drg. Allen Screw SK-336 1. Sub-assy. drg.Ref. The internal diameter 80 mm is to be checked by means of limit gauge to drg. same should be replaced with new one. SK-787.8. Sub-assy. e) Yoke sub-assy. The grease passage should be absolutely clear. This overhauling and maintenance schedule is based on actual field experience under Indian conditions. no. Ref. f) Polymide bush . Couplers are to be opened for the major overhauling. INSPECTION AND REPLACEMENT OF COMPONENTS 1. The rubber spring plates and steel plates work. Though these couplers are rigid and are designed for taking a compressive and tensile load of 100 tons and 70 tons respectively. Rubber spring plate SK-343. 2.17. The rubber parts of the air pipe coupler (MR & BP) must be replaced as and when opened irrespective of their condition. Ref. Bearing bolt 2. Ferrozell bushes 3. due to their operation in extreme load conditions in India it is recommended to overhaul these as given below to ensure a trouble free service. Clogged grease should be removed by kerosene / steel rods. Draw and Buff gear is the major sub-assy.SK. Bearing bolt should be checked for its wear by the condemning gauge. The major stress bearing components of these sub-assy. 1) After every 18 months of service or during every POH.O. Also ensure that the grease when applied through the grease nipple flows easily . drg.Since it absorbs load during compression and tension it should be replaced after alternate POH or after working more than 3 years of service OVERHAULING AND MAINTENANCE PROCEDURES DURING P. it is very essential to carryout necessary preventive periodic repairs and overhauling at regular intervals.SK. Bearing bracket sub-assy. The procedure of replacement of polymide bush as given in the procedure for replacement of polymide bush. are 1. Ref. Leaf spring complete 4. At the time of POH of the coach the couplers should be stripped open and individual stress bearing components should be checked with their respective condemning gauges (as explained in the respective chapter) after cleaning these parts. Main stress bearing and the load transmitting components of this sub-assy. 2) In case of physical damage or accidents. no [40-588-07(2)]. SK-753 .H Escorts-Semi-permanent Couplers fitted on EMU / DMU / MEMU stock of the Indian Railways are working under sever strenuous conditions. Note:. Bearing bracket with support drg. no [40-586-06(2)].. no [40. Since these couplers are one of the stress bearing components of the EMU stock. as these couplers are now running with the Indian Railways for the last 40-50 years. Replacement of polymide bush is essential to protect excessive wear on the yoke welded assembly and allen screws M42x300 of the draw & buff gear. drg. drg.2551. are – a) Pair of cup sleeves b) Rubber spring plates c) Allen screw M42x300 d) Articulation bearing sub-assy. Inspection and replacement of components of draw and buff gear drawing no. as a shock absorber. which absorbs shocks during application of tensile and compressive loads. Carrier sub-assy 5.13) at least 2-3 places on both sides of plate. SK-752.1837(1)] The thickness of rubber spring plate should be checked using the snap gauge (40. 2. Polymide bush of the rear plate should also be replaced at the time of POH of the coach. Components of Intermediate tube sub-assy of semi-permanent coupler end A and end B should be replaced on condition basis. After overhauling the couplers they should be stocked in a clean & dry place till the time of fitment on the coaches. Replacement of the yoke is to be carried out on condition basis. no [40. Components of centering device drg.e. The springs should be checked for their strength and any rust formation. After complete overhauling of the couplers. Date of overhaul should be punched / stamped on the coupler intermediate tube to maintain the overhauling records.6 mm the articulation bearing must be replaced by new one. Die penetrate test etc.10(2)] should be replaced on condition basis except all the compression springs. SK-756. It is always recommended to replace inner race and the ball in pairs. Other components should be replaced on condition basis as and when found broken or worn out excessively. Fitting of polymide bush in cold condition by any means is not recommended as the cracks will develop internally which may curtail the life of the polymide bush. The pair of lower & upper cup-sleeves should be checked by the condemning gauge. rubber plates and steel plates are required to be opened out of the yoke during POH and checked for : a) Total height of 7 steel plates + 6 rubber spring which should not be less than 216. drg. SPRING CONDEMNING CRITERIA OF CENTERING DEVICE SK-756 [40.8 mm. rubber sealing rings and rubber tubes must be replaced as and when the couplers are stripped irrespective of their condition. no[13-088. drg. Allen screws M42x300 are under load at the time of tension and are prone to wear against the rubbing action by the steel plates.) Load (min) kg at L 10 Free length (min) [mm] 61 . Inspection & replacement of components of MR & BP Air pipe coupling drg. NDT may include ultrasonic testing.1000. PROCEDURE FOR REPLACEMENT OF POLYMIDE BUSH Place the new polymide bush in a container containing any light lubricating oil.5 mm(comp. Articulation. But in any case the yokes must be checked by NDT for internal fatigue stresses / cracks which might have developed during running period and are not visible to the naked eye. Use of hammer to open the adjustable cup sleeves is to be avoided as far as possible. SK-762. Every time the coupler is opened the gap between inner race and the ball should be checked by a filler gauge. 20 minutes till the polymide bush becomes soft. (SK-198 (same for End ‘A’ & ‘B’ With change in elbow position) For all types of air pipe couplings. bearing (inner and outer race) must always be under lubrication since there is a direct metal-to-metal contact in between them. if found defective or rusted or in case physically damaged. slide the polymide bush on the steel tube of the rear plate and allow it to cool for some time. 5. Springs with corrosion and pitting are to be rejected. Grease must be applied on all the moving parts. In case of any deformation or ageing effect is found in any of the plates it must be replaced by a new one. no. Spring are to be checked for serviceability as per the table give below – Spring Part No. Absence of proper lubrication may form rust and hence cause jamming of the articulation bearing. Ref. 4. nos. 3. The springs which are always under compressive & tensile loads must be checked for their strength and should be replaced if they cross the condemning limits. If the gap is more than 0.03-14(4)] Length (L) [mm] 29. They should be replaced if found excessively worn-out on shank dia.1000. a coat of black Enamel paint should be applied all over to protect the main body from rusting. Boil water in a bigger container placing the container with lubricating oil and polymide bush inside the bigger container. Keep it for approx.g) Fork eye (sub-assembly) The rubber draft gear i. b) External condition of rubber spring plates.10(2)] Springs are to be condemned on condition basis. They should be replaced. Now. Ref. 7 40. no. Fixture for centering device. Fixture for pressing the Articulation bearing ii. drg. 4.SK-809.8 40.3 mm). 6. Press the Articulation Bearing with the help of pressing mandrel. no [40-3000. Ref.A. RCF-600 (sheet 4) with two pins drg.10-2(4)] LIST OF FIXTURES AND GAUGES Description i.5 40. 3. ASSEMBLY FIXTURE FOR DRAW & BUFF GEAR PROCEDURE 1. & Leaf spring Bearing bolt 351 351 60 38 510 510 Drawing No. Place the Articulation Bearing on the collar of locater as in figure. Position the spring loaded locater in the bore of Fork eye.6 40. Place yoke in the frame (RCF-600) at 90º to normal position along with front and rear plates.2551. no. 207.A.10 40. Articulation bearing Bush (dia 80 B9) [Ferrozal) Carrier S. no[40-3000.SK. iv.2551. 601 RCF 602 SK.SK.2551.2551.SK.SK. Ref. (dia 138d) Front plate & forked head (dia 22h11) Rear Plate SA (dia 30H11) Yoke S.SK.SK.SK.SK. Adjust the adjustment bolts to achieve a free movement of locater within the bore of Fork Eye.02 40.2251.3 mm and lock them by tightening the nuts of the clamps (use RCF-601 for checking dim. Condemning gauges for Allen Screw Cup Sleeve Pair of cup sleeves Bolt Bolt Front plate S. 338 40.9 40.12 FIXTURE FOR PRESSING ARTICULATION BEARING METHOD OF USING THE FIXTURE FOR PRESSING THE ARTICULATION 2. RCF-600 in the two holes in plates and press them with the help of a press to a height of 207. Ensure that Articulation Bearing has fully engaged and in position (observe the collar). .A.SK.10-1(4)] SK-808.SK.11 40.2551. Assemble the six rubber springs and seven steel plates on two clamps drg. drg. The spring loaded locater will automatically slide down. 5.2551.1 40.2551.2551. Assembly fixture for Draw & Buff gear iii.01 40. BEARING 1. 2.2551.2551.SK. Press the Fork Eye in which the Articulation Bearing is to be pressed on the set of adjustment bolts. RCF 599 RCF 600. 7. 2. Fixture for articulation bearing RCF 599 (for pressing in fork eye) . into the yoke : RCF 600 2. Apply pressure in the cylinder due to which the Tee Head Bolt will move upward then . and then slides up gradually and ultimately comes out with upper clamp.30-32 mm. 4. Tighten allen screws. Press the buffer plates and tighten up the nuts. 18-19 mm. Place the Spring plate On the Tee Head Bolt. Keep the top block on to the yoke. 6. If so dismantle and reassemble the parts with new plates. Insert the Spring Pot and Spring on the Tee Head Bolt. 1 kg. Place the Tee Head Bolt on the Guide Pin ensure that the center of the Bolt is on the center of the Guide Pin. slightly press it and insert it inside the fixture and then place Centering Pin on the upper side of Tee Head Bolt.3. SCREW DRIVER HAND PRESS BENCH-VICE ALLEN KEYS 6 mm. 5. 2. Ensure proper alignment of holes in the plates & yoke and remove the pins. Keep the yoke on to it. The lower clamp touches the yoke. PART LIST OF ESCORTS SEMI PERMANENT COUPLER & RECOMMENDED PERCENTAGE HOLDING FOR POH LIST OF DEVICES. Now keep the draw & buff gear partial sub-assy. : RCF 601 3. 1. then Remove The Centering Pin and tighten the nut on Bolt. METHOD OF USING THE ASSEMBLY FIXTURE FOR CENTERING DEVICE 1. The plates should not be loose in the yoke. 6. Keep the buffer plates into the holding clamps and insert the two pins inside.34-36 mm HAMMER Approx. GO gauge for draw & buff gear sub-assy. 7. 3. Fixture for pressing the draw & buff gear sub-assy. METHOD OF USING THE FIXTURE FOR DRAW & BUFF GEAR SUB-ASSY. 5. Place the clamped assembly as per (1) above on the yoke and with the help of press. into it and press it. 3. 32 mm Fixtures 1. Keep the resting block on to the press. 5. 4. 22-24 mm. Assemble the yoke with the fork eye by introducing allen screws. Fixture for assembly of centering device & Spring holder : RCF 602 4. FIXTURES AND STANDARD TOOLS REQUIRED FOR OVERHAULING OF SEMI-PERMANENT COUPLER SPANNERS 11-13 mm. start introducing it smoothly into the yoke. 4. Release the pressure and then remove the assembly. 10(4) (4) SK-797 40.524.52407.2551.SK.15 (03) SK 767 & 40.586.01.5.02 (4) SK-758 40.do - Check the internal dia 80 with the gauge and reject the component.4 (4) SK-790 -do .07 (3) 40.03(4) SK 765 13.03 (4) SK-781 40.2551.2551.586.SK.586. 40. 3 Front plate (sub-assy) 40.01 Reject the bolt if gauge passes dia 30.4 (4) 40. Check the profile of cup sleeves by applying the paint on the counter as shown in the drawing 40.524. if the thickness of plate found to be worn out more than 2 mm reject the leaf spring.8 (3) a) Check the straightness of the plate.11 Check the internal dia 32 if gauge passes reject the component. In case the distance found less replace the 1 or 2 rubber spring plate.07.4(4) SK-800 - The thickness of 10 mm hylam sheet is to be checked by means of vernier caliper.06.SK.58.03(4) SK312 40.2551. d) Check the condition of threads. if found bent reject it.588.03 40.586.CHECK SHEET FOR SUB ASSEMBLIES & COMPONENTS OF SEMI PERMANENT COUPLER S.06. 6 Rubber Spring Plate consists of 6 rubber spring and 7 steel plate.5 (4) 40.07. Ferrozell bush (upper) Ferrozel bush (lower) 40. b) Check the condition of the rubber.524. 4 5 Rear plate (sub-assy) Yoke (sub-assy) 40.586. In case wear exceed more than 3 mm reject the .SK.7 (4) 40.SK. if gauge passes. b) 802 (40.SK.06..2551.07.06.SK.2551. If found worn out reject the plate.07. c) If gauge passed dia 37. 7 Bearing bracket (subassy).1837 (1) SK343 SK-242 RCF 601 a) The length of the unstressed spring should not go below 216.do - Check the area where leaf spring touches the slide plate.5 increases to 252 reject it the yoke.2551. b) Reject the plate if gauge passes dia 138. b) If the internal distance 249.1 (4) SK-757 40.06(3) SK.01(4) 40.SK.SK.128.2551.6 (4) a) Check straightness of the front plate if found bent reject it. a) Check the internal dia if gauge passes dia 138 and 47 reject it the gauge. 138 & 22. b) If gauge passes dia 30 reject it.No Description Drawing No Inspection Gauge No Instructions 1 2 Bolt Cup Sleeve (upper and lower) 40.06.2551. If the paint is touching more than the place reject the cup sleeve.SK. 8 Carrier (sub-assy) a) Leaf Spring complete 40.8 mm. 9 Slide Plate 40. if found deformed reject it. If passage are clogged clean the same using the wire rod and kerosene.586.770 40.586. 13 Pair of cup sleeve 40. .317.03(3) SK-341 40.338 a) Check the condition of shank and threads if found deformed or damage reject the screw. If the paint is touching more than the place reject the cup sleeve.2551. 11 Allen screw 42x300 40. Subpages (23): View All Comments You have no permission to add comments.07.1000.12(4) a) Check the external dia 80 if gauge passes reject the bolt. replace the bush.9 (4) a) Check the condition of ball and outer race if any abnormality or cracks noticed reject the bearing.17. d) Check the condition of threads and shank if found deformed reject the bearing bolt.2551.10.2551.SK. b) Check the greasing passage after removing the grease nipple.SK. c) Check the condition of nipple if found defective replace it. (2) SK-336 SK. 10 Bearing bolt 40.slide plate. b) If gauge passes dia 42 reject the screw.SK.06.SK. 12 Articulation bearing 40.2551 (2) Check the profile of cup sleeves by applying the paint on the counter as shown in the drawing 40.01.01(4) SK821 40.1.6(4) If gauge passes dia 22.2551. 14 Fork head of centering device 40.SK.(3) SK-787 40.SK. b) If gauge passes dia 80 reject the bearing.1960 (3) SK. Sign in | Report Abuse | Print Page | Remove Access | Powered By Google Sites . Documents Similar To Schaku Coupler - ICF Des..Skip carouselcarousel previouscarousel nextH TYPE CBCBrake SystemBrake BindingCoupler GageIRSEE Seniority ListRailway Curve BookScharfenberg Semipermanent Coupler Half 010.617 User Manual.pdfElimination of Camber Setting in a Rail Coach FactoryAutomatic Scharfenberg Coupler 010.616 User ManualDerailment Due to Wheel Defects Vehicle DefectsRail Wheel Int. TOTPSchaku Coupler Rdso Spec No. 61-B-36-R_1_68-1Mechanical Department of Indian Railways Vision for 2020Coach Dev ElopementSpecifications for Concrete SleepersDerailment MechanismCasnub Bogiesp42 ME13.6 Couplings EditChap 50INDIAN TERRORISM IN PAKISTAN The Story Of Two Spies And One SaboteurCamlock Catalogo5.6 Non Sparking ToolsDealing With FailuresMachine Drawing March06 Rr210305TM 10-3990-205-12P SPREADER, LIFTING10steps for New Pump InstallationAssembly of the Tiny TrapAcoples SKF1.- Manual Tercero de Mantenimiento-05!03!2012Vertical Multistage Pumps 50HzMore From Sumit ShyamalSkip carouselcarousel previouscarousel nextIS - 814 - 1991 (PART-1)IS-228_24CEOWB 636312348195127173 English Bilingual Form8AIS 3063M&C_PCN_100_2013IS-3400_7IS 2896-1979IS-11620IS-10810_53Final Revised Spec IRST-29-2016IS-3400_3IS-10810_5M&C_PCN_102-2009IS-1573IS-13871-1993IS 2016RDSO_PE_SPEC_TL_0011-2000 (Rev. 1)IS 1570Elrs Spec Bl 0003 (Rev. 1)IS 1363 (PART 1)Schaku Coupler Rdso Spec No. 61-B-36-R_1_68-1Spec. no.C-9202-R2 _Oct 08_ (1)IS 2707-1982IS 1363 (PART 1)C-K514ICFMDSPEC166REV03Revised Spec. No.C 9202 R3Schaku Coupler Rdso Spec No. 61-B-36-R_1_68-1C-K511 AMD.02IS 1030-1998Footer MenuBack To TopAboutAbout ScribdPressOur blogJoin our team!Contact UsJoin todayInvite FriendsGiftsLegalTermsPrivacyCopyrightSupportHelp / FAQAccessibilityPurchase helpAdChoicesPublishersSocial MediaCopyright © 2018 Scribd Inc. .Browse Books.Site Directory.Site Language: English中文EspañolالعربيةPortuguês日本語DeutschFrançaisTurkceРусский языкTiếng việtJęzyk polskiBahasa indonesiaSign up to vote on this titleUsefulNot usefulYou're Reading a Free PreviewDownloadClose DialogAre you sure?This action might not be possible to undo. Are you sure you want to continue?CANCELOK
Report "Schaku Coupler - ICF Des.."
×
Please fill this form, we will try to respond as soon as possible.
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
Copyright © 2024 DOKUMEN.SITE Inc.