SAP Note 2496856 - Restrictions and Implementation Recommendations for PPDS for S4HANA 1709



Comments



Description

2017-11-02 Page 1/172496856 - Restrictions and Implementation Recommendations for Production Planning and Detailed Scheduling for SAP S/4HANA 1709 Version 2 Type SAP Note Language English Master Language English Priority Recommendations / Additional Info Category Release planning information Release Status Released for Customer Released On 16.10.2017 Component SCM-APO-PPS-ERP ( PP/DS on ERP ) Please find the original document at https://launchpad.support.sap.com/#/notes/ 2496856 Symptom This note provides information about restrictions and recommendations for Production Planning and Detailed Scheduling for SAP S/4HANA 1709. Other Terms PP/DS Production Planning and Detailed Scheduling PPDS PP/DS for SAP S/4HANA Reason and Prerequisites With Production Planning and Detailed Scheduling for SAP S/4HANA 1709, some restrictions apply to the productive use of certain functions in the area of Production Planning and Detailed Scheduling (PP/DS). SAP wishes to inform customers of these restrictions and provide some recommendations here. Solution Production Planning and Detailed Scheduling for SAP S/4HANA Production Planning and Detailed Scheduling (PP/DS) for SAP S/4HANA is not a legal successor of the PP/DS component from the SAP SCM Server. Data migration and customer code migration from PP/DS component from the SAP SCM Server is not supported by the standard solution. Basic manual settings needed to set up PP/DS Set up integrated liveCache and the relevant operational jobs by following the SAP S/4HANA installation and operations guide. Also refer SAP note 2407589 (Manual installation of liveCache for S/4HANA). Run the mandatory reports SLCA_INIT_FOLLOW_UP, /SAPAPO/OM_CREATE_LC_TABLES. You can now use transaction LCA03 to check the functionality of the system in an SAP-liveCache-relevant business client. © 2017 SAP SE or an SAP affiliate company. All rights reserved Check if pre-delivered ATP categories exist. Setup and activation of Locations Location Type. The SCM Product master is read-only for active version and can be used for maintaining simulative parameters in simulation versions. Materials that were created in SAP S/4HANA releases prior to 1610 have to be enabled for usage in PP/DS in SAP S/4HANA. Verify if ND-APO and NDI (New Dimension Integration) is checked. The PP/DS Horizon can only be maintained at the level of planning versions in SAP S/4HANA./SAPAPO/UPD_LOC_SP_PL for updating Plant./SAPAPO/LOC_CREATE Change the location details . and by including SAP S/4HANA with system type SAP_APO and release 713 so that an Integration model pointing to itself (own system and client) can be created and logical system and queue types could be maintained. Enable number range in PP/DS for SAP S/4HANA in PP/DS global parameters and values (Transaction /SAPAPO/RRPCUST1). Plant. Business Partner (1021). refer SAP note 2342043. check the report documentation © 2017 SAP SE or an SAP affiliate company. maintain number ranges for production campaigns and interchangeability groups depending on the usage of these functions. SCM Extensibility Feature for SCM Related Fields in Product Master and data mapping. To do so run report PRD_SCM_GUID_CONVERSION. As a result. Register the CIF queue (Transaction SMQR). (Transaction BF11). Set up CIF user parameters. Update . Freely defined attribute of Product Master is not supported. Set up the CIF customizing in customizing by choosing Basic Settings for Creating the System Landscape. SAP recommends using CIF Post-Processing as the error-handling option to avoid queue blocks. select Advanced Planning > Basic Settings > Activate Advanced Planning and Scheduling Set up the Model '000' and Version '000' manually and check whether they exist. For more information. To activate PP/DS for SAP S/4HANA in customizing. MRP Area and Shipping Point Use following BAdIs in case adaption is needed. refer SAP Note 2393581 for further information. MRP Area and Shipping Point. replaces Customer (1010) and Vendor (1011) Execute reports mentioned below create and update locations Create . Create Business Partner locations on saving a Business Partner . Local material creation in PP/DS is not supported. For more information. Refer S/4HANA Administration Guide for Implementation and SAP Note 2272406 for more information./SAPAPO/LOC_DETAILS Setup and activation of Materials SCM Product Master is integrated into the SAP S/4HANA Product Master with CDS Redirects on material master.2017-11-02 Page 2/17 Activate the flag for Advanced Planning in customizing./SAPAPO/CREATE_LOCATION for creating Business Partner location. The advanced planning attributes are shared between Plant location and corresponding MRP area locations. There is no need for maintaining distribution definition or publication types as the PP/DS is part of SAP S/4HANA. it is not possible to maintain different values for advanced planning relevant fields between these locations. Set the application indicator for ND-APO (New Dimension Plug-In APO) to active. All rights reserved . Activate PP/DS Materials by selecting the "Advanced Planning" checkbox in the "Advanced Planning" tab of the material master. In addition. It is not possible to customize the standard mapping provided between S/4HANA Material master and PP/DS for S/4HANA Product master. Enable Target-System independent Settings in CIF (Transaction CFC9) to enable "APO Resources" in Work Center Capacity: header tab. All rights reserved . We recommend that you use external capacities as much as possible. contracts. The settings are controlled in customizing by selecting Advanced Planning > Basic Settings > Settings for Data Transfer Re-transfer of Orders Complete retransfer of material dependent orders can be achieved with the report /SAPAPO/PPDS_DELTA_ORD_TRANS Automatic Creation of Transportation Lanes Transportation lanes between plant and MRP area. transportation lanes should be maintained manually. all material dependent orders and batches are integrated into liveCache for all PP/DS-relevant materials. If needed. Activate PP/DS work centers by selecting the "Advanced planning" checkbox Setup and activation of Source of Supply In-house production: Use transaction CURTOADV_CREATE (in the SAP Easy Access Menu. between plants or between plants and distribution centers are not created automatically. Automatic Creation of Hierarchies for Planning Product Automatic Creation of Hierarchies for Planning Product is not supported. This would be required to transfer handling unit. Forecast Consumption © 2017 SAP SE or an SAP affiliate company. select Logistics > Master Data > PDS for Advanced Planning) to enable PDS transfer to PP/DS For automatic change transfer of PDS on change implement BAdI CUSLNTRTO_ADDIN BOM for phantom assemblies mandatorily need production versions and need to be transferred to PP/DS using CURTOADV_CREATE External Procurement: Create the integration model for scheduling agreements. In case "No Change Transfer" is maintained. Change transfer mode "No Change Transfer" is not supported in PP/DS for SAP S/4HANA in Target-System independent Settings in CIF (Transaction CFC9). This is required to send to PP/DS different resource types and resource categories. the value gets defaulted to 'N' (Change Transfer for Pl. The assignment of final products to a planning product using hierarchies should be done manually.-Vers-Independent Resource and PV 000) Setup the Capacity Versions for integrating external capacities from ERP in customizing by selecting Advanced Planning > Master Data > Resource > Specify Capacity Variants. calendar resources etc.2017-11-02 Page 3/17 Setup and activation of Resources Local resource creation in PP/DS is not supported. and purchasing info records which needs to be integrated to PP/DS should be used using integration model maintenance and activate it Activation of Orders and Batches By default. any specific process that uses a different low-level code calculation needs to be planned independently. integration is also available during planned order conversion. ATP Check for Planned Orders for RPM Products is supported for component check during order conversion for PP/DS for S/4HANA. This requires the orders in liveCache to have the same components as that of the PP orders for a consistent result. in SAP S/4HANA through MRP Live. This means the data modelling should be such that once a material at one BOM level is PP/DS-relevant (Advanced Planning-relevant). Availability to Promise Integration PP/DS for S/4HANA is integrated to advanced-ATP for planned and production/process orders for component check. The Assignment mode maintained in Check mode and the allocation indicator maintained in the Requirement Class should be the same for consistency in the system's behavior.Backward Consumption Only 2 . Check Mode is not displayed in PP/DS product master and cannot be changed. such as Planning with Planning Package. This is to ensure that depended demands are also in liveCache or PP/DS. business process relying on ATP check for planned and production/process orders that are not integrated to PP orders or having different order parameters from liveCache orders for ATP check will be affected. whether those are relevant to Advanced Planning or not.Backward/Forward Consumption 3 . then the materials above that BOM level should also PP/DS-relevant (Advanced Planning-relevant). This cannot be configured individually for each material © 2017 SAP SE or an SAP affiliate company. Locations corresponding to Storage location MRP areas (location type 1007) and subcontracting MRP areas (location type 1050) are planned before planning the corresponding plant locations MRP live ill not support planning with stock transfer between MRP areas. In addition. integration with advanced ATP will not check with orders in liveCache. Planning with Co-Products. In this case. Planning with Planning Product .2017-11-02 Page 4/17 Consumption period is calculated in calendar days in PP/DS for SAP S/4HANA and in working days in SAP S/4HANA Maintain the Category Group in customizing by selecting Advanced Planning > Maintain Category Groups and add relevant ATP categories. In addition. Due to this reason. In PP/DS. The conversion rule for ATP check need to be set globally for all materials under customizing -> Advanced Planning ->Global Settings -> Maintain Global Parameters and Defaults ( /SAPAPO/RRPCUST1 ).Forward Consumption Only MRP Live All downstream materials should be Advanced Planning-relevant if planned together with MRP Live. the Requirement Class has to be defined as Check Mode (same identifier). Category group defines which categories (of customer requirement) consume PIR. Maintain requirement class in customizing by selecting Cross-Application Components -> Advanced Available-to-Promise -> Configuration Activities for specific document types -> Sales Order and deliveries -> Configure Requirement Classes and maintain Check mode by selecting Advanced Planning > Maintain Check Mode or maintenance view /SAPAPO/V_ATP06. All rights reserved . Therefore. Interchangeability. but with PP orders instead. The corresponding strategy group of the requirement class has to be defined in ERP material master. Trigger the Forecast consumption using Report /SAPAPO/CSP_CORRECT_FCST in case in the Product view the Elements tab result is different from that of the Forecast tab The following consumption modes are supported by PP/DS for SAP S/4HANA 1 . Low-level code calculation happens for all materials. Creation of Downtimes and Fixing intervals from Production Scheduling Board is not supported. given appropriate customizing settings. and not for PP/DS.Minimize Runtime SAP005 . For a list of SAP notes to be implemented.-Dependent Setup Activities Additional heuristics are also supported if the heuristics are configured to be executed in the background.Schedule Sequence SAP002 . © 2017 SAP SE or an SAP affiliate company.Stable Forward Scheduling SAP_DS_02 .Remove Backlog SAP003 . then the Advance Planning flag must be removed. Usage with EWM as a part of S/4HANA It is possible to use EWM and PP/DS which are part of S/4 HANA in the same client. In case you want to add capacity with the same category only for the purpose of SAP S/4HANA ERP. All rights reserved . Deletion of the resources in PP/DS has to be performed separately. Editing Resource master data together with the same sim-session as that of the Production Scheduling Board is not supported. without a user interface. The following standard heuristics are supported while working with Production Scheduling Board SAP001 . Production Scheduling Board (Fiori App) Campaign planning and block planning are not supported.2017-11-02 Page 5/17 Orders other than planned and production/process orders can rely on the fact that the advanced-ATP executes an ATP check during conversion anyway.Schedule Operations SAP_DS_01 . Time Profile setting options 'Segments' and 'Hide Non-WT' are not supported.Change Fixing/Planning Intervals SAP_DS_04 .Schedule Sequence Manually (Fiori UI pop-up supported) SAP004 . after which you can save this addition. Create order independently without referencing an operation is not supported. refer corresponding release information note for the app. This has to be performed separately. without change transfer being switched on.Activate Seq. If you try to create a new Advanced Planning-relevant work center without capacity. Removal of Advanced Planning flag from Material Master Removing Advanced Planning flag from Material Master will not delete the related orders or data from PP/DS. Deletion of Advanced Planning-relevant Work Centers Capacity deletion in advanced planning-relevant work centers functions like it does in the conventional integration model. you get an error message.Enhanced Backward Scheduling SAP_DS_03 . all partial lots created when using FS cover exactly one requirement and are scheduled in a sequence (in contrast to FX. Integration of orders generated out of "Standalone SCM-APO" to PP/DS for SAP S/4HANA or vice versa is not supported. this lot-sizing procedure is not available because better options are available to create a finite schedule for planned orders. Planning with Validity Recommendations of BOMs and Routings Regarding planning with limited validities of BOMs and routings. where all partial lots are scheduled to start at the same time). The limitations of the PDS functionality are described as follows: Block Planning: © 2017 SAP SE or an SAP affiliate company. This makes finite planning that might be done later in SAP S/4HANA easier. especially if there are no planned orders of other products using the same resource. All rights reserved . Explanation and recommendation: If planning is performed in SAP S/4HANA. see documentation note 385602. but the data modelling should ensure that there is no data dependency. PPM is not supported in PP/DS for SAP S/4HANA. Special Procurement Types The following special procurement types from SAP S/4HANA are supported in PP/DS for SAP S/4HANA: Subcontracting Stock transfer Phantom assembly Production in alternative plant (called "production in alternative location" in SAP APO) The following special procurement types from SAP S/4HANA are notsupported in PP/DS for SAP S/4HANA: Withdrawal from alternative plant Direct production/collective order Phantom in planning Lot-Sizing Procedure Fixing and Splitting The lot-sizing procedure Fixing and Splitting (FS) is not supported in PP/DS for SAP S/4HANA. DP and PP/DS). Though the planning is executed infinitely. In PP/DS for SAP S/4HANA. "Standalone SCM-APO" and PP/DS for SAP S/4HANA can be used together.2017-11-02 Page 6/17 Usage of "Side-by-Side SCM-APO" as a part of S/4HANA Certain versions (refer SAP Note 2376061) of a "Standalone SCM-APO" system running side-by-side with SAP S/4HANA are supported (including all functions integrating standalone SNP. Production Data Structure (PDS) The supported functionality of PDS differs from that of the production process model (PPM). the FS procedure spreads the planned orders.The differences are described in SAP Note 1079959. The PDS is NOT RELEASED for the following functionalities: Parameter efficiency Extended order generation (EOG) Multiple output planning (MOP) Since only PDS is possible in PP/DS for S/4HANA. the support for the above functionalities is NOT RELEASED and can only be supported with help of BADI implementations Planning with Phantoms: © 2017 SAP SE or an SAP affiliate company. Note: When a Stock Transfer Requisition with characteristic requirement is converted in SAP S/4HANA or changed in SAP S/4HANA after the conversion is triggered from PP/DS for SAP S/4HANA. Subsequent documents like delivery will be created without requirements in PP/DS for SAP S/4HANA which may cause broken pegging relationships. It is not recommended to directly convert STR with characteristic-requirement in SAP S/4HANA or change the converted STO afterwards.2017-11-02 Page 7/17 Classification of operations with class type 018 is not possible for recipes. Variant Configuration and Object Dependencies: To add characteristic requirements to an input node. Comparison Report PDS and SAP S/4HANA Explosion: The comparison report (transaction /SAPAPO/RTO_ORD_COMP) does not compare the following: Sub-operations and secondary resources Setup groups and setup keys Configuration of the input and output products Durations of order internal relationships Continuous input/output must be set using a BAdI. All rights reserved . In case of non-configurable BOM. there might be inconsistencies in characteristic-requirement data of the converted/changed Stock Transfer Orders. it is possible to set default requirements by maintaining batch classification in the BOM. it is necessary to implement the BAdI method CHANGE_EXPL_RESULT of the BAdI /SAPAPO/CULLRTOEXPL or to use an ABAP class that is maintained at the input node. No material quantity calculation. PP-PI/Recipes: Relationships between phases of different recipes are not supported. a BAdI must be implemented for the classification of the activities. No product flow (container resource). If recipes are used in SAP S/4HANA and block planning is used in PP/DS for SAP S/4HANA. Fixed Pegging Fixed pegging in PP/DS for SAP S/4HANA is not kept during all document type changes in SAP S/4HANA. Document type change from transport order to delivery is not supported. not supported by fixed pegging either.2017-11-02 Page 8/17 When using the PDS. Make-to-Order: Though it is technically possible to use fixed pegging in a make-to-order scenario as well. Document type changes from customer inquiry to customer quotation and from customer quotation to sales order are not supported. Not supported at all are forecasts and forecast consumption. scheduling agreements (neither SD nor MM) and REM backflush. The limitations of fixed pegging with respect to other functions and processes are described in SAP Note 704583. A prerequisite for this is that no fixed pegging must have existed before. Batch Determination: Batch determination in SAP S/4HANA is not influenced in any way by the fixed pegging in PP/DS for SAP S/4HANA. However. © 2017 SAP SE or an SAP affiliate company. SAP Note 698427 lists all supported document type changes. The batch determination in SAP S/4HANA does not trigger creation of the corresponding fixed pegging arc in PP/DS for SAP S/4HANA. Assembly processing is not supported (No integration of SAP S/4HANA assembly orders (planned orders)). Production versions are mandatory for phantoms in S/4HANA. ECM-relevant PDS. it can propagate the priorities from the requirement. All rights reserved . can be copied to inactive planning versions. transferred from SAP S/4HANA. Collective orders are not supported in PP/DS for SAP S/4HANA. Prioritization: Though fixed pegging does not calculate any priorities by itself. even though this is not an online process. and consequently. since these are not sensible from a process point-of-view. Phantom BOM needs to be integrated to PP/DS for S/4HANA with transaction curtoadv_create Editing Production Data Structure (PDS) Engineering Change Management (ECM)-relevant changes for components cannot be simulated using the 'PDS Edit' functionality. Some additional comments: Shelf Life: Fixed pegging does not take shelf life restrictions into account. but not for the requirement node at the source location. It is however possible to use the heuristic SAP_PP_019 to create fixed pegging in PP/DS for SAP S/4HANA based on the same batches. Note the following restrictions: The stock transfer orders have two nodes. Fixed pegging is applicable for the supply node at the target location. it is not allowed to use the same phantom several times in the BOM of a finished product in case a component of this phantom is assigned to different operations in the routing. it does not make much sense because the assignment between demand and receipt is already given by the account planning segment. of Safety Stock and Safety Days' Supply from Location Product Master © 2017 SAP SE or an SAP affiliate company.' and 'stock exceeds target stock' are provided. target stock alerts are only generated when a static target stock level method is used. the quantities for the fixed pegging are kept for the order item but not necessarily for the correct schedule line. PP/DS for SAP S/4HANA does not take into account all possible values that can be maintained on the Lot-Size tab in the APO product master. To consider dynamic safety stock (for example.2017-11-02 Page 9/17 Quantity Propagation: Changes in the order quantity of a requirement do not lead to the adjustment of the order quantity of a fixed pegged receipt element and vice versa. safety days supply) in PP/DS for SAP S/4HANA. The heuristic for creating fixed pegging can be called before or after a MRP-level-based Production Planning Run. during document type changes. For planning. The mapping is as follows 'SM' if safety stock & time is maintained 'SB' if only safety stock is maintained 'SZ' if only safety time is maintained Time-dependent target stock level methods are not supported by PP/DS for SAP S/4HANA. in SAP_PP_002 . it is not possible to include the SAP_PP_019 heuristic because there is no possibility in the Standard Heuristic Framework to integrate other heuristics in addition to the product heuristics.Safety Days' Supply from Location Product Master SM . If you want to integrate logic similar to that provided by SAP_PP_019 within a product heuristic (for example. Multiple scheduling lines in sales and purchase orders: Considerable information for the integration between SAP S/4HANA and PP/DS for SAP S/4HANA is based on the order item and not on the schedule line item.Standard Lot Heuristic). new alerts 'stock below safety stock. Characteristics. The SAP S/4HANA Customizing value for the percentage of safety stock availability will not be integrated with PP/DS for SAP S/4HANA. Therefore. the BAdI /SAPAPO/RRP_PLANNING must be used to create fixed pegging before the Net Requirements Calculation (Method PEGID_GET_IO) Safety Stock in PP/DS The Virtual Safety Stock Elements option that is used to cover unexpectedly high requirements is the only safety stock method supported in PP/DS for SAP S/4HANA. Consequently. All rights reserved . PP/DS for SAP S/4HANA supports the following entries: Reorder point method: 2 (Reorder supply from location product master) Target stock level method: Target days' supply from product master Safety stock methods: No Safety Stock SB . The option Real Safety Stock Requirements that is needed to resolve delays or problems in production is not supported.Max. shelf-life and minimum-maximum pegging intervals are not considered for the new stock alert types. Product master data of PP/DS is mapped from the SAP S/4HANA material master to utilize the target stock level method functionality.' 'stock below target stock.Safety Stock from Location Product Master SZ . During the planning of single products or between MRP levels in a Production Planning Run. it is not a problem-solving tool. Compact Planning Compact scheduling concentrates on reduction of lead time of orders. From the planning perspective. partially confirmed orders). PP/DS Optimizer PP/DS Optimizer is an optional component in S/4 HANA. see Note 604757. Order Combination for Mill Products For more information on this functionality. Also not supported are setup durations that have been modified using an available BAdI. For the supported optimizer version. orders should contain no fixed activities. Make sure that the report ends without errors. To achieve this in a meaningful way. refer SAP Note 1686826. For information regarding installation of SCM Optimizers. If an error occurs. refer SAP note 2501607 Planning Scenarios within Consideration of Length Allowance Certain planning scenarios within consideration of length allowance are not supported. Customers are able to see the explanations but will be unable to jump from an explanation to the place where the problems could be fixed. PP/DS Optimizer cannot create orders in PP/DS for S/4HANA. See SAP Note 712066 for recommendations and restrictions for the PP/DS Optimizer. The solution does not support scenarios where the operation duration is fixed and the operation varies according to operation quantity. All rights reserved . Setup times are fixed in the PDS.2017-11-02 Page 10/17 Shelf Life Create dependencies for characteristic: Implement Note 394229. a compact schedule cannot be guaranteed. Run report RVBCOR08. The navigation inside the explanation GUI is restricted to functionality that is offered by the ALV © 2017 SAP SE or an SAP affiliate company. other optimization strategies such as Prioritization or partially confirmed orders (PCO) should be used instead. the system is not always able to schedule the operation and close existing gaps even though the scheduling mode 'Insert and Close Gaps' is used. Reservation Planning This functionality is not supported. refer Product Availability Matrix (PAM) of relevant version of S/4 HANA. see SAP Notes 751392 and 563863. If they do. Explanation Protocol for PP/DS Optimizer The Explanation Protocol is to be used like a protocol. Scheduling Mode 'Close Gaps' Depending on the complexity of the scenario and the planning environment. Regarding shelf life functionality. In such cases where orders do contain fixed activities (for example. either the operation duration or the operation capacity requirement may be variable (but not both at the same time). multi. There is no solution as yet for this problem. The transaction RPMBAL to display capacity utilization (capacities of resources and their utilization by activities coming from RPM LC matrices) is not released. Subcontracting Following sub-contracting scenarios are supported Subcontracting Without Source Location in PP/DS Subcontracting with Source Location in PP/DS Subcontracting with Scheduling Agreements in PP/DS Subcontracting with Third-Party Provision of Components in PP/DS Source of supply for subcontracting is modelled with a subcontracting PDS. This needs creation of subcontracting MRP area in S/4HANA and a corresponding subcontractor location of type 1050 should be created manually with the same name as that of subcontracting MRP area. If it is desired to match the MRP controller to the SAP APO planner. Default ATP categories are delivered for subcontracting purchase requisitions. subcontracting purchase orders and subcontracting scheduling agreements. single-mixed and multi-mixed). it has to be considered that the field planner in SAP APO has three characters and is independent from a location (in contrast to SAP S/4HANA). However this can be changed in customizing -> Advanced Planning ->Global Settings -> Maintain Global Parameters and Defaults ( /SAPAPO/RRPCUST1 ) Serial Numbers A material may have a serial number in SAP S/4HANA. However. Only rough-cut planning is possible at the subcontractor location For propagating the changes of a subcontracting info record or subcontracting scheduling agreement to the linked subcontracting PDS. A subcontracting external procurement relationship is linked to this subcontracting PDS.and not in combination with shop floor resources (single.2017-11-02 Page 11/17 grid. the lists inside the GUI are very long and the display could be slow. Assign the subcontracting MRP area in S/4HANA to the components. there is no processing of serial numbers in PP/DS for SAP S/4HANA Planning Without Final Assembly © 2017 SAP SE or an SAP affiliate company. When the Explanation Protocol has to protocol a large amount of data. Subcontracting is modelled with subcontractor location only for components. an absolute transfer of a PDS is necessary. Rapid Planning Matrix (RPM) The Rapid Planning Matrix can only be used in combination with the iPPE and with production line resources . Automatic transfer for subcontracting PDS happens only for changes in the production version. Capacity Reservation This feature is not supported. Also see SAP Note 699773. Transfer Planner from SAP S/4HANA to SAP APO The planner in SAP APO does not correspond to the MRP controller in SAP S/4HANA and is not transferred to SAP APO. All rights reserved . The operations of production orders must have the status DSEX in SAP S/4HANA to keep their activity dates in PP/DS for SAP S/4HANA. An operation of a manufacturing order in SAP S/4HANA is partially confirmed. this should not have an impact on the dates of the goods receipt time processing activity. The activity dates of planned orders are generally retained. Keeping Activity Dates when Transferring Orders to PP/DS for SAP S/4HANA The functionality to keep activity dates provides the possibility to avoid PP/DS for SAP S/4HANA having to do a rescheduling when orders are transferred from SAP S/4HANA to PP/DS for SAP S/4HANA. you observe in PP/DS that the remaining duration and dates of the operation are not getting updated according to the new (just confirmed) values. Alternate Sequences of SAP S/4HANA Routing Alternate sequences functioning as at present in SAP S/4HANA routings are not supported in integrated PP/DS for SAP S/4HANA orders (See SAP Note 437400). If a second partial confirmation is done on the same operation. Limitations: Goods receipt time processing activities are always scheduled. as long as the PDS is not re-exploded. PP/DS Horizon The 'PP/DS Horizon' field is only available in Model and Version Management. SAP in any case recommends infinite strategies in the strategy profile for CIF integration. is taken over in PP/DS for SAP S/4HANA. iPPE Workbench Express The iPPE Workbench Express is not released at all for SAP S/4HANA integration and CDP. with correct and unchanged settings at the handling resource and with an unchanged goods receipt processing time. If activity dates are kept in PP/DS for SAP S/4HANA.2017-11-02 Page 12/17 The system only creates safety stock in the make-to-stock segment. existing violations of other boundary conditions in PP/DS will not be removed. PP/DS setup information was retained. Setup Information Integration Setup information from SAP S/4HANA. Prior to this. if maintained (non-initial). For some finite strategies. Multiple Partial Confirmations on an Operation of a Manufacturing Order Multiple partial confirmations on an operation of a manufacturing order do not reduce the remaining duration of the operation. for example. MRP-based Detailed Scheduling (DS) © 2017 SAP SE or an SAP affiliate company. Not all finite strategies are supported with this functionality. Only demands in the make-to-stock segment can consume stock. the system switches to infinite scheduling in case the activity dates are kept. The corresponding SAP APO operation also has the remaining duration dates adjusted correctly. All rights reserved . violations of pegging relationships and relationships between operations. It has to be thus ensured that both systems have maintained consistent data. However. It is not present in product master for each product. However. Keeping activity dates overrules the settings for synchronization for a resource. No backtracking in scheduling: A scheduling action can affect more than operation. Multilevel Scheduling Framework The objective of the Multilevel Scheduling Framework is to provide a basis for heuristics such that they can tackle more complex scheduling problems by processing the activity network instead of single activities. you must consider SAP Note 1101409. the scheduling modes 'Insert Operation'. pegging arcs with maximum length) Continuous I/O © 2017 SAP SE or an SAP affiliate company. only lines belonging to the planning segment and the restrictions assigned to those lines are taken into account during the optimization run. the scheduling action might still terminate without solution. 'Insert Operation and Close Gaps' and 'Squeeze In' can cause some operations to be pushed outside the planning horizon (the operation sequence is kept with these scheduling modes). MMP also does not consider the settings made in 'Model and Version Management'.that is to say. However. Order validity is considered such that orders that cannot be scheduled finitely on a resource are scheduled deallocated within the order validity. The Model Mix Planning algorithms do not take the priorities of the customer-independent requirements into account. see SAP Note 627377. Reference Operation Sets Reference operation sets are only integrated for PDS and for orders.2017-11-02 Page 13/17 MRP-based DS functionality is not supported. each operation is scheduled only once. The functionality of the Genetic Algorithm for multilines is limited and should be used only after consultation with SAP. If it is not possible to schedule the orders deallocated within the validity interval. The Multilevel Scheduling Framework is not yet released for customer developments as SAP might change the interface without compatibility. the orders remain in their original positions. The following conditions/parameters are not supported by this heuristic: Relationships with maximum length (order internal. This could happen because the problem only occurs at the second operation. If 'Schedule Infinitely' is chosen as the fault-tolerance option. the scheduling action can terminate without solution. For example. or between activities of different orders . independently of previous operations and in a given sequence. Model Mix Planning (MMP) For information on the limitations for Model Mix Planning. Since infinite scheduling does not allow scheduling outside the planning horizon. Fault-Tolerant Scheduling Fault-tolerant scheduling is only used for scheduling of orders and cannot be used for their creation. Usage of Long Products Planning (LPP) For LPP solution to be used. All rights reserved . If a scheduling problem consisting of several operations is solved by an allowed violation of a constraint for the first operation. PP/DS for SAP S/4HANA requires a mapping of reference characteristics procedure code via BADI /SAPAPO/CURTO_CREATE Usage of CDP: Prerequisite: To use planning with CDP (and batches) data in the PP/DS for SAP S/4HANA please activate the content of BC-set /SAPAPO/APO_ON_ERP_CDP.2017-11-02 Page 14/17 Shelf life Characteristics Container resource Production campaign constraints Block planning Synchronization on multi-resources Operation Split The functionality of operation split is not supported in PP/DS for SAP S/4HANA. This leads to the following system behavior when using VC-planning in the one system approach: CIF transfer for classification data in class type 300 is not required APO reads from SAP S/4HANA classification which is assigned to MARA The APO product master data transaction /SAPAPO/MAT1 does not show the VC relevant class assignments. (SAP S/4HANA classification data is assigned via MARA whereas the APO product master display shows APO-assignments via /SAPAPO/MATKEY) Reference characteristics: unlike SCM Server. Integration models need to be maintained for relevant organization areas for these class types. assignments to 23/300 can be viewed on the SAP S/4HANA material master. © 2017 SAP SE or an SAP affiliate company. This leads to the following system behavior when using CDP-planning in the PP/DS for SAP S/4HANA deployment: PP/DS for SAP S/4HANA reads from SAP S/4HANA classification which is assigned to /SAPAPO/MATKEY The product master data /SAPAPO/MAT1 shows the CDP relevant class assignments only. where CIF maps table fields for reference characteristics. PP/DS for SAP S/4HANA directly reads class 300 related data from SAP S/4HANA. CIF transfer for classification data in class type 23/300 to type 230/400 is required. which can be viewed on the SAP S/4HANA material master. CIF transfer for classification data of class type 300 is not required. When running in the one system approach. Also see SAP Note 441777. PP/DS for SAP S/4HANA directly reads related data from the APO-only classes of type 230 and 400. Classification System (CDP vs VC/iBase) Usage of VC: When running in the one system. This will introduce customizing for APO classes 230 and 400. All rights reserved . There is no link between this functionality and CIF delta report. the classification is checked for: VC regarding the same configuration reference CDP regarding the existence of characteristics It is possible to perform an extended configuration check for the classification with the effect that the value of the characteristics is checked as well. Reference characteristics: It is necessary to first transfer characteristics and then the BOM and routings. see SAP Note 528189. by order internal relationships a start-start relationship can be defined Between orders. CDP and Block Planning Concerning CDP. Regarding block planning.2017-11-02 Page 15/17 (SAP S/4HANA classification data is assigned via MARA whereas the APO product master display shows APO-assignments via /SAPAPO/MATKEY) Additional Info: If the components for subcontracting are planned with characteristic dependent planning (CDP).CDP and variant configuration (VC) . it is not possible to read SAP APO master data information in the BAdI implementation. the functionality of continuous consumption can be used Other limitations: Note that continuous consumption is only considered in production planning heuristics and not in scheduling heuristics. Therefore. In the delta report. © 2017 SAP SE or an SAP affiliate company. Classification is not used for components of in-house production orders. All rights reserved . Consistency Check in liveCache (Transaction OM17): Consistency of information for characteristics-based time series is not checked Some checks do not prove full consistency but only carry out important plausibility checks Checks for VC configuration only apply to active planning version (planning version 000) Correction of inconsistencies may require subsequent execution of CIF delta report. see SAP Note 526883. there are certain limitations regarding unspecified characteristics in planning and pegging. Overlap and Continuous Input / Output Overlap due to continuous production (quantities are continuously handed over to the next processing step instead of only at the end) can be modeled in two ways: Within an order. The iPPE side access does not support CDP classification. The simultaneous use of different configuration schemes . the characteristic values are not transferred to SAP S/4HANA.within one client is not supported. 2017-11-02 Page 16/17 Continuous consumption does not work with external procurement and sales orders. See further explanations in the Customizing where the heuristics are maintained and also SAP Note 448960. Characteristics-based Deployment in PP/DS © 2017 SAP SE or an SAP affiliate company.' which is screen 1000 from the function group /SAPAPO/RRP_FRAMES. It is therefore necessary to contact SAP in order to evaluate if the mentioned functionalities can be used in the customer's scenario.DPS Variable View and other related transactions /SAPAPO/PPT . see 'Demand' tab) only lead to satisfying results in very simple cases. and component requirements are calculated using the formula X = (Order quantity) * A + B. the combination of partial delivery and delivery tolerance leads to incorrect results because the system cannot calculate the delivery tolerance correctly in case of a partial delivery. "use entire receipt" and "use total stock" (Under the product master. relationships) The function can be called only from those transactions that call the screen 'Receipts View. This includes the transactions: /SAPAPO/RRP4 . For example. All rights reserved . durations. It is not recommended to split in-house orders in order to create a workaround for the partial delivery of the output products because this may lead to performance problems. The functionalities "delivery tolerances". Durations and Component Requirements The calculation of capacity requirements. usually at the end of the order (with the exception of continuous input/output).Mass Conversion/Transfer of Planned Receipts in Active Planning Version /SAPAPO/CDPS0 . In contrast to SAP S/4HANA. other formulas are not supported in PP/DS for SAP S/4HANA.Receipts View /SAPAPO/RRP7 . Pegging with Delivery Tolerances and 'Use Total Supply' This functionality should be used only after consultation with SAP. Partial Delivery of Output Products The full quantity of an in-house order is available at one discrete point in time. A partial delivery of the output product is not supported in PP/DS for SAP S/4HANA. Accessibility The Resource Planning Table is not intended to handle or to be used for such business functions as: Planning of multiresources Planning of bucket resources Displaying network information (pegging.Product Planning Table Calculation of Capacity Requirements. The heuristic SAP_PP_C001 must not be called by the heuristic SAP_PP_Q001. Due to this reason. When an operation is stretched or shrunk manually or using heuristic 'Fill gaps by changing operation duration' (SAP_PI_002) in the Detailed Scheduling Planning Board. Stretching and Shrinking of Operations (Process Industry Scenario) Stretching and shrinking operations. Software Components Software Component Release S4CORE 102 . Planning assumes that these quantities are located at the customer and should therefore not be available for a requirement in the distributor's plant. the planner must subsequently execute the scheduling function. To schedule the stretched or shrunk operations. either manual or using heuristic.102 This document is referenced by SAP Note/KBA Title 2491467 SAP S/4HANA 1709: Restriction Note Terms of use | Copyright | Trademark | Legal Disclosure | Privacy © 2017 SAP SE or an SAP affiliate company. this is not relevant for PP/DS processes and is not available. operations are not scheduled automatically. All rights reserved . Customer Consignment Stock Customer consignment stocks are not planning-relevant. is only applicable for process industry scenarios.2017-11-02 Page 17/17 This feature is not supported.
Copyright © 2024 DOKUMEN.SITE Inc.