Road Project 2011-12

March 18, 2018 | Author: anutam.cool | Category: Government Of India, Economy Of India, Road, Road Infrastructure, Road Transport


Comments



Description

Sl. No.Name of the Project 1 Solapur-Maharashtra/Karnataka Border-Bijapur 2 Aurangabad- Barwa Adda 3 Hoskote- Dobaspet 4 Rajahmundary-Gundugulanu 5 Jalgaon-Gujarat/Maharashtra Border 6 Amravati-Jalgaon 7 Jind-Punjab/Haryana Border 8 Anandpuram-Vishakhapatnam-Ankapalli S. No Name of Project 1 Ahmedabad- Vadodara 2 Beawar- Pali-Pindwara 3 Kota-Jhalawar 4 Nagpur- Wainganga Bridge 5 Barwa Adda- Panagarh 6 Jabalpur- Lakhanadon 7 Kishangarh-Udaipur-Ahmedabad 8 Chhatisgarh/Orissa Border- Aurang 9 Jabalpur-Katni-Rewa 10 Hospet-Bellary- KNT/AP Border 11 Shivpuri- Dewas 12 Gwalior- Shivpuri 13 Meerut- Bulandshahar 14 Vijayawada- Machhlipatanam 15 Rohtak-Jind 16 Patna-Buxar 17 Birmitrapur-Barkote 18 Angul-Sambalpur 19 Muzaffarpur-Barauni 20 Raipur-Bilaspur 21 Hospet-Chitradurga 22 Cuttack-Angul 23 Mah/KNT Border-Sangareddy 24 Rampur-Katgodam 25 Etawah-Chakeri 26 Agra-Etawah 27 Lucknow-Raebarelly 28 Muhulia-Baharagora-Kharagpur 29 Solapur-Maharashtra/Karnataka Border 30 Tindivanam- Krishnagiri 31 Panikholi- Rimoli 32 Lucknow-Sultanpur 33 Kiratpur - Ner Chowk 34 Vijaywada-Elluru-Gundugolanu 35 Abdulgunj-Betul Length (Km.) 110.54 221.51 80.02 120.74 208.84 275.23 69.35 58.22 Length (km) 102.3 244.12 88.09 45.43 122.88 80.82 555.5 150.4 225.69 95.44 321 125.3 62.52 64.6 48.6 125.44 125.62 153 107.56 125.53 120.03 112 145 93.23 160.21 124.52 70 125.9 100.06 182.18 166.17 125.9 84.32 103.59 121 TPC 1102.48 2340 720.69 1617 1968.37 2537.81 438.75 839 TPC 2125.4 2388 530.01 484.19 1665 776.76 5387.3 1232 1895.45 910.08 2815 1055 508.87 606 283.25 1129.11 778.15 1220.32 354.09 1216.03 1033.65 1123.69 1266.6 790 1573 1207 635.9 940 923.04 624.2 1410 1043.51 1818.47 1684 912 69 1617 1968.6 110.5 97.75 839 .35 257.81 438.26 104.22 942.05 390.37 2537.74 934.93 1635.36 Gomti – Udaipur 37 Baleshwar-Khargpur 38 Jowai-Meghalaya/Assam Border 39 H/UP Border-Yamunanagar 40 Khagria-Bakhtiarpur 41 Mulbagal-Karnataka/AP Border 42 Gwalior-MP/UP Border 43 Bamitha-Satna 44 Solapur-Maharashtra/Karnataka Border-Bijapur 45 Aurangabad.Barwa Adda 46 Hoskote.02 120.48 2340 720.11 320.31 119.35 58.74 208.83 1102.98 22.19 107.Dobaspet 47 Rajahmundary-Gundugulanu 48 Jalgaon-Gujarat/Maharashtra Border 49 Amravati-Jalgaon 50 Jind-Punjab/Haryana Border 51 Anandpuram-Vishakhapatnam-Ankapalli 79.23 69.33 141.77 112.45 471.51 80.3 102.54 221.84 275. 49%) Grant 68.Annual Annuity 548.567 Grant 57.01 Premium 3.20 Semi Annual Annuity 365.40 Semi.00 Premium Premium / Grant Received 309.60 Premium 251.31 Grant 255.60 Premium 134.07 Premium 50.92 Grant 917.94 Grant 369.56 %) Grant 83.00 Semi.61%) Grant 5.77 Grant 172.89 Grant 463.50 Grant 68.5 Premium 5.00 (4.72 Grant 422.62 Grant 219.89 Premium 128.00 Premium 91.Premium / Grant Projected 108.94 %) Grant 18.59 Grant 82.32 (5.00 (34.Annual Annuity 126 (13.45 Premium 63.83 %) Grant 62 Premium 149 Grant 145.60 Premium 135.9 (10 %) Grant Premium / Grant Projected 5.08 Premium 131.60 Grant 261.9%)Grant 9.99%) Grant 311 Grant 337 (27.51 Premium 27.13 Semi-Annual Annuity 146.25 Grant 331.5 Premium 81 Premium 228 Grant 5.04 Premium 10.25 Premium 381.83 Grant 475.5 Premium 133.74 %) Grant 72.90 Premium 66.70 Premium 340 (17.99 Premium 40.27 Grant 101.96 Grant 276.20 Premium 82.64 Grant 21.00 (27.72 (11.09 Premium 80.49 (38.04 Grant Premium / Grant Received 75.00 Premium 61.22 Grant 67.5 Grant 159.00 Premium 180.57 Premium 33 Premium .35 Premium 106.92 Grant 148.50.68 Grant 221.76%) Grant 636 Premium 29.00 Premium 37.00 Premium 27.00 (3.5 Grant 316.00 Premium 45.40%) Grant 27.99 Grant 394.37 (9.52 Grant 79.3 %) Grant 3 Premium Td.80 Premium 63.53 (9 %) Grant 140.60 Premium 29 (5.31 Grant 383.01 Premium 34.70 Grant 12.69%) Grant 209.09 Premium 145.02 Grant 336. 23 Grant 56.47.30 Grant 279 Grant 521.6 Grant 15.67 Grant 5.13 (40%) Grant 9.60 s Premium 35 Premium 125.60 Premium 135.75 Grant 75.74 %) Grant 72.56 % Grant 10 % Grant 21.12 Grant 0.67 Premium 28.83% Grant 62 Premium 149 Grant 9 % Grant 5.30 Grant 172.00 Premium 27.00 (3.07 (20%) Grant 103.99 Premium 156.44 Grant 64.04 Premium 10.08 Premium 131.3 % Grant 3 Premium 11.20 Premium 82.09 Premium 145.00 Premium .70 Grant 245. - IRB LT GVK JMC DS Construction Gannon Dunkerley GMR BSCPL SOMA PNC GVK Essel C&C Madhucon Vijay Gammon Gammon Abhijeet KNR-JKM IVRCL Ramky Abhijeet L&T ERA Oriental Ramky Essel Transtrroy Gayatri Essel-Atlanta ILFS Gammon Transtrroy . Transstroy-OJSC Consortium IVRCL Assets & Holdings Ltd. L&T Infrastructure Development Projects Ltd. Unity Infra Projects Transstroy (India) Ltd. L&T Infrastructure Development Projects Ltd.Preferred Bidder Sadbhav Enginnering Ltd KMC Constructions Ltd. Sadbhav Gammon Navayuga Sadbhav KMC Transstroy IVRCL L&T L&T Unity Transtrroy . 500 km of NHDP in the year 2011-12.a.500 km have been invited or are under evaluation and they are likely to be awarded in the early months of the new Statement showing NPV of Savings on account of awarded amount and the projections in respect of projects awarded/Bids received during 2 1.a. Grant/VGF is taken at the level projected or bid out. This road connect These bids gave a NPV saving of Rs 6. In the full year. discounted at 12% p.500 km road contract awarded by NHAI during FY2011-12 In yet another instance of aggressive bidding for highway projects. NPV is the present value of the expected annual premium over the concession period. which is about 28 percent higher than the previo Already bids for about 1.6. It has not been discounted as it will be paid during the period of construction and prior . The NPV of grant amount (VGF) is shown in negative in parenthesis. 2. over the concession period. 4. 3. the total benefit (premium or grant versus what was expected) to NHAI has All put together NHAI has been able to award about 6. developers offered premium to seven out of eight highway projects with a Larsen and Toubro got the two bids of NH6 and thus would be completing the full stretch from Gujarat border to Amravati. Premium is payable after the commercial operation date and is expected to increase by 5% p.451 crore. the road ministry awarded projects under NHDP and oth arded in the early months of the new calendar year.085 km. KMC-led consortium grabbed the project in Bihar-Jharkhand rsus what was expected) to NHAI has been to the order of Rs 30.03.144 kms awarded by National Highway Authority of India (NHAI) during March-end. Besides this.980 crore.300 km in the year 2012-13 and road ministry would be awarding a tota ojects awarded/Bids received during 2011-12 (upto 30. This shows the continued interest of the highway developer group in the NHAI bout 28 percent higher than the previous record .2012) r the concession period. which was in 2010-11 at 5.n out of eight highway projects with a total length of 1. ng the period of construction and prior to the commercial operation date. . This road connects Hazira port –Surat to Paradip and eventually Kolkata. One project faile border to Amravati. NHAI is committed to award 7. oad ministry would be awarding a total of 8. abbed the project in Bihar-Jharkhand of Aurangabad.AI) during March-end. One project failed to attract strong interest and thus the quoted amount was much lower than the expected bid.300 from NHAI. which is 6 laning of the Golden quadrilateral between Delhi-Kolkata.BarwaAdda. awarded projects under NHDP and other heads. . Other successful highway developer group in the NHAI projects.800 km from NHDP including 7. Transtroy and IVRCL. ween Delhi-Kolkata. Unity Infra. . Other successful bidders include Sadbhav.he expected bid.
Copyright © 2024 DOKUMEN.SITE Inc.