Project Reporter 1Jan09

March 28, 2018 | Author: Kulmohan116 | Category: Mobile Phones, 3 G, Telecommunications, Technology, Engineering


Comments



Description

cover.qxp 29/12/2008 12:43 PM Page 1 Indian Edition: Annual Subscription Rates: Print Edition: Rs. 1950/-, Frequency: Fortnightly (1st & 15th of every month) Vol. 4 No. 13 l January 1, 2009 India’s Project Database 145 Projects Highlights www.ProjectReporter.co.in ☛ SATCOM-N/M Equipment for Indian Air Force. ☛ 400 telecom towers in the rural areas ☛ Setting up agro processing unit in Punjab ☛ Alumina refinery work order in Orissa ☛ 1.5 mtpa Lead Zinc Beneficiation plant for Rampura Agucha Mines ☛ Order for Pranahita-Chevella Lift Irrigationpackage 6 ☛ 1.3 mtpa cement grinding unit in Orissa ☛ Construction of CIDCO Exhibition Centre ☛ Mumbai Offshore Container Terminal Project ☛ Agro-based industrial project at Ferozepur ☛ Global schools at Hyderabad and Visakhapatnam ☛ Heavy engineering equipment manufacturing plant near Chennai ☛ Food-processing unit spread over 11.5 acre near Nashik r to c ise ects t l j Mu Pro Multisector HIGHLIGHTS Agro Research (1) Plans a laboratory for its research and development purposes . . 1 Alumina (43, 44) Alumina refinery work order in Orissa . . . . . . . . . . . . . . . . . . . . . 43 1.5 mtpa greenfield alumina refinery at Rayagada. . . . . . . . . . . 44 Aluminium (45) Anti-Corrosives (76) Modern anti-corrosives manufacturing facility near Ranipet. . . . 76 Canal/Dam/Irrigation (46) Order for Pranahita-Chevella Lift Irrigation-package 6 . . . . . . . . 46 Cement (2) 1.3 mtpa cement grinding unit in Orissa . . . . . . . . . . . . . . . . . . . . 2 Construction (47) Construction of CIDCO Exhibition Centre. . . . . . . . . . . . . . . . . . 47 Container Terminal (65) Mumbai Offshore Container Terminal Project . . . . . . . . . . . . . . . 65 Edible Oil (3) Agro-based industrial project at Ferozepur . . . . . . . . . . . . . . . . . . 3 Education (4,5) Global schools at Hyderabad and Visakhapatnam. . . . . . . . . . . . 4 300 schools across India in the next 5 years . . . . . . . . . . . . . . . . 5 Equipment (6, 7) Heavy engineering equipment manufacturing plant near Chennai6 Expansion of existing facilities in Thiruvallur. . . . . . . . . . . . . . . . . 7 Food Processing (77) Food-processing unit spread over 11.5 acre near Nashik . . . . . 77 Food Products (8, 78) Icecream plant at Kolkata by 2010 . . . . . . . . . . . . . . . . . . . . . . . . 8 Hospitality (9 to 12, 13, 79, 80) Plans to construct hotel in Pune . . . . . . . . . . . . . . . . . . . . . . . . . . 9 70-storeyed luxury hotel in Marine Lines . . . . . . . . . . . . . . . . . . 10 Constructing a hotel in Coimbatore with 120 rooms. . . . . . . . . . 13 Constructing ‘Mall Matrix’ on 3 lac sq ft in Sector 74 . . . . . . . . . 80 Housing (14, 15, 48, 49) Iron & Steel (16, 50, 63) 3 mtpa steel project at Bistapal . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Setting up a rolling mill having a capacity of 65,000 tpa . . . . . . 63 IT Park (51) IT Park at Durgapur . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 IT/Ites (17, 18, 81) Setting up data centre at Thiruvananthapuram. . . . . . . . . . . . . . 17 Material Handling System (52) Mining (19) Multiplex (20, 66) Plans to develop 44 cinema screens in Punjab . . . . . . . . . . . . . 20 Oil & Gas (53, 67, 82) Parking Systems (21, 83, 84) Manufacture of entire multi-parking systems at Shirwal . . . . . . . 21 Setting up mechanised parking in Mantri Mall area . . . . . . . . . . 83 Polypropylene (68) New manufacturing facility for Polypropylene compound at Jejuri68 Port (22 to 24, 54) Single-point mooring (SPM) facilities . . . . . . . . . . . . . . . . . . . . . 23 Five new berths under the PPP model . . . . . . . . . . . . . . . . . . . . 24 Power (25 to 28, 55 to 58, 64, 69 to 72, 85, 86) 2640 mw Bhavanapadu Coal Based Thermal Power Plant . . . . 25 Kakatiya thermal project stage-I of 500 mw . . . . . . . . . . . . . . . . 70 Stage-II of Kakatiya thermal power project planned. . . . . . . . . . 71 600 mw Mettur Thermal Power Project in Tamil Nadu . . . . . . . . 72 Real Estate (29) Super luxury commercial-cum-residential project at Kochi. . . . . 29 Retailing (30) Roads/Highways (31, 59, 73, 74, 87, 88) Ambala - Chandigarh Highway project completed . . . . . . . . . . . 73 Padalur - Samayapuram Four lane road completed. . . . . . . . . . 74 Shopping Mall (32, 33, 89 to 99) Constructing ‘AlphaOne’ spread over 25 acres . . . . . . . . . . . . . 94 Constructing ‘TDI Mall’ in Sector 17 . . . . . . . . . . . . . . . . . . . . . . 95 Constructing ‘Viva Collage’ over 3.37 acres at GT Road . . . . . . 97 Telecom (34, 60, 100) SATCOM-N/M Equipment for Indian Air Force. . . . . . . . . . . . . . 60 400 telecom towers in the rural areas. . . . . . . . . . . . . . . . . . . . 100 Titanium Dioxide (35) Titanium dioxide project in Tamil Nadu . . . . . . . . . . . . . . . . . . . . 35 Township (101) Transport (75) Chennai Metro Rail project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 Turbines (36) Warehouse (37) Water Sector (38 to 42, 61, 102) Second desalination plant in Chennai. . . . . . . . . . . . . . . . . . . . . 38 Trans Varuna Sewerage Scheme project under JNNURM . . . . 39 Water Drainage Scheme of Varanasi District . . . . . . . . . . . . . . . 40 Solid Waste Management Scheme of Varanasi District . . . . . . . 42 Godavari Drinking Water Supply Scheme. . . . . . . . . . . . . . . . . . 61 Weather Stations (62) Supply of automatic weather stations in 500 locations. . . . . . . . 62 *Numerals denote serial no. Focus: Telecom . . . . . . . . . . . . . . . . . . . . . . . . . . Pg 9 to 12 PROJECTS ARE CLASSIFIED AS FOLLOWS: Conceptual / Planning Stage (1 to 42) Contract Award (43 to 62) Joint Venture (63 to 64) Project Update / Commissioned Projects (65 to 75) Under Implementation Stage (76 to 102) E-Tender / Expression of interest / RFP / RFQ (103 to 115) Tenders / Bids (116 to 145) For Subscription / Advertising: Tel: 91-22-24193000 | Fax: 2417 5734 | E-mail: [email protected] Project information is being provided for the reference of readers. However, readers are cautioned to make inquiries and take their decisions on investment after consulting experts on the subject. Contact Information provided should not be treated as an invitation to solicit information from the respective company. PROJECT REPORTER bears no responsibility for any decision taken by readers on the basis of information provided herein. While all efforts are made to ensure that the information published is correct, PROJECT REPORTER bears no responsibility for any unlikely errors that might occur. Editor: Pratap Padode • Research: Sandeep Sharma, Nipa Kamat, Sunita Andhe Project Reporter • 1 • January 1, 2009 Highlights copy.indd 2 29/12/2008 12:37:21 PM Business Head (Schools).500082. T: 079-26564018 .00 C K Narayana. Barakhamba avenue. 23296805.00 M Mahesh.00 Education A Navneet. 350. Approvals from the state government is in place. T: 0512-2242452. Managing Director. Opp: NIMS. 2246640.Hospitality 70-storeyed luxury hotel in Marine Lines. 4th Floor. navneeta@zils@esselgroup. M: 9870688350. Andheri Kurla Road. F: 28369886. Chennai . The Tamil expansion will start in January 2009. 5 Zee Essel Group’s education division plans Interactive to set up 300 schools across India in the Learning next 5 years.00 Sumit Guha. F: 2400172. T: 06612400080. devanshu@vadilalgroup. Kolkata West Bengal 20. The schools in Pradesh Ltd the state will start from the academic year 2009-10. M: 9820211410. Navangapura. K. 104-106. 4 Visu Plans to set up global schools at HyderAndhra International abad and Visakhapatnam. GM (Midsegment). 7 Caterpillar India The company plans to expand production Thiruvallur at its existing facilities in Thiruvallur. Vice President . Mumbai luxury hotel will commence operation in . and 3. The construction of hotel will start by February 2009. Director.400063. Chennai . T: 011-44447777.in 11 Piccadily Hotels Pvt Ltd The Empowered Committee of the Punjab Ludhiana government gave approval to a hotel Punjab project at Ludhiana. Melnallathur Village. T: 022-28454499. Delhi . Rourkela.110001. 90. Wazirpur District Center. Education Lumbini Enclave. T: 011-41802300 / 01. R A Puram. 155. Mumbai 400099. P-25. 2 Shiva Cement Ltd Plans expansion of 1 million TPA clinker Sundergarh and 1.com. F: 26564027.152001. Yashodham. 240016. Agreement signed with the State Government. Thiruvallur.602004.Projects. anoop@visuintn. Anoop Kumar.Tamil gineering equipment manufacturing plant Nadu near Chennai. 3rd Floor. rkl_shivacem@sancharnet. Project Manager. C -1. Chennai . 2009 Project Reporter. early 2012. Systems Ltd 6 Caterpillar India The company plans to set up a heavy en. Equipment .com 800. Near Navrangpura Rail. 18 & 1/2 Anaj Mandi. Orissa-769004. M: 08940961531. F: 44441234 *Figures are approximate (Rs.602004. Cp. AGM . 27641085. Punjagutta. Hyderabad . T: 044-47600000.110 034. Melnallathur Village. Blk-H.in Edible Oil . T: 04023399241. F: 23395214.2. R P Gupta.T: 022-26743900. Punjab. T: 0163-2244765. The Lalit. Plaza Cinema Bldg. shivacem@ dataone. 23/11. 12 Cargo Motors Pvt Ltd The Empowered Committee of the Punjab Jalandhar government gave approval to a hotel Punjab project at Jalandhar. Dyna.indd 2 29/12/2008 12:37:35 PM . The project would go on stream in the first quarter of 2011. blvexports@yahoo. T: 044-47600000.00 Shanti Prasad Shukla-Project Mgr.. Pune Maharashtra 72.co. Ahmedabad .. F: 27351856 Agroresearch .00 DB Realty: Shirley Dsilva. [email protected]. Goregaon (East). Cannaught place.Opera. Project Manager. Andheri (E). The works are likely to start by February 2009. The works will start thereafter and will take upto 21 months to complete. Chintamani Plaza. InterHospitality continental hotels. C K Narayana. T: 044-24610066. Thiruvallur. Crore) Project Reporter • 2 • January 1.Conceptual/Planning Stage Sno Organisation Project Title / Details Location Budget* Contacts Sector 1 Ghari Industries Pvt Ltd Kanpur based company plans to foray Kanpur into agriculture sector and is working to Uttar develop high yielding variety of seeds. 3 Bhagwati Lacto Vegetarian Exports Pvt Ltd The Empowered Committee of the Punjab Ferozepur government recently approved an agroPunjab based industrial project at Ferozepur Cantonment. Environment clearance is expected by June. 2nd Main Road.24. Nationwide 1.. The work will start by end of 2009 and the Vaidya Marg. Maharashtra mix House. 27641085.000 litres of ice cream daily. shirley. 27353193.00 Devanshu Gandhi. Civil Township.in Cement 32. Manager Sales. Food Vadilal House.92 Sameer Mittal. MD. 28402304. The unit will have a capacity to manufacture 50.in. Equipment Hospitality 10 Global Hyatt Corporation/ DB Hospitality The companies are jointly building a Mumbai 1000. PRO.com 9 Sabari Group The company plans to construct hotel in of Hotels Pune.Products way Crossing. 01127351856.3 million TPA cement grinding Orissa unit in Orissa. General A.600028.380009. Netaji Subhash Place. Ferozpur Cantt . M: 09849578963. New Delhi. T&F: 28402322. M: 09872644765.Hospitality tions.00 Ambar Burman. New Delhi . Pradesh The company has decided to set up a laboratory for its research and development purposes and will come out with the product in near future. Nadu 8 Vadilal India’s oldest and largest ice cream Industries Ltd makers plans to set up a plant at Kolkata by 2010. environmental planning and assessment. Wipro Infotech IT Mission has been selected as technical consultant.klausmultiparking.com 21 Klaus Multiparking Systems India The company plans to set up a facility for Shirwal the manufacture of entire multi-parking Maharashtra systems at Shirwal. Manager . M: 09235396004 35.00 Nitin Sood. P. Managing Director) N C Sahu.com 100. Manager . Multiple Hospitality 18 Aegis BPO Services Essar group’s BPO arm plans to set up three facilities in the states of Bihar.O.410202. Manager . Balaji Bhavan. . Plot No. 225.25450378 / 25458662. 23/11.. 2726881. keralaitmission. Manager E Governance.com Varanasi 15 State Urban Construction of 692 residences for poor Development in Maheshpur. Mumbai . Gurgaon . srinivasan. After the exploration work is over. Pradesh 16 Uttam Galva The company plans setting up a 3 milSteels lion tonne steel project at Bistapal. DGM (Projects).Box No.indd 3 29/12/2008 12:37:36 PM . Lucknow. Manager Sales.9. M Mahesh.aegiscomgroup. Building No. 2725646. M: 08940961531. T: 471-2314307. Behare Arcade. UP Nagar. Thiruvananthapuram . F: 2286711. Donvat Village. Crore) Project Reporter • 3 • January 1. Manager . Jharkhand and Madhya Pradesh.in. 14 Tanaji The company has announced the launch Karjat Maharashtra Malusare City of its Phase II of the affordable homes project in Karjat. 19 Orissa Mining Corporation (OMC) The company as part of the joint venture Orissa will take up coal mining in the Mandakini coal block-B in Talcher Coalfield. Land Tamil Nadu acquired.00 Kunjal Mehta.13 A K Singh. www.Parking ing. Project Officer.Finance. Chief Finance Officer.Sales & Market. 2394578. Land requirement is reduced to 2146 acres in place of 2400 acres as per the MOU. .. The phase-II work will start in January 2009 and is expected to complete by December 2009. Ashok Marg. The project is executed by Sterling Construction Systems Ltd (SCS).278053 / 055. 2393431.600028. including waste management. F: 2391629. . B Wing. Rupanpur and Jai Prakash Uttar Agency.p@silvexrealty. The company is offering 15. M: 9820284611.81 acres allotted so far. Bhubaneshwar-75001. 42 Systems B. Plot 42-A. com 24. [email protected]. 4th Floor. CBD Belapur (E). Orissa. info@ orissamining. The commercial operations of this hotel will start by December 2009. Pune . 4th Floor. Pen Iron & Steel Road. Kerala. . 130.Sales. 7945. Nav Chetna Housing Building. Kerala (KSITM) This project is currently in the ‘request for proposal’ stage. Navi Mumbai . T: 022-66601100. T: 020 . Haryana. The works will start. Maharashtra . 3C. CMPDIL is likely to take up detailed exploration work for the same. ICT Campus. Chennai . The Karjat site is spread over 100 acres and is master planned by the Australian firm.. 325 and 400 sq ft carpet area. detailed project report (DPR) and obtaining the required forest clearances.411 004. Mani Auluck. Prabhat Road.com. near Pune. Sector 11. jayaraj@keralamission. T: 044-24610066. who have been contracted to provide services such as turnkey project management. T: 0124-4708100.695033. R A Puram. transport and traffic design. Prabhat police Chowki. F: 2314284. info@uttamgalva. T: 022-67727100. Opp.Conceptual/Planning Stage Sno Organisation Project Title / Details Location Budget* Contacts Sector 13 Sabari Group The company plans construction of a Coimbatore of Hotels hotel in Coimbatore with 120 rooms.400034. 2396889. Block Multiplex A.Projects. Phase III. measures will be taken for preparation of the mining plan. OMC House. F: 25458663.com Mining *Figures are approximate (Rs. Sinclair Knight Mertz Consulting. 27. DLF Cyber City. 392245. Essar IT/Ites House.org 560.. Vellayambalam.org. 2009 Project Reporter.000 homes in the second phase of 160. T: 02192. Orissa 17 Kerala State KSITM plans to set up another data centre Thiruvanan thapuram at Thiruvananthapuram. Maharashtra. 239343.122002.00 IT/Ites N Jayaraj. M: 09447018629. T: 0674-2393495. once the RFP is finalized by March 2009.00 Mohan Mane. 2nd Main Road. Tendering process is not yet over. www. sales@pvrcinemas. Near Khopoli. F: 4708101. (Nitin Bhave. Housing Srinivasan P. 20 PVR Ltd Plans to develop 44 cinema screens in Punjab Punjab with an investment of around Rs 3 crore per screen and all will be ready by the mid of 2009. Mahalaxmi. www. T: 05222286709. F: 23236375.Power van. Sanjay Bhaty. Energy Infratech Pvt Ltd (EIPL) are the project Consultant & Project Manager.A. Plot No. Banjara Hills. EPC contracts are under finalization. P Sambasiva Rao. F: 23553462.in Port Port Power 1000. Essar House. Mangalore-575010. Andhra Pradesh . Road No. Panambur.Port ment Cell. Tekkali. 28 Ind-Barath Energy Utkal Limited (IBEUL) The company has proposed to build 700 Jharsuguda District mw (2x350) coal-based power plant at Orissa Sahajbahal in Jharsuguda district. 30 .181 crore for the power plant. The state Cabinet has decided to allot about 700 acre more to Vanpic in addition to 2000 acre already earmarked for the project. 2407341. Vice President. The construction work is likely to start in January 2009 and the project is scheduled to be commissioned by January 2011. The stage-I of the plant is expected to be commissioned in a period of 45 months from financial closure and stage-II is expected to be commissioned in 12 months thereafter. Project Director. Sr Manager (Commercial). Hyderabad .. Business Develop. Chairman) 24 New Mangalore Port Trust (NMPT) The port plan to undertake project to build Mangalore five new berths under the public private Karnataka participation (PPP) model. Port & Customs Building. Project Development Activities for stage 1 (2 * 660 mw) are progressing well. 270632. Mahalaxmi.00 Sudhir Shah. 2009 Project Reporter. Keshavrao Khadye Marg.com 4500. Raghunandapuram Street. Gujarat. Andhra Pradesh . Power *Figures are approximate (Rs. Sr. D. 244755. M: 9819730092 [email protected] M R Hedaoo. 270426.2. 96.Finance. F: 244899. GSPC Bha. The port is looking for a partner having a petroleum refinery and requiring SPM to handle between 9 and 12 million tonnes per annum (mtpa) of crude oil. www. Meenakshi Banjara ville.00 Jagan Mohan Rao. (A Janardhana Rao. The project will be executed in stages of about 1320 mw each. Plot No. 8-21 & 22. EIPL are project consultants and project managers. Karnataka.gujaratpetro. Gujarat. 25 East Coast Energy Pvt Ltd The company is setting up 2640 mw Bhavanapadu Coal Based Thermal Power Plant near Bhavanapadu.200 to 2. F: 270184 / 232040. F: 2408390 . Sr Manager.532201. Sector .Conceptual/Planning Stage Sno Organisation Project Title / Details Location Budget* Contacts Sector 22 Vanpic Ports The mandate to develop Vadarevu Pvt Ltd and Nizampatnam ports is given to the UAE based Ras Al Khaimah Investment Authority and Matrix Enport Holdings. Kandla Gujarat . 26 Gujarat State The corporation is planning to set up a Petroleum 200 mw wind farm project.Power porate Affairs. M: 09441200546. Hyderabad 500034. Chief Engineer. T: 02836-238055. The project financial closure is expected by February 2009. T: 040-23553460. F: 24928896. T: 079-23237576-78.00 Manish Kedia. IBEUL has also achieved a financial closure of Rs 1. 1000.40011100. Land acquisition is in process. Andhra Pradesh. Gandhinagar 382011. Gujarat The coal supply arrangements have been made. Mumbai 400034. The Vadarevu Port in Prakasam district and Nizampatnam Port in Guntur district will be connected through an industrial corridor. New Kandla (Kachchh) 370210. District. T: 022.500033. F: 23551749. M: 09825227039.400 mw. Satyasai Nagar.net 23 Kandla Port Trust The port plans to set up a single-point mooring (SPM) and allied facilities for handling crude under the public-private partnership development model in two years time. avnnaidu@ vanpic..eastcoastenergy. T: 040 66307666.com 3150. PRO.indd 4 29/12/2008 12:37:36 PM . Cor. Crore) Project Reporter • 4 • January 1. 66701001. Vanpic Ports Pvt Ltd is the spv formed to execute this project in March 2008.K. T: 08945-244944. T: 0824-2407493. AVN Naidu. Corporation Srikakulam District Andhra Pradesh Gujarat 27 Essar Power The company plans to double capacity of Jamnagar its upcoming power plant in the Jamnagar District district of Gujarat from 1..11. Director . Jubilee Hills. Srikakulam District. www.Statutory clearances are being obtained. Conceptual/Planning Stage Sno Organisation 29 DLF Homes Project Title / Details Location The company plans to undertake a super Kochi luxury commercial-cum-residential project Kerala on a prime location in Marine Drive. So far. Mundhwa. Off Andheri Kurla Road. P O: 57. Sector. Pump.. state-of-art multiplex. T: 011-40604400. The company also plans to provide broadband services in future. F-Block. Sushant lok. Girish. Sansad Marg. 680018. Shiv Sagar Estate. food courts. It will be a multiple Punjab specialty mall having spaces for branded retail outlets. Contacts 1) Sanjey Roy. T: 0124-4317700.12 Suraj Lal. 2009 Project Reporter. . Dr.C.Allahabad Zone. Mumbai . 6 . Near Appolo Hospital. M: 09312069104. MD.com 526. 39 UP Jal Nigam Received approvals for its Trans Varuna Sewerage Scheme project under JNNURM Scheme.Projects.2803909. Gold Souk.. [email protected] Planning.50 lac sq ft of area on Mall Road. 45 Museum Road.Sales & Shopping Marketing. (Baba Kalyani. T: 01142102030. F: 22353921 31 Karnataka rural development and panchayat raj ministry The ministry plans to take up road repair Karnataka and upgradation work coming under the zilla panchayat (ZPs) limits in the state by March 2009. Government of Tamil Nadu plans for a Chennai second desalination plant with a capacity Tamil Nadu of 100-million-litre-a-day plant for Chennai. [email protected] Warehouse 35 Tata Steel 38 Chennai Metropolitan Water Supply & Sewerage Board The company has plans to set up titanium Tuticorin dioxide project in Tamil Nadu. New Delhi. . Funding awaited.Corporate ComTelecom munications. Executive Engineer. F: 40190155. Construction to start by March 2009 and complete by January 2010. Panvel.com. budget hotels and gaming zone.1.indd 5 29/12/2008 12:37:36 PM . Kochi Kerala Budget* .net 100. T: 044-28451300. Pune Cantonment.2. Deputy Director.com Amritsar Punjab 34 YOU Mumbai based company is gearing for Multiple Telecom India net telephony services. The centre is likely to provide grant for this project to the tune of Rs 870 crore. Mumbai . New Delhi-110001. M: 09910005447. Worli. CMD) Turbines 37 Arshiya Company has received approvals from the Mumbai International Special Economic Zones (SEZs) Board Maharashtra Ltd to set up its Free Trade and Warehousing Zone (FTWZ) at Sai Village. Plot No.dlf.D N Marg. Mall Jasola. newbharathpitstop@vsnl. Around 300 District Tamil Nadu acre of land acquired at Sattankulam in Tuticorin district. Paresh Zaveri. Construction to start by February 2009 and will be operational within 36 months. Sansad Marg. Ambedkar Bidi. Manager .com 33 Splendour Group Plans to construct ‘Splendour Gold’ over 2. T: 022-42305500 . www.411 036. F: 28458181. Plot No 54. F: 2624499. Water Sector *Figures are approximate (Rs. T: 0484.sheriff@ youtelecom.net. A Wing. 22032754.vsnl.in 2) Lt Gen M.in. 2nd floor.Highways 560001. Chief Engineer . MS Roads/ Building. Allahabad. Manager-Corporate Communication. CCM. 2353339. .in Sector Real Estate 50. T: 01142102030. Pune .. Splendor Forum. T: 0532-2423283. 32 AGS Group Plans to construct ‘The Souk’ on 15 lac sq Amritsar ft of area on GT Road. F: 26822598. food courts.400059.. Dr. Sarita Iyer. Banerji Road.122002.43. T S Saggu. 3-screen multiplex. DLF Centre. Shopping Mall Block. Uttar Pradesh .in 309. Kochi. ravi@splendorgroup. F: 2577776. 3rd floor. T: 020-26702777. F: 25325527 Titanium Dioxide 36 Bharat Forge The companies plans to jointly set up a Mundra Ltd/Alstom manufacturing facility for a whole range of Gujarat supercritical turbines and generators with an annual capacity of 5000 mw in Mundra. 301 Ceejay House. New Delhi. Vice-President.00 Murli.55 Shridhar.arshiyainternational. www.G. T: 080-23370151. Head . AVP . Banerji Retailing Road Kacheripady. M: 09810216996.400018. Level 3. Phase. Jubilee building. . Tenders to be floated within a month.Water Sector ing Station Road.. Varanasi Uttar Pradesh 900. hotel etc. Chennai .226001. Crore) Project Reporter • 5 • January 1. Asst. Bangalore 560025.. cmwssb@ md2. Haryana . www. Makwana. M: 0941500398. T: 080-22032162. .I. they Pvt Ltd have not received government approvals for national telephony services.00 Ismail Sheriff.a tyre retail outlet by 2010. ismail. 2420677. Ravi Kumar.110001. Annie Besant Road. It will have retail shopping arcade. Director . siyer@ bharatforge. No. 30 New Bharath Kochi based company plans to set up Tyres New Bharath Pitstop .dlf. F: 40604444.00 Mohan Zackaria Mathews. Gurgaon. Ernakulam.600002. Bangalore. T: 02240190000. They have started with international only.3. Marol Co-op Industrial Area. 1 A. Crore) Project Reporter • 6 • January 1.D N Marg.Engineering. piling. P B No 979. Allahabad. [email protected]. Manapakkam. F: 044-2249 3317.com Alumina 44 Larsen and Bagged order from Utkal alumina for Rayagada Toubro (L&T) setting up a 1. Uttar Pradesh . com (E Sudhir Reddy. T: 0532-2423283. T: 04422526000.D N Marg.II) under Urban Infrastructure Development Scheme for Small and Medium Towns (UDISSMT) scheme. MD)” 46 Patel Engineering Ltd The company in consortium with BHEL and Navyuga has bagged Pranahita-Chevella Lift Irrigation-package 6 from the Andhra Pradesh Government. Bhilwara (Rajasthan) and 1 Aluminium Handling package at Lanjigarh. 22528000. F: 2624499.Conceptual/Planning Stage Sno Organisation Project Title / Details Location 40 UP Jal Nigam Plans to implement Water Drainage Varanasi Scheme of Varanasi District under Uttar JNNURM Scheme. F: 22480340. Director . Uttar Pradesh .Aluminium goe Lane.Bagged a turnkey contract from A P Cine structures & Workers Co-operative Housing Society Projects Ltd Ltd. T: 033-65500725-39. Allahabad.35 S Ramachandran. Jogeshwari (West) Mumbai Irrigation 400102. Man.00 “P K Chandra. Chennai – 600089.upjn.00 D Bhagat.Projects. F: 23345004. Allahabad. 244. Uttar Pradesh . Orissa. for the Navi construction of CIDCO Exhibition Centre Mumbai including civil. T: 0532-2423283. www. Chief Engineer . IVRCL Towers.5 mtpa greenfield alumina Orissa refinery at Rayagada. Road 10. 445. Hyderabad for a proposed group housing society at Khajaguda. P B No 979. F: 23345004. Chief Engineer . ramu@ivrinfra. 6 . 6 . CMD) 550.00 S Kanappan. Hyderabad 500034. Executive .226001. Sr. F: 2624499.indd 6 29/12/2008 12:37:36 PM . piping and commissioning assistance for the alumina refinery. M: 0941500398. 6 . 26782916. 15. Funding awaited. Banjara Hills. Tenders to be floated soon. 22528000. (Rupen Patel. F: 26782455. T: 04066613652. Director . T: 0532-2423283.upjn.Pradesh ceived all necessary approvals. tanks. 26767513) 47 IVRCL Infrastructures & Projects Ltd Bagged a contract from CIDCO. 2009 Project Reporter. Karimnagar District Andhra Pradesh Hyderabad Andhra Pradesh 114. structural and tanks for the alumina refinery. interior & site development Maharashtra works at Plot No. Company Secretary.226001. T: 04422526000. Contract Award (Sno.Business Housing Development & Corporate Strategy. MD) (Shobha Shetty. Funding awaited. 516. mbecal@mbecl. F: 2624499. Budget* Contacts Sector 191. M: 0941500398. CMD) *Figures are approximate (Rs.28 S Ramachandran. Mount Poonamallee Road. Patel Estate Canal/Dam/ Road.700001.in (S Srinivash Singh. IVRCL Towers.1 Suraj Lal.Engineering. 2420677. Executive .1 (Phase . Funding awaited. Tenders to be floated soon. F: 044-2249 3317. equipment erection. T: 022-26767661. The Pranahita Lift Irrigation scheme seeks to divert about 160 TMC water from river Pranahita to irrigate an area of 12. www. Project to complete within 24 months.upjn. Re. 2420677.Allahabad Zone. Kolkata . 3859.org Water Sector Varanasi Uttar Pradesh 86. 4th flr. 2420677. Mount Poonamallee Road. Manapakkam. Road 10.Finance. Maharashtra. 48 IVRCL Infra. 7th Floor. M: 0941500398.5 million tones per annum capacity Lead Rajasthan Zinc Beneficiation plant for Rampura Agucha Mines. com (E Sudhir Reddy. www.Allahabad Zone. 43 to 62) 43 Larsen and The company has bagged order from Lanjigarh Toubro (L&T) Vedanta Aluminium for setting up an Orissa alumina refinery at its 3 mtpa Lanjigarh plant in Orissa. Banjara Hills. Chennai – 600089. Design & Research Centres.20. T: 04066613652. ramu@ivrinfra. structure. Chief Engineer . 4th flr.000 acres in the drought prone areas of Telangana region.org Water Sector 41 UP Jal Nigam Plans to implement Varanasi Drinking Water Scheme Priority .Allahabad Zone. GM . The scope involves civil. Tenders to be floated within a month. Design & Research Centres.7 Suraj Lal. 19 & 30 in Sector 30A at Vashi. 486. Hyderabad 500034.co.Business Construction Development & Corporate Strategy. VP .D N Marg. [email protected] S Kanappan.com Alumina 45 McNally Bharat Engineering Company Ltd Bagged 2 orders from Vedanta Group for Bhilwara 1.org Water Sector 42 UP Jal Nigam Received approvals to implement Solid Varanasi Waste Management Scheme of Varanasi Uttar Pradesh District under Urban Infrastructure Development Scheme for Small and Medium Towns (UDISSMT) scheme. 22138905-08. The order comprises of civil.62 Suraj Lal. The work is expected to complete in 20 months. com (E Sudhir Reddy.com Bagged a contract from Bhushan Steel Angul Ltd for civil.Power junga Building. Hyderabad .D. erection.T: 011-23316801. www.com 55 Moser Baer The company has bagged the 420-mw Reoli Dugli hydro project with free power bid of 14. T: 0120-4607800. 979.Durgapur structures & tronics Industry Development Corporation West Projects Ltd Ltd to construct an IT Park. 2009 Project Reporter. vsramana@ lntecc. ramu@ivrinfra. CMD) Mundra Gujarat 120. Oil & Gas Kalpataru Synergy. Gujarat. New Delhi . Himachal Pradesh . AGM . Noida . Sidhi District Madhya Pradesh 12.26730291. Priti Setia.elecon. of Company Ltd Adani Group for design. 43-B Okhla Industrial Estate. 52 Elecon Bagged a prestigious order from Mundra Engineering Port and Special Economic Zone Ltd. F: 23318072. Vice President . Project is to commission by 2012. Associate Corp.4. . Anand Sojitra Road. Corporate Communications Manager..Projects. Offi cer . MD) 56 DCM Shriram The company has bagged the 90-mw Infrastructure Khoksar hydro project in Himachal Ltd Pradesh. Vinod Sharma.setia@ moserbaer.00 Vinit Shrivastav. T: 04066613652. 105. T: 011-40594444. T: 04040090400. 22528000.com (N Jindal.com 54 Lanco Kondapalli Power Pvt Ltd / Pembinaan Redzai Sdn Bhd (Malaysia) The consortium has got the mandate Vizhinjam from the Government of Kerala (GOK) for Kerala Development of International Deepwater Seaport and Container Transshipment Terminal at Vizhinjam. T: 022-30645000. Phase . T: 022. Madhapur. Veera Desai Road. The civil works have started and expected to complete by December 2009. structures & Project Implementation Agency for provid. Joint G M . Road 10. 11. Software Units Layout. Phase III. T: 044.Project Dept. Director . Andheri Industrial Estate. equipment erection Orissa and piping works for its phase . 240. Mumbai . Corporate CommuniMaterial cations Manager.Zangas Consortium has recently Dadri bagged a contract for Section B of the Gujarat 48” dia Vijaypur-Dadri High Pressure Gas Pipeline project. 101. akawasthi@dscl. 70. 51 IVRCL Infra. LANCO House.110001. Tamil Nadu. 227113.Contract Award Sno Organisation Project Title / Details Location Budget* Contacts Sector Puducherry 49 IVRCL Infra. Director . Opp. Banjara Hills. Mundra. com (E Sudhir Reddy. Mount Poonamallee Rd. .com. (Jagdish Kumar Gupta. com 53 Kalpataru Power Transmission Ltd / Zangas Consortium KTPL .Bagged an order from West Bengal Elec.I Bengal (Incubation centre) at Durgapur. F: 236457. F: 23345004.00 Ajay Munot. A K Awasthi.. Santacruz (East). F: 23116127.00 Paresh M Vyas. Mumbai .) Himachal Pradesh .III expansion at Angul.22526552. 30643120. International Home Décor Park. New Delhi . T: 04066613652. M. narasimhan@ lancogroup.62 Housing S Ramachandran.(U. Crore) Project Reporter • 7 • January 1. ramu@ivrinfra. 5th Floor. Andheri (West).388120..500081. testing and commissioning of Material Handling System for West Port. F: 4607832. Executive Director.2 per cent.elcon.Business Development & Corporate Strategy. Power Sukhbir Singh. MD) Power Power *Figures are approximate (Rs. 4th flr. Kanchen. Express Highway. CEO.CommuIron & Steel nications. A Narashiman. Sr.in (Deepak Puri. 4th flr.201301. Banjara Hills. ext: 338. Hyderabad 500034. CMD) 50 Larsen & Toubro 401. 57 Jindal Steel and Power Ltd Company has received an order from 58 J Kumar Infraprojects Essar Constructions (India) Ltd for Piling Works of the 2x600 mw Power Project at Ltd Mahan in Sighi District. 16-A. Sector 127. The scope of work includes setting up a steel melt shop and coke oven plant.) Projects Ltd ing EPC services on turnkey basis for constructing a new housing system at Kalapt site for tsunami affected people at Puducherry. F: 26730814.600089. structural. 18 Barakhamba Road. HITEC City.T. F: 23345004. Plot No. T: System 02692-237016/17. M: 09811898075.. Grand Hyatt. Hyderabad 500034. Chennai . Road 10. [email protected] rate Affairs. F: 30643131. Comm. Plot 7.400055.110020. ajaymunot@kalpataru. IVRCL Towers.00 V S Ramanna.com The company has bagged 40-mw Lara Himachal hydro project in Himachal Pradesh with a Pradesh free power bid of 16. sukhbirsingh@jindalsteel. IVRCL Towers.Bagged order from Govt of Puducherry.indd 7 29/12/2008 12:37:36 PM .4 per cent.Business IT Park Development & Corporate Strategy. supply.Corpo.01 S Ramachandran. priti. 4607803. Handling Vallabh Vidyanagar . 122002. Pune) . 65 To 75) 65 Gammon Indira Container Terminal Pvt. 13. Mumbai Maharashtra Varanasi 67 Jhunjhunwala Company has recently commissioned a Vanaspati Ltd refinery unit having a capacity of 400 met. SPV Mumbai 1015. Joint Venture (Sno.400025. (B Malla Reddy.indd 8 29/12/2008 12:37:37 PM . Oshiwara.Contract Award Sno Organisation Project Title / Details Location Budget* Contacts Sector 59 C&C The company in JV with BSCPL InfraBihar Constructions structure Ltd has received an order for Ltd a Dedicated Freight Corridor from New Kardwadiya to New Ganj Khwaja in Bihar. Begumpet. F: 4536799. [email protected] 60 ORG Informatics Ltd 78. installation and commissioning of remote unmanned automatic weather stations in 500 locations across the country by May 2009. 63 to 64) 63 Steel Authority of India Ltd (SAIL) Formed a JV company M/s Steel Complex Thiruvanan Ltd with Government of Kerala to set up a thapuram rolling mill having a capacity of 65. 781. T: 040. F: 24367015 Iron & Steel Bagged order from Bharat Sanchar Nigam New Delhi Ltd.Delhi tegration and commissioning of SATCOMN/M Equipment for Indian Air Force.Uttar ric tones per day at Varanasi (which was Pradesh installed and commissioned by Alfa Laval (India) Ltd. 24367481-6.March 2009. jhoola@satyam. BDO. The power generated will meet IOCL Paradip refinery and petrochemicals complex power requirements. Nati Imli.. Haryana Highways .06 Nitin Tyagi. Manager – Project. Crore) Project Reporter • 8 • January 1. Mumbai which consists of 2 screens and 634 seats. mra@candcinfrastructure. 70. T: 0124-4109700. T: 0542-2595930. Andheri (West). net. Haryana. tarandeep.. 301. F: 66403655..com. Hitech City. 66 Fame India Ltd Fame India has commenced operations at its Fame Ghatkopar.00 . Mumbai 400053. Plot Roads/ No. The project is 66614025. Carnac Bunder. 34 Sant Tukaram Rd. CII Green Building.Corporate Communications. Ltd.in. www. MD & CEO) 61 Maytas Infra The company in JV with L&T and Kirlos. Varanasi. Gurgaon. F: achieved financial closure.400009. F: 4109750. installation. 2nd Floor. T: 011-22467360.122001. T: 022-66614000. Citi Mall.00 Praveen Dhole. in.com Water Sector 62 Astra Hyderabad-based company received an Nationwide Microwave order from Antrix Corporation Ltd. 23312160. F: 2210480. Astra Towers. Survey No:12 (Part). T: 040-23408100 / 40037800. 6-3-1186/5/A. (Ajoy Khandheria. Multiplex Tarandeep Singh. Andheri Link Road. Andhra Pradesh. F: 66658626.Veer Savarkar Marg.com. 64 Tata Power Joint venture agreement signed with IOCL Orissa Company Ltd for establishing a coal-based power plant / IOCL in Orissa. Lodi Road.30618000. T: 0124-4536666.000 tpa Kerala to produce TMT bars.80 M V Reddy.62 Anil Uttarwar.Hyderabad Ltd kar Bros has bagged Godavari Drinking Andhra Water Supply Scheme from Hyderabad Pradesh Metropolitan Water Supply and Sewerage Board. Terminal Projects Ltd Offshore Container Terminal Project has Mumbai . The work entails transmission of 735 Mld treated Godavari water from Clear Water Reservoir at Kondpak to Master Balancing Reservoirs at Ghanpur.Projects.Oil & Gas hunwala Bhavan. The construction is to start by Feb . Amogh Plaza. Uttar Pradesh . Alok Agarwal.com Project Update/Commissioned Project ([email protected]. info@orgltd. Gurgaon . MD) Weather Stations Ispat Bhawan. The civil works are likely to start by Jan . Corporate Center Block A. Shalini Singh .00 M R Arora.221001. Asst Manager. including a 3-year construction period. 2009 Project Reporter. (D N Jhunjhunwala. 3rd Flr. Jhunj. 50. CMD)  page 13 *Figures are approximate (Rs. www. a comProducts Ltd mercial arm of department of space. Sr. Prabhadevi. 2211313. Hyderabad.maytasinfra.. GM Marketing. T: 022-67171936. Kondapur Hyderabad-500038. This work is of 105 kms on the MughalSone section of the Eastern Corridor and is to complete within 36 months. Telecom Sushant Lok-1. F: 23401107. Mumbai . Manager .com undertaken on BOT basis for a period of 30 years. PR Executive. F: 23378944. Opp.Power tions Manager. The contract envisages supply. New Delhi for supply. New Delhi-110003. shalinis@tatapower. The project works are likely to start in 2nd or 3rd week of January 2009. Delhi. 809.in . Gammon Container Infrastructure incorporated for developing the Mumbai Maharashtra House.Corporate Communica. T: 022-66403636.jhoola. Mgr .co. Orchid Square.Feb 2009. Sector 32. WiMax and to be launched 3G services are likely to add momentum to the existing growth rate.Focus: Telecom Sector Connecting Geographies Telecom is the fastest growing sector in India. most Indians today have telephone on demand. emerging as one of the fastest growing telecom markets in the world. becoming the second largest telecommunication network in the world after China. On June 18. and the government has plans to raise the tele-density to 40-45 per cent by 2010. and investors. thereby offering greater growth opportunities for service providers to exploit the large untapped potential. India reached the target of having 300 million telephone subscribers. 2009 . BACKGROUNDER The country with a huge population of more than 1.89 per cent in June 2008. Rural Telephony has the potential to drive the Project Repor ter • 9 • Januar y 1. Wireless telephony is growing at a CAGR of about 100 per cent. India’s overall tele-density stood at 26. India is adding around 8.5 million to 10 million new mobile subscribers to the network each month. equipment suppliers. The telecom sector is the most liberalized of all in India and offers huge opportunities to the telecom operators. The growth of cellular mobile services is leading the telecom revolution in India. 2008. The number of phones trebled during 2003-2007. From waiting for years to get a telephone connection.1 billion offers immense growth potential for the telecom sector. India is expected to become the second largest telecom market in the world by 2010. Gross revenues for the sector have All India Project Repor ter • 10 • Januar y 1. such as shared wireless infrastructure. wireline subscriber base was 39. GSM companies added over 6. 2007. 6. By fiscal 2010. with a majority of the new users being from rural areas.46 per cent. Indian mobile operators are adding over 8 million subscribers a month. the cumulative revenues of cellular. 2009 . Mobile phones accounted for 80.9 Million on March 31. 1. had risen to a humongous US$ 30. The number of mobile subscribers in India has gone up to around 280 million. In order to increase the penetration of telecom services in rural and remote areas and to accelerate growth in mobile service acceptability. as revealed in a Voice & Data survey. The Indian telecom market had generated revenues around US$ 20 billion in 2006-07. 3 BSNL 39811109 16.888 billion registering a growth of 21. Government owned BSNL share is to the tune of 16.2 per cent of the total telephone subscriber base at the end of March 2007.18% PRIVATE SECTOR PERFORMANCE 2 Vodafone Essar 56703506 23.47 per cent. (excluding the GSM subscriber base of Reliance Telecom) crossing the 212 million mark.75 per cent respectively. Telecom access to rural areas is going to be a crucial development in India.06 per cent.88 per cent.Focus: Telecom Sector grown at a compound annual rate of about 21 per cent and stands at 26 billion US$ in 2007. 3.96% 7 Spice 3637129 1.50% 8 MTNL 3743879 1. Aircel.18 per cent market share. Spice. GROUP COMPANY WISE % MARKET SHARE .46% The share of private sector in total telephone connections has steadily increased to 72. GSM PLAYERS As per Cellular Statistics for October 2008 released by Cellular Operators Association of India. The Internet subscriber base in the country. as on March 31. The private sector companies grew at a rate of 66 per cent in 2007 as against public sector companies that grew at 16. NEW SUBSCRIBER BASE growth in the years to come. The private sector is mainly active in the wireless segment while wireline accounts for only about 2 per cent.8 per cent. The share of mobile phones had increased from 71.40 per cent in December 2007 from 20. The sector’s share is about 3 per cent of the national GDP. followed by Vodafone Essar sharing 23.9 per cent in 2003. fixed line.47% 4 IDEA 31582937 13. international long distance.07 per cent.07% 5 Aircel 14659298 6.55% 9 BPL 1807902 0.68 per cent at the end of May 2008.3 Million as compared to 6. national long distance.69 per cent at the end of March 2006 to 87.07 per cent over May 2008.3 per cent. No. 2006 registering a growth of 34. broadband.OCTOBER 2008 Sl.3 million new customers in June 2008.06% 6 Reliance Telecom 9582695 3. In July 2008. according to the Cellular Operators’ Association of India (COAI). Reliance Telecom. stood at 9. the Indian government has been taking necessary initiatives. Indian will require around 330.92 million. To meet this enormous need. Bharti Airtel leads the board with 33. radio trunking and VSAT services. the telecom operators are resorting to network infrastructure sharing. FACTS AND FIGURES • • • • The total telecom subscription in India surged at a CAGR of over 38 per cent from fiscal 2003 to fiscal 2007. followed by IDEA.000 telecom network towers. While the total mobile subscriber base was 277.05 million. Name of Company Total Subscribers % Market Share 1 Bharti Airtel 80199747 33. 1. MTNL and BPL at 13.55 per cent and 0.50 per cent.96 per cent.00% TELECOM TARIFF & REVENUES The local call tariff from mobile calls has seen steady decline from Rs 16 per minute in the year 1999 to Re 1 per minute in 2007. making the country the third largest telecom market in the world. with a growth of 3.75% 241728202 100. Ericsson. Ericsson. LG. Mobile phone pro-duction is estimated to grow at a CAGR of 28. TELECOM EQUIPMENT MANUFACTURING India’s telecom equi-pment manufacturing sec-tor is set to become one of the largest globally by 2010. Establishment of an independent regulator .the Telecom Regulatory Authority of India (TRAI) . Introduction of Mobile Number Portability in a phased manner. FDI ceiling in telecom services has been raised to 74 per cent. Motorola.Focus: Telecom Sector ATTRACTING FOREIGN INVESTMENT The world’s telecom giants such as Nokia. as against 125. Introduction of a Unified access licensing regime for telecom services on a pan-India basis.5 billion between 2008-2010.000 in 2007. Flextronics Elcoteq Cel-estica. with the entry of new licence holders and their launching of new services. Allowing service providers to share active infrastructure. Global telecom service providers like Vodafone. Alcatel. The telecom industry saw an estimated US$ 8.5 billion in investment flow in during 2006-07 alone. Domestic manufacturers have little contribution in the seg-ment.09. who have set up manufactu-ring bases in India. Salcomp. Telecom Regulatory Authority of India (TRAI) estimates that the country will need about 350. Implementation of New Telecom Policy (NTP’99).for the telecom sector.6 billion. Opening the industry for private sector participation. The industry is expected to receive an investment of a whopping US$ 32. Cisco. India’s surging domestic market is also providing excellent investment opportunities in other segments of telecom equipment industry. totalling 107 million hand-sets by 2010. Project Repor ter • 11 • Januar y 1. Siemens.6 per cent from 2006 to 2011. AT&T. Other foreign majors that have set up manu-facturing bases in India include Foxconn.000 telecom towers by 2010. The government aims under the Bharat Nirman program. GOVERNMENT INITIATIVES The Government has taken many proactive initiatives to facilitate the rapid growth of the Indian telecom industry. Revenues are estimated to grow at a compound annual growth rate (CAGR) of 26. Samsung and Alcatel-Lucent. Singapore Telecom and Siemens are making a dent in the Indian market. of which US$ 550 million was in the form of foreign direct investment. Perlos and Solectron. 100 per cent foreign direct investment (FDI) is permitted in telecom equipment manufacturing through the automatic route. Presently the telecom hardware manuf-acturing sector is dominated by international majors like Nokia. Motorola. Introduction of Calling Party Pay (CPP) regime and lowering of access deficit coupled with introduction of revenue sharing regime. Elextronics Aspocomp. Samsung and LG have established their presence in the telecom handset market in India. Concurrently.3 per cent from 2006 to 2011. starting in the fourth quarter of 2008 . touching US$ 13. 2009 . VALUE ADDED SERVICES MARKET According to a study by Stanford University and consulting firm BDA.7 per cent of total subscribers in Asia-Pacific and 35.7 per cent of revenues from the region.6 billion by 2011. while addressing the India Telecom 2008 in New Delhi recently has expressed his optimism about the In Store ● ● ● Mobile Number Portability 3G and the Broadband Wireless Access Mobile Virtual Network Operators (MVNOs) upcoming launch of 3G and Broadband Wireless Access (BWA). accounting for 46. Echoing similar sentiments.7 per cent from 19. India’s share in Asia-Pacific (excluding Japan) data revenue is estimated to almost double from about 6 per cent in 2007 to 11. and data services will be the major factor behind the growth. with mobile penetration fairly high even in rural India.. FUTURE PROJECTIONS According to a report by Gartner Inc. mobile broadband through 3G & BWA is expected to deliver a much needed internet access to rural India as well.P Focus: Telecom Sector to connect all the rema-ining villages without tele-phone services. Some positive steps in this direction are expected soon. basically village public telephones (VPTs). According to global technology research firm Gartner.74 billion by 2010. 3G and BWA will offer the convenience of mobility with the rich multimedia content of the internet. in 2007. stood at around US$ 80 million and it is likely to touch US$ 450 million by 2012.5 percent by 2011. Cellular market penetration will rise to 60. According to an analyst firm Springboard Research. India had only 3. India’s mobile subscriber base is projected to exceed 737 million connections by 2012 growing at a CAGR of 21 per cent and India is likely to remain the world’s second largest wireless market after China in terms of mobile connections. that hereafter 3G will become the predominant platform to build and deliver upon India’s broadband objectives. The telecom industry has urged the government to bri-ng out a comprehensive con-vergence policy to deal with changing technology. However. India is expected to lead Asian countries in terms of mobile gaming revenues. research firm Gartner estimates data services to account for 22 per cent of the total revenues by 2010 from 12 per cent in 2007. the Indian mobile value-added services (MVAS) is poised to touch US$ 2.8 per cent in 2007. Project Repor ter • 12 • Januar y 1. Dr Manmohan Singh.8 million WiMAX subscribers by 2012. The gove-rnment will invest US$ 2 billion to set up 1.4 million broadband subscribers in January 2008. 2009 . the value-added services market in India is expected to grow to about US$ 5. However. which was much lesser than the government’s target of 9 million. He is of the view.12 lakh commu-nity service centres in rural India to provide broadband connectivity in 2008-09. Prime Minister of India. India will become the leading market for WiMAX in the Asia pacific region and is expected to have 15. The overall cellular services revenue in India is projected to grow at a CAGR of 18 per cent from 2008-2012 to exceed US$ 37 billion. For urban India. The mobile gaming revenues in India. and enable content on mobile dev-ices. Khairatabad. Officer on Special Duty (OSD). Amogh Plaza. T: 044-24310171. Chief Engineer .com. T: 080-22070100.560025. Highways Museum Road. F: 23499101. 7-A. M: 09980137242.000 tpa by April-May 2009.com 74 Maytas Infra The company has recently inaugurated Ltd Padalur .in Tamil Nadu 190. T: 020-26052378.00 N K Kumar. 39839415.Corporate Communications.raman@gmrgroup. Pune . Ministry of Environment and Forests has accorded environmental clearance recently for this project. the project is programmed for completion in the financial year 2014-2015. 39839415. 500. 3100. This project is expected to commission in 39 months. Padalur . Regional Manager. Engineer Projects. Chennai .Samayapuram Four lane road on NH 45. Begumpet. ce_civil_thermal@apgenco. M: 9422315919. Chief Engineer . F: 23499101.Chandigarh Punjab Ltd Highway project of 35 km stretch on NH21 and NH22. Power 443. co. Tamil Nadu.500082. The project funding will be done by both the State and the Central Government contributing 40 per cent each and the balance to be met from a loan granted by the Japan International Cooperation Agency (JICA). G M . K Ratna Babu. 39839000.in 72 BGR Energy The company got the mandate from TNEB Tamil Nadu Systems Ltd to set up 600 mw Mettur Thermal Power Project in Tamil Nadu. F: 24360576. 75 Chennai Metro Rail Ltd Krishnapatnam Andhra Pradesh Chennai Chennai Metro Rail project will have Tamil Nadu two corridors with a length of around 45 km partly underground and elevated.00 Navin Karthik. Gera Gardens Building 2. F: 24312320.411003.00 Rohini Raman.500082.Maharashtra pylene compound at Jejuri. P V Raju. No. ce_civil_thermal@apgenco. Koregaon Park. 208. ce_civil_thermal@apgenco. MD) 69 Andhra Pradesh Generation Corporation Ltd (APGenco) The company is executing 2x800 mw Sri Damodaram Sanjeeviah Thermal Power Station at Krishnapatnam. . 39839415. Karnataka .com. T: 044-24326171. The works are underway and the commissioning is expected shortly. Vidyutsoudha. Vidyutsoudha. rohini. Bangalore. chennaimetrorail@gmail. The balance funds will be provided by Power Finance Corporation. Chennai . Vidyutsoudha. Hyderabad . Tamil Nadu. 14600.Corporate Roads/ Communications. The financial closure would be achieved in couple of months as the company has recently signed up for a Rs 1. Power 2150. Chief Engineer ...gov.00 K Ratna Babu. T: 040-23499000. PFC/REC are the project financiers. F: 23401107.Skip House. Unit No. 73 GMR The company has recently completed and Chandigarh Infrastructure inaugurated the Ambala .Samayapuram segment has been upgraded with divided carriageway along with strengthening of the existing carriageway. 25/1. 3rd Flr.Thermal. Pune. rglmgrpune@hssil. The company has placed equipment orders to BHEL. Alwarpet.00 K Ratna Babu.500082. Tendering process is on and the contract will be awarded by February 2009. F: 23499101. Hyderabad. Crore) Project Reporter • 13 • January 1.TherPower mal.700 crore loan from KFW of Germany.600018. Anna Salai. www. Hyderabad . T: 040-23499000.TherPower mal.maytasinfra.gov. 11/6. T: 040-23408100 / 40037800. Hyderabad .gov. .Project Update/Commissioned Project  page 8 Sno Organisation Project Title / Details Location Budget* Contacts Sector 68 Hydro S&S The company has recently commissioned Pune Industries Ltd a new manufacturing facility for Polypro. Mgr .indd Sec1:13 29/12/2008 12:37:37 PM . Teynampet.500016. Krishnapatnam Andhra Pradesh 2050. JICA has since agreed to finance the project and the loan agreement between the Government of India and the Government of Japan was signed on 21-11-2008 at Tokyo.in 71 Andhra Pradesh Generation Corporation Ltd (APGenco) The company is planning Stage-II of Kakatiya thermal power project with a capacity of 600 mw. Tentatively.00 Anil Uttarwar. 6-3-1186/5/A.600018. Polypropylene Roads/ Highways Transport *Figures are approximate (Rs. (Narayan Sethuramon. Khairatabad. The capacity will be 6000 tpa and there are plans to enhance this capacity to 10. Khairatabad. T: 040-23499000. Seethammal Road. 39839000. 2009 Project Reporter. 39839000.in 70 Andhra Pradesh Generation Corporation Ltd Andhra The company is implementing Kakatiya Pradesh thermal project stage-I of 500 mw. The company has tied up credit line with five banks to meet the working capital requirements. PRO. jayaraj@keralamission. Project Manager.411 004.org 12412.000 tonnes of beans by February 2009. T: 020 . K. Mumbai . Ahmedabad.6 mmtpa to 15 Karnataka mmtpa to get the maximum value from the hydrocarbon molecule. jdrugs@vsnl. Thiruvananthapuram . Mangalore . Corrosives Chennai . Managing Director) *Figures are approximate (Rs.25450378 / 25458662. www. harpreet.600001. DB Realty: Shirley Dsilva.klausmultiparking. Vellayambalam.Hospitality mix House.Parking Systems ing. 77 Freshthrop Fruits Ltd (FFL) The company is setting up a food-proNashik cessing unit spread over 11. F: 2314284. dsilva@dbg. Thiruvanan thapuram Kerala 82 Mangalore Refinery & Petrochemicals Ltd (MRPL) The company is expanding its refining ca. anil@freshtrop. Architects: R K Associates. SCO-1. 83 Klaus multiparking Systems Pvt Ltd The company is setting up mechanised parking in Mantri Mall area. (Uttam Kumar Basu. Opp. (Nitin Bhave. T: 079 .Project Under Implementation Stage Sno Organisation Project Title / Details Location 76 Carborundum The company is setting up a modern Ranipet Universal Ltd anti-corrosives manufacturing facility near Tamil Nadu Ranipet.26. Manager . 1st Floor. Plot No. T: 022-28454499.2270400. Manager . Behare Arcade. Moore Street. auluckmani@gmail. The capacity of this unit will be 200 tonnes of Pomegranate juice concentrate a day. 3C.5 acre near Maharashtra Nashik.. 78 Jindal Drugs The company plans to manufacture cocoa Jammu & powder and cocoa fat at its Jammu plant. Opp Karnavati Club. B & C. Kashmir The plant is in trial run mode currently and aims to process 12. www. 380051. Dona Paula Goa 79 Global Hyatt Corporation/ DB Hospitality The companies are jointly constructing a second Hyatt hotel in Goa with 320 rooms. F: 22020690.Mangalore pacity in Phase III. GM (Finance). The site grading works have started.411 004. Mall to be operational by August 2009. T: 0172-5025301-3. Karnataka. Moodapadav..June 2009.66527060.Parking Systems ing. IT/Ites ICT Campus.org. F: 25458663. Engineers India Ltd are appointed as the project management consultants. Prabhat Road. 2725646.klausmultiparking. Sector . Madhya Marg. Crore) Project Reporter • 14 • January 1.575030.000-15. 28402304. The unit is expected to start operation shortly in January 2009. The project will complete by February 2009. Parry AntiHouse. Plot No. Maharashtra. Marketing Executive. Opp.indd Sec1:14 29/12/2008 12:37:37 PM . www. which would have Maharashtra the first fully automatic parking system. Bangalore which will have parking space for 1. T: 020 .com. Kuthethur P O Via Katipalla. M: 09447018629. Bangalore Karnataka Budget* .in . General A..400 cars. 80 Parsvnath Developers Ltd Constructing ‘Mall Matrix’ on 3 lac sq ft in Mohali Sector 74. This will be done by August 2009. Behare Arcade. 66527061. from 9.cumi-murugappa. Prabhat Road. Pune .Project ConOil & Gas struction. 6th Floor. “Harpreet Singh. Nariman Point Products Mumbai . Yashodham.. Road.co.00 Hospitality N Jayaraj. Dyna.com (M M Murugappan. 2726881. branded retail outlets and MovieTime 3-screen multiplex. GM .in. sushilchandra@mrplindia. T: 471-2314307. www. T&F: 28402322. The project will complete in March 2009. Kerala. Project to complete by October 2011. MD) . 43. F: 2535817. Bakhta. shirley. Prabhat police Chowki.com. F: 66527069. jindaldrugs. www. 3C. F: 2270382. S. 42 B. (Nitin Bhave. 6th Floor.Sales & Market. Maharashtra. Pankaj Rawal. 2009 Project Reporter.com. G.00 Sushil Chandra.00 Contacts Sector Vellappan.net. 603 A. 100 tonnes each of mango and guava. The commercial production is likely to start by May . Shapath IV.400063. M: 09876588812. Goregaon (East)..com” 60. Mani Auluck.695033.. Chairman) Anil Agarwal. Project Manager. Pune . 81 Kerala State KSITM is expanding the facilities of the IT Mission existing state data centre in Thiruvana(KSITM) nthapuram.singh@parsvnath. The commercial operations are likely to start by December 2010.com . T: 044-25306789. 25.Sales & Market. Delhi. 84 Klaus Multiparking Systems India The company is executing a project at the Mumbai Bandra Kurla complex. Prabhat police Chowki.Food war Vi. F: 25458663.in. keralaitmission. auluckmani@gmail. Vaidya Marg. Managing Director) . 42 B.400021.25450378 / 25458662. T: 022-22871633. Mani Auluck. Manager E Governance. Chandigarh. M: 9870688350. Project comprises of a shopPunjab ping mall having a 150 luxurious room ITC hotel. T: 0824.com Food Processing . 1st floor. Project comPunjab Ltd prises will offer anchor stores. Poorvi Marg.O. Udupi district.. 2009 Project Reporter. F: 40604444.in Shopping Mall Jalandhar Constructing ‘Splendour Shagun’ on Punjab Ladowali Road.5 lac sq ft. T & F: 0820-2599603.. Dhirubhai Ambani Knowledge City. J Singh. Near Appolo Hospital. Poorvi Marg.110049. E . www. Nandikuru Power P.in” Shopping Mall 90 Ansal Plaza Mall Managemnet Co.3. The contractor for this stretch is yet to be engaged. 87 National Highways Authority of India (NHAI) The work on Ganjam-Ichhapur stretch is on. Budget* Contacts Sector Power 1000.spiritglobal. J Singh. M: 09717500299.00 Venkatesh Somayaji. 2010. (Ansal API) Amritsar Constructing ‘Ansal Plaza’ on Airport Road covering an area of 2 lac sq ft. Assistant Manager . B-301.Shopping rate Affairs. Project to complete by May 2009. venkatesh. extn: 2615. H Block. www. T: 011-26255532.00 S S Gaharwar. Architects: Gautam & Gautam Associates. Sector .30386010.indd Sec1:15 29/12/2008 12:37:37 PM .50 lac sq ft. New Delhi . E .Marketing. Prodipta Sen.. Karnataka . New Delhi. F: 26250957. food courts. The work is on.5 & 6. “Nikhil Bhardwaj. New Delhi . F: 26250957. (Ansal API) Constructing ‘Boulevard’ on Mall Road covering 0. Asst Manager . business centre and car parking space.alphagcorp. T: 011-40604400. T: 011-26255532. Location Silvassa Dadra and Nagar Haveli (U. branded retail outlets and entertainment zone. anchor stores. Malaysia. Assistant Manager .Punjab ect comprises of a shopping complex of G+10 floors having a 3-screen multiplex. Andrews Ganj New Delhi . Asst.400710.com . but is delayed for another six months on account of mishaps along the stretch. T: 01125074100. Project to complete by Dec. Project Manager. . Architects: SAA. ssgaharwar@ nhai. *Figures are approximate (Rs.T. Splendor Forum. .110075.co. 46220099.23.110049.Sales & Marketing.org Roads/ Highways 89 Ansal Plaza Mall Managemnet Co. food & entertainment area. gym. Project comprises of a G+4 storey structure having branded retail outlets and food courts.org Roads/ Highways 88 National Highways Authority of India (NHAI) Plans to construct the Sunakhala-Ganjam Orissa stretch in Orissa as part of Golden Quadrilateral project involving four laning of the National Highway (NH)-5. ..10th Floor. extn: 2615.Marketing & Corpo. 46220099. 5 star deluxe hotel. ravi@splendorgroup. Navi Mumbai . 26250957.net . The Ltd (UPCL) New Mangalore Port is constructing a dedicated berth for UPCL to handle 3 million tonne coal per annum for the project. V P . Mall 24 Barakhamba Road. Vasant Vihar. General Manager Orissa Projects. Via Pudubiri. restaurants.Marketing. Shopping Ravi Kumar. Crore) Project Reporter • 15 • January 1.110075. spaces for branded retail outlets and car parking area for more than 1200 vehicles. T: 01125074100.76 S S Gaharwar. 176.) Padubidri 86 Udupi Power The company is building a 1. . Dwarka. Andrews Ganj New Delhi . Manager . Project to complete by December 2010.5 & 6.somayaji@ relianceada. T: 011-46220000. Orissa 242. Construction to complete by February 2009. business centre and car parking space.110057.110057. ssgaharwar@ nhai. Project comprises Ltd of a 125 room budget hotel and will offer amenities like anchor stores. nikhil@apmmc. delhi. restaurants. New Delhi . F: 23731281. B-301. New Delhi .Project Under Implementation Stage Sno Organisation 85 Global Wind Energy (ADAG Group) Project Title / Details The subsidiary company of ADAG is coming up with a greenfield project for manufacturing wind energy components at Silvassa. Sudarshan.spiritglobal. T: 011-46220000. General Manager Orissa Projects. Ashoka Estate. New Delhi .10. T: 011-43561111. www.10. Ansal Plaza Khel Gaon Marg.. G.110001. Plot No. Ansal Plaza Khel Gaon Marg. Construction to complete by August 2009. gym.574138.Marketing. Proj.000-Mw Karnataka Corporation thermal power plant at Padubidri. “Nikhil Bhardwaj. T: 022.Marketing.. F: 30376633..23. G.. The project is part of Golden Quadrilateral project involving four laning of the National Highway (NH)-5.com 93 Splendour Group Ludhiana Punjab Amritsar 94 Alpha G Corp Constructing ‘AlphaOne’ over 25 acres on GT Road. Project to complete by February 2009. Dwarka. 26250957. hypermarket. . Project comprises of a G+3 Punjab floors shopping cum entertainment zone having hypermarket. Media Head. Shopping Mall Hoshiarpur 91 Spirit Global Constructing ‘Global Mall’ on HoshiarPunjab Constructions pur-Chandigarh highway over a built up area of 5. M: 09910005447. banquet hall.4 acres of land. M: 09324382480. Project comprises a G+5 storey block having spaces for high-end retail stores. Mall Jasola. Sector .in Shopping Mall 92 Spirit Global Constructing ‘Global Mall’ on Ferozepur Ludhiana Constructions Road over 5. Asst Manager . banquet hall. Vasant Vihar. T: 044-22326612.. Door No. Cutomer Care Executive. Worli.Project Under Implementation Stage Sno Organisation Project Title / Details Location Budget* Contacts Sector 95 TDI Constructing ‘TDI Mall’ in Sector 17. sanjeevsharma@ omaxe.Chennai hoomi. 550. sales@ collageindia. www. 66670200. Chennai 600041. car parking area.600032. etc. etc. business centre. Benetton’s. Project to be ready by March 2009. Som Datt Builders House.com. New Delhi . Chicago.. Architects: HOK. Chandigarh Infrastructure Project comprises of a shopping cum Punjab Ltd entertainment complex having spaces for branded retail outlets. atrium. Project comprises of a Punjab Lower ground + G + 3 storey block providing spaces for Multiplex.110001.Vi. M: 09811432830.com 99 Omaxe Limited Constructing ‘Omaxe Plaza’ on 1.indd Sec1:16 29/12/2008 12:37:37 PM . New Delhi . Kasturba Gandhi Marg. 42166600 / 66. Paramount Fashion. the integrated township with SEZs Tamil Nadu focussing on engineering and multi-services sectors. 101 Marg Ltd The company is setting up Marg Swarnab.000 residential units and supporting social infrastructure. amusemnet facility. Project Punjab comprises a G+5 floors block having a 3 screen multiplex. Amit Garg. MD & CEO) Eshwar. 9364272722.Marketing. F: 23324555.info *Figures are approximate (Rs. 9. F: 41896653. As of now. They are covering Mizoram.Sales & Leasing. T: 011-23731666 / 177. AGM . .info. . M: 09871890430. Kottaivakkam. Corporate offices and entertainment zone. Asst. Manager . Omaxe House. T: 011-46066333.. T: 022-66670311. Vishal Kothari.com. hypermarket. Old Mahabalipuram Road. South Phase. F: 22327348. 1st Floor.50 lac sq Jalandhar Infrastructure ft of area on Grand Trunk Road. florist. . Marg Axis. S K Sharma. info@chennaidesal. foodcourts / restaurants. 2009 Project Reporter. music stores. The township coming up 80 km south of Chennai will have a total built up area of over 30 million sq ft including 15. F: 23324555. 463. East of Kailash. 7. the company has set up more that 250 towers and rest will be done by March 2009. T: 011-26436810 . . T: 080-41966868. Kasturba Gandhi Marg. Local Shopping Mall Centre. . T: 011-46066333. CEAT Ma..75 lac sq Ludhiana ft of area at Ferozepur Road. Chattisgarh and Meghalaya states. Cutomer Care Executive. F: 41896653. M: 09818099268. New Delhi . . 30 A. CMD) 100 KEC The company is setting up 400 telecom Multiple International towers in the rural areas. (Ramesh Chandak. The plant would start producing freshwater from seawater in January 2009. Adidas. T: 044-24541111. 6th cross Road.12. Vishal Kothari. showrooms. corporate@tdigroup. food court. Annie Besant Road. The project is undertaken on Design-Build-Own-Operate-Transfer basis. Thiru. Mumbai .. Imran H.chennaidesal. The phase-I construction has started and will complete by October 2009. T: 011-23731666 / 177. Guindy. F: 24541123. and Befesa of Spain holds the balance.110019. 7. Kalkaji. bhatiakh@kecrpg. Community Center. Chennai .. F: 26218534.37 Jalandhar acres at GT Road. branded shops. Marketing and Leasing Shopping Executive. Dr. Local Mall Shopping Centre.Punjab prises of a G+5 storey commercial block having branded retail outlets.Shopping utive. [email protected] Water Sector Kumar. Architects: RSP Design Consultants (India) Pvt Ltd. Project to complete by March 2009.net Shopping Mall 97 Collage Group Constructing ‘Viva Collage’ over 3. CCM. 56-58.. New Delhi 110019. food courts and a multiplex. Jaipur and Nagpur. Project Punjab Ltd comprises of a G+6 storey block having spaces for branded retailers like Koutons.com Shopping Mall 98 Omaxe Limited Constructing ‘Omaxe Terminal Mall on 4 Amritsar lac sq ft on Ajnala Airport Road. showrooms.Ka Industrial Estate. Construction to complete by March 2009. New Delhi . The company is building the telecom towers at its three manufacturing units in Jabalpur.Telecom hal. 102 Chennai Water Desalination Ltd The company is implementing 100 million Chennai Tamil Nadu litre a day seawater desalination plant for Metrowater at Kattupalli Village near Chennai. Tamil Nadu. (GRK Reddy. [email protected] Shopping Mall 96 TDI Constructing ‘TDI Mall’ over 1.com 100. branded retail outlets. etc.110065. Project com. Crore) Project Reporter • 16 • January 1.00 Kiran Bhatia. Kalkaji. Omaxe House. 42166600 / 66. 9. corporate@tdigroup. Project to complete by February 2009. Marketing and Leasing Exec.110001. IVRCL holds a 75 per cent stake in Chennai Water Desalination. Township 4/318. T:91-5944-233347 F: 91-5944233473 singhgk2003@yahoo. service roads and CR/HR/Escape gates including design of canal. No. Km.44 Contact: Executive Engineer.in Category: Residential/Commercial Buildings 110 | Government of Madhya Pradesh. The private partner will construct the building initially for manufacturing Antirabies Vaccine and Tetanus Toxoid on the Land provided by the University at Patwadanagar. Package No. The Institute is looking for collaboration under BOT in production of above products by CGMP norms. 29. Km.P. Singh. Submission Date: 15/01/2009 | Location: Greater Noida U. Jabalpur .com Category: EPC/Civil Works/Fencing/Wall Works 107 | Mumbai International Airport Pvt Ltd Details: Expression of interest for Terminal 1C Hotel Project. Narmada Project Canal Div. Construction a new domestic terminal building. Arera Hills. Katni.00 to km 213) Stretch of NH-76 to be executed as Package 3 on operation. Km. Madhya Pradesh. Dwarka. Rampur. Ta. lining. 0/0 to 0/800 3 Hariywada Bhilachal Road.K. Ratlam. structures and road approaches of distributory and minors of Nadan Distributory offtaking from Ch. Dantiwada. SCO 89-90. T: 91-11-25074100/4200 Ext. G-5&6. Burhanpur. Submission Date: 01/09/2009 | Location: Bathinda Punjab Contact: Project Manager. Uttar Pradesh. Proposal are invited from International / National Five Star Hotel Chains or Entities having collaboration with Five Star Hotel Chain. Sector-10. the fast emerging Commercial Hub of Punjab by Punjab Infrastructure Development Board & Punjab State Electricity Board on design .2nd floor. Gujarat. T: 017612661111-10. Dist. District Khandwa. Santacruz (East). Khandwa. Chief Finance Officer. Punjab Infrastructure Development Board. Submission Date: 12/02/2009 | Location: Gujarat Tender value (Rs Crore): 367. M. lining.482008. Dist. 2 Ta. Madhya Pradesh. T: 91-79-232 56681 Category: Roads/Road over Bridge/Bridges/Flyovers/Highways 106 | G.00 to 120 Km on EPC contract including canal system operation and maintenance for two years.55 Contact: Executive Engineer. 0/0 to 2/090 4 Lodapa Approach Road. Directorate of Urban Administration & Development (UADD) Details: Request for proposal for consulting services cities support unit. Dantiwada. c. hotelproject@gvk. Delhi. New Delhi-110075. F: 6156031. Narmada Vasahat.E-Tender / EOI / RFP / RFQ 103 | Sardar Sarovar Narmada Nigam Ltd Details: E-Tender for constructing canal earthwork. T: 91-1722640775 F: 91-172-2640776 M: 91-9357188267 / 9988003316 pdppunjab@yahoo. IL & FS Infrastructure Development Corporation is the project development advisor to Government of Punjab. Panchayat R & B Division. canal structures and gates for Morbi Branch Canal reach 0.com.: 1003/2415. Dean. Inspection of all the Materials and Equipments of Main Power Block andBalance of Plant will be in the scope of Third Party Inspection Agency. Category: Canal/Dam/Irrigation 105 | Department of Roads & Buildings Details: 21/2008-09: E-Tender for improvement and strengthening to various road under 12th Finance Commission 2008-09. Submission Date: 14/01/2009 Location: Kota-Chittorgarh Rajasthan Contact: General Manager (OMT). Executive Director (PRG). Vidyut Nagar. with provision for further expansions. Submission Date: 10/01/2009 | Location: Gujarat Tender value (Rs Crore): 1. Sector 34. IL & FS IDC.indd 2 29/12/2008 12:37:53 PM .org Category: Roads/Road over Bridge/Bridges/Flyovers/Highways 112 | Madhya Pradesh Power Generating Company Ltd Details: MPPGCL/PRG/MTPP/ICB/03: Request for Qualification for Appointment of Third Party Inspection Agency for 2x600 mw Malwa Thermal Power Project at Purni. Install Plant Machinery and Other Systems and Run for 20 years. Contact: Rajiv Ranjan Mishra. 28. T: 91-120-2328011-20 F: 91-120-2328010 Category: Residential/Commercial Buildings 109 | Punjab State Electricity Board Details: Request for proposal for development of Five Star Hotel on lease/revenue sharing model in Bathinda City. 1 Arkhi Approach Road. Dhanera. Rewa. Submission Date: 24/01/2009 | Location: Pantnagar Uttarakhand Contact: Dr. Km.400099. Terminal 1C at Santacruz. 6202 Category: Residential/Commercial Buildings 108 | India Exposition Mart Ltd Details: Expression of interest for the development of the guest house at the India Expo Centre at express highway. Terminal 1B. Annexe Building.A. Greater Noida on builtoperate-transfer basis. Dist. [email protected]. Gujarat. T: 91-288 240692 Category: Canal/Dam/Irrigation 104 | Sardar Sarovar Narmada Nigam Ltd Details: 5 OF 2008-09: E-Tender for constructing earthwork. 0/0 to 0/315 2 Jivana Approach Road. 2660500-10.P. Submission Date: 08/01/2009 | Location: Ujjain.operate transfer basis. Dhanera. Rajkot. 0/0 to 2/500 6 Bhadali Kotha Road. Chhatrapati Shivaji International Airport. Ta. namely (i) Main Power Block through BHEL (ii) Balance of Plant (BoP) through other vendor under finalisation. Contract period: 11 months. Application Last Date: 15/01/2009. 0/0 to 3/17. T: 91-2717-226487.C. Lot 2: Dewas. Singrauli and Sagar. 2009 Tender. Km.439 Km of Sanand Branch Canal. Ta. Sanand. Dantiwada & Tharad. T: 022 6156789. 2660310 F: 22665661 Category: Architects/Interior Work/Consultancy 113 | Madhya Pradesh Power Generating Company Ltd Project Reporter • 17 • January 1. Mumbai . Submission Date: 01/07/2009 | Location: Mumbai Maharashtra Contact: 1st Floor. Greater Noida201306.1289 Ha). Morbi -363642. Management Support Unit. Deesa. Lalbaug.P. Maharashtra. Proposals are invited from reputed consulting organisations to support the implementation of urban reforms and infrastructure development under JNNURM/ UIDSSMT/ IHSDP and MPUSP through the deployment of consultants in 1) Municipal Finance and Accounts 2) IT and E-Governance 3) Municipal Engineering 4) Social Development for each of the following packages: Lot 1: Ujjain. Gujarat.-25. Shed 1&2. Gautam Budh Nagar. Contact: Project Director. T: 91755-2763060/1/2 F: 91-755-2763868. 3/6. Oil Fed. Category: Architects/ Interior Work / Consultancy 111 | National Highways Authority of India Details: Request for proposal to procure financial consultant for operation & maintenance of Kota-Chittorgarh Section (km 381. Room no239-241. diagnostics and immunobiologicals for human and veterinary health. Uttarakhand. Completion period: 18 months. The works are being implemented in two parts. which will include space for a 4/5 Star Hotel with an initial capacity of about 72 Rooms. G.B. Dhanera. Lot 3: Satna. Bhopal-462011. K. Madhya Pradesh. Ta. Submission Date: 19/01/2009 | Location: Sanand Gujarat Tender value (Rs Crore): 2. Plot No. Submission Date: 20/01/2009 |Location: Khandwa Madhya Pradesh Contact: Y. B/h. No. Chandigarh. Madhya Pradesh Urban Services for the Poor Programme (MPUSP). 0/0 to 0/880 5 Asiya Approach Road. structures. 27. Ta.co. (C. Pantnagar. Pant University of Agriculture & Technology Details: Expression of interest for joint ventures in production and commercialization of vaccines.build . College of Veterinary and Animal Sciences. maintenance and transport (OMT) basis.49 Contact: Executive Engineer. Time limit for completion of work: 24 months. Dantiwada. Saurashtra Branch Canal Dn. Banaskantha. Km. Police Station. Ta.c. Rastogi. University will charge Rentals for Land and basis Facilities and will get part of Total Revenue as per MOU and Terms of Offer. Palanpur. Dhanera. 6156793. Knowledge Park-II. Ahmedabad382110. Seva Sadan.18. Ratlam M. Shed 1&2.2447025 Category: Canal/Dam/Irrigation 121 | Narmada Valley Development Authority Details: 45/CE/2008-09: Execution of the main Canal (Bargi Right Bank Canal) from R.20 Contact: Executive Engineer. G-5&6. Design. T: 017612661111-10.RFQ/Tenders/Bids Details: MPPGCL/PRG/STPS-EXT/ICB/02: E-Tenders for Appointment of Third Party Inspection Agency for 2x250 mw Satpura Thermal Power Project at Sarni. Submission Date: 21/01/2009 Location: Bargi Right Bank Canal Madhya Pradesh Tender value (Rs Crore): 184. Jabalpur . Delhi. Office of CE(UNZ). Nepean Sea Road. T: 91-11-28031621 Category: Construction 123 | L. New Delhi. 2660310 F: 22665661 Category: Architects/Interior Work/Consultancy 114 | National Highways Authority of India Details: Request for qualification from applicants interested in design.gov. T: 011-26517827.C.D. construction. Delhi. New Delhi. G-5&6. T: 91-22-22612416 F: 91-22-22621608 cecsouth@cr. finance. 6th Floor. engineering. Sector-10m Dwarka. ONGC Chandkheda. Institute of Tuberculosis and Respiratory Diseases Details: LRSI/103G/PM/08/2008: Construction of Private Ward at LRS Institute of TB & Respiratory Deseases. 26517829 Category: Construction 124 | Karnataka Neeravari Nigam Ltd Details: Construction of FICs on Kagalagomba district Minor OL-4 to 5 (BL-33). District Betul.M. construction of canals (about 42. Submission Date: 20/01/2009 | Location: Maharashtra Tender value (Rs Crore): 1. Completion period: 15 months. Madhya Pradesh. Bhatia. railnet.482008.Project : Construction of lining work and providing deeps (On Service Road of Main Canal) for L. Water Resources. Submission Date: 20/01/2009 | Location: Jamnagar Gujarat Tender value (Rs Crore): 1. GM (BOT).10 Contact: MBC Division No.R. Executive Director (PRG). Madhya Pradesh.K.in Category: Canal/Dam/Irrigation 122 | M.66 Contact: Sh. 154.Demow Assam Tender value (Rs Crore): 562. To R. Project Division. Karnataka Category: Construction 125 | Maharashtra Airport Development Company Ltd Project Reporter • 18 • January 1. namely (i) main power block through BHEL (ii) Balance of Plant (BoP) through other vendor under finalisation. Vidyut Nagar. Rastogi. Completion period: 18 months. Plot No.P. feasibility report. Executive Engineer.72 Contact: Director.1. Project Construction Division. K. Submission Date: 09/01/2009 | Location: New Delhi Delhi Tender value (Rs Crore): 8. On Turnkey Basis comprising the work of Survey. preparation of permanent Land Acquisition cases. Period of completion: 30 months including rainy seasons.44 Contact: Divisional General Manager (Civil). Ahmedabad. Application Last Date: 05/01/2009 Submission Date: 01/07/2009 | Location: New Delhi Delhi Tender value (Rs Crore): 2. Yadav. NAB Building. The works are being implemented in two parts. In length) by Excavation. Noida-201301.00 Contact: GK Sahu. Planning. Category: Architects/Interior Work/Consultancy 120 | Narmada. Submission Date: 23/01/2009 | Location: Jorbat-Shillong Assam Tender value (Rs Crore): 536. Geotechnical Investigations. Mumbai-400001. 3rd Floor. 7/7. cement concrete lining all inline structures and commissioning and testing of the canal system. Rampur. Submission Date: 02/06/2009 | Location: Ahmedabad Gujarat Tender value (Rs Crore): 0. No. Uttar Pradesh. Jilla Seva Sadan No. engineering. Estimation. Period of contract: 11 months each. Noida-201301. F: 91-761-2370373 [email protected]. Rajkot.nic. 2660500-10. EOC. Gujarat.00 Contact: GK Sahu. 6th Floor.51 Contact: R K Mishra. T: 91-120-2410467/2596676/2596647 F: 91120-2410295. Maharashtra. Mumbai-400036. 3290399. Gavai VC & MD.B. Submission Date: 23/01/2009 | Location: Jorhat. Contract period: 18 months. Category: Architects/Interior Work/Consultancy 118 | Central Railway Details: CAO(C)/19-of-2008: Architectural consultancy and structural designs for proposed new station building and circulating area at Amravati station of Bhusawal Division of Central Railway. Sector-10m Dwarka.org Category: Roads/Road over Bridge/Bridges/Flyovers/Highways 115 | National Highways Authority of India Details: Request for qualification from applicants interested in design.2. T: 91-11-25074100/4200 [email protected] Category: Architects/Interior Work/Consultancy 119 | NTPC Ltd Details: CS-7014-751B-9: Consultancy services for preparation of mine plan. Jabalpur. V. 2009 Tender. Gujarat. operate & transfer basis.650 Km of Bargi Diversion Project. development. operation and maintenance of the Four laning of Jorbat-Shillong Section (From km 0/000 to 61/800) of NH-40 in Assam & Meghalaya. New Delhi. Sector-1. Validity of quotation in days: 180 Submission Date: 27/01/2009 | Location: Kagalagomba Karnataka Tender value (Rs Crore): 0. T: 91-22-23696109 / 3673 / 23686112 F: 91-22-23696110..ONGC Ahmedabad Asset. & Minor M1R. Housing Board Details: Construction of School Building i/c International Service and Site Development works of KV Sector 5 Dwarka. development. New Delhi-110075. GM (BOT). Bargi Hills. Water Supply & Kalpsar Department Details: B-2/3 OF 2008–2009: Demi-III W. Inspection of all the Materials and Equipments of Main Power Block andBalance of Plant will be in the scope of Third Party Inspection Agency.org Category: Roads/Road over Bridge/Bridges/Flyovers/Highways 116 | Oil & Natural Gas Corporation Ltd Details: DC5SC08020: Consultancy for composite proposal for interior works including revised sitting arrangements on all floors at Avani Bhavan. Maharashtra. Submission Date: 13/01/2009 | Location: Amravati Maharashtra Tender value (Rs Crore): 0. Gaddanakeri. K. New Delhi-110075.S. Avani Bhavan. -E6 A.D.000. 196.00 Contact: Satish M. Sector-24. Near Priyadarshini Park. operation and maintenance of the Four-laning of Jorhat-Demow Section of NH-37 from km 453/000 to 534/800 in the State of Assam on DBFOT Pattern under SARDP-NE Phase A on BOT(Annuity) Basis for a pre-agreed concession period (the “Concession Period”).indd 3 29/12/2008 12:37:53 PM .3. Sri Aurobindo Marg.60 Km. Category: Architects/Interior Work/Consultancy 117 | Maharashtra State Road Development Corporation Ltd Details: Providing consultancy services as supervision consultants for the work of modernisation & computerisation of integrated border check posts at 22 locations in the State of Maharashtra on build. M2R and M3T in Taluka: Jodiya of District: Jamnagar. Submission Date: 02/03/2009 | Location: Uttar Pradesh Contact: Divisional General Manager (CS-Th) / Manager (CS-Th). Delhi. Dist. A-8A.050 Km.Gautam Budh Nagar. area drainage/nalla diversion study & eia/ emp study of Tilaipalli Coal Mining Block. Uttar Pradesh. T: 91-11-25074100/4200 gksahu@nhai. HSCC Corporate Office. T: 91-761-2370995. T: 079-3290299.05 Contact: A. Madhya Pradesh. construction. Submission Date: 20/01/2009 | Location: Betul Madhya Pradesh Contact: Y. T: 0281. finance. mining & selling of coking coal from coal block allotted to BSMDC. testing and commissioning at site and carrying out performance/acceptance tests of equipment. i. delivery at site. transportation. Puram Tehri. JLN Marg. AVS Building.in.12.e. Submission Date: 14/01/2009 | Location: Mormugao Goa Tender value (Rs Crore): 130. 2009 Tender. Uttaranchal.78 Crores. Chennai Port Trust. Haryana. designing and construction management of terminal building and allied facilities at Nagpur Airport. T: 044-25360646. design.300 and Baina Road at Ravindra Bhavan Junction from Km 1. Bihar. Chennai-600001. Cuffe Parade. Dwarka. Category: EPC/Civil Works/Fencing/Wall Works 130 | Bihar State Mineral Development Corporation Details: BSMDC/2008-09/02: Selection of Joint Venture Partner for exploration development. Office: Vikas Bhawan. supply. Mumbai-40005. F: 25380968 Category: Port 129 | NHPC Ltd Details: NHPC/CCW/DMTP/01 DT 11. Regd. PFBR Project. Completion period: 5 months. supply. New Secretariat.gov.93 Contact: Chief Engineer. Puram Uttaranchal Tender value (Rs Crore): 0. transit insurance. Tamilnadu. Class of contractors: III. Location: Sunderbans. Tehri. Patna-800001. Faridabad-121003. or piling and superstructure works in any waterway projects. Category: Port 126 | Tiruchirappalli City Corporation Details: 140/2008-2009: Construction of channel and providing cement concrete cover slab at Pillukara Street Ward No. testing. Category: Power 136 | National Highway Authority of India Details: 4 Laning of NH-17B from Km 13. mining and selling of Coking Coal from the Saria Koiyatand Coal Block having 232 MT of coal resreve allocated to BSMDC under Government Company Dispensation Scheme in pursuance of the provisions of section.000) of Mormugao Port. installation.Tenders/Bids Details: Planning. Tamilnadu. 30 Metres Hi-Mast Towers in mechanized ore handling plant area and 2 Nos.222046 / 127. final painting. T: 9144-25360646. 7th Floor.020 including construction of Flyover cum ROB upto Gate No.11. 1. erection/installation.2008: Planning. fabrication. testing and commissioning. T: 044-2415393 Category: Construction 132 | Chennai Port Trust Details: Construction of additional berth (ro-ro berth) at the southern side of Bharathi Dock. 20 metres Hi-Mast Towers in Oil Dock in Chennai Port Trust. Delhi. Administrative Building.. 1. Submission Date: 07/01/2009 | Location: Chennai Tamil Nadu Contact: Chief Mechanical Engineer. Submission Date: 19/01/2009 | Location: Tamil Nadu Tender value (Rs Crore): 46. Sector-10.7.99 Crores. T: 06722 . installation & commissioning of two numbers of 3000 TPH capacity Reclaimers for Iron Ore Handling Plant. 8th Floor. Centenary Building. G-5&6. F: 91-1376-236712 Category: Electrification 134 | Chennai Port Trust Details: Rehabilitation fo Trawler wharf at Chennai Fishing Harbour. Submission Date: 31/01/2009 | Location: Nagpur Maharashtra Contact: Vice Chairman & Managing Director.: RUSDIP/TR-02/BPR/ DR/02: Construction of storm water drainage system at Ramnagar Domar & Kali Bagich to Golabag at Bharatpur. manufacture. handing over of Top Shield Argon System for 500 MWe PFBR Power Project. Submission Date: 13/02/2009 | Location: Sunderbans West Bengal Contact: Chief Engineer (Civil Contracts-III). Iron Ore Handling Plant. Submission Date: 28/01/2009 | Location: B. T/F: 222256.97 Contact: Chief Engineer. NHPC Office Complex. Jawahar Circle. (ii) Average annual turnover during the last 3 years should be atleast 30% of the present estimated cost. Submission Date: 01/06/2009 | Location: Pillukara Street T. supply of material. Tamilnadu.. Tenders are invited from experienced & eligible bidders. Completion period: 24 months. Tamilnadu. B. Submission Date: 27/01/2009 | Location: Kalpakkam Tamil Nadu Contact: Project Director.25 MW. (b) Two similar works each costing not less than 50% of the estimated cost i.e.18 Contact: SM (C&MM). testing & commissiong of hydro mechanical and electro-mechanical plant & machinery leading to sucessful operation and performance of the project. [email protected] Project Reporter • 19 • January 1. T: 91-129-2256035. E & M Department. Means execution of Marine piles and superstructure works in ports. Tiruchirappalli-620001.indd 4 29/12/2008 12:37:53 PM . (c) One similar work costing not less than 80% of the estimated cost. Tenders are invited from Technically and Financially sound Bidders interested for executing detailed coal exploration. Rajasthan. Tamilnadu. Submission Date: 19/01/2009 Contact: Managing Director. Category: Construction Details: EM/IOHP-26/08 Dated:11/12/2008: Design. inspection at contractor’s works. Puram. Chennai. T:91-2266151300 F: 91-22-22163814. Project: Durgaduani Mini Tidal Power Project (3x1.240 to Km 1. installation. akhtar@nhai. testing and commissioning of 6 Nos. Rs. Rajasthan Urban Infrastructure Development Project Details: RUSDIP/NCB-IR/15: Contract Pkg No. World Trade Centre.28 Contact: Commissioner.e. Submission Date: 05/02/2009 | Location: Bharatpur Rajasthan Contact: Project Director. Chennai-1. Bharathidasan Salai. F: 91129-2256035. Rs. No. (a) Two similar works each costing not less than 40% of the estimated cost i. F: 91-141-2721919. T: 91-1376-235447.00 to Km 18.gov. Maharashtra. chmppt@paradipport.. engineering. T: 91-44-27480939 / 27480902 F: 91-44-27480933. New Delhi-110075. manufacturing. Kalpakkam-603102. providing civil foundation. Paradip Port Trust. F: 91-44-25360968 Category: Port 128 | Tehri Hydro Development Corporation Ltd Details: THDC/TH/C&MM/2008-09/19: External electrification of CISF Fire wing Quarters and new and old shopping complex at B. supply. F: 25380968 Category: Port 127 | Government of Rajasthan. Goa. Jaipur-302017. 9 (Km 0.03 Contact: General Manager (T) PC-II. Districts of South and North 24 Paraganas in the State of West Bengal. documentation including submission of relevant data. Orissa. Engineering Department No. T: 91-11-25074100. T: 044-25360646. Tenders are invited from Experienced and Capable Consultant. T: 91-141-2721966. packing. Eligibility: (i) Should have satisfactorily completed similar works of values as listed below during the last 7 years. systems and services.6. Paradip-754142. T: 91-612-2238583 Category: Mining 131 | Paradip Port Trust 135 | Bharatiya Nabhikiya Vidyut Nigam Ltd Details: BHAVINI/CMM/INST/280389: Design. Sector-33. design & engineering. civil construction. manufacture. 13 & 17.in Category: Drainage 133 | Chennai Port Trust Details: EME/ 81 /2008/SE (OH): Design. Rajaji Salai. Submission Date: 16/01/2009 | Location: Paradip Orissa Contact: Superintending Engineer.40 Crores. 1. Completion period: 2 months. Submission Date: 09/01/2009 | Location: Chennai Tamilnadu Tender value (Rs Crore): 15. preparation of detailed drawings. Tender value (Rs Crore): 0. Garhwal-249001. Rs. Rajaji Salai. Rajaji Salai. Engineering Department. forwarding.N. The Project is to be handled over to NHPC after successful completion. 81 Contact: Er. F: 91-141-2721919.2. construction of pumping station. Completion period: 12 months. plumbing. internal & external electrification. AVS Building. JLN Marg. Jawahar Circle. Haryana. electrical works.K. 1 No. Category: Roads/Road over Bridge/Bridges/Flyovers/Highways 139 | Government of Haryana Details: Design. 352/54. Construction of CWRs & OHRs including supply.E. Mail@ruidp. New Delhi-110076. Submission Date: 12/01/2009 | Location: Chennai Tamilnadu Tender value (Rs Crore): 5. Goa. construction of tubewells. T. Rajasthan.50 MLD) sixteen hour pumping capacity water treatment plant in/c civil.: RUSDIP/TR-02/RSM/ WS/02: Construction of intake well design. Mumbai . C-3.K. laying and commissioning with testing of DI & uPVC pipelines and replacing of leakaged pipeline etc. Sonepat. Submission Date: 01/09/2009 | Location: Kishan Ganj Delhi Tender value (Rs Crore): 0. New Delhi-110003. Completion period: 24 months. complete in all respect at Purba Ramchandraghat under Khowai block of west Tripura District.00 Contact: Deputy General Manager (II). F: 91-141-2721919. Construction. Murlidhar Temple Compound. Jaipur-302017.13-14.303. Mail@ruidp. PWD W/S & Sanitation Circle. F: 41673112.55 MGD (2.30 meters. Submission Date: 20/01/2009 | Location: Rewari Haryana Tender value (Rs Crore): 94.24632950 Category: Construction Next Issue Focus: Construction Contact: sandeep@asappmedia. Boundary Wall. F: 91-3812324073 Category: Water Sector 145 | Airport Authority of India Details: Construction of New Integrated Terminal at Civil Enclave. erection and commissioning of all civil. Contract period: 12 months.96.Pratap Padode. Project Reporter hold no responsibility for any unlikely errors that might occur. Mumbai 400 002. testing and commissioning of Upvc and DI pipelines in distribution system and transmission system. Printed and Published by Pratap Padode on behalf of ASAPP Media Pvt Ltd. C/o S.13 Mtrs. Executive Engineer.gov. A .26 x 24. Rajasthan. C/o S. Category: Water Sector 141 | Government of Haryana Details: Augmentation & Extention W/S Scheme Kharkhoda Town District Sonepat. Madhukar. Completion period: 6 months.in Category: Water Sector 143 | Government of Rajasthan. and printed at Jayant Printery. laying. 2 No. Kishan Ganj. Rajiv Gandhi Bhawan.. AVS Building. fire detection and fire fighting system etc. Mathura Road. Jointing of 600 mm i/d RCC Pipe Inlet Channel = 50 Meters. Submission Date: 12/02/2009 | Location: Bundi Town Rajasthan Contact: Project Director.com. co.44 meters. Submission Date: 01/07/2009 | Location: Sonepat Haryana Tender value (Rs Crore): 3. HVAC system. Delhi. for UWSS Rajsamand.Tenders/Bids Category: Roads/Road over Bridge/Bridges/Flyovers/Highways 137 | Haryana State Roads and Bridges Development Corporation Ltd Details: 5715 /HSRDC/08 Dated: 08/12/2008: Four Lanning of various Roads in Rewari Town & Construction of New Roads in Rewari District. T: 91-141-2721966. of Av. supply of all necessary equipments.5 MLD capacity MPS & Sewage Treatment Plant based on Aerobic attached growth moving bed boifilm reactor technology (MBBR) in all respect including boundary wall. Rajasthan Urban Infrastructure Development Project Details: RUSDIP/NCB-IR/15: Contract Pkg No. Submission Date: 16/01/2009 | Location: Goa Tender value (Rs Crore): 278. Testing & Commissioning of 4. T: 91-172-2585265 Category: Roads/Road over Bridge/Bridges/Flyovers/Highways 138 | Container Corporation of India Ltd Details: CON/EP/TNPM/CC Pavement/T-II / 2008: Construction of CC Pavement. Haryana. Size 117 x 117 x 2. pump chamber of size 7.gov. Zakaria Bunder Road. Submission Date: 05/02/2009 | Location: Rajsamand Rajasthan Contact: Project Director. PWD W/S & Sanitation Circle. DWS Division. staff quarter with all interconnecting piping including supply. construction of Road/ Path at Water thereafter and construction of 1 No.in Category: Water Sector 144 | Government of Tripura Details: 51/NIT/EE/DWS/AGT-II/2008-09: ARWS scheme at Purba Ramchandraghat/ Design supply and construction of 0. Panchkula. Delhi. T: 011 41673093 . Engg (Civil)-I. In connection with Rail Coach Factory project at Lal Ganj. construction and commissioning of 18 MLD capacity Water Treatment Plant including commissioning of equipments. Subject to Mumbai Jurisdiction only. Project Reporter • 20 • January 1.00 Contact: Executive Engineer. T:0130-2220321 Category: Sewage Treatment 140 | Northern Railway Details: Construction of RCC Over head Tanks of capacity 450 KL and 225 KL and allied works like pump house boundary wall. district Rae Bareli (UP). Girgaum Road.E.com All rights reserved.84 Contact: Executive Engineer. Contract period: 18 months. Tenders are invited from experienced & eligible bidders. Completion period: 18 months. Editor. Opposite Appollo Hospital.50 Meters i/d each for Raw Water & clear water. at Chennai.08 Contact: Senior Manager. pump operator room. Laying. While all efforts are made to ensure that the information published is correct. mechanical electrical and instrumentation works complete on turnkey basis and operation and maintenance for 12 months during defect liability period and operation and maintenance for two year there after at Kharkhoda Town District Sonepat. T: 91-381-2323313.: RUSDIP/TR-02/BND/ WS/02: Construction of OHSRs and CWRs including providing. Delhi. Chief Administrative Officer. Culvert and Dismantling & Laying of Railway Track etc.). Erection. Submission Date: 16/01/2009 Location: Purba Ramchandraghat Tripura Tender value (Rs Crore): 1. Tripura. Jawahar Circle. Jaipur-302017. Navbharat Estate. jointing. Sonepat. Bay No. Haryana. T:0130-2220321 Category: Water Sector 142 | Government of Rajasthan.60 x 18. Submission Date: 01/07/2009 | Location: Sonepat Haryana Tender value (Rs Crore): 4. pathway ect. sanitary. S/S Tank 4 Nos. Suction well & Scour Well 2. Providing. 2009 Tender. Rajasthan Urban Infrastructure Development Project Details: RUSDIP/NCB-IR/15: Contract Pkg No. Haryana. RCC CWT of size 16. RCF/RBL. Safdarjung Airport. T: 91-141-2721966. replacement of water meters for UWSS in Bundi Town. Sewri (West). Agartala-II. filtration plant of capacity 4 MLD complete in all respect and all other works contingent thereto. testing and successful commissioning of the plant etc. T: 011.39 x 2. mechanical. Agartala. 2 Nos. SH: Civil. PA & CCTV System.25 Contact: Group General Manager (Engg.indd 5 29/12/2008 12:37:54 PM . Completion period: 9 months. JLN Marg.pro@concorindia. Bhushan. Laying of pipe line at Head works.. Brick Masonry Boundary wall 1220 meters.400 015.85 Contact: V. Sec.
Copyright © 2024 DOKUMEN.SITE Inc.