is1893_part-2

April 2, 2018 | Author: Vijay Rama Raju | Category: Column, Seismology, Pressure, Buckling, Masonry


Comments



Description

For Comments OnlyIS 1893 (Part 2) Doc No. CED 39 (7231) Draft Indian Standard (Not to be reproduced without the permission of BIS or used as an Indian Standard) CRITERIA FOR EARTHQUAKE RESISTANT DESIGN OF STRUCUTRES: PART 2 LIQUID RETAINING TANKS (Revision of IS 1893(Part 2)) ICS 91.120.25 Earthquake Engineering Sectional Committee, CED 39 0 INTRODUCTION 0.1 In the fifth revision IS 1893 has been split into following five parts: Part 1: General provisions and buildings Part 2: Liquid retaining tanks Part 3: Bridges and retaining walls Part 4: Industrial structures including stack like structures Part 5: Dams and embankments Part 1 contains provisions that are general in nature and applicable to all types of structures. It also contains provisions that are specific to buildings only. Unless stated otherwise, the provisions in Part 2 to 5 shall be read in conjunction with the general provisions in Part 1. 0.2 IS 1893 (Part 2) contains provisions on liquid retaining tanks. Unless otherwise stated, this standard shall be read necessarily in conjunction with IS: 1893 (Part 1): 2002. 0.3 As compared to provisions of IS1893:1984, in this Standard following important provisions and changes have been incorporated: a) Analysis of ground supported tanks is included. b) For elevated tanks, the single degree of freedom idealization of tank is done away with; instead a two-degree of freedom idealization is used for analysis. c) Bracing beam flexibility is explicitly included in the calculation of lateral stiffness of tank staging. d) The effect of convective hydrodynamic pressure is included in the analysis. e) The distribution of impulsive and convective hydrodynamic pressure is represented graphically for convenience in analysis; a simplified hydrodynamic pressure distribution is also suggested for stress analysis of the tank wall. f) Effect of vertical ground acceleration on hydrodynamic pressure is 1 Last Date for Comments 30 06 2006 For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) considered. 0.4 In the formulation of this Standard, assistance has been derived from the following publications: 1. ACI 350.3, 2001, “Seismic design of liquid containing concrete structures”, American Concrete Institute, Farmington Hill, MI, USA. 2. Eurocode 8, 1998, “Design provisions for earthquake resistance of structures, Part 1 General rules and Part 4 – Silos, tanks and pipelines”, European Committee for Standardization, Brussels. 3. Housner, G. W., 1963a, “Dynamic analysis of fluids in containers subjected to acceleration”, Nuclear Reactors and Earthquakes, Report No. TID 7024, U. S. Atomic Energy Commission, Washington D.C. 4. Housner, G. W., 1963b, “The dynamic behavior of water tanks”, Bulletin of Seismological Society of America, Vol. 53, No. 2, 381-387. 5. Jain, S. K. and Medhekar, M. S., 1993, “Proposed provisions for aseismic design of liquid storage tanks: Part I – Codal provisions”, Journal of Structural Engineering, Vol. 20, No. 3, 119-128. 6. Jain, S. K. and Medhekar, M. S., 1994, “Proposed provisions for a seismic design of liquid storage tanks: Part II – Commentary and examples”, Journal of Structural Engineering, Vol. 20, No. 4, 167-175. 7. Jaiswal, O. R. Rai, D. C. and Jain, S.K., 2004a, “Codal provisions on design seismic forces for liquid storage tanks: a review”, Report No. IITK-GSDMA-EQ-01V1.0, Indian Institute of Technology, Kanpur. 8. Jaiswal, O. R., Rai, D. C. and Jain, S.K., 2004b, “Codal provisions on seismic analysis of liquid storage tanks: a review” Report No. IITK-GSDMA-EQ-04-V1.0, Indian Institute of Technology, Kanpur. 9. Priestley, M. J. N., et al., 1986, “Seismic design of storage tanks”, Recommendations of a study group of the New Zealand National Society for Earthquake Engineering. 10. Veletsos, A. S., 1984, “Seismic response and design of liquid storage tanks”, Standards for the seismic design of oil and gas pipeline systems, Technical Council on Lifeline Earthquake Engineering, ASCE, N.Y., 255-370, 443-461. 0.5 In the formulation of this Standards due weightage has been given to international coordination among the standards and practices prevailing in different countries in addition to relating it to the practices in the field of this country. Moreover, to be consistent with present international practice of code writing, a commentary explaining the rationale behind a particular clause is also provided 2 For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) whenever necessary. 0.6 In the preparation of this Standard considerable help has been given by the Indian Institute of Technology Kanpur, Visvesvaraya National Institute of Technology, Nagpur and several other organizations. 0.7 For the purpose of deciding whether a particular requirement of this Standard is complied with, the final value observed or calculated expressing the result of a test or analysis, shall be round off in the accordance with IS 2:1960. The number of significant places retained in the rounded value should be the same as that of the specified value in this Standard. 0.8 The units used with the items covered by the symbols shall be consistent throughout this Standard, unless specifically noted otherwise. 3 CED 39 (7231) Draft Indian Standard CRITERIA FOR EARTHQUAKE RESISTANT DESIGN OF STRUCUTRES: PART 2 LIQUID RETAINING TANKS 1 SCOPE 1. Part 1 : General Provisions and Buildings 3370:1967 4326:1993 Code of Practice for Concrete Structures for the Storage of Liquids Code of practice for Earthquake Resistant Design and Construction of Buildings 11682:1985 Criteria for Design of RCC Staging for Overhead Water Tanks 13920:1993 Ductile detailing of reinforced concrete structures subjected to seismic forces – Code of practice 3 SYMBOLS The symbols and notations given below apply to the provisions of this Standard: Ah = Design horizontal seismic coefficient (Ah)c= horizontal seismic coefficient for convective mode (Ah)i = Design horizontal seismic coefficient for impulsive mode Av = Design vertical seismic coefficient B = Inside width of rectangular tank perpendicular to the direction of seismic force 4 . 456:2000 Title Code of Practice for plain and Reinforced Concrete 1893(Part 1): Criteria for Earthquake Resistant 2002 Design of Structures. 2 REFERENCES The following Indian Standards are necessary adjuncts to this Standard: IS No.For Comments Only IS 1893 (Part 2) Doc No. Guidance is also provided on seismic design of buried tanks.1 This Standard covers ground supported liquid retaining tanks and elevated tanks supported on staging. on the vertical center line at a height h when loaded by a uniformly distributed pressure q. measured from top of foundation to the bottom of container wall ht = Height of center of gravity of roof mass above bottom of tank wall hw = Height of center of gravity of wall mass above bottom of tank wall hc*= Height of convective mass above bottom of tank wall (considering base pressure) hi* = Height of impulsive mass above bottom of tank wall (considering base pressure) hcg = Height of center of gravity of the empty container of elevated tank. CED 39 (7231) Cc = Coefficient of time period for convective mode Ci = Coefficient of time period for impulsive mode d = Deflection of wall of rectangular tank. in the direction of seismic force dmax = Maximum sloshing wave height D E = Inner diameter of circular tank = Modulus of elasticity of tank wall ELx = Response quantity due to earthquake load applied in x.direction ELy =Response quantity due to earthquake load applied in y.For Comments Only IS 1893 (Part 2) Doc No. measured from base of staging I = Importance factor given in Table 1 of this code 5 .direction g = Acceleration due to gravity h = Maximum depth of liquid h = Height of combined center of gravity of half impulsive mass of liquid (mi / 2) and mass of one wall (mw ) hc* = Height of convective mass above bottom of tank wall ( without considering base pressure ) hi* = Height of impulsive mass above bottom of tank wall ( without considering base pressure) hs = Structural height of staging. CED 39 (7231) Kc = Spring stiffness of convective mode Ks = Lateral stiffness of elevated tank staging l' = Length of a strip at the base of circular tank.For Comments Only IS 1893 (Part 2) Doc No. along the direction of seismic force L = Inside length of rectangular tank parallel to the direction of seismic force m = Total mass of liquid in tank mb = Mass of base slab / plate mc = Convective mass of liquid mi = Impulsive mass of liquid ms = Mass of empty container of elevated tank and one-third mass of staging mt = Mass of roof slab mw = Mass of tank wall mw = Mass of one wall of rectangular tank perpendicular to the direction of loading M = Total bending moment at the bottom of tank wall M* =Total overturning moment at base Mc = Bending moment in convective mode at the bottom of tank wall M*c = Overturning moment in convective mode at the base Mi = Bending moment in impulsive mode at the bottom of tank wall M*i = Overturning moment in impulsive mode at the base p = Maximum hydrodynamic pressure on wall p cb = Convective hydrodynamic pressure on tank base p cw = Convective hydrodynamic pressure on tank wall pib = Impulsive hydrodynamic pressure on tank base piw = Impulsive hydrodynamic pressure on tank wall 6 . CED 39 (7231) pv= Hydrodynamic pressure on tank wall due to vertical ground acceleration p ww = Pressure on wall due to its inertia q = Uniformly distributed pressure on one wall of rectangular tank in the direction of ground motion Q cb = Coefficient of convective pressure on tank base Q cw = Coefficient of convective pressure on tank wall Qib = Coefficient of impulsive pressure on tank base Q iw = Coefficient of impulsive pressure on tank wall R = Response reduction factor given in Table 2 of this code (Sa/g) = Average response acceleration coefficient as per IS 1893 (Part 1):2002 and Clause 4.For Comments Only IS 1893 (Part 2) Doc No.5 of this code t = Thickness of tank wall t b = Thickness of base slab Tc = Time period of convective mode (in seconds) Ti = Time period of impulsive mode ( in seconds) V = Total base shear Vc = Base shear in convective mode Vi = Base shear in impulsive mode x = Horizontal distance in the direction of seismic force. of a point on base slab from the reference axis at the center of tank y = Vertical distance of a point on tank wall from the bottom of tank wall Z = Seismic zone factor as per Table 2 of IS 1893 (Part 1): 2002 ρ = Mass density of liquid ρw = Mass density of tank wall φ = Circumferential angle as described in Fig. 8a 7 . hi. 8 . 4. mi is rigidly attached to tank wall at height hi (or hi* ). parameters mi. These hydrodynamic forces are evaluated with the help of spring mass model of tanks. Similarly.1 – Ground Supported Tank 4.2 Circular and Rectangular Tank For circular tanks. 3. the value of hi and hc shall be used to calculate moment due to hydrodynamic pressure at the bottom of the tank wall. The value of h*i and h*c shall be used to calculate overturning moment at the base of tank. hi.For Comments Only IS 1893 (Part 2) Doc No. the liquid exerts impulsive and convective hydrodynamic pressure on the tank wall and the tank base in addition to the hydrostatic pressure. Hence.2. The parameters of this model depend on geometry of the tank and its flexibility. hi and hc account for hydrodynamic pressure on the tank wall only. mc.1 – General Hydrodynamic forces exerted by liquid on tank wall shall be considered in the analysis in addition to hydrostatic forces. CED 39 (7231) 4 PROVISIONS FOR SEISMIC DESIGN 4. hi and hc account for hydrodynamic pressure on tank wall and the tank base.2 Spring Mass Model for Seismic Analysis When a tank containing liquid vibrates. tank can be idealized by an equivalent spring mass model. 4.1 –Ground supported tanks can be idealized as spring-mass model shown in Fig. convective mass.1. 1.2. mc is attached to the tank wall at height c h (or hc*) by a spring of stiffness Kc . 4. hc h*c and Kc shall be obtained from Fig. In order to include the effect of hydrodynamic pressure in the analysis.2. which includes the effect of tank wall – liquid interaction. The impulsive mass of liquid.1. 2 and for rectangular tanks these parameters shall be obtained from Fig. CED 39 (7231) 9 .For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) 10 .For Comments Only IS 1893 (Part 2) Doc No. For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) 11 . 4. hi. 4a) can be idealized by a two-mass model as shown in Fig. . 4d). mc .2. these parameters shall be obtained from Fig. 12 . 2. Kc. hc h*c and Kc shall be obtained from Fig.2.2.2.1 Elevated tanks (Fig.2.3 In Fig. 4.2 For elevated tanks with circular container.2. 4c. hi* . one representing the impulsive plus structural mass behaving as an inverted pendulum with lateral stiffness equal to that of the staging. hi. 3. ms is the structural mass and shall comprise of mass of tank container and one-third mass of staging. For elevated tanks with rectangular container. CED 39 (7231) 4. 4c. mc.2 Elevated Tank 4.For Comments Only IS 1893 (Part 2) Doc No.2.3 For tank shapes other than circular and rectangular (like intze.2. Ks and the other representing the convective mass with a spring of stiffness. 4.2. hi. and mi. 4. hc hc* and Kc of equivalent circular tank shall be used. parameters mi. the value of h / D shall correspond to that of an equivalent circular tank of same volume and diameter equal to diameter of tank at top level of liquid. 4c can be treated as two uncoupled single degree of freedom systems (Fig.2.4 For elevated tanks. truncated conical shape). the two degree of freedom system of Fig. CED 39 (7231) 13 .For Comments Only IS 1893 (Part 2) Doc No. in seconds. h = Maximum depth of liquid.For Comments Only IS 1893 (Part 2) Doc No.1 Ground Supported Circular Tank For a ground supported circular tank.3. . q = mi ---. NOTE . 6b and 6c).1. time period of impulsive mode of vibration. time period of impulsive mode of vibration Ti.+ mw 2 _____________ Bh g 14 .3. wall may have flexible connection with the base slab. (Different types of wall to base slab connections are described in Fig. wherein wall is rigidly connected with the base slab (Fig. is given by h√ρ Ti = Ci ----------------√ t/D √ E where Ci = Coefficient of time period for impulsive mode. Ti in seconds. 4. time period evaluation may properly account for the flexibility of wall to base connection.In some circular tanks. 5.) For tanks with flexible connections with base slab. is given by Ti = 2π √ d --g where d = deflection of the tank wall on the vertical center-line at a height of h. CED 39 (7231) 4.1 Impulsive Mode 4. t = Thickness of tank wall.2 Ground Supported Rectangular Tank For a ground supported rectangular tank. and ρ = Mass density of liquid. 6.1. when loaded by uniformly distributed pressure of intensity q.3 Time Period 4. 6a. wherein wall is rigidly connected with the base slab. D = Inner diameter of circular tank.3. Value of Ci can be obtained from Fig. E = Modulus of elasticity of tank wall. and = lateral stiffness of staging Lateral stiffness of the staging is the horizontal force required to be applied at the center of gravity of the tank to cause a corresponding unit horizontal displacement. 4.For Comments Only IS 1893 (Part 2) Doc No. 15 . NOTE -The flexibility of bracing beam shall be considered in calculating the lateral stiffness.3.3 Elevated Tank Time period of impulsive mode.1. is given by where ms Ks = mass of container one-third mass of staging. and B = Inside width of tank. Ks of elevated moment resisting frame type tank staging. CED 39 (7231) h h mi _____hi+ mw ___ 2 2 = _________________ mi ____ + mw 2 mw = Mass of one tank wall perpendicular to the direction of seismic force. Ti in seconds. For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) 16 . 2 Convective Mode 4. Value of Cc can be obtained from Fig. (b) Rectangular Tank: Time period of convective mode of vibration.3. 4. is given by Tc = Cc √ L/g where Cc = Coefficient of time period for convective mode. and D = Inner diameter of tank. 5. for circular and rectangular tanks.3. 7. However.1 Time period of convective mode. Tc in seconds. the expression for Tc can be alternatively expressed as: a) Circular Tank: Time period of convective mode.2. Value of Cc can be obtained from Fig. CED 39 (7231) 4. and L = Inside length of tank parallel to the direction of seismic force.For Comments Only IS 1893 (Part 2) Doc No. in seconds.2 Since the expressions for mc and Kc are known.3. 17 . soil flexibility may affect impulsive mode time period. Generally. is given by Tc = Cc √ D/g where Cc = Coefficient of time period for convective mode. effect of flexibility of soil may be considered while evaluating the time period.2.3. soil flexibility does not affect the convective mode time period. is given by The values of mc and Kc can be obtained from Figrs 2a and 3a respectively. Tc in seconds. 4.3 For tanks resting on soft soil. 5. Ah shall be obtained by the following expression.5. 2 and Table 3 of IS 1893(Part 1): 2002 and subject to Clauses 4. 18 .5 percent of the critical. CED 39 (7231) 4.5.1 to 4.----2 R q Ah = where Z I R Sa/g = = = = Zone factor given in Table 2 of IS 1893 (Part 1): 2002. 4.4 of this standard.5 Design Horizontal Seismic Coefficient Design horizontal seismic coefficient.4 Z I Sa --.For Comments Only IS 1893 (Part 2) Doc No. Importance factor given in Table 1 of this standard.5. Damping in the impulsive mode shall be taken as 2 percent of the critical for steel tanks and 5 percent of the critical for concrete or masonry tanks. and Average response acceleration coefficient as given by Fig. Response reduction factor given in Table 2 of this standard. subject to Clauses 4.1 to 4.4 Damping Damping in the convective mode for all types of liquids and for all types of tanks shall be taken as 0.---. 5 1.0 Note . Tanks of post earthquake importance All other tanks with no risk to life and with negligible consequences to environment. I Type of liquid storage tank Tanks used for storing drinking water. CED 39 (7231) Table 1 – Importance Factor. and intended for emergency services such as fire fighting services.Values of importance factor.For Comments Only IS 1893 (Part 2) Doc No. I given in IS 1893 (Part 4) may be used where appropriate. non-volatile material. 19 . low inflammable petrochemicals etc. society and economy I 1. 20 .3 1. special moment resisting frame (SMRF) Tank supported on steel frame# Ground Supported Tank Masonry tank a) Masonry wall reinforced with horizontal bands* b) Masonry wall reinforced with horizontal bands and vertical bars at corners and jambs of openings RC / prestressed tank a) Fixed or hinged/pinned base tank (Figrs. 6b. 6a.5 2. 6f) Steel tank a) Unanchored base b) Anchored base Underground RC and steel tank+ 1.5 R 1.e..8 2.5 2. values of can be interpolated between ground supported and underground tanks based on dept of embedment.0 4.5 1. R Type of Tank Elevated Tank Tank supported on masonry shaft a) Masonry shaft reinforced with horizontal bands * b) Masonry shaft reinforced with horizontal bands and vertical bars at corners and jambs of openings Tank supported on RC shaft RC shaft with two curtains of reinforcement.5 2.8 1.5 2. 6e. 6d) c) Unanchored contained or uncontained tank (Figrs. These R values shall not be misunderstood for those given in other parts of IS 1893 for building and industrial frames. i. * These tanks are not allowed in seismic zones IV and V + For partially buried tanks.0 # These R values are meant for liquid retaining tanks on frame type staging which are inverted pendulum type structures.0 2. CED 39 (7231) Table 2 – Response Reduction Factor.3 1. ordinary moment resisting frame (OMRF) b) Frame conforming to ductile detailing i. 6c) b) Anchored flexible base tank (Fig. each having horizontal and vertical reinforcement Tank supported on RC frame# a) Frame not conforming to ductile detailing.5 1.For Comments Only IS 1893 (Part 2) Doc No.e. just above the base of staging (i. for other damping. 4.5. 4.e. 4.75. CED 39 (7231) 4.6 Base Shear 4.5.5.6. and convective (Ah)c modes.4 Value of multiplying factor for 0.6. 4. the value of Sa /g shall be obtained using the same expression which is applicable upto time period of four seconds.1 Design horizontal seismic coefficient.1 Ground Supported Tank Base shear in impulsive mode.2 Elevated Tank Base shear in impulsive mode.5.5 percent damping shall be taken as 1. and = Acceleration due to gravity. Ah will be calculated separately for impulsive (Ah)i.3 For time periods greater than four seconds. at the bottom of tank wall is given by Vi = (Ah)i (mi+mw+mt) g and base shear in convective mode is given by Vc = (Ah)c mc g where (Ah)i = Design horizontal seismic coefficient for impulsive mode.5 for 5 percent damping and be multiplied with appropriate factor. mi mw mt g = Impulsive mass of water = Mass of tank wall = Mass of roof slab. 4. the value of Sa/g shall be taken as 2. at the top of footing of staging) is given by Vi = (Ah)i (mi+ms) g and base shear in convective mode is given by 21 . (Ah)c = Design horizontal seismic coefficient or convective mode.2 If time period is less than 0.For Comments Only IS 1893 (Part 2) Doc No.1 second. 2 Overturning moment in impulsive mode to be used for checking the tank stability at the bottom of base slab/plate is given by M*i = (Ah)i mi(h*i +tb)mw(hw +tb) + mt (ht+tb) +mbtb/2 g and overturning moment in convective mode is given by M *c = (Ah)c mc ( h*c +tb) g where Mb = mass of base slab/plate.3 Total base shear V. and tb = thickness of base slab/plate. at the bottom of wall is given by Mi = (Ah)i (mi h i+mw hw+mt ht)g and bending moment in convective mode is given by Mc = (Ah)c mc hc g Where hw = Height of center of gravity of wall mass.7. and ht = Height of center of gravity of roof mass.7. 4.1 Ground Supported Tank 4.1 Bending moment in impulsive mode. can be obtained by combining the base shear in impulsive and convective mode through Square root of Sum of Squares (SRSS) rule and is given as follows Vc = √ Vi2+ VC2 4. 22 .1.7 Base Moment 4. CED 39 (7231) Vc = (Ah)c mc g where ms = Mass of container and one-third mass of staging. 4.7.For Comments Only IS 1893 (Part 2) Doc No.1.6. 2 Elevated Tank Overturning moment in impulsive mode.8. Different components of staging may have different critical directions. 4. staging components can be designed for either of the following load combination rules: i) 100 % + 30 % Rule: ± ELx ± 0.2. CED 39 (7231) 4. at the base of the staging is given by Mi* = (Ah)i mi(hi* +hs) +ms hcg g and overturning moment in convective mode is given by M *c = (Ah)c mc ( hc + hs) g where hs = Structural height of staging. 4. 4.8. the design shall be worked out for tank empty and tank full conditions.3 Total moment shall be obtained by combining the moment in impulsive and convective modes through Square of Sum of Squares (SRSS) and is given as follows M = √Mi2 + Mc2 M = √M *i2 + M* c2 4. 4.3 As an alternative to 4.8. measured from base of staging.1 Ground supported rectangular tanks shall be analyzed for horizontal earthquake force acting non-concurrently along each of the horizontal axes of the tank for evaluating forces on tank walls.For Comments Only IS 1893 (Part 2) Doc No.3 ELx ± ELy 23 .4 For elevated tanks. staging components should be designed for the critical direction of seismic force.7. and hcg = Height of center of gravity of empty container.8 Direction of Seismic Force 4.7.8.7.3 ELy and ± 0. measured from top of footing of staging to the bottom of tank wall.2 For elevated tanks. y/h where D tanh 0.9 Hydrodynamic Pressure During lateral base excitation. CED 39 (7231) ii) SRSS Rule: √EL2x + EL2 y Where.866 --h ρ = Mass density of liquid. on base slab (y = 0) on a strip of length l'. is given by piw = Qiw (y) (Ah )i ρ g h cos φ 2 Qiw (y)= 0. piw .1 Impulsive Hydrodynamic Pressure The impulsive hydrodynamic pressure exerted by the liquid on the tank wall and base is given by (a) For Circular Tank (Fig.9. Coefficient of impulsive hydrodynamic pressure on wall. 8a ) Lateral hydrodynamic impulsive pressure on the wall.For Comments Only IS 1893 (Part 2) Doc No. and y = Vertical distance of a point on tank wall from the bottom of tank wall. Impulsive hydrodynamic pressure in vertical direction. Qiw (y) can also be obtained from Fig.866 1. is given by 24 . φ = Circumferential angle. 4. 9a. 4. ELx is response quantity due to earthquake load applied in x-direction and ELy is response quantity due to earthquake load applied in y-direction. tank wall is subjected to lateral hydrodynamic pressure and tank base is subjected to hydrodynamic pressure in vertical direction. 9a. on the base slab (y = 0 ). from the center of tank. Impulsive hydrodynamic pressure in vertical direction. 9b.866 ---h The value of coefficient of impulsive hydrodynamic pressure on base Qib (×). 25 .866---h Qib (x)= ----------------------L cosh 0. Qiw (y) is same as that for a circular tank and can be read from Fig.For Comments Only IS 1893 (Part 2) Doc No. is given by piw = Qiw (y) (Ah )i ρ g h where. is given by: pib = Qib (x) (Ah )i ρ g h x sinh 0. 8b) Lateral hydrodynamic impulsive pressure on wall piw .866(Ah ) I ρ g h ----------------------sinh cosh l' 0.866 ---h x = Horizontal distance of a point on base of tank in the direction of seismic force. with h/L being used in place of h/D. can also be read from Fig. (b) For Rectangular Tank (Fig. CED 39 (7231) Pib x 0.866---h = 0. 674---D ----------------------h cosh 3.125 --.--.--. 10a. b) Rectangular Tank (Fig.674---D The value of Qcw(y) can also be read from Fig. CED 39 (7231) 4. 10b..For Comments Only IS 1893 (Part 2) Doc No.2 Convective Hydrodynamic Pressure The convective pressure exerted by the oscillating liquid on the tank wall and base shall be calculated as follows: a) Circular Tank ( Fig.5625 y cosh 3. is given by pcw = Qcw (y) (Ah )c ρ g L 26 . is given by: Pcw Qcw (y) (Ah )c ρ g h D 1 1. Convective pressure in vertical direction.cos2 φ cos φ 3 = Qcw(y) = 0.---D 3 D 3 h sech 03. 8a ) Lateral convective pressure on the wall pcw . on the base slab (0 = y ) is given by Pcb = Qcb(x) (Ah )c ρ g D where x 4 x Qcb(x) = 1. 8b ) The hydrodynamic pressure on the wall p cw .9.674 --D The value of Qcb(x) may also be read from Fig. 3 In circular tanks.4165 = _____________ cosh h cosh 3. However. in the absence of more exact analysis.25 --. 11a.. hydrodynamic pressure due to horizontal excitation varies around the circumference of the tank.For Comments Only IS 1893 (Part 2) Doc No.---L 3 D where h sech 3. The pressure on the base slab (y = 0 ) is given by Pcb = Qcb(x) (Ah )c ρ g L 3 x 4 x Qcb(x) = 1. CED 39 (7231) y 3.9.4 Hydrodynamic pressure due to horizontal excitation has curvilinear variation along wall height.--. 4. the hydrodynamic pressure on the tank wall may be approximated by an outward pressure distribution of intensity equal to that of the maximum hydrodynamic pressure (Fig.162---L Qcw (y) 0. an equivalent linear pressure distribution may be assumed so as to give the same base shear and bending moment at the bottom of tank wall (Figs. 11b. However. 12a). 4. for convenience in stress analysis of the tank wall.5 Pressure Due to Wall Inertia Pressure on tank wall due to its inertia is given by Pww = (Ah )i t ρ m g Where ρ m = Mass density of tank wall. and t = Wall thickness. 27 .9.162 --D The value of Qcb(x) can also be obtained from Fig. 4.9. 12b and 12c).162---L The value of Qcw (y) can also be obtained from Fig. CED 39 (7231) 28 .For Comments Only IS 1893 (Part 2) Doc No. For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) 29 . CED 39 (7231) 30 .For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) 31 .For Comments Only IS 1893 (Part 2) Doc No. For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) 32 . this induces additional pressure on tank wall. 4.11 Sloshing Wave Height Maximum sloshing wave height is given by D dmax = (Ah)c R --2 L dmax = (Ah)c R --2 Where For circular tank For rectangular tank 33 .10 Effect of Vertical Ground Acceleration Due to vertical ground acceleration. whose distribution is similar to that of hydrostatic pressure. time period of vertical mode of vibration for all types of tank may be taken as 0. CED 39 (7231) 4.3 sec. 4. effective weight of liquid increases. and Sa g = Average response acceleration coefficient given by Fig. 2 and Table 3 of IS 1893 (Part 1):2002 and subject to Clauses 4.10. which can be given as p = √( piw + pww)2+ pcw2+ pv2 4.For Comments Only IS 1893 (Part 2) Doc No.3 of this code.2 The maximum value of hydrodynamic pressure should be obtained by combining pressure due to horizontal and vertical excitation through square root of sum of squares (SRSS) rule. In absence of more refined analysis.5.10.2 and 4.5.1 Hydrodynamic pressure on tank wall due to vertical ground acceleration may be taken as Pv = (Av ) ρ g h (1-y/h) Av = Z I Sa ---x ----x ---2 R q where y = vertical distance of point under consideration from bottom of tank wall. 34 . 4. may be used in the connections.12 Anchorage Requirement Circular ground supported tanks shall be anchored to their foundation (Fig. The piping system shall be designed so as not to impart significant mechanical loading on tank. 13) when h 1 ----.> ---D (Ah)i In case of rectangular tank. 4.For Comments Only IS 1893 (Part 2) Doc No.13 Miscellaneous 4. which add flexibility to piping such as bellows.13. CED 39 (7231) (Ah)c = Design horizontal seismic coefficient corresponding to convective time period. Local loads at pipe connections can be considered in the design of the tank. expansion joints and other special couplings. the same expression may be used with L instead of D. Mechanical devices.1 Piping Piping systems connected to tanks shall consider the potential movement of the connection points during earthquake and provide for sufficient flexibility to avoid damage. 4 Shear Transfer The lateral earthquake force generates shear between wall and base slab and between roof and wall. 4. For such tall tanks. 4. the designer may use some discretion in choosing the value of response reduction factor R consistent with expected seismic performances and ductility. safety of shaft type of staging of elevated tanks against buckling shall be ensured. It is necessary that 35 . In buried tanks. They often become landmarks on the landscape.Delta Effect For elevated tanks with tall staging (say. Where unusual shapes and forms for supporting structures are used.6 Aesthetics Elevated water tanks are prominently in public view and visible from near as well as long distances. 4.3 Buried Tanks Dynamic earth pressure shall be taken into account while computing the base shear of a partially or fully buried tank. staging height more than five times the least lateral dimension) it may be required to include the P-Delta effect.2 Buckling of Shell Ground supported tanks (particularly.13.7 Quality Control Quality control in design and constructions are particularly important for elevated tanks in view of several collapses of water tanks during testing. Earth pressure shall also be considered in the design of walls. dynamic earth pressure shall not be relied upon to reduce dynamic effects due to liquid. connection between container and staging should be suitably designed to transfer the shear force. to justify the choice of R value vis-à-vis the seismic safety. Innovations in the shape and form should be encouraged when they improve the ambience and enhance the quality of the environment. however. 4.13.13. wall-to-roof slab and wall-to-wall joints shall be suitably designed to transfer shear forces. steel tanks) shall be checked for failure against buckling. It will be incumbent on the designer. 4. Similarly. Wall-to-base slab.5 P.13. Similarly in elevated tanks.13.For Comments Only IS 1893 (Part 2) Doc No. CED 39 (7231) 4. It is therefore important that the shape and form of the container and the supporting structure must receive due attention from the point of aesthetics.13. it must also be confirmed that higher modes of staging do not have significant contribution to dynamic response. During construction and casting of columns. a) For shafts with diameter less than 8 m. one 12 mm diameter stirrup shall be provided on either side of joint within 40 mm. Minimum thickness of shaft shall be 150 mm for shaft diameter upto 4 m. CED 39 (7231) quality of materials and construction tolerances are strictly adhered to during construction phase. some electricity in verticality of column may develop. Otherwise higher confinement reinforcement shall be provided near construction joints to compensate for lower strength at construction joint. 36 . Minimum width of unflanged brace shall no be less than 1/30th of its clear length between junctions. Additional moment due to this eccentricity must be considered in the analysis. tmin = 150 +(D-4000)/80 mm b) For shafts with diameter equal to or greater than 8 m. For isolated footings. In absence of any estimate and calculation for the same. v) vi) vii) viii) ix) B) RC Shaft Staging i) Minimum thickness of shaft shall be suitable for constructability which depends on height of formwork for one lift of concrete. Formwork at brace-column junction should designed and shall be rigid enough to avoid bulging as well as leakage of slurry from plastic concrete. For larger diameter shafts.e. In columns. Some suggestions on construction tolerances and detailing are listed below. tie beam near top of footing shall be provided.For Comments Only IS 1893 (Part 2) Doc No. Eccentricity up to 20 mm may be allowed in column between two brace levels. In zones IV and V. A) RC Frame Staging i) ii) iii) iv) Minimum size of column should be 400 mm (diameter and/or side of rectangular column) Clear height of column between braces should not be more than ten times the size of column. use of diagonal bracings in vertical plane shall be encouraged. following equation shall be used to arrive at minimum thickness. The information given below is not exhaustive and designers and construction engineers are expected to have competence to take adequate measures to ensure required structural performance. Information on detailing of RC and steel diagonal bracings is given in IS 11682:1985. Splices in longitudinal bas shall not be provided in special confining zone. near brace-column junction). construction joints shall be avoided in special confining zone (i. At horizontal construction joints in shaft additional vertical bar on either side of the joint with ld. In case of mat foundations. lifting of beam on tension side can be allowed at soil contact. Over any height of 1.2percent of shaft height. In tank wall or shaft not more than one-third of vertical bars shall be spliced at any section. anchorage length shall be provided.25 times the base diameter provided the maximum compression is within permissible limits. Openings in shaft: Detailing of shaft at the opening shall take into consideration effective continuity of reinforcement at all sides. The minimum diameter of vertical bars shall be 10 mm. Additional vertical and circumferential reinforcement shall be same as that required as per design calculations. lap length shall be 1. Minimum vertical reinforcement shall be 0. Vertical Alignment – The centre point of shaft shall not vary from its vertical axis by more than 0. The spacing of circumferential bars in each layer shall not be more than 300 mm or shell thickness whichever in less circumferential reinforcement shall be placed nearer the faces of shell. For circumferential bars.6 m.For Comments Only IS 1893 (Part 2) Doc No. Grouting of construction joint shall be done with cement slurry. CED 39 (7231) tmin = 200 +(D-8000)/120 mm where. Circumferential reinforcement shall not be less than 0. This is required to account for secondary moments and eccentricities. wall of shaft shall not be out of plumb by more than 10 mm. The maximum eccentricity at base may be permitted up to 0. at junctions with foundation and with container).1percent of the specified theoretical diameter. At vertical edges of door opening stiffeners may be required.2 times the maximum compression in soil.4 times development length in tension.e. The reinforcement shall be provided in two layers. Maximum centreto-centre distance between vertical reinforcement in each layer shall not exceed 300 mm.2percent or concrete area in vertical section. This tension shall not exceed 0. Shaft thickness – The measured wall thickness shall no vary from the specified wall thickness by more than – 5 mm or + 10 mm. D is diameter of shaft in mm ii) Additional thickening of shaft and extra vertical and circumferential reinforcement shall be provided at top and bottom level of shaft (i. circumferential reinforcement shall be divided equally in two layers. Shaft diameter – The measured centerline diameter of shaft at any section shall not vary from the specified diameter by more than 20 mm plus 0.25percent of concrete area. 37 iii) iv) v) vi) vii) viii) ix) x) xi) xii) . Since vertical reinforcement is provided in two layers. More information on detaining near openings is given in IS 11682:1985. reinforcement bars in direct tension shall have lap length twice the development length in tension. The splices of bars 22 mm or larger diameter in direct tension shall be enclosed in stirrups made of bars not less than 6 mm dia. CED 39 (7231) xiii) In ring beams.For Comments Only IS 1893 (Part 2) Doc No. with pitch not more than 150 mm. with pitch not more than 100 mm or stirrups of 8 mm dia. **** 38 .
Copyright © 2024 DOKUMEN.SITE Inc.