is 4270

March 17, 2018 | Author: Punam Rabha | Category: Pipe (Fluid Conveyance), Calibration, Specification (Technical Standard), Business


Comments



Description

Doc:STI/4270/5 October 2001SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF STEEL TUBES USED FOR WATER WELLS ACCORDING TO IS 4270:2001 (Third Revision) 1.0 LABORATORY: A laboratory shall be maintained which shall be suitably equipped and staffed where different tests given in the specification shall be carried out in accordance with the methods given in the specification. TEST RECORDS: All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. All testing apparatus/measuring instruments shall be periodically checked and calibrated and records of such checks/calibration shall be maintained. Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request. QUALITY CONTROL: It is recommended that, as far as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this Scheme [See IS 397 (Part I):1972, IS 397 (Part 2):1985 and IS 397 (Part 3):1980]. In addition, effort should be made to gradually introduce a Quality Management System in accordance with IS/ISO 9000 as appropriate to the activities of the organization. STANDARD MARK: The Standard Mark, as given in Column (1) of the First Schedule of the license, shall be put on each pipe, provided always that tubes which marked thus conforms to every requirements of the Indian Standard. Each tube shall be embossed with the manufacturer’s name or Trade mark. MARKING: In addition the following information shall be included in the label attached to each bundle or stenciled on the tube. a) b) c) d) e) f) Name of manufacturer or trade mark; Type & Trade of pipe; Nominal size; Length of pipe; Identification mark in code or otherwise to enable the date and lot of manufacturer to be traced back to factory records; and License number (CM/L……….) 2.0 2.1 2.2 3.0 3.1 4.0 4.1 4.2 The final authority to judge the conformity of the product to the Indian Standard shall be with the Bureau. REJECTIONS: A separate record shall be maintained giving information relating to the rejection of production not conforming to the requirements of the specification and the method of its disposal.0 7. defective goods or their components are replaced or repaired free of cost by the licensee in case the complaint is proved to be genuine and the warranty period (where applicable) has not expired. as indicated in Table 1 attached and at the levels of control specified therein. Such material shall in no case be stored together with that conforming to the specification.5 meters between such punched holes before being sold in the market (Please refer to para 4 of Mild steel tubes (Quality Control) order.0 10.1 . REPLACEMENT: Whenever a complaint is received soon after the goods with Standard Marks have been purchased and used. 6. shall be carried out on the whole production of the factory which is covered by this scheme and appropriate records and charts maintained in accordance with paragraph 2.0 above. the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations. with an interval of maximum 1. Rejected tubes shall be punched with holes of minimum 5 mm diameter to be cleared and through. by any process. the factory shall maintain appropriate controls and checks to ensure that their product conforms to the requirements of these clauses. and if there is adequate evidence that the goods have not been misused. In the event of any damages caused by the goods bearing the Standard Mark. from the factory or godowns. All threads shall be coated with a petroleum jelly or other suitable rust preventing compound. 1978 issued by Government of India Ministry of Industry (Department of Heavy Industry) Dt. as subsequently amended. entire liability arising out of such non conforming product shall be of licensee and BIS shall not in any way be responsible in such cases.18 July 1978 as amended on 1st June 1983). The Bureau shall pay for the samples taken by it from the open market. All the production which conforms to the Indian Standards and covered by the license shall be marked with certification mark of the Bureau. In respect of all other clauses of the specifications. 1988.0 8. as stipulated under clause 13 of IS 4270:2001. Standard mark on the rejected tubes shall be clearly defaced before their disposal. SAMPLES: The licensee shall supply free of charge. LEVELS OF CONTROL: The tests.Doc:STI/4270/5 October 2001 5. or claim being filed by the consumers against BIS Standard Mark and not “conforming to” the relevant Indian Standard. 9. 10. The marking of the product shall be stopped immediately if directed to do so by Bureau for any reason. or the testing equipment goes out of order. there is some difficulty in maintaining the conformity of their product to the specification. a statement of quantity produced.1 12. The information regarding resumption of markings shall also be sent to the Bureau. The marking may be resumed as soon as the defects are removed under intimation to Bureau.0 . Table 1……….Doc:STI/4270/5 October 2001 11. 11. at any time. marked and exported by him and the trade value thereof at the end of each operative year of license. The marking may then be resumed only after permission by the Bureau. PRODUCTION DATA: The licensee shall send to BIS as per the enclosed proforma-1 to be authenticated by a Chartered Accountant or by the manufacturer by giving an affidavit/undertaking.0 STOP MARKING: The marking of the product shall be stopped under intimation to the Bureau if. 3 IS 4270:2001 One One day’s production One hour production Once in six months 7. Mass. No testing is necessary if the consignment of the skelp/strip received and duly identified and with manufacturer’s test certificate covered under BIS Certification Scheme indicating the values.5 14. 5. of Samples Lot Size Frequency Remarks 5.Doc:STI/4270/5 October 2001 IS 4270: 2001 STEEL TUBES USED FOR WATER WELLS TABLE 1 LEVELS OF CONTROL (Para 5 of the Scheme of Testing and Inspection) TEST DETAILS Clause Requirements Test Method Clause 5.1. 6 Mechanical Properties.2 & 7.1 -do- One of pipes of one particular size and grade at each tube mill. In case the sample fails in any one or more of the tests specified.1 & IS 4270:2001 Table 1 & IS 1608 One Four hours production Every four hours. .3 Table 2 to Table 5 One Every hour.1 Reference IS 4270:2001 & Relevant part of IS 228 or any other established instrumental/ chemical. Fig. Workmanship 9. LEVELS OF CONTROL No.3 & Table 6 & 7 Fig 4. wall thickness.3 Check martensite for 5. i) Tensile test 6. Alternatively all the tubes shall be checked and only those tubes found conforming shall be marked. Pipe/tube ends.2 Chemical Composition. 6. 14.1 IS 4270:2001 7.2 & 5. In case of failure of either of the samples. -do- -do- In case the sample fails that hour’s production shall not be marked. Dimensions Outside Diameter.2 IS 4270:2001 & IS 2328 -do- of one particular size & grade at each tube mill. the pipes represented by these test pieces shall not be marked. 7. -do- Each tube Those found not conforming shall not be marked. ii) Flattening test.2 -do& 9. two further samples shall be drawn from the lot and tested for that requirement. the pipes shall be accepted. One One heat Each heat in the consignment. If both the samples pass.2. one 9. 9. length and straightness. 1 to 10. Protection of Ends 13 IS 4270:2001 10 Sockets 10. 12. of Samples Lot Size Frequency Remarks 8. Protective Coating i) Bituminous coating ii) Zinc coating.6 Reference IS 4270:2001 One Four hours production of one particular size & grade at each tube mill. Hydrostatic test.4 -do- As per IS 4711 one particular size & grade.2 -doIS 4736 One Four hours production of Every four hour -do- 13. 8 -do- Each tube 12. One Each Consignconsignment ment. . Adequate inspection to ensure protection of ends according to this standard. LEVELS OF CONTROL No.1 -do- One Each day’s production Each day Those found not conforming shall not be marked. 12.Doc:STI/4270/5 October 2001 IS 4270: 2001 STEEL TUBES USED FOR WATER WELLS TABLE 1 LEVELS OF CONTROL (Para 5 of the Scheme of Testing and Inspection) TEST DETAILS Clause Requirements Test Method Clause 11 Alignment test (not applicable for plain and pipes) 11 & Fig. Quantity not covered with BIS Certification Mark. and the reasons for such non-coverage Brand Name under with non certified goods were sold Quantity Exported with BIS Standard Mark and its value Brand Name under which BIS Certified goods are exported Authentication by Chartered Accountant Signature of Authorised Signatory Name Date 4.0 . Grade/Type/Size Brand/Trade/Name(s) of BIS Certification Marked Products Total production of the articles(s) licensed for certification marking Total production of the article(s) conforming to Indian Standard Production covered with BIS Certification Mark and its value a) b) Quantity (tonne) Invoice sale price 2. 3.0 5. Note : Incase a clause is not applicable.1 PROFORMA FOR OBTAINING QUARTERLY PRODUCTION DETAILS Period covered * Name of Licensee CM/L No.1 6. suitable remarks may be given against it. If any.2 Brand Name used on production covered under BIS Certification Mark Calculation of marking fee as per agreed Rate of Marking Fee a) b) Unit Quantity covered with BIS Certification Mark -----------------------------------------------------------------------------------------------------------*Information to be filled up by BO before forwarding to the licensee.1 5.1 2.1 3. c) Marking fee rounded off in whole rupees as obtained by applying unit rates given in (a) on quantity given in (b) 4. Name of Articles (s) 1.Doc:STI/4270/5 October 2001 PERFORMA .1 3. IS No.
Copyright © 2024 DOKUMEN.SITE Inc.