INDUSTRIAL TRAINING FULL REPORT new.pdf

April 2, 2018 | Author: Elora Sofea | Category: Internal Combustion Engine, Axle, Engines, Machines, Vehicle Parts


Comments



Description

INDUSTRIAL TRAINING REPORTJABATAN KERJA RAYA CAWANGAN KEJURUTERAAN MEKANIKAL PANJI, 16100, KOTA BHARU, KELANTAN DARUL NAIM. NUR ELORA SOFEA BINTI ZURAIMAN MA 13174 FACULTY OF MECHANICAL ENGINEERING UNIVERSITY MALAYSIA PAHANG 27 JUNE 2016 - 2 SEPTEMBER 2016 ACKNOWLEDGEMENT In the Name of Allah, the Most Beneficent, the Most Merciful. All praised to the Prophet Muhammad SAW. Firstly, thankful to Allah SWT for gave me this great chance to go through industrial training in Jabatan Kerja Raya (JKR) and finish it successfully. First and foremost, I would like to thank my industrial supervisor, Abd Malek Bin Abd Ghapar for guidance, information and knowledge during completing my training in JKR. Besides from that, I also want to thank all the head units, Mr Zainuddin (heavy machinery), Mr Fadhli (light vehicle), Mr Anuar (VTL) during my training in heavy machinery, vehicle and VTL for their guidance, knowledge and support. Apart from that, I also want to convey gratitude to all the staffs and technicians here for their kindness in helping me while completing my industrial training. In addition, it is important to have teamwork during my training and here I really want to thank my colleagues for their kindness, exchange ideas and knowledge during my training even though we came from different universities. Then, I want to convey my appreciation to my Universiti Malaysia Pahang lecturers and supervisor, Mr Rosdi bin Daud for his willingness to come to JKR Kelantan. Last but not least, I want to thank my family for their love, motivation and support during my industrial training in JKR. Thanks for all the ideas, opinion, knowledge and suggestion that have given to me in order for me to complete this report. i ABSTRACT This report is set out to give the reader full information about my industrial training in Jabatan Kerja Raya (JKR) Mechanical Branched in Kelantan. Industrial training is one of the compulsory curriculums in Universiti Malaysia Pahang which students need to complete whether in consultant, factory and company. This course is sets up for student in order to give them experience and gain knowledge in working environment before going through the real working life. My industrial training is at Jabatan Kerja Raya or known as JKR Mechanical branched which provide maintenance and construction to the public sectors in Malaysia. In Jabatan Kerja Raya, I have been send to Mechanical branched which located in Panji, Kota Bharu, Kelantan. At this branched, I have been assigned to workshop, building maintenance and project. In workshop, there are three units which are heavy machinery, vehicle and Vehicle Testing Line (VTL). During my placement, I have learned a lot new knowledge about vehicle maintenance and safety. These knowledge are useful for me in future and gives me a lot of advantageous to prepare myself for my future career. Last but not least, in this report included the introduction, brief background about this company, task and mini project I have been assigned, recommendations and conclusion in details during my industrial training in JKR. ii TABLE OF CONTENTS Page ACKNOWLEDGEMENTS i ABSTRACT ii TABLE OF CONTENTS iii LIST OF FIGURES CHAPTER 1 v COMPANY PROFILE 1.1 Company Background 1 1.2 Company’s Objective 1 1.2.1 Vision 2 1.2.2 Mission 2 Logo 3 1.3.1 Description 3 1.3.2 Colour 3 Organization Chart 4 1.4.1 JKR Main Branch Organization Chart 4 1.4.2 JKR Mechanical Branch Organization Chart 5 1.3 1.4 1.5 1.4.2.1 Project Department 6 1.4.2.2 Administration and Financial 7 1.4.2.3 Workshop Department (Light and Heavy Vehicle) 8 Gantt Chart (Industrial Training) CHAPTER 2 2.1 9 COMPANY ACTIVITIES Introduction 10 2.1.1 Workshop Department 10 2.1.2 Project Department 11 2.1.3 Building Maintenance 11 2.1.4 Administration and Financial 11 iii CHAPTER 3 STUDENT ACTIVITIES 3.1 Engine overhauled 12 3.2 Final Drive (Heavy Vehicle) 18 3.2.1 Final Drive Mechanism 19 3.2.2 Types of Final Drive 20 3.2.3 Types of Heavy Machinery 20 3.3 Vehicle Test Line (VTL) 22 3.4 Project/ Tasks 29 3.4.1 Oil Trap Water Separator 29 3.4.2 Workshop Layout Renovation 31 3.4.3 Oil Drum Storage 32 Summary of Daily Activities 40 3.5 CHAPTER 4 CONCLUSION 4.1 Conclusion 47 4.2 Recommendations 48 49 REFERENCES iv 7 ‘V’ 8 Engine 14 2.3 Assembling 18 3.2 Organizational Chart 4 1.6 Horizontal Opposed Engine 13 2.2 Workshop Department 8 2.7 Bulldozer 22 3.1 JKR’s Logo 3 1.1 Light Vehicle 16 3.LIST OF FIGURES Figure No.5 Horizontal Engine 13 2. Title Page 1.8 Test lane 23 v .3 Mechanical Branch 5 1.1 Administration and Financial 7 2.8 Rotary Engine 14 3.4 Project Unit 6 2.3 Heavy Vehicle 9 2.2 Piston 17 3.6 Excavator 21 3.4 Vertical Engine 13 2.4 Final Drive Drawing 19 3.5 Planetary gear 20 3. 18 Drainage Before 29 3.10 Above Carriage Suspension 24 3.13 Smoke Testing 26 3.23 Full View 33 3.9 Vehicle Entry 24 3.32 Top View 38 3.27 Top View (3D) 35 3.25 Side View 34 3.22 Workshop Layout 32 3.17 Test Report 28 3.24 Front View 34 3.33 Side View 39 vi .19 Insert Grill 30 3.16 Undercarriage Test 28 3.15 Roller Brake Test (Rear Wheel) 27 3.29 Side View (3D) 36 3.20 Insert Sand 30 3.30 Back View (3D) 37 3.28 Back View 36 3.21 Insert Mat 31 3.26 Side View (3D) 35 3.3.14 Side Slip Test (Front Wheel) 26 3.12 Diesel Smoke Tester 25 3.31 Side View 37 3.11 Database 25 3. 34 Zoomed View 39 3.35 Side View 40 3.36 Gear 41 3.38 Oil Jet (Sketch) 45 vii .3.37 Workshop Layout 42 3. 2 COMPANY’S OBJECTIVE 1. public hospitals. 1 . For this training. time and cost as prescribed. military and water works. road. Meanwhile in Sabah and Sarawak another entity of Public Works Department exists under respective state government’s jurisdiction. In Mechanical branched. Deliver mechanical system / projects that meet quality. Perform maintenance of mechanical systems.F.CHAPTER 1 INTRODUCTION OF INDUSTRIAL TRAINING 1. quality. 1. Kelantan. plant construction and quarry plant belonging to the government that meet quality. As public government department. Complete the mechanical systems design work that meet the standards. works are focused on machinery maintenance and mechanical construction for the department. The mains infrastructure of public government which maintained by JKR are federal road. time and cost as prescribed. time and cost as prescribed.A McNair as its first head organization. JKR has been divided into a few branched which experts in their own field such as mechanical. I have been assigned to Mechanical branched in Panji. 3. public school and public government buildings. With this. slope. electrical. building.1 COMPANY BACKGROUND Jabatan Kerja Raya or Public Works Department as it known has been formed since 100 years ago by Major J. vehicles. such as roads and water supply systems. 2. state road. JKR is the federal government department in Malaysia under Ministry of Works Malaysia (MOW) which is responsible for construction and maintenance of public infrastructure in Malaysia. Kota Bharu. JKR has touched many aspects of the nation's life by providing necessary infrastructure.  Developing human capital and new competencies. vehicles.  Building a harmonious relationship with the community. 1. project management and engineering services for the development of the nation’s infrastructure through creative and innovative human capital and state-of-the-art technology. 5.2 Mission PWD Mechanical Engineering Branch is committed to contribute to national development by:  Helping our customers realize the policy / objectives and deliver services through cooperation as a strategic partner.  Strengthen existing engineering competency.  Emphasis on integrity in providing services. plant and quarry belonging to the PWD to meet the current department needs.  Providing asset management services and the effective and innovative projects.2. Provide technical consultancy related to the mechanical engineering field to government agencies and statutory bodies within time required.1 Vision To become a world-class service provider and centre of excellence in asset management.2.  Standardisation of processes and systems to provide consistent revenue. 1.  Preserving the environment in service delivery. 2 . Manage the assets of which consist of mechanical services in buildings.4. The arch-shaped lines in concentrated black color denotes to construction related work and maintenance of bridges and as well as a representative of the JKR organizations assigned as one of the leading the country in implementing engineering work.3. Yellow symbolizes maturity brands of JKR as one of the oldest organizations established and replicates the image growing in achieving its objectives. Straight black lines. Starting from the base.2 Colour 1.3 LOGO Figure 1. Fourteen lines on a straight line signify a pledge to executing building operations comprising 14 states and federal territories in Malaysia.3.1. Grey symbolizes existence values . 3. 3 . 2. on the line shaped arch symbolize the participation to implement the road network nationwide. Black symbolizes strength / unity quality of branch . 3.1 Logo 1. 1.1 Description: 1. 4. 2. 5.values of human capital in provide services. the exhibited logo as it mirrors the diversity of fields of work entrusted to the Jabatan Kerja Raya (JKR). black colored curved lines symbolizes clean water supply and reflects that JKR is a dynamic organization. Generally.the branch in JKR organization entrusted to implementing development projects. 4. Each department play their role in maintaining and developing country infrastructures. in JKR Mechanical Branched works are mainly focused in machinery maintenance and mechanical construction. For instance. Figure 1. There are eight departments in JKR Kelantan.1 JKR Main Branch Organization Chart Organization chart below show the main departments in the JKR Kelantan.4 ORGANIZATION CHART 1.2 Organizational Charts 4 .1. 1.2 JKR Mechanical Branch Organization Chart Figure 1.3 Mechanical Branch 5 .4. 4. 1.1 Project Department Figure 1.2.Mechanical Branch has been divided into five department  Project  Building maintenance  Administration and Financial  Quarry  Workshop (Light And Heavy Vehicle) Each of the department play an important role in maintaining goverment machinery and infrastructure.4 Project Unit 6 . 2.2 Administration and Financial Figure 2.1 Administrational and Financial 7 .4.1. 4. Heavy Machinery/Vehicle and Vehicle Test Line (VTL).3 Workshop Department (Light and Heavy Vehicle) Figure 2. 8 . bulldozer and etc. Function of Light Vehicle and Heavy Machinery units are kind of similar. it provides transportation for staff to go to construction site while Heavy Machinery unit provides vehicle for construction like backhoe.2. It needs to maintain and repair the government light and heavy vehicle. In Light Vehicle unit.2 Workshop department Workshop department is divided into three units which are Light Vehicle.1. Observation .Mini project VTL .1.Site visit .Writing report MAINTENANCE .Operating equipment/ software .Practical .Observation .Mini project VEHICLE .Site visit .Operating equipment/ software .5 GANTT CHART (INDUSTRIAL TRAINING) 2016 WEEK 1 2 3 4 UNIT HEAVY MACHINERY .Observation 9 5 6 7 8 9 10 .Data collecting/ analysing .Observation .Data collecting/ analysing PROJECT .Observation .Practical .Data collecting/ analysing . As I have explained above that.1 Workshop Department Figure 2. Project and Building Maintenance departments. Quarry and Administration and Financial. Workshop. for 10 weeks of internship.1. this company has five department which is Project. I will explain in details about this company activities. I only have been to Workshop. Building Maintenance.CHAPTER 2 COMPANY ACTIVITIES 2. However.1 Heavy Vehicle 10 . 2.1 INTRODUCTION In this chapter. Sound Level Test And Headlight Beam Test. Emission Test.1. 2. In Light Vehicle Unit.Workshop department is divided into three units which is Light Vehicle.  Gives technical advice related to mechanical system tools in government building. Above Carriage Inspection Stage 2: Diesel Smoke Test. Roller Brake Test.2 Project Department  Carry out work in compliance with the government policies which is will be introduced from time to time. Suspension Test.1. During my internship in this unit. elevator and air conditioning system. Each unit responsible in maintenance or repairing government vehicle. 2. Speedometer Test. Stage 1: Vehicle Entry.  Evaluate and accrediated the deal chosen. Heavy Machinery/Vehicle and Vehicle Testing Line.  Plan maintenance programme and cost estimated for mechanical system tools in government building and infrastructure which needed to be maintain 11 .  Make sure internal energy used in optimal level.3 Building Maintenance  Gives technical advice related to mechanical system tools in government building. It need to go through four stages. Stage 4: Under Carriage Inspection And End Of Lane Test. government vehicle or transportation that need to be repair will be send to this unit. prepare project draft and estimated cost of mechanical system tools for government building and infrastructure that will build.  Planning. I have watched inspection of vehicle. Stage 3: Sideslip Test.  Design and prepare drawing with technical specification to call the deal for federation and state project . I have watched demonstration on Final Drive. While during heavy machinery. Every government vehicle need to be test to ensure its safety. for Vehicle Test Line (VTL). Besides.  Managing and maintaining mechanical system tools of government infrastructures like fire fighting system. I have watched an engine overhauled and through this I learned more about each compartment in vehicle. 1. financial and etc.2.4 Administration and Financial Administration and Financial is the main department in JKR Mechanical as it needs to managing and handle expenditure as well as projects in JKR Mechanical. It has been divided into few units like project. mailing. 12 . burn a fuel to create heat. 13 . There are two types of engine system.1 ENGINE OVERHAULED An engine or motor is a machine designed to convert one form of energy into mechanical energy. Electric motors convert electrical energy into mechanical motion. Heat engines. pneumatic motors use compressed air and others—such as clockwork motors in wind-up toys—use elastic energy. including internal combustion engines and external combustion engines (such as steam engines).CHAPTER 3 STUDENT ACTIVITIES 3. four stroke engine and two stroke engine and five types of engine which is commonly used  Vertical  Horizontal  Horizontal opposed  ‘V’ 8  Rotary. which then creates a force. 4 Vertical Engine Figure 2.6 Horizontal Opposed Engine 14 .Figure 2.5 Horizontal Engine Figure 2. Main bearing 2. Crankshaft 9.8 Rotary Engine Engine system consists of Mechanical system. Fuel system. Electrical system. Crankcase 6. Push rod 4. Rocker arm 15 . Connecting rod bearing 3. Piston ring 13. i. Mechanical system 1. Engine block 8. Tappet 5. Cooling system. Valve 12. Rocker cover 7. Cylinder head 11. Lubrication system.7 ‘V’ 8 Engine Figure 2. Piston 10.Figure 2. Cooling system There are two system in cooling system which are water cooling system and air cooling system. Carburettor 3. Fuel tank 11. Oil filter 2. Contact point 4. Injector (nozzle) 8. Component: iii. Fuel tank cap 12. Oil gelory iv. Oil sump (crankcase) 4. Radiator 2. Water pump 16 . To avoid engine components from wear 2. Oil pump 5. Injection pump 7. Air cleaner 3. Function: to control engine’s temperature during using the engine. A/C pump (transfer pump) 9. 1. Component: 1. thus to prevent engine from over heating. Fuel system Function: To distribute fuel into combustion chamber with specific amount at a certain time.ii. Spark plug Lubrication system Function: 1. Throttle body 2. Fuel filter 6. Distributor 5. To control engine temperature Component: 1. Glow plug (Heater) 10. Gives lubrication to components during using the engine 3. Fan v. component in engine break and engine under power. Battery 5.3. Fuse box 3. testing all the components. Rubber hose 7. Component: 1. we will proceed to engine overhaul. Ignition switch 2. An engine overhaul is a comprehensive engine tune-up that involves removing and disassembling a vehicle's engine.1 Light . This is done to improve vehicle performance and prolong the life of the engine. Relay After knowing all the components in the engine. Belting 4. Electrical system Function: to distribute electrical current to each section with specific amount . Alternator 4. Reserve tank 5. cleaning and replacing parts as needed and then reassembling the engine. Why engine need to be overhaul? The factors of engine need to be overhaul are noise in engine. Radiator cap 6. Starter motor 6. 17 Vehicle Figure 3.  Step 2: Engine 1. 12. Remove piston by using wooden hammer. push rod and tapped. Open bolt/nut round that connected with speed gear 2. After that.  Step 1: Body engine 1. Remove main bearing in engine block and main cap 11.2 Piston 18 . Open the crankcase and bolt connecting rod. Open cylinder head. 7. Disassemble radiator and its component. open ‘C’ clip/eyer clip of guindy pin in piston to remove connecting rod from piston. Remove camshaft. Open exhaust manifold and other components which attach to engine body. 6. 5. 13. Then. Remove cylinder head gasket on surface of engine block and clean it. open the bolt rocker arm and remove its valve. Open bolt main cup to remove the crankshaft. Clean outer parts of the engine. Start from side part. 4. 3. Open bolt fly wheel and remove it housing.Steps On Engine Disassemble. 9. 10. Take out all other remain components and clean them. 8. 4. Throw away the engine oil from the drain plug. 3. Open bolt/nut/screw on engine mounting. Figure 3. 2. 3 Assembling Note: Damaged or wear components need to be replace with new component. Each final drive has the same components. 19 .Figure 3. 3. The final drives are located at the ends of each axle housing. It connects to the differential axle which connects to the wheels.2 FINAL DRIVE (HEAVY VEHICLE) Final drive is the last part of a set of gears that delivers the necessary torque to turn the wheels of a vehicle. The final drive is a double reduction unit that consists of two planetary gear sets. A final drive provides the last speed reduction and the torque increase in the power train. planetary carrier 9. 1. planetary carrier 7. sun gear 10. spindle housing 11. wheel 12. planetary gears 8.4 Final Drive Drawing From the figure above. hub 4. ring gear 6. bearing cup and cone 2. bearing cup and cone 3.Figure 3. planetary gears 5. sun gear 20 . Spline housing is fastened to the axle housing. The oil in the final drives is the same oil that is in the differentials. The planetary carrier is turned in the same direction as sun gear but at a slower speed. The axle shaft is connected to the differential by splines. the planetary gear moves around the inside of ring gear. Each final drive has an oil reservoir.2. double reduction and planetary gear set. Oil is added to the final drive through a filler plug on the outside cover. Final drive single and double reduction is rarely used now because of its construction. Carrier is connected to wheel. Because ring gear is held stationary. Carrier is turned in the same direction as sun gear but at a slower speed. Sun gear is engaged with planetary gears which are held in planetary carrier. Power from differential turns the axle shaft. Sun gear turns planetary gear because ring gear is stationary. The components of the final drive are lubricated from the oil that is inside of the final drives. 21 .2. Oil is removed from the final drive through a drain plug. The axle shaft turns gear. the planetary gears move around inside of ring gear. 3.1 Final Drive Mechanism Ring gear is splined to hub which is connected to spindle housing by spline. While final drive using planetary gear widely used in heavy machinery cause it has a lot of advantages. The movement of the planetary gears causes planetary carrier to turn.2 Types of Final Drive There are different final drive used by heavy machinery which is single reduction. Sun gear is connected to the axle shaft by splines. The movement of the planetary gear causes planetary carrier to turn.3. Carrier turns sun gear. hub and spindle housing are held stationary. Sun gear is engaged with planetary gear. Carrier turns wheel. Sun gear turns planetary gears. Ring gear. Planetary carrier is fastened to sun gear by spline. Heavy machinery is categorized by working methods like excavation. lifting. holes.6 Excavator Excavators are used in many ways:  Digging of trenches.5 Planetary Gear 3. transportation and mixer.3 Types of Heavy Machinery Final drives are widely used in heavy machinery.Figure 3.2. Excavator Figure 3. foundations  Material handling  Brush cutting with hydraulic attachments 22 . sand. mines and quarries. especially.7 Bulldozer A bulldozer is a crawler (continuous tracked tractor) equipped with a substantial metal plate (known as a blade) used to push large quantities of soil. engineering projects and farms. rubble. or other such material during construction or conversion work and typically equipped at the rear with a claw-like device (known as a ripper) to loosen densely compacted materials. in conjunction with a pile driver  Drilling shafts for footings and rock blasting. 23 . heavy industry factories. Forestry work  Forestry mulching  Demolition  General grading/landscaping  Mining. Bulldozers can be found on a wide range of sites. by use of an auger or hydraulic drill attachment  Snow removal with snow plow and snow blower attachments avator Bulldozer Figure 3. military bases. but not only open-pit mining  River dredging  Driving piles. Vehicle test line can do the inspection for few vehicles in short amount of time. Every inspection stages are automatic. results will be printed for each vehicle inspected and it will be kept in database for future use. At the end of inspection. Figure 3.8 Test Lane 24 . Passage on test lane is based on big monitors at right side of test lane.3. Test lane computer (TLC) and sensor in test lane VLT will supervise every vehicle (every axle) on test lane automatically.3 VEHICLE TEST LINE (VTL) Jabatan Kerja Raya mostly inspected government vehicle to ensure its safety. make sure that there is no vehicle and any sensor is switch on on the test lane. 25 .9 Vehicle Entry o Above carriage inspection Figure 3.10 Above Carriage Inspection Then. The technician need to check the engine and chassis number to ensure it is the same with the database. There are four stages of inspection  Stage 1 o Vehicle entry Figure 3. the vehicle data need to be put into the database.Before start the operation. If the results are above 50%.Figure 3.11 Database  Stage 2 o Diesel smoke test The test is during engine in neutral / free gear. the vehicle will be sued to environmental department and need to change its component. Figure 3. Diesel smoke tester machine is used to test the pollution emitted by vehicle.12 Diesel Smoke Tester 26 . 13 Smoke Testing o Emission test o Sound level test o Headlight beam test For emission.  Stage 3 o Side slip test Figure 3.Figure 3.14 Side Slip Test (Front Wheel) 27 . sound level and headlight beam test. it would not be carried out during vehicle test. 15 Roller Brake Test (Rear Wheel) A roller brake tester is a method of allowing the dynamic assessment of the braking system of a motor vehicle. The driving rollers operate at a low (known) speed using a gearbox and motor arrangement and during a test measurements of the maximum braking force are taken by applying the vehicle brakes which induces a reaction force on the electric motor itself.Sideslip test is carried out to inspect the alignment of the car. It will be done for front and back wheel. Roller brake testers consist of a mechanical floor unit which contains electrical motors. o Suspension test o Speedometer test Suspension and speedometer test are not carried out during the inspection. o Roller brake test Figure 3. 28 . whilst the vehicle itself is in a static condition. two independent sets of three measuring rollers. brake force transducers and additional safety sensors. An electric transducer with strain gauges then measures the individual induced forces which are acting during the deceleration phase in order to calculate the individual braking forces for each wheel. 16 Undercarriage Test The undercarriage test is carried out to check if there is any leaking or damaged component. Stage 4 o Undercarriage test Figure 3.17 Test Report 29 . test report Figure 3. o End of lane. this project given by my supervisor for the trainee as there was visit by HQ Audit. it needs to be send for services. This is because the existing oil trap is lower than water flow which cause sand in oil trap cannot trap the oil. we came up with solution that the oil trap needs to be build higher than water flow.4. Firstly. Problem Statement: The oil trap in the drainage didn’t properly function as it needs to trap the oil flow from the workshop. Thus. The test failed if the results are below the assigned efficiency. 3. Solution: As this was only a simple task.18 Drainage (Before) 30 .1 Oil Trap Water Separator.The test report will be out at the end of tests to show the results of the test.4 PROJECTS/ TASKS 3. For the vehicle that didn’t pass the test. the drainage would be clogged oil. This project is mainly about environmental problem and how the trainee need to came up with solution. Figure 3. Figure 3.20 Insert Sand 31 .19 Insert Grill  The grill is installed in order to hold the mat and sand.Installation steps: Figure 3. 21 Insert Mat  Green mat function as to prevent the sand from flowing out 3. Sand is put into the drainage to trap the oil Figure 3. I was assigned to sketch the workshop layout and came with new idea for new arrangement.4.2 Workshop layout renovation This task was given to trainees as there was visit by HQ Audit. 32 . The workshop of Light and Vehicle Unit need to be renovates to make sure that vehicles. oil drum and others are neatly arranged. The new layout was drawn by using software Catia by one of our teammates. tools.  Worktable (Meja Kerja) o Space to keep tools and machine.  Stor o Install used battery and oil.  Vehicle Service (Tempat Servis Kenderaan) o Space for repairing and services.  Toilet (Tandas) o For worker uses  Walkway (Laluan Pejalan Kaki) o Walkway for workers around workshop 33 .  Heavy Machinery Main Control Room (Bilik Kawalan Jentera) o For workers to observe works in workshop.22 Workshop Layout  Main Office (Pejabat Utama) o For technician and assistant engineer.Figure 3. 3 Oil drum storage Problem statement: There is no specific space for oil drum storage in workshop. Oil drums are kept scattered at the workshop and it could cause danger for the worker. Usually.4. With this. o Oil drum will be neatly arranged if there is storage to keep it. Its objective is to improve working environment. it will hazardous for workers as it could cause accidents. it will reduce accidents.23 Full View 34 . Advantages of oil drum storage. by keeping oil drum in storage and guard it well. avoid hazard at work like explosion and easy installation of oil drum.  Easy arrangement. This project is mainly on environmental working condition. Thus. these drums will be labelled and storing it by label will make work easy. trainees were given task to build (proposal) for oil drum storage.  Improve safety at working place. o If there is oil spill.3. Design of oil drum storage by using Inventor AutoDesk Figure 3. 25 Side view 35 .24 Front view Figure 3.Figure 3. 27 Top view (3D) 36 .26 Side view (3D) Figure 3.Figure 3. Figure 3.28 Back view Figure 3.29 Side view (3D) 37 . 38 . we have designed the possible layout involving the oil trap building and nearest building involved.30 Back view (3D) Figure 3. By using the Delmia software.31 Side view Oil Storage and Layout of workshop using Delmia software.Figure 3. From all the view that we have chosen. we can see workers gathering the oil barrels to the oil storage building. Oil Storage Workers picking up oil Barrel Workshop building Figure 3.32 Top View 39 . Workshop Building Figure 3.33 Side view Oil Trap Building Figure 3.34 Zoomed view Workers Workers controller 40 . Figure 3.35 Side view 41 .  Briefing about the rules and history of this company.  Problem: The sun gear wear. Zainuddin Bin Daud and tour around the work area and to recognize and learn the components in engine.  The technician gave details explanation on how final drive works and factors of why gear need to be change.  Go to office to settle about thumbprint and send feedback letter from factory to Industrial Training Unit.36 Gear 42 .  Description of duties by Mr. it need to be change to avoid accident and ensure the vehicle run smoothly.3. For this unit. Also briefing about laws and safety regulations and equipment’s need to be wear during work.  Supervisor shown us certain places in the company.  First assigned unit is Heavy Machinery Unit. I have watched demonstration for final drive. So. Figure 3. Brought 27th June 2016 – 30th June 2016 overall look workshop.5 SUMMARY OF DAILY ACTIVITIES Week Details 1  Introduction session with the administration. 3  In third week. we’re in progress do the oil trap water separation project.  The factors are mainly because of piston ring wear and valve’s leak.  Besides that. 3th July – 5th July 2016  The purpose was to find the problem and we need to improve it.  Other than that. technician shows us the demonstration of overhauled engine in light vehicle.  Innovation project of oil trap water separator. it needs to be change. 11th July 2016 – 14th July 2016  I have been assigned to do the layout for control unit.  If the piston ring wears. Mohd Fadhli Bin Mohamad.2  Learn about the components of the engine. we have been given a detail explanation on factors of underpowered engine. We measure the parameter of the room and design it using software.  Then. 43 . factors of valve leak are because it is not properly closed which can cause scratch on valve and there will be oxygen out. I have been assigned to Light Vehicle Unit and was introduced to Head unit.  The solution was we need to increase the level of oil trap in the drainage so that it will trap the water when the water flows through it.  Besides. Figure 3.  Demonstration on smoke tester. automatic gearbox and engine overhaul.37 Workshop Layout 5  During this week.  If the results of the test is higher than 50. the car will be issued by environmental department. 24th July 2016– 28th July 2016  Briefing by Mr Anuar in Vehicle Testing Line Unit (VTL).  Given a mini project which was workshop layout innovation.  He shows around the workshop and gave details explanation on each test of the car.  The purpose of this project is to change the oil drum in the 44 . I have been assigned to Vehicle Test Line (VTL) unit.  I have been assigned to sketch the old layout of heavy machinery and vehicle unit. The smoke tester purpose is to detect the pollution of smoke emitted from the vehicle.  Self-study on final drive.  We have been given new mini project which is oil drum storage by supervisor.  We are needed to change and improved the old layout of heavy machinery and vehicle unit. 17th July 2016 – 21th July 2016  The layout was drawn by using Catia software.4  Cleaning workshop. it didn’t pass the test because the result of front brake is less than 50%. Toyota Fortuner 2.  Task was mainly about air conditioning system. . I have been prepared for Industrial Training presentation as there would be lecturer visit.  As for the Nissan Urvan.Report  I did self-study on fire fighting system and installation of ceiling cassette split type air conditioner (E series) Acson. 6  Inspection on vehicle like Toyota Hilux.  The vehicle failed the test if it didn’t pass the range or limit that had been assigned.  Briefing given by Mr Azi Izwan and he gave me task to be 7th August 2016 – 11th August 2016 completed within a week. 45 .Slide Presentation .  During this week.  While for Toyota Hilux. organizational chart in Jabatan Kerja Raya and function of each department in JKR. easy to keep the oil drum and to ensure the safety of the workers. it didn’t pass the test because the result of rear brake is less than 50%  Vehicle that didn’t pass the test will be send to the service center for services 7  At 7th week. I have been assigned to Building Maintenance Unit. Nissan Urvan.5G 31st July 2016 – 4th August 2016  Only Nissan Nevara passed all test during the inspection while other vehicle had failed.storage.Log book . we have meeting with our supervisor to discuss for new project about innovation. He gave us 14th August 2016 – 18th August 2016 briefing and details about this unit.  Divided into three groups.  Besides.  Wall mounted split type air conditioner usually used in hotels. I have been given task by my supervisor to managed files for Audit visit from main branch.  I have been assigned to Project Unit and Mr Zamri gave briefing 21st August 2016 – 25th August 2016 9 about this unit.  Did self-study on installation of wall mounted split type air conditioner.  During this week.8  Mr Zulfadli brought us to Air Cond Workshop unit. he introduced us to the staff of this unit. 46 .  He introduced me to staffs of this unit.  Other than that.  We were given quizzes and task.  Clean the workshop and arrange tools.  Given task to study about fire fighting system  Wet riser system  Dry riser system  Hose reel system  Meeting with supervisor and other trainee.  We need to come up with new idea to innovate any tools in workshop. houses and small room.  Each group need to present their ideas. my group idea which was 3rd group chosen.  1st group: circuit breaker to avoid electrical waste  2nd group: smart toolbox and air-conditioning filter.  After discussion. We created this oil jet as automatic hydraulic and can be control by remote. Figure 3. 47 .  3rd group: oil jet and tool dispenser.  Oil jet function as to keep oil from spill onto the floor during repairing the vehicle. It is easy for technician to use tools.10  Study on do’s and do not’s in installation of mechanical system in air conditioning system.38 Oil Jet (Sketch)  For tool dispenser.  Final meeting with our supervisor to discuss about our final 28th August 2016 – 1st September2016 project. it acts like washing machine but for tools. I had developed skills in work ethics. Since there are different levels of personnel.CHAPTER 4 CONCLUSION AND RECOMMENDATION 4. Basically the program was successfully completed whereby all the objectives highlighted by Industrial Training Committee were achieved. Mechanical and others. I have learned lot of new things and have acquired sufficient exposure in new area such as instrumentation. the program was not only beneficial for me in term of technical or academic base but I could also develop various skills. all the objectives of the program are full-filled. I had the opportunity to integrate theory with practice while completing the assignment and projects given by my supervisor. thus smoothen the learning process. The integration of the theoretical knowledge and the industry has enhanced better understanding on the subjects that I have learned in the university. Moreover. I had experience in adapting to this kind of environment. I also have a chance to relate all the theories learned at university with real working life. From this program. after undergo three months of Industrial Training.1 CONCLUSION In conclusion. Jabatan Kerja Raya is an ideal place for Industrial Training Programme as the experience and knowledge gained is the most valuable lesson which cannot be received in class. communication and management skills. The combination of technical and non-technical skills has provided an opportunity for the student to prepare in working life culture. 48 . I would like to suggest for the Mechanical Faculty or UMP to extend two more weeks. it would be lack of opportunities for us to be chosen. from my experience. I couldn’t been assigned to other department as I have only short amount of time. the briefing for Industrial Training should be given one semester before the search is on. I would like to suggest some recommendations to be reviewed by industry unit of University Malaysia Pahang. In order for the next candidates to gain better knowledge and experience of working environment from the Industrial Internship Program. Besides that.2 RECOMMENDATION During industrial training. I had been given ample opportunity to learn and experience working in corporate organization.4. This is because most of company only want to take students with 3 months industrial training. I feel that there are rooms for further improvement so that I can meet the requirements of their practical placements particularly in fulfilling the objectives of the placement. so the faster they apply the better chances they get the placement. Other than that. The list of company previous student had done their internship should also be publish to make the job of applying internship easier. With this. Almost all University students in Malaysia is applying to do internship in the same period of time UMP student. 49 . The time given for me to do industrial training is very short which only ten weeks. The appropriate verification letter should be given to student before their semester break so they could search and apply for internship during their holiday. as such I would like to make some recommendations for both JABATAN KERJA RAYA (JKR) and UMP. Books from Jabatan Kerja Raya 50 . Industrial Training Guideline Handbooks 3.REFERENCES 1. Notes 4.0) (Vehicle Inspection Station) 2. Jabatan Kerja Raya Manual Pengendalian(v1.
Copyright © 2024 DOKUMEN.SITE Inc.