HSE DIRECTIVE 4LIFTING OPERATIONS 108 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 PURPOSE, SCOPE AND STRUCTURE Purpose • Provide requirements and instructions for safe use of lifting equipment in accordance with statutory requirements and BP’s own requirements • Contribute to the establishment, maintenance and further development of an acceptable safety level for personnel, the environment and material assets in the planning and performance of lifting operations Scope • This directive applies to all BP-operated installations and contracted installations on the Norwegian continental shelf • Contractors of contracted installations who have a system that satisfies the requirements in this directive may use their own system provided this has been clarified upon implementation Structure • BPN’s lifting operations directive consists of the following: 1. Purpose, scope and structure 2. BPN’s requirements additional to NORSOK R-003 3. NORSOK R-003 “Safe use of lifting equipment” BPN’s additional requirements apply in addition to, or replace, the requirements stated in NORSOK R-003. These are operational requirements, as well as requirements for roles and duties, and competence. • Field- and installation-specific governing documentation relating to lifting is available in the HSE instructions for Valhall/ Hod and Ula/Tambar • The hierarchy of the governing documents for lifting operations is as follows Plil AF s33 BPÑs DíFEKTíV 04 (ÑOFSOK F·003 & BPÑs lilleggskravì BP 3 Colden Safelv Fules, ÑSLF, BPÑ inlerne krav Valhall/HOD og Ula/Tanbar FeIt-/innretningsspesifikke HMS-instrukser 109 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 References • The Petroleum Safety Auhtority’s regulations • BP’s 8 Golden Safety Rules • BP’s NSLR (North Sea Lifting Rules) • HSE directive 1 - Work Permits • HSE directive 10 - Helicopter Operations • HSE directive 11 - Safe Job Analysis • 1.70.010 Lifting Equipment Manual • BP Drilling & well Operations Policy Web page for crane and lifting equipment BPN internal check list and instructions my be found on the BP 0-page on the intranet; Lifting Operations: http://stavanger.bpweb.bp.com/intranet/crane/ BPN’S REQUIREMENTS ADDITIONAL TO NORSOK R-003 “SAFE USE OF LIFTING EQUIPMENT” Below is an outline of BPN’s requirements additional to the following sections of the NORSOK standard: • SECTION 4 - SAFE USE OF LIFTING EQUIPMENT • SECTION 6 - ADDITIONAL REQUIREMENTS FOR DIFFERENT LIFTING INSTALLATIONS • SECTION 7 - ADDITIONAL REQUIREMENTS FOR DIFFERENT LIFTING EQUIPMENT • APPENDIX A - ROLES AND RESPONSIBILITIES • APPENDIX B - TRAINING REQUIREMENTS The sub-sections below refer to the sections in R-003 Section 4.4 Planning • Every lifting operation shall be planned in a safe manner and as a minimum the 4-point-check shall be filled in. The form is available on the intranet or as paper copy. Section 4.7 Communication • When performing lifting operations in very noisy areas, headset w/integrated telephone must be used • In case of disruption, unclear or failing communication, immediately stop the lifting operation until safe communication has been restored Section 4.8. Safe execution (please also see Norsok chapter 3.1.16) • Upon execution of safety critical tasks, installation specific work instructions shall be adhered to: Ula, Valhall. Section 4.8.2 Signaller and slinger • Lifting operations with offshore cranes or SIMOPS cranes must always be carried out with a minimum of three persons/ roles involved: the lifting appliance operator, signaller and slinger. 110 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 • For all other permanent lifting appliances (BOP cranes, travelling cranes, wireline winches, personnel and work winches, etc.) a risk analysis defining the minimum number of staff required to perform lifting operations must be available • No lifting operations with permanent lifting appliances must be carried out with fewer staff than the pre-defined minimum number. Whether extra personnel is required in addition to the minimum number must be considered during the planning of lifting operations. • In operations where both the signaller and slinger are needed, these two must not change roles during the performance of a lifting operation • If the lifting appliance operator has a good visual overview of the area, the slinger can, with clearance from the lifting appliance operator, handle and touch the load when it is under control and below hipheight (1,3m). Section 6 Additional requirements for different lifting appliances • All types of jacking and chain hoists must be secured against overload. By an overload protection system. • Fibre slings must not be used for lifting operations by offshore crane used between vessel and installation. Section 7 Additional requirements for different lifting gear • The lifting gear shall satisfy the requirements in BPN’s Lifting Equipment Manual • The following lifting equipment may not be used: o Plate clips o Magnetic yoke o Vacuum yoke o Pallet truck Section 7.5 Eye bolts and eye nuts • Eye bolts must be grade 80 and preferably RUD type in order to standardize the assortment. • Assembled and described units from vendors shall not be modified (e.g. change of eye bolts mounted on el. engines having eye bolts for material handling) Section 7.11 Load carriers • A deviation from the requirement that offshore containers must not be stacked on top of each other, can only be made when: o there is prior approval from the Business Unit Leader or a delegated person o The container is designed for stacking and labelled “Godkjent for stabling” (Approved for stacking) o the container is equipped with a crane pendant and/or lifting yokes that enable hooking up while standing on deck o stacking is limited to pre-defined areas o the risk assessment of the lifting operation shows that the 111 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 risks of lifting the container up and down are as low as practically possible, and lower than the risks associated with other feasible alternatives o approved work permit level 1, with enclosed risk assessment and risk-reducing measures • When the container is moved internally, the doors must be closed with locking devices, incl. spring hooks Appendix A - Roles and responsibilities The role and responsibility matrix below shows appendix A in NORSOK R-003. In addition, BPN-specific roles/responsibilities are indicated in italics. All references are to NORSOK R-003. Description of roles and responsibilities onshore The company (Performance Unit Leader & Head of Country for BPN): • implement the NORSOK standard, have the internal expertise necessary to stipulate requirements for the discipline area, in accordance with the statutory requirements, • have at its disposition on adequate and qualified expertise (person) available, • have at its disposition on adequate and qualified operational and technical support available, • carry out verifications in the discipline area. • Have the overall responsibility for ensuring that relevant requirements and guidelines are implemented into BPN’s projects and relevant contractor companies in order to secure proper risk control. Engineering Authority, EA: • Responsible for ensuring the availability of appropriate systems in order to maintain the technical integrity control of the installations • Define the “engineering” competence matrix and ensure TA’s competence • Make sure that BPN has an organized enterprise of competence within lifting • Responsible for ensuring that the regulatory requirements regarding competent control are met and that supervision takes place in accordance with own and regulatory requirements • Ensure that the organisation has competent personnel in the positions stated below. • Ensure verification that the systems function (seen to by Compliance Coordinator) Technical Authority Lifting Equipment (TAL) • Compliance Coordinator for lifting equipment • Responsible for BPN’s directive, procedures, instructions and specifications within his discipline and for ensuring that these are in line with the regulatory requirements • Responsible for giving advice regarding applications for exemptions and that they are acceptable in relation 112 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 to specifications, directives, procedures and regulatory requirements • Give advice to Operations Support Teams, BPN’s projects and offshore personnel regarding the company’s own and regulatory requirements, and make sure that they are complied with Internal Discipline Leader, enterprise of competence, lifting • Responsible for all competent control/certifications performed by BPN’s internal enterprise of competence, lifting. • Responsible for ensuring that the planned quality level is achievable and for making sure that necessary specification, procedures, instructions and guidelines for the work have been prepared. • Evaluate and reject/approve certificates • Give advice regarding the company’s own and regulatory requirements, and make sure that these requirements are met by the external enterprise of competence, lifting, as well. Operations Support Team Leader (OSTL): • Overall responsibility for securing sufficient lifting personnel and competence in OST. • Responsible for ensuring that relevant requirements and procedures are implemented in BPN’s operating and maintenance systems and in relevant contractor companies. Technical responsible person (mechanical discipline engineer) (see also Technical responsible person Off- shore): • maintain the technical condition of the lifting equipment, • make sure the necessary maintenance program is established, implemented, carried out and maintained in line with the manufacturer’s instructions and experience with the use of this type of equipment. See appendix G regarding maintenance, • make sure that the necessary expert inspections are carried out and followed up in accordance with appendix H regarding expert activities, • ensure that the necessary documentation for lifting equipment is available in accordance with appendix E regarding documentation and marking, • consider the need for and recommend renewal and modifications of lifting equipment in consultation with the users. Job Officer (JO) / Responsible Engineer (RE) • Responsible for ensuring that BPN’s requirements regarding lifting equipment and operations are communicated to BPN’s suppliers and contractors • Responsible for ensuring that BPN’s suppliers and contractors are informed of any deviations and need for compensating, corrective and preventive measures. 113 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Description of roles and responsibilities offshore: The Offshore Installation Manager (OIM) shall • Ensure compliance with this NORSOK R-003 and make sure that all statutory requirements are met. • Establish, implement and maintain installation-specific governing documentation • Make sure that there are sufficient and qualified personnel available to perform safe lifting operations, • Appoint technically and operationally responsible persons for all lifting appliances and lifting operations on the installation. The responsibility shall be linked to a position/positions onboard the installation • appoint a person with responsibility for loading and unloading operations with boats as described in OLF’s guideline no. 061 • make sure the responsible persons have sufficient authority Technical responsible person Offshore (Responsible for the performance and experience transfer to Technical Leader Onshore) (see also Technical Leader Onshore) • maintain the technical condition of the lifting equipment, • make sure the necessary planned maintenance is carried out according to the manufacturer’s instructions and experience with the use of this type of equipment. See appendix G regarding maintenance, • make sure that the necessary expert inspections are carried out and followed up in accordance with appendix H regarding expert activities, • consider the need for and recommend renewal and modifications of lifting equipment in consultation with the users. The operational responsible person shall • make sure compliance with this NORSOK standard and installation-specific governing documentation , • be in charge of the overall and operational management of the lifting operations, • ensure uniform planning and performance of lifting operations in different areas, and evaluate safety in connection with simultaneous operations, • ensure sufficient exchange of information among the shifts, • make sure that the lifting operations are carried out with sufficient and qualified personnel, • make sure that the standards’ requirements regarding storage of loose lifting equipment are met, • appoint mentors, • approve offshore crane operation practice, • consider whether a lifting appliance can be classified as a “simple lifting appliance”, 114 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Description of roles on the different installations, Dec. 2007 * Technical responsible person Offshore for all lifting equipment, except drilling-related lifting equipment ** Applies to drilling-related lifting equipment, i.e. only 1st line offshore crane maintenance ***NUI-Leader is delegated the operational and technical responsibility for lifting equipment and gear when the NUI is manned. Definition: Drilling-related lifting equipment: Lifting equipment to be maintained by the drilling contractor. Consists of pipehandling system, BOP crane, drawwork, etc. used in connection with drilling. The drilling contractor is responsible for 1st line maintenance on offshore cranes on the drilling platforms. The drilling contractor is also responsible for performing maintenance on and inspections of all loose lifting equipment in the drilling area. The operator of the lifting appliance shall • lead and ensure safety for each lift, • plan each lifting operation, see sec. 4.4 NORSOK R-003, • select the appropriate lifting gear, • make sure the lifting appliance and the lifting gear are in good working order and in accordance with the manufacturer’s instructions, specifications and instructions, • make sure the lifting appliance is maintained in accordance with the maintenance programme, • carry out first line maintenance or ensure that it is carried out in accordance with the maintenance programme, • carry out a pre-use check of the lifting appliance, • take care of necessary alerts for lifting operations in progress, • make sure the necessary communication has been set up between everyone involved in the operation, • coordinate the lifting operation with other ongoing activities, • operate the lifting appliance and lifting gear correctly according to the manufacturer’s instructions, this NORSOK standard and the company’s governing documents, Lifting Equipment Operational Manager Eldar Larsen Eldar Larsen Eldar Larsen Sigmund Prestegaard Sigmund Prestegaard Sigmund Prestegaard Rig Owner Internal disipline leader, enterprise of competence Svein H. Hetland Svein H. Hetland Svein H. Hetland Svein H. Hetland Svein H. Hetland Svein H. Hetland Rig Owner Onshore Technical Responsible Torger Gimre Torger Gimre Torger Gimre Arne Vargervik Arne Vargervik Arne Vargervik Rig Owner Offshore Installation Manager OIM Valhall OIM Valhall OIM Valhall OIM Ula OIM Ula OIM Ula Rig OIM Technical Leader, Offshore OTL-V M/U * BP Drilling supervisior ** OTL-V MU *** OTL-V * Seadrill Rig Supt ** OTL-V *** Rig Supt Operationally Responseble OLT-V M/U BP Drilling Supervisor OTL-V MU *** OTL-V Seadrill Rig Supt OTL-V *** Rig Supt 115 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 • follow instructions and signals given by the signaller, and obey a stop signal regardless of who is giving it, • operate the equipment in accordance with the capacities and limitations that apply for the lifting appliance, • halt a lifting operation if there is any doubt about the safety. The operation must not be recommenced before safety has been re-established, • not participate in lifting operations if he feels physically or mentally unfit, • not participate in other activities which might divert his attention while operating the lifting appliance, • carry out a check of the lifting appliance after it has been used, • keep a daily log where this is a requirement, • report any undesirable incidents. The signaller shall • participate in the planning of each lifting operation, • clear the lifting route and ensure the necessary cordoning off to keep personnel not involved in the lifting operation outside the exposed area • make sure the slinger is in a safe area when the load is lifted and lowered, • give the start-up signal for and direct the safe movement of the lifting appliance and the hook load in accordance with this NORSOK standard and the company’s governing documents, • communicate in accordance with the requirements of this NORSOK standard, • inform everyone involved in the lifting operation who the new signaller is, if a new signaller has to take over. The new signaller must confirm that he takes over the responsibility, • stay in visual and radio contact with the slinger at the begining and the end of operation, • supervise the lifting operation at all times • not touch the load. The slinger shall • participate in the planning of each lifting operation, • select and use lifting gear in accordance with the manufacturer’s instructions, this NORSOK standard and the company’s governing documents, • check the lifting gear before and after use, • make sure the load and load carrier are carefully prepared and secured before the lifting operation is started, • hook the straps on and off the load and the crane hook or lifting gear, • inform the signaller when the load is ready for lifting and when the hook is free again at the end of the lift, • not touch a load that is swinging or rotating, • not physical touch a load that is above hip height (above 1.30 m) The deck operator shall • peform the slinger and/or signaller’s duties in connection with lifting operations with offshore cranes. 116 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 The mentor shall • provide instructions and training in accordance with the relevant training plan or training programme, • consider at all times which tasks the person concerned can perform independently and supervise his/her performance of these tasks, • be responsible for the crane operation during periods where new lifting appliance operators are undergoing training, • confirm that the training has been carried out in an adequate manner and verify that the person concerned has obtained a competence level which is in line with the relevant training plan or training programme. The external examiner shall • evaluate and approve new offshore crane operators in connection with practical tests carried out in accordance with the instructions available in KOSAR. The rigger shall • approve for use and issue tags for temporary lifting appliances with SWL less than 2 tonnes in line with the procedure in 8.4. If more than one person takes part in the rigging of a temporary lifting appliance, a responsible rigger shall be appointed. The navigator on duty (Captain) See OLF guideline no. 06 The seam shall • carry out the tasks of the slinger and/or signaller in connection with lifting operations with an offshore crane, • secure the load. Appendix B. Training requirements The following skill requirements apply to the requirement stipulator: Technical Authority Lifting Equipment, TAL: • Be updated on current lifting equipment rules • Good relevant technical background • Thorough knowledge of current requirements regarding lifting appliances, including relevant requirements in NORSOK R-003 and accompanying standards • Knowledge of enterprise of competence and necessary documentation as described in regulatory requirements, standards and federal and local BP documents • Knowledge of maintenance programs and systems used for the lifting appliances Internal Discipline Leader, enterprise of competence: • The Discipline Leader shall have the competence stipulated in Samordningsradet’s additional criteria for enterprise of competence 117 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Appendix B.7 Mentor arrangement • Installation specific training and verification shall be documented in the database KOMPAS Appendix B.8 Skills maintenance and B.9 Skills veri- fication • Offshore crane operators and deck crew shall undergo maintance and verification of competence with a crane simulator every three years • Operators of other types of motorised lifting appliances (other than offshore cranes) shall refresh and document the installation-specific training every three years NORSOK R003 SAFE USE OF LIFTING EQUIPMENT Foreword The NORSOK standards are developed by the Norwegian petroleum industry to ensure adequate safety, value adding and cost effectiveness for petroleum industry developments and operations. Furthermore, NORSOK standards are, as far as possible, intended to replace oil company specifications and serve as references in the authorities’ regulations. The NORSOK standards are normally based on recognised international standards, adding the provisions deemed necessary to fill the broad needs of the Norwegian petroleum industry. Where relevant, NORSOK standards will be used to provide the Norwegian industry input to the international standardisation process. Subject to development and publication of international standards, the relevant NORSOK standard will be withdrawn. The NORSOK standards are developed according to the consensus principle generally applicable for most standards work and according to established procedures defined in NORSOK A-001. The NORSOK standards are prepared and published with support by The Norwegian Oil Industry Association (OLF) and Federation of Norwegian Manufacturing Industries (TBL). NORSOK standards are administered and published by Standards Norway. Annexes A, B, C, D, E, F, G, H, I and K are normative. Annex J is informative. Introduction The intention of this NORSOK standard is to provide requirements and guidelines for the safe use of lifting equipment. This NORSOK standard shall help to establish, maintain and further develop an acceptable level of safety for personnel, the environment and material assets in the planning and execution of lifting operations. 118 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 During the preparation of this NORSOK standard, consideration was given to Norwegian regulations, European and international standards, OLF and NR guidelines, and the operator companies and shipowners’ internal specifications and procedures relating to the safe use of lifting equipment. Amendments made to Rev. 1, October 1997 are so extensive that it was not appropriate to mark them. This NORSOK standard shall, based on input from the users, be revised on an annual basis by a revision group. Improvement proposals shall be coordinated by the individual company before being sent to the revision group. In order to assist learning and experience exchange, the improvement proposals and the revision group’s processing of these shall be made available. Standard Norge is secretariat for the revision group. 1. SCOPE This NORSOK standard embraces the safe use of lifting equipment used in connection with lifting operations in the petroleum activities. It does not include the use of lifts and fall protection equipment. NOTE Examples of lifting equipment covered by this NORSOK standard can be found in Annex J. 2. NORMATIVE AND INFORMATIVE REFERENCES The following standards includeregulations and guidelines which, through references in this text, comprise theregulations and guidelines in this NORSOK standard. The latest versions of thereferences shall be used unless otherwise agreed. Other recognised standards canbe used provided that it can be proven that they satisfy or exceed therequirements and guidelines in the standards referred to below. 2.1 Normative references DNV Certification Note CN 2.7-1, Offshore Containers DNV Certification Note CN 2.7-2, Offshore Service Containers EFIBCA Standard 005, Single trip DAT Regulation no. 608, order no. 555, Use of work equipment (see NOTE below) FOR 1986-01-13 no. 31 The Norwegian Maritime Directorate: Regulations for deck cranesetc. on mobile installations (see NOTE below) FOR 1978-01-17 nr. 04 The Norwegian Maritime Directorate: Regulations for loading andunloading appliances on ships (see NOTE below) 119 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 IMDG code, DAT Regulation no. 820, order no. 522, Regulations for machinery (see NOTE below) DAT Regulation no. 1139, Regulations for classification, marking etc. of dangerouschemicals (see NOTE below) MSC/Circ. 860, Guidelines for the approval of offshore containers handled in openseas NORSOK R-CR-002, Lifting Equipment NORSOK Z-015, Temporary equipment NS-EN 365, Personal protective equipment against falls from a height -General requirements for instructions for use, maintenance, periodicexamination, repair, marking and packaging. NS-EN 813, Personal protective equipment for prevention of falls from aheight - Sit harnesses NS-EN 12079, Offshore containers -Design, construction, testing, inspection andmarking NS-EN 45004, General criteria for the operation of various types of bodiesperforming inspection OLF/NR 061, Guidelines for safety in the interaction between the installation,supply base and offshore service vessel (see NOTE below) OLF/NR 078, Recommended guidelines for the use of riding belt (see NOTEbelow) OLF/NR 081, Implementation of NPD’s requirement set forth in the Facilitiesregulations Section 55 and the Activities regulations Section 80, with regardsto remote operated pipe handling FOR 1998-12-29 no. 1455 The Norwegian Maritime Directorate: Regulations for equipment onships (see NOTE below) Note Unauthorisedtranslation of title. 2.2 Informative references DNV - Rules for planning and execution of marine operations. 120 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 3. TERMS, DEFINITIONS AND ABBREVIATIONS The following terms, definitions and abbreviations apply for this NORSOK standard. 3.1 Terms and definitions 3.1.1 blind lifts lifting operation whereby the lifting appliance operator does not have a direct view of the load or landing area NOTE Use of closed circuit television monitoring the work area is not considered to be direct view. 3.1.2 should verbal form used to indicate that among several possibilities one is recommended as particularly suitable without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required NOTE The term ‘should’ means that other solutions can be chosen than the one recommended in the standard. It shall be documented that the alternative solution provides an equivalent level of safety. 3.1.3 documented training training whereby it can be documented that the person who will use the lifting equipment has received practical and theoretical training that provides knowledge about its structure, operation, applications, limitations and scope of use, as well as maintenance and inspection in accordance with the requirements set for safe use and operation stipulated in regulations and instructions for use 3.1.4 simple lifting appliances lifting appliances (overhead cranes, winches, chain hoists, monorail cranes, etc.) where use is not considered to involve a hazard to life, health and/or material assets 3.1.5 dangerous goods load that is classified and marked in accordance with the IMDG code 3.1.6 fixed attachment point for lifting appliance pad eyes, winch and mobile crane foundations, lifting beams and beams for temporary attachment of beam clamps 3.1.7 pre-use and post-use check visual and functional assessment (not test) of the lifting equipment’s technical condition before and after use (without disassembly) 3.1.8 suspended work platform mechanically operated work platform that can move freely NOTE For example, suspended on rope. 121 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 3.1.9 installation facility, plant and other equipment for petroleum activities (however, not ships that transport petroleum in bulk) NOTE In this NORSOK standard, supply and standby boats are included in the definition of an installation. Examples of installations include fixed installations, floating production, storage and offshore loading (FPSO) vessels, rigs, barges, crane barges, service vessels etc. 3.1.10 inspection visual control of lifting equipment for defects, and check of operating controls, limit switches and indicators NOTE Normally does not require disassembly. 3.1.11 snatch block lifting equipment consisting of at least one sheave in a frame with an attachment point for rope, wire sling or chain that can be attached to a fixed point or to a movable point on the load. 3.1.12 can verbal form used for statements of possibility and capability, whether material, physical or incidental 3.1.13 elevating work platform mechanically operated work platform that moves vertically in guides 3.1.14 controller person in enterprise of competence who has sufficient theoretical knowledge, practical experience and understanding to carry out control of lifting equipment in a satisfactory manner 3.1.15 crane lifting appliance whereby the load can be moved horizontally in one or more directions, in addition to the vertical movement 3.1.16 critical lifting operations operations requiring a work permit and special safety measures in order to address the interface with adjacent activities NOTE These operations include, but are not limited to • lift over critical areas, process equipment and well equipment, • personnel transport with the lifting appliance, unless management on board has established other approval arrangements, • coordinated lift whereby the weight exceeds the maximum lifting capacity of one of the lifting appliances, • overload testing of the lifting appliance with SWL over 10 tonnes, • lift of special loads such as structures, mobile cranes etc, • heavy lifts that are not considered routine operations, • subsea operations using the offshore crane. 122 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 3.1.17 load carrier all types of container, baskets, tanks, skids and frames that are used to transport load 3.1.18 lifting and stacking truck forklift truck and similar mobile motorised work equipment for combined lifting, moving and stacking 3.1.19 lifting components parts of the structure of, or used as part of a lifting gear, such as hooks, shackles, rings, eye bolts, etc. 3.1.20 lifting operation all administrative and operational activities before, during and after a load is moved and until the lifting equipment is ready for a new load 3.1.21 lifting appliance combined unit that is used to lift loads, with or without horizontal movement NOTE Examples of lifting appliances are shown in Annex J. 3.1.22 lifting gear components or equipment used between the lifting appliance and the load or on the load to grip it, but which is not an integrated part of the lifting appliance NOTE Examples of lifting gear are shown in Annex J. 3.1.23 lifting equipment common term for lifting gear, lifting appliances and lifting components, used together or individually 3.1.24 man overboard boat MOB boat for speedy rescue of personnel in the sea 3.1.25 material handling plan plan for moving load on the installation to ensure a safe and efficient operation NOTE The material handling plan takes into account, among other things • the need for type and number of lifting and transport equipment, • the need for loading and unloading areas, • preparing for the use of lifting and stacking trucks, trolleys etc., • access to areas and workplaces for operation and maintenance. 3.1.26 nominal capacity (R0 or Rn) the actual hook load that the crane is designed to lift in a given operating condition NOTE 1 For example, boom configuration, number of lines, off lead, side lead, heel, trim, radius, wave height, etc. 123 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 NOTE 2 Nominal capacity R0 is equivalent to SWL as defined in ILO conventions. Nominal capacity for an offshore crane is stated in the crane’s load chart for different significant wave heights. 3.1.27 offshore container transportable unit for repeated transport of load or equipment, a unit that can be handled in open sea to/from installations and vessels NOTE 1 The unit includes equipment for lifting, handling, filling, emptying, cooling and heating etc. NOTE 2 There are two categories of offshore container: 1. Offshore freight container a. Freight container for dangerous goods. b. Freight container for non-hazardous load that is not covered by the IMDG code. 2. Offshore service container Service container produced and equipped for special use, mainly for temporary installation. 3.1.28 offshore crane slewing crane for general use mounted on an installation and which is used to handle loads to and from supply boats, barges or semi-submersible installations 3.1.29 offshore installation manager overall manager on the installation NOTE On a vessel this will be the captain. 3.1.30 rigger person who assembles, controls and issues tags for temporarily assembled lifting appliance 3.1.31 competent control control carried out by an enterprise of competence in order to verify that lifting equipment satisfies relevant requirements and is designed, embedded, installed, set up, tested, documented and maintained in such a way that use of the lifting equipment is fully justified NOTE There are four types of competent control: • initial control; • - periodic control; • - extraordinary control; • - safety evaluation. 3.1.32 competent person person approved by The Norwegian Maritime Directorate to certify and perform competent control on installations that are subject to The Norwegian Maritime Directorate’s regulations 3.1.33 enterprise of competence entity in the operator companies’ organisation, or in other companies or institutions, that together have sufficient theoretical knowledge and practical experience to understand calculations for lifting equipment, its design and function, and to carry out necessary examinations and tests in order to issue certificates 124 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 3.1.34 certificate form based on ILO’s recommendation, issued by the enterprise of competence/competent person, confirming that the lifting equipment meets statutory requirements and is designed, embedded, installed, set up, tested, documented and maintained in such a way that use of the lifting equipment is fully justified. The certificate shall state the statutory requirements on which it is based NOTE 1 The scope of the control for certification purposes will vary, depending on whether EU regulations or maritime regulations apply. NOTE 2 EU regulations Here, the certificate is based on the manufacturer’s declaration of conformity and CE marking in accordance with DAT Regulation no. 820, order no. 522. Reference is made to chapter IX of DAT Regulation no. 608, order no. 555, for a description of the scope of the control. NOTE 3 Maritime regulations Here, the certificate can be based on, for example, FOR 1986-01-13 no. 31, or FOR 1978-01-17 no. 04. Similarly, the classification regulations or the declaration of conformity and control tagging in accordance with FOR 1998-12-29 no. 1455 can form the basis where this applies. NOTE 4 Previously, the term ‘Certificate of Use’ was used instead of ‘Certificate’. Previously issued Certificates of Use will remain valid documentation that use of the lifting equipment is fully justified. 3.1.35 certified safety training training provided by certified training enterprise in accordance with the requirements in section 49 and section 50 of DAT Regulation no. 608, order no. 555 3.1.36 significant wave height average height of the highest third of prevailing waves, typically measured over a period of three hours. NOTE As a rule of thumb, significant wave height is about half the maximum wave height. 3.1.37 safe working load SWL maximum load the lifting equipment is certified to withstand under normal use NOTE SWL is normally used by ILO and shall apply on all floating and other mobile installations and ships that are not covered by EU regulations. 3.1.38 shall verbal form used to indicate requirements strictly to be followed in order to conform to the standard and from which no deviation is permitted, unless accepted by all involved parties 125 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 NOTE This verbal form is used in connection with requirements that shall be fulfilled in order comply with this NORSOK standard. If other solutions are necessary, this shall be treated as a nonconformance and dealt with as a deviation according to company requirements. The alternative solution, together with any compensating measures, shall provide an equivalent level of safety. 3.1.39 working load limit WLL maximum load that a sling or a lifting component is certified to withstand under normal use and in a given configuration 3.1.40 test specific operation of lifting equipment, with or without a defined load, in order to determine whether the lifting equipment is suitable for use 3.1.41 test load specified load that the lifting equipment shall withstand within the manufacturer’s specified limits without resulting in permanent deformation or other defects, and thereby confirming that the design, materials and manufacture comply with specification and statutory requirements 3.1.42 heavy lift load that is handled with the offshore crane’s main block 3.1.43 examination function test of all safety devices, i.e. limiting and indicating equipment, brakes, clutches etc. in order to verify that they operate within the tolerance requirements NOTE An examination is more comprehensive than an inspection. 3.2 Abbreviations BOP blow out preventer (utblasingssikring) CE Conformite European (CE-merking som bekrefter overensstemmelse med grunnleggende krav i EU- direktiver) CETOP European Oil Hydraulic and Pneumatic Committee DAT Direktoratet for arbeidstilsynet DNV Det Norske Veritas EFIBCA European Flexible Intermediate Bulk Container Association HAZOP hazard and operability study IMDG International Maritime Dangerous Goods (Code) (Code) ILO International Labour Organisation KOSAR Kompetansesenteret for arbeidsutstyr AS MOB mann-over-bord-bat MSC The Maritim Safety Committee NR Norsk Rederiforbund OLF Oljeindustriens Landsforening OMHECOffshore Mechanical Handling Equipment Committee 126 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 SJA sikker jobb analyse (safe job analysis) SWL sikker arbeidsbelastning (safe working load) WLL storste tillatte arbeidslast (working load limit) UHF ultra high frequency VHF very high frequency 4. SAFE USE OF LIFTING EQUIPMENT This clause describes the individual lift and how the persons involved shall carry it out. This description applies to all types of lifting equipment used. Subsequent sections state additional requirements that apply for different types of lifting equipment. 4.1 Overall requirements All use, maintenance, storage, checks, inspection and examination of lifting equipment shall comply with the manufacturer’s instructions for use, and the requirements in this NORSOK standard with annexes, see NS-EN 365. The lifting equipment shall not be modified for purposes other than those stated without the consent of the manufacturer and enterprise of competence. Lifting equipment shall only be used by personnel who have and can document competence as described in Annex B. Responsibilities of the company and personnel who are involved in lifting operations are described in Annex A. 4.2 Management The operational responsible person shall manage all of the activities with lifting appliances within his area of responsibility. Lifting appliance operator is in charge of the individual lifting operation. When considered to be safer, a person other than the lifting appliance operator can be designated to be in charge of the lifting operation. If a signaller is involved in the lifting operation, he shall be responsible for directing the load. 4.3 Risk assessment All personnel involved shall assess the need for a pre-job talk, SJA or use of other risk analysis methods as described in Annex I. If, during the execution of a lifting operation, there is a change in operational conditions or in the assumptions on which the risk mapping was based, the operation shall cease and the need for a new risk assessment and implementation of any corrective safety measures shall be considered. 127 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 4.4 Planning Each lifting operation shall be planned in order to ensure safe execution and that all predictable risks are taken into consideration. The planning shall be carried out by personnel who have the relevant competence. For repeated or routine operations, such planning is only necessary the first time, provided that an operating procedure is in place or documented in another way. Periodic revisions shall be carried out to ensure that no critical factors have changed. The planning of lifting operations shall, as a minimum, ensure that • all personnel involved are familiar with the task, i.e. what is to be lifted, weight of the load, what lifting equipment to use, the travel path, and the roles of the persons involved in the lifting operation, • competent and sufficient personnel are present at all phases of the lifting operation, • the travel path is clarified and any obstacles are removed before lifting commences, • barriers are in place to prevent personnel from walking or standing under suspended load, • method of communication is clarified, • the lifting operation can be executed safely in relation to simultaneous operations, • lifting appliances and lifting gear are suitable and will be used in accordance with the manufacturer’s instructions for use, • the landing area can accommodate the load in terms of size and weight, • use of tag line is considered, • personnel involved have sufficient competence and knowledge of the regulations and standards that govern the operation that is to be executed, • work permit is obtained for critical lifting operations, • enterprise of competence is involved in tandem lifts where the weight can exceed the lifting capacity of one of the lifting appliances. For subsea lifting operations, a recognised standard shall be applied, such as “DNV - Rules for planning and execution of marine operations”, in addition to this NORSOK standard 4.5 Limitations The lifting appliance operator shall map and take into consideration limitations that can affect the lifting operation, including the capacity of the lifting equipment, weather conditions, movements, landing areas, blind zones and other limitations as a result of the travel path. 4.6 User check User of lifting equipment shall check the lifting equipment and make sure that it is in a safe condition before and after use. 128 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 The pre-use and post-use checks should include the following: • visual check of the lifting equipment; • function test of the equipment in accordance with the manufacturer’s recommendations; • function test of the emergency stop device; • report any faults or defects to the technical responsible person. Daily check routines of the lifting equipment can cover this user check requirement. Lifting appliances shall not be used if safety systems or parts of safety systems are not functioning or have been isolated. 4.7 Communication At all times there shall be adequate communication between all personnel who are involved in the lifting operation. Radio equipment appropriate for the relevant lifting operation shall be used. Radio check shall be carried out prior to the start of the lifting operation. When directing the load, instructions shall be clear and unambiguous. The lifting appliance operator can repeat the signaller’s instructions (confirmatory communication) to avoid any misunderstandings during lifting operations. When directing the crane in blind zones, transporting personnel and other lifting operations where radio communication is of prime importance, confirmatory communication shall be used. In order to help the lifting appliance operator, the desired crane movement can be stated in metres. Where appropriate, a communication method can be chosen whereby the signaller gives a continuous signal to continue the movement. The lifting appliance operator shall stop immediately if he does not receive the signal. The method of communication to be used shall be agreed as part of the pre-job talk or SJA. Unnecessary use of radios shall be avoided. All unnecessary noise or activity that can distract the lifting appliance operator shall be avoided. Unless otherwise agreed, communication shall be in Norwegian. All personnel who are involved shall be competent in the language chosen. 129 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 When directing the crane, the following instructions shall be used: Instruction Instruction (Norwegian) (English) Action Hiv Pick up lift the load Lår Lower lower the load Topp bom Boom up raise the boom Legg bom Boom down lower the boom Sving høyre Slew right slew to the right (from crane operator’s position) Sving venstre Slew left slew to the left (from crane operator’s position) Stans Stop stop the movement immediately Pent/fint/rolig Gently/slowly slow movement Slakk av Slack off release tension in the wire so that the hook can be release Fri krok Hook free lift up released hook If visual signals are used, the hand signals shown in Annex F shall be used. When using personnel winch, the communication requirements in OLF/NR 078 shall be followed. Lifting appliance operator shall at all times be fully attentive to the operation. 4.8 Safe execution 4.8.1 Fundamental safety requirements The load and any load carrier shall be properly secured and prepared before the lifting operation commences. For transport of bulk loose material, a load carrier shall be used that is designed such that material cannot fall out during loading or unloading operations. Liquid products shall be transported in sealed load carriers. For internal transport, load carriers should be used where practical. Relevant areas shall be barriered off before the lifting operation commences. On installations with significant movement, loads shall be secured against unintentional displacement or overturning. Procedures describing when and how this shall be carried out shall be available on each installation, see Annex C. Loads shall not be transported over personnel. 130 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Personnel shall not walk under suspended load. All personnel who are involved in the lifting operation shall ensure that they have an unrestricted escape route in all phases of the operation. Loads shall be attached to the lifting appliance and handled in such a way that the load remains stable throughout the entire lifting operation. The lifting operation shall cease immediately if safety is jeopardised, when instructions are unclear, or in the event of loss of communication. Lifting appliance operator shall only obey instructions from the designated signaller, but shall obey the emergency stop signal at all times, regardless of who gives this signal. Lifting appliance operator shall not leave the operator’s cabin or station with load hanging on the hook. If a lifting appliance is used to hang off a snatch block or similar, the lifting appliance shall be secured against unintentional use. If a block and tackle/chain hoist is used between the hook on the lifting appliance and the load in order to manoeuvre the load in connection with assembly or disassembly work, care shall be taken to ensure that the block and tackle/chain hoist does not become load bearing when the lifting appliance is in motion. If the assumptions on which the planning and risk assessment were based change during the operation, the operation shall cease and the need for a new risk assessment and initiation of any corrective safety measures shall be considered. 4.8.2 Signaller and slinger All participants in a lifting operation shall, at all times, know who is the signaller. Participants in lifting operations and their roles can be made known through the wearing of special clothing, such as a reflective vest, hardhat or similar. The signaller and slinger shall stand in a safe area at all times when the crane and/or lifting wire is moving. The slinger can manually guide the empty hook to and from the load or load carrier. If the lifting appliance operator has a good visual overview of the area, the slinger can, with clearance from the lifting appliance operator, handle/manoeuvre the load when it is under control and below shoulder height. If the lifting appliance operator has a good visual overview of the 131 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 area, the signaller can carry out the slinger’s duties, see Annex A. In such circumstances, the signaller can, with clearance from the lifting appliance operator, handle/manoeuvre the load when it is under control and below shoulder height, and manually guide the empty hook to and from the load or load carrier. 4.8.3 Blind lifts In connection with blind lifts, there shall always be at least two persons (signaller and slinger) who have visual contact with the load and each other, and have radio contact with the lifting appliance operator. Any closed circuit television that monitors the work area is considered to be an aid, and not a replacement for either of these persons. If load has to be be pushed or pulled into position manually, a signaller shall be present by the load or as close to the load such that he can direct the lifting appliance safely and thereby address the safety of other involved persons. Where possible, the signaller should place himself in a position where he can give the stop signal manually in the event of radio failure. 4.8.4 Lifting operations through hatches and in shafts For lifting operations through hatches and in shafts, the requirements for blind lifts apply, see 4.8.3. Lifting through several levels shall be covered by local procedures, possibly through an SJA. In particular, the risk of the load or load carrier snagging on hatch frames should be assessed. For crane operations in shafts, the lifting appliance operator shall ensure that the lifting appliance brake function is active and that any function for automatic overload protection is disconnected during the operation. 4.8.5 Use of tag line Lifting appliance operator shall assess and approve the use of tag line. Tag lines should not be used for lifting operations to and from vessels. If, however, it is necessary to use tag lines, this shall be agreed between the vessel and lifting appliance operator, and particular care and attention shall be exercised. The end of the rope shall be secured against fraying, but knots shall not be used at the free end of the rope. For internal movement of load, tag line can be used. Tag line should be used to keep control of a load, not to gain control over a load. If several tag lines are necessary, personnel who are not deck 132 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 operators can be involved in the operation. SJA shall then be carried out, and the personnel shall have undergone the necessary training related to the use of tag lines. 4.8.6 Transport of scaffolding material and boards Where practically possible, scaffolding material and boards should be transported in dedicated load carriers. For lifting operations to and from vessels, scaffolding material and boards shall always be transported in a dedicated load carrier. When moving scaffolding material and boards whereby load carrier cannot be used, nylon ratchet straps shall be used to prevent slipping. The slings shall be wrapped round twice and choked around the load. The slings should be choked in the same direction. 4.8.7 Radioactive sources, trace elements and explo- sives Radioactive sources, trace elements and explosives shall be placed and handled in accordance with the material safety data sheets, marking on the load carrier and local procedures. When radioactive sources, trace elements or explosives are sent ashore from the installation, the vessel and supply base shall be notified. Receiving of containers for radioactive sources, trace elements or explosives shall be dealt with by the designated person on the installation. 4.9 Completion and evaluation Any undesirable incidents taking place during the lifting operation shall be reported. After the operation is completed, the persons involved shall assess whether experience transfer or improvements to operational procedures are necessary. After the lifting operation is completed, any barriers shall be removed and the area tidied. 5. ADDITIONAL REQUIREMENTS FOR THE LIFTING OF PERSONNEL Moving personnel with the aid of lifting appliance involves a high risk. Such operations are only permitted when other transport or method is not possible or appropriate. The intention of the requirements below is to reduce the use of this type of personnel transport to a minimum, and to ensure that management on the installations are familiar with and follow up lifting of personnel. 133 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 5.1 General requirements An ongoing assessment shall take place to determine whether routine work can be carried out more safely through establishing permanent access or by identifying other methods of performing the work tasks. This assessment shall be implemented in consultation with the safety delegate service and the operational responsible person. All lifting of personnel with lifting appliance can be logged in order to maintain an overview of the scope of the lift and type of work operations. All lifting of personnel with lifting appliance shall be voluntarily. The offshore installation manager shall, directly or through delegating, approve all personnel transport with lifting appliance. The lifting appliance operator shall have at least one year’s experience as operator of equivalent lifting appliances. Lifting equipment shall be approved for the lifting of personnel. In this connection, ‘approved’ means the following: • For lifting equipment put into operation after 14.1.98: Type approved by Notified Body for personnel transport. This applies for lifting equipment that comes under the scope of DAT Regulation no. 820, order no. 522. • For lifting equipment put into operation before 14.1.98 and lifting equipment that does not come under the scope of DAT Regulation no. 820, order no. 522: Safety in connection with personnel transport shall be reviewed and found acceptable by the company. In this respect, an overall assessment of operational and technical conditions shall form the basis. The assessment shall be documented. The review shall be performed based on technological developments. This means that relevant requirements in DAT Regulation no. 820, order no. 522, annex 1, and relevant safety standards related to these regulations shall be taken into consideration. For mobile installations that are registered in a national ship’s register, and that follow a maritime operating concept, relevant technical requirements in the Norwegian Maritime Directorate’s regulations which, according to the company’s assessment provide the same level of safety as DAT Regulation no. 820, order no. 522, can form the basis. Secure locking device shall be used between the crane hook and the lifting gear. This can be done through locking the safety latch or by using safety wire. During operations involving the lifting of personnel over the sea , life vest or survival suit shall be worn. MOB shall be on standby in accordance with requirements that apply for work over the sea. 134 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Lifting appliance operator shall assess whether the operational conditions (weather, visibility, movements) permit a safe execution of the operation. In connection with blind lifts, the lifting appliance operator shall have eye contact with the signaller, who in turn shall have eye contact with the personnel who are being lifted. Radio contact shall be established and maintained between one of the persons being lifted, lifting appliance operator and signaller. A checklist shall be used to ensure that the requirements to lifting of personnel are addressed. 5.2 Use of work basket When transporting people with lifting appliances and work basket, • the lifting appliance’s maximum allowable load shall be at least twice the weight of the work basket with maximum load, • fall protection equipment shall be used, • tools shall be secured against fall, • the area below the work basket shall be barriered off. Before using work basket, a SJA shall be carried out. In connection with welding work from the work basket, measures shall be taken to ensure that there is no current leakage through the lifting appliance in order to prevent damage to crane components. 5.3 Transfer of personnel between installation and vessel Offshore installation manager and captain shall approve the transfer of personnel between the installation and vessel. Transfer shall be logged. For this type of transfer, the following applies: • transfer shall take place in good visibility with good lighting, and only when weather conditions permit a safe transfer; • a pre-job talk involving relevant personnel shall be carried out; • lifting appliance operator shall be in charge of the transfer; • before the operation commences, the pick-up and lay-down areas for the personnel transfer basket shall be prepared to ensure adequate room to carry out a safe operation; • duty navigator and lifting appliance operator shall maintain radio contact with each other throughout the entire operation; • raising and lowering of the basket shall insofar as possible take place over the open sea; • MOB shall be on standby; • the personnel transfer basket shall be able to function as a temporary life raft for the number of people it is designed for. 135 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 MOB should not be used to transfer personnel between the installation and the vessel. The traditional personnel net basket should not be used, but replaced with equipment for personnel transport that satisfied the requirements in DAT Regulation no. 820, order no. 522. When using the traditional personnel net basket: • the net basket shall be maintained in good condition. It shall be tested every six months with a test load twice the maximum load. The result of the test shall be logged, • the net basket shall be stored together with life vests in a storage area where it cannot be damaged by equipment or chemicals, • measures shall be taken to ensure that the crane hook does not injure anyone using the personnel net basket by using an appropriate pennant line, • personnel who have not been transferred by personnel net basket previously shall be accompanied by a person who is very familiar with its use, • personnel shall stand on the ring on the outside of ropes on the net basket, with both hands free to secure a firm grip on the ropes. 5.4 Handling of man overboard boat (MOB) with off shore crane When using the offshore crane to handle the MOB, the crane, boat and pennant line shall be approved for such use. The approval shall refer to the relevant crane and the additional dynamic load applied by the crane and pennant line on the boat. An operating procedure shall be prepared for handling the MOB with the offshore crane. The procedure shall include, among other things, descriptions of normal travel path, placing personnel in the boat, and how the personnel shall be evacuated in the event of crane stoppage. An elasticised pennant line or other suitable damping element should be used between the MOB hook and crane. During exercises, the MOB shall only be launched in wind speeds below 13 m/s (25 knots) (at 10 m level) and significant wave height below 2.5 m or allowable movements for the installation. Each installation shall define limit values for maximum allowable movements. 5.5 Handling of man overboard boat (MOB) with davit An operating procedure shall be prepared for use of davit. The procedure shall include, among other things, how to place personnel in the boat, and how the personnel shall be evacuated in the event of davit failure. During exercises, the MOB t shall only be launched in wind speeds below 13 m/s (25 knots) (at 10 m level) and significant wave height below 2.5 m or allowable movements for the installation. Each installation shall define limit values for maximum allowable movements. 136 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 5.6 Use of personnel winch and riding belt For use of personnel winch, OLF/NR 078 should be used, in addition to relevant requirements in this NORSOK standard. Split pin shall be used on shackle nut between riding belt and winch wire. It shall not be possible for the split pin to fall out during use. Other types of pin shall not be used. Use, maintenance, storage, check, inspection and examination of riding belts shall as a minimum comply with manufacturer’s instructions for use, see NS-EN 813 and NS-EN 365. 5.7 Use of movable work platforms Movable work platforms shall be considered as lifting equipment, and shall be subject to requirements to safety outfitting as other personnel transport equipment. There is no requirement for one-year’s experience for operators of movable work platforms. Operator shall be approved by the operational responsible person. Fall protection equipment shall be used in connection with use of movable work platform. Tools shall be secured against fall. The deck area below the work platform shall be barriered off. Normal operation of machinery or remotely operated equipment shall not take place while movable work platform is being operated in the area. Movable work platforms shall be mechanically secured when in the parked position. Movable work platforms can be used without signaller or slinger. Work platform operator shall carry out relevant parts of the tasks that would otherwise be carried out by the slinger and signaller. 6. ADDITIONALREQUIREMENTS FOR DIFFERENT LIFTING APPLIANCES 6.1 Offshore crane 6.1.1 Shift handover The outgoing shift shall inform the incoming shift about significant ongoing and planned work relevant to the operation. The outgoing shift shall also inform the incoming shift about any incidents. 6.1.2 Necessary personnel There shall be two deck operators available at all times during operations with the offshore crane. 137 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 The crane operator and deck operators can assess whether the operation can be carried out safely without the direct involvement of both deck operators. The one who is not involved shall wear normal work clothes and be equipped with radio on the crane channel. There shall be at least two deck operators directly involved in the operation during • blind lifts. • large movements on mobile installations. • narrow landing areas. • heavy lifts. • use of tag line. • complex lifts such as tandem lifts, assembly lift and |asymmetric lifts. Each installation shall determine limit values for movements and identify landing areas that require the direct involvement of at least two deck operators in the operation. In order to address the principle of two safety barriers when lifting and landing, at least two persons shall at all times have the load under visual contact in the event that the operation has to be stopped. If the crane operator or one of the deck operators has a good visual overview (not via closed circuit television) of the area, the signaller can carry out the slinger’s tasks. In such circumstances, there shall be a clear division between the roles. Participants in lifting operations and their roles can be made known through the wearing of special clothing, such as a reflective vest, hardhat or similar. See also requirements in 4.8.2. 6.1.3 Operational limitations Operations with the offshore crane shall be halted when • the crane operator considers further operation unsafe. • wind speed or wave height exceeds 80 % of the crane’s design limit. • movements on the mobile installation make it difficult to carry out the operation in a safe and controlled manner. Each installation shall determine limit values for movements. In such circumstances, the operation can only be resumed after reviewing the ‘Checklist for lifting operations under marginal weather conditions’, see Annex K. The review shall be carried out by the involved persons, as a minimum the crane operator, duty navigator on the vessel, deck operator and operational responsible person. Crew on the vessel can participate via radio. 138 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 6.1.4 Use of lifting gear In order to address additional dynamic loads, a higher safety factor for lifting gear used for lifts between the vessel and the installation shall be applied. Safety factor shall be selected in accordance with requirements in NORSOK R-CR-002. Plates shall be transported in baskets or by drilling holes in the plates to accommodate shackles. Plates can be lifted in and out of load carrier through the use of chain or wire slings. In such circumstances, the lift shall not exceed shoulder height. Plate clamps shall not be used in connection with lifting with the offshore crane. The latch on the main hook and whip-line hook shall always be fitted with lock-pin to prevent unintentional opening of the latch, for example by means of a through bolt which is secured with nut or split pin. The crane ball or block shall be painted in a colour that is easily visible. If the crane has two independent lifting systems, loose lifting gear should be removed from the hook that is not in use. Fixed hook with Clevis connection on chain shall only be used internally on the installation. Fibre slings should not be used in lifting operations between the vessel and installation. If use of other lifting gear of lifting components is deemed unsafe, unsuitable or could damage the load, fibre slings can be used in lifting operations between the vessel and installation. An SJA shall then be carried out. Special care shall be exercised when using eye bolts and eye nuts. Since it can be difficult to determine material/steel quality of equipment and machinery, eyebolts/nuts can be used in accordance with the following principles: • for lifts from vessel to installation, primary load carrier is used; • for lifts in/out of load carriers, use eye bolts and eye nuts in accordance with supplier’s recommendations, where this is considered to be the safest lifting method; • for internal transport with the offshore crane, use suitable load carrier or slings; • for assembly, use eye bolts and eye nuts in accordance with supplier’s recommendations. If eyebolts are included as part of the equipment that is intended for lifting with the offshore crane on the installation and to/from the vessel, this shall be stated on the certificate. 139 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 6.1.5 Loading and unloading of supply boat Dynamic load chart shall be used for all lifting operations involving vessels. Crane operator shall enter relevant significant wave height and shall not lift loads that exceed the crane’s nominal capacity (Rn) stated in the dynamic load chart. For landing load on vessel and how much load area that can be used, see Annex D. Duty navigator is responsible for safe positioning of the vessel. This should however be carried out in consultation with the crane operator. Everyone who is involved in the loading and unloading operation shall be equipped with a radio, preferably UHF. In order to ensure communication with vessels that do not have such radios, the installation can have three extra UHF radios set to the crane channel for the purpose of loan to the vessel. Vessel deck crew and deck operators on the installation shall wear radio with headset and integrated microphone. In order to prevent spillage over the vessel, or other discharges from interfering with vessel operations, an announcement can be made over the public address and alarm system that the vessel is laying to the installation. If discharges from the installation interfere with vessel operations, the loading and backloading operation shall cease. Crane operator and duty navigator on the vessel shall carry out a pre-job talk before the loading and backloading operation commences. The talk should include • a review of the extent of the operation, positioning of load, backload etc.. • bulk delivery, number of hoses that shall be used and need for manned crane. • operational conditions that can create difficulties for the execution of the operation. • any heavy lift or other loads that require special precautions, e.g. acid, isotopes etc.. • any seafastenings. • information exchange about personnel under training or other factors that shall be taken into consideration. • transfer of material safety data sheets for loads requiring this. Before loading, transport documents shall be transferred between the installation and vessel. In addition, material safety data sheets shall accompany loads where this is a requirement. Before the operations commence, duty navigator on the vessel shall ensure that safe zone and escape route are known to the crew on the vessel and crane operator. 140 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Signal for when to hook on and off shall be agreed beforehand between crane operator and crews. Pennant shall be of an adequate length to ensure the safety of the crew on the vessel at all times. Length of pennant should be at least 7 m. Loose pennants that are not in use represent a safety risk to the crew on the vessel. The number of pennants and allowable working load shall be appropriate for the load. During crane operations, the vessel should move as little as possible and not follow the movement of the load. Visibility (not via closed circuit television) shall always be such that the crane operator can see the deck crew, hook and load on the vessel deck. Load shall never be swung over the wheelhouse or crew on the vessel. Load should be lifted and lowered over the sea when possible. 6.1.6 Loading and unloading when using load carriers “Load picking” shall not take place. “Load picking” means taking load carriers that are positioned in between other loads, and which requires crew to climb on other load carriers or expose themselves to other hazard in order to hook on the load. Nor is it allowed to extract load from a load carrier on the vessel deck. Barrel lifters and pallet trucks shall only be used to handle load in and out of load carriers. General requirements to use of load carriers are described in 7.11. 6.1.7 Loading and unloading of drill pipe and casing When preparing to carry out the lift, the slinger shall ensure that protectors are firmly in place. When lifting tubulars, slings shall be wrapped around twice, choked and secured. Slings should be choked in the same direction. Due to the small bend diameter when choking, this area shall be inspected thoroughly in connection with pre-use check. To prevent mixing and incorrect use of slings, efforts should be made to use only one type of sling for all transport of drill pipe and casing to an installation. To ease the working of slinging up pipe bundles, the following standard wire rope can be used: Wire rope dimension O20 mm, length 8 m, 30 cm soft eye Wire rope type 6 x 36 + 1FC Safety factor 6 Choking SWL of the sling shall be reduced by 25 % when choking. 141 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Locating Slings shall be placed 1/4 of the pipe sling on load length from the end of the load. Angle Sling angle through the choke shall not exceed 120?. Working angle Working angle should not exceed 45?. Securing After the slings are tight, a safety clamp shall be fitted and tightened. Guidelines should be prepared for how many tubulars of each type can be lifted in one load. 6.1.8 Receiving and return of bulk Systems for receiving bulk and fluid on the installation shall be ready before the vessel arrives. This is important in order to avoid misunderstandings and errors when transferring bulk. Each installation should use valve diagrams and checklists for this preparation. Hoses, hose connections and buoyancy elements shall comply with the requirements in OLF/ NR061 and be colour coded. Hoses that are used simultaneously should be the same length. Deck operator shall check buoyancy elements and marking, and make sure that the hoses are without visible damage that can lead to a leak. Where appropriate, bulk hoses should be fitted with a swivel between the hose and the installation. Prior to loading and unloading, transport documents shall be exchanged between the installation and vessel. In addition, material safety data sheets shall be exchanged where this is a requirement. Throughout the bulk transfer operation, continuous radio contact shall be maintained between the vessel, crane operator and person receiving/sending bulk on the installation. Bulk hoses should be vented before and after use. Bulk hoses shall be sent to the vessel by means of the crane. The hose should normally be hooked on at the end. Care shall be taken to ensure that bulk hoses do not snag on the installation structure thereby causing additional strain force. Two deck operators should be used when handling bulk hoses. Crane operator can only leave the crane during the bulk operation if consent is given from the duty navigator on the boat. If bulk transfer is carried out under difficult weather conditions, the crane operator shall remain in the crane until the operation is complete. In the event of wind speeds exceeding 15 m/s (about 30 knots) and significant wave height over 4 m, the crane should be manned. 142 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 As soon as loading or unloading is complete, the crane operator should retrieve the hose. 6.1.9 Lifting in connection with assembly and disassembly work Specialist personnel with knowledge of the equipment shall be involved in connection with the planning of the work operation and handling of own equipment. In connection with assembly and disassembly lifts, a pre-job talk or SJA shall be completed. Specialist personnel with knowledge of the equipment to be lifted, as well as the crane operator and deck operators, shall participate. In connection with assembly and disassembly lifts, the instructions for use from the equipment supplier shall be followed. The slinger shall pay particular attention to ensure that the load is completely free before lifting commences. To prevent overloading lifting equipment in connection with disassembly, the weight indicator should be monitored closely to ensure that it does not exceed the stated or assumed weight of the load. 6.1.10 Lifting operations to and from the drill floor During lifting operations on the drill floor, all personnel involved shall be on the same radio channel. Before the hook or load is brought into the drill floor area, the lifting operation shall be cleared with the responsible person on the drill floor. 6.1.11 Transport of chemical tanks Crane operator and deck operators shall know the contents of the tank, hazards and material safety data sheets. Chemical tanks shall be placed and dealt with in accordance with transport documents and local procedures. Before transport, the slinger shall check that covers are in place on drains and discharge points, that the outside surface of the load carrier is not contaminated by substances or chemicals, and that the tank is otherwise ready for the lift. 6.2 Overhead crane If the overhead crane is located in an area with a good overview, and there is no blind lifts involved, the lifting appliance operator can carry out the lifting operation alone through dealing with the slinger and signaller’s tasks. When operating an overhead crane or bridge crane with two speeds, the load should be stabilised and secured by commencing the lifting operation at crawl speed. 143 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 6.3 Pipe handling on pipe deck and in the drilling area This subclause deals with the use of the drawworks or similar lifting equipment for lifting of top-driven rotation system in coordination with other pipe handling equipment. For requirements to remotely-operated pipe handling, reference is made to OLF/NR 081 . Pipe handling in the drilling area to and from deck shall be carried out in accordance with local procedures. Only personnel who are cleared by the operational responsible person can be present in the drilling area. When lifting tubulars with the claw or magnet, the work area shall be barriered off and no personnel shall be in the vicinity. When barrier off the area, special attention shall be given to the fact that tubulars can slip out and represent a hazard for surrounding areas. If lifting appliances are located in an area with a good overview, and there is no blind lifts involved, the lifting appliance operator can carry out the lifting operation alone through dealing with the slinger and signaller’s tasks. A local procedure shall be in place for the number and type of tubulars that can be lifted safely in one bundle. Before commencing the lift, the lifting appliance operator shall make sure that the correct gripping arrangement has been selected and that the claw or magnet is in the correct position and is correctly secured to the load. The crane path shall be free of obstacles and supply cables shall run freely. The operator shall ensure that the gripping arrangement is in the correct position and properly secured. The operator shall ensure that the lifting appliance and guiding device are coordinated. 6.4 Cargo winch (tugger) As part of the pre-use check, the winch operator shall check that the hook and swivel are in order and that nut and split pin are used on shackles. Split pin shall not be capable of falling out during use. Other types of pin shall not be used. Winch operator shall make sure that the wire rope is undamaged, and that it is spooled correctly to prevent bunching up on the drum which could cause the load to slip. Winch operator shall never use his hands to guide the wire rope onto the drum while it is in motion. For requirements to blind lifts, see 4.8.3. 144 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 6.5 Lifting and stacking truck Requirements to competence, use and control of lifting and stacking trucks are based on DAT Regulation no. 608, order no. 555. When using lifting and stacking trucks on offshore installations, adequate consideration shall be given to the installation’s movements, slippery deck and narrow loading areas. 6.6 Suspended work platform and elevating work platform Requirements to competence, use and control of suspended work platform and elevating work platform are based on DAT Regulation no. 608, order no. 555. When using suspended work platform and elevating work platform on installations, adequate consideration shall be given to weather conditions and the installation’s movements. 6.7 Simple lifting appliances The operational responsible person shall assess whether a lifting appliance can be classified as simple. The assessment shall focus on • special requirements to competence. • use of several signallers. • lifting in blind zones. • operation in critical area. • simultaneous operations. • tonnage and lifting height. If simple lifting appliances are located in an area with a good overview, and there is no blind lifts involved, the lifting appliance operator can carry out the lifting operation alone, including the slinger and signaller’s tasks. 7. ADDITIONAL REQUIREMENTS FOR DIFFERENT TYPES OF LIFTING GEAR Use and daily check of lifting gear shall be in accordance with the manufacturer’s instructions for use, and requirements in this NORSOK standard with annexes. In addition, relevant parts of recognised training material used by certified training enterprises can be referred to. 7.1 Storage of loose lifting equipment All installations shall have dedicated area(s) where loose lifting equipment not in use shall be stored. Loose lifting equipment shall be protected against the weather and other harmful conditions during storage. Sizeable lifting gear such as lifting beams, pendants, internal load carriers and similar shall insofar as practically possible, be protected against harmful conditions during storage. An updated index should be kept of the issue and return of lifting 145 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 equipment used in connection with setting up of temporary lifting appliances as described in this NORSOK standard. The user shall inspect loose lifting equipment for the correct marking, possible overload, wear and damage, before and after use. The user is responsible for returning loose lifting equipment to the storage area after use. Defect and damaged loose lifting equipment shall be marked and set aside at a designated place clearly identified for this purpose. 7.2 Slings The load shall be attached to the hook by means of slings or other suitable lifting gear. Protective material shall be placed between the slings and any sharp edges, and a check shall be carried out to ensure that the bend diameter complies with the manufacturer’s instructions for use. If several slings are used in the same eye or hook they shall not lay on top of each other. When slings or chains are used, consideration shall be given to the number of legs, the angle and other factors that alter the capacity of the sling. The sling shall be wrapped twice around the object to be lifted, if possible. The sling shall be tensioned with care, and not jerked. Care shall be taken to ensure that the load is distributed evenly between the legs. 7.3 Chain Special care shall be exercised when using chain. The pre-use check shall focus in particular on corrosion and flexibility of each link. 7.4 Shackles For all lifts of material or personnel, only shackles with double locking shall be used, for example nut plus split pin or screwed connection with split pin. Other types of pin shall not be used. For securing static loads, other types of shackle can be used. Shackles without rotating bolt should not be used in permanently installed lifting arrangement due to the danger of transferring rotating forces to the shackle bolt. If shackle without rotating bolt is used in lifting arrangement, the bolt shall be properly secured to withstand any rotating forces transferred to the shackle bolt. 7.5 Eye bolts and eye nuts Eye bolts and eye nuts shall always be screwed in to the point where the entire collar is in contact with the surface. 146 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Pre-use check shall include a check of the threads in the material in which the eyebolt will be mounted, and that the thread dimension and type are the same. 7.6 Wire rope clamps Wire rope clamps shall be of a type with two gripping surfaces. U-bolt clamps shall not be used on lifting equipment. When using wire rope clamps, the minimum breaking load of the wire rope shall be reduced in accordance with manufacturer’s instructions for use, and the correct number of clamps shall be used. 7.7 Beam clamps and trolleys If trolleys are used, end stops on beam shall be installed. Trolleys without automatic brake shall always be secured against unintentional movement during and after use. Beam clamps shall be installed as described in the manufacturer’s instructions for use, and not be subjected to load beyond the stated load angles. 7.8 Turnbuckles If turnbuckles are used in the lifting arrangement, they shall be certified and approved for lifting. 7.9 Lifting nipples and lifting caps Lifting nipples and lifting caps shall be certified and approved for lifting. Before use, a check shall always be carried out to ensure that the thread section on the pipe and on the lifting nipple or lifting cap are undamaged, that the lifting equipment is correctly installed, and that the thread dimension and type are the same. When moving load with lifting nipple or lifting cap, the area below the travel path shall be barriered off. 7.10 Single and multi-sheave block When securing snatch block to the load bearing structure, the operator shall ensure that all split pins, locking and safety pins are in place and in good condition. The user shall ensure that the load bearing structure is strong enough to withstand the resultant force (load plus wire tension and any friction forces) and that the snatch block is correctly positioned such that the wire rope does not rub against the side plates. For complex arrangements, an enterprise of competence should verify the correct set-up and calculations of resultant forces. 147 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 7.11 Load carriers Before use, the slinger shall check that the load carrier and attached lifting set are suitable and that the load is satisfactorily secured. The check shall ensure that • load carrier has been controlled and approved, • all load is secured in such a way that it cannot move around, • load does not stick out over the sides of the load carrier, • multi-leg sling on open load carriers, tanks, special containers and modules are secured against snagging the load etc. Net or canvas can be used as covering, or the legs of the slings can be secured with cable ties, • all load is positioned such that it is easy and safe for the receiver to handle the material when unloading the load carrier, • equipment is always placed on pallets when loading containers, • pallets or timber are always used on the floor of the basket, • load is stamped as necessary when using pallets etc., • safety net is used to prevent load from falling out of load carriers with doors, • heavy and/or unstable items are secured by means of tensioning arrangement, • there are no loose parts on the load that could fall off during the lift, • no loose items that could fall down are in the forklift pockets, • multi-leg chain slings are not crossed when attached to load, • dangerous goods is marked with the correct hazard sticker on all four sides in accordance with the DAT Regulation no. 1139. When lifting to vessels, it shall also be ensured that • all load are registered on a manifest, • type of dangerous goods is stated on the manifest, • required material safety data sheets, declarations etc. always accompany dangerous goods, • containers are sealed with a seal having a unique number, • tags on load carriers show the correct destination and are signed. All load carriers shall be placed such that the slings can be hooked on from deck level. It is not allowed to climb onto the top of the load carrier to hook on the sling. Load carriers shall not be stacked on top of each other, either on the installation or on the vessel. However, if hooking on can be done from deck level, an exception can be made for empty garbage containers which, in accordance with the instructions for use, can be stacked into f each other. Stacking shall be limited to a maximum of three empty garbage containers. In connection with this stacking, particular attention shall be given to increased windbreak, and to ensure prevention of damage to the slings. 148 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Load carriers should not be placed on tubulars. On installation where this is unavoidable, routines shall be prepared with measures to address safety in this event. Other load shall not be placed on top of load carriers. Extreme caution shall be taken when opening doors on load carriers in case there are loose objects that could fall out. Load in load carriers shall not be lifted when personnel are in the load carrier. When placing load in load carrier, the load shall be set down on pallets/timber and secured. The weight shall be distributed evenly in the load carrier insofar as possible. Heavy loads should be placed at the bottom of containers. Lifting set for offshore containers (sling assembly and shackles) should not be removed except for inspection and maintenance, or if a container shall be installed for a longer period on an installation. 7.12 Load carriers for gas bottles Gas bottles shall be transported with fitted protection cap in load carrier designed for the purpose. 7.13 Big bags Big bags for repeated use shall be documented as lifting gear. Big bags for single use shall have a type certificate in accordance with EFIBCA Standard 005. “Single use” means transport from the manufacturer via the supply base to the installation. Big bags shall only be used in connection with lifting of load to/ from load carrier. 8. PERMANENT ATTACHMENT POINTS AND TEMPORARILY ASSEMBLED LIFTING APPLIANCES 8.1 Permanent attachment point for lifting appliance Before a permanent attachment point (typically lifting pad, lifting beam) for a lifting appliance is used for the first time, an enterprise of competence shall issue a confirmation that it is ready for use. Any restrictions on use of permanent attachment points shall be specified in the confirmation and be legible on/ near the attachment point, or be made known to the user in another way. Normally, permanent attachment points for lifting appliances will be designed for maximum 10 % lateral load (see NORSOK R-CR-002). All permanent attachment points for load shall be clearly marked with SWL and identification number 149 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Lifting equipment that is used on a permanent attachment point, and which is not in regular use, should be removed after use. Where the environment is suitable for storing the equipment and the equipment does not otherwise represent a hazard, it can nevertheless hang on the permanent attachment point over a longer period. Pre-use and post-use check of the attachment point shall always be carried out. Load test or periodic control is not required unless the enterprise of competence has made this a requirement. 8.2 Lifting point on lifted component Use of lifting point on component which is designed to lift only weight of the component itself, shall be described in the manufacturer’s instructions for use or documented in another way. There is no requirement for certification or control of such lifting points by enterprise of competence. Pre-use and post-use check of such lifting points shall be carried out. 8.3 Attachment points for pulling and seafastenings Strength of attachment points for pulling and seafastenings shall be documented. There is no requirement for certification or control of attachment points for pulling and seafastenings. If vertical movement of the load occurs in connection with pulling, the attachment point shall be subject to the requirements in 8.1. The execution of pulling operations should be based on relevant parts of this NORSOK standard, see 4.3 and 4.4 in particular. Pre-use and post-use control of attachment points for pulling and seafastenings shall be carried out. 8.4 Temporarily set-up lifting appliance Use of lifting appliances attached to temporary attachment points should be limited. If there is a repeated need to lift components in connection with maintenance etc., a permanent attachment point should be installed for the lifting appliance. The following applies for use of temporarily assembled lifting appliances:. 150 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 D e s c r i p t i o n P e r m a n e n t a t t a c h m e n t p o i n t f o r l i f t i n g a p p l i a n c e I n s t a l l a t i o n o r r e a s s e m b l y o f e q u i p m e n t w h e r e c o n fi r m a t i o n h a s b e e n g i v e n b y e n t e r p r i s e o f c o m p e t e n c e t h a t t h e a t t a c h m e n t p o i n t i s r e a d y f o r u s e . T e m p o r a r y a t t a c h m e n t p o i n t f o r l i f t i n g a p p l i a n c e L o a d s l e s s t h a n o r e q u a l t o 2 t o n n e s L o a d s g r e a t e r t h a n 2 t o n n e s R i g g i n g f r o m t e m p o r a r y a t t a c h m e n t p o i n t w h e r e c o n fi r m a t i o n h a s n o t b e e n g i v e n b y e n t e r p r i s e o f c o m p e t e n c e t h a t t h e a t t a c h m e n t p o i n t i s r e a d y f o r u s e . R i g g i n g w h e r e c a l c u l a t i o n c o m p e t e n c e i s r e q u i r e d f o r a p p r o v i n g t e m p o r a r y a t t a c h m e n t p o i n t o r f o r c a l c u l a t i n g f o r c e s o n l i f t i n g a p p l i - a n c e o r l i f t i n g g e a r . E x e c u t i o n : R e f e r e n c e i s m a d e t o 8 . 1 r e g a r d i n g p e r m a n e n t a t t a c h m e n t p o i n t s f o r l i f t i n g a p p l i a n c e . R i g g e r a s s e s s e s w h e t h e r t e m p o r a r y a t t a c h m e n t p o i n t i s s t r o n g e n o u g h . F o r c e s o n t h e l i f t i n g g e a r c a n b e d e t e r m i n e d b a s e d o n l i f t t e c h n i c a l t a b l e s . I n o r d e r t o h e l p t h e u s e r , t a b l e s s t a t i n g c a p a c i t i e s f o r d i f f e r e n t p r o fi l e t y p e s c a n b e p r e p a r e d . I f c a l c u l a t i o n c o m p e t e n c e i s c o n s i d e r e d n e c e s s a r y , p r o c e e d a s f o r l o a d s g r e a t e r t h a n 2 t o n n e s . I f n e c e s s a r y , p e r f o r m c a l c u l a t i o n s i n o r d e r t o d o c u m e n t t h e s t r e n g t h o f t h e t e m p o r a r y a t t a c h m e n t p o i n t . Q u a l i fi e d p e r s o n s h a l l f o r e a c h a n d e v e r y c a s e v e r i f y t h e s e t - u p , i n c l u d i n g i n s t r u c t i o n s f o r u s e o r o p e r a t i o n p r o c e d u r e . C o m p e t e n c e f o r a p p r o v a l : A t t a c h m e n t p o i n t : e n t e r p r i s e o f c o m p e t e n c e A s s e m b l i n g : D o c u m e n t e d t r a i n i n g i n a c c o r d a n c e w i t h t r a i n i n g p l a n n o . O - 2 . 2 D o c u m e n t e d t r a i n i n g i n a c c o r d a n c e w i t h t r a i n i n g p l a n n o . O - 3 . 2 E n t e r p r i s e o f c o m p e t e n c e C o m p e t e n c e f o r u s e r : S e e t a b l e f o r r e c o g n i s e d s t a n d a r d f o r t r a i n i n g i n A n n e x B . D o c u m e n t a t i o n C o n fi r m a t i o n f r o m e n t e r p r i s e o f c o m p e t e n c e t h a t t h e a t t a c h m e n t p o i n t i s r e a d y f o r u s e . T h e r e s p o n s i b l e r i g g e r t a g s t h e t e m p o r a r y l i f t i n g a p p l i a n c e c o n fi r m i n g t h a t t h e e q u i p m e n t i s r e a d y f o r u s e . T h e t a g s h a l l s t a t e - a r e a / m o d u l e , - w e i g h t o f l o a d t o b e l i f t e d , - d e s c r i p t i o n o f h a n g - o f f p o i n t , - t o t a l l i f t i n g c a p a c i t y , - l i m i t a t i o n s o f u s e , - d a t e a n d r i g g e r ’ s s i g n a t u r e . I f r i g g e r i s p r e s e n t t h r o u g h o u t t h e w o r k o p e r a t i o n , i . e . r i g g i n g u p , u s e a n d r i g g i n g d o w n , a n d t h i s i s a c o n t i n u o u s o p e r a t i o n , t h e r e i s n o t a g r e q u i r e m e n t . I f t h e r i g g e r l e a v e s t h e w o r k p l a c e , t h e e q u i p m e n t s h a l l b e t a g g e d w i t h “ N o t a p p r o v e d f o r u s e ” . E n t e r p r i s e o f c o m p e t e n c e , a s d e s c r i b e d i n A n n e x H , i s s u e s c e r t i fi c a t e o r o t h e r u s e r d o c u m e n t a t i o n t h a t c o n fi r m s t h a t t h e t e m p o r a r y l i f t i n g a p p l i a n c e c a n b e u s e d . HSE DIRECTIVE 4 LIFTING OPERATIONS ATTACHMENTS Annex A (Normative) Roles and responsibility Annex B (Normative) Training requirements Annex C (Normative) Requirements to local procedures Annex D (Normative) Logistics Annex E (Normative) Documentation and marking Annex F (Normative) Hand signals Annex G (Normative) Maintenance Annex H (Normative) Enterprise of competence Annex I (Normative) Risk mapping Annex J (Normative) Examples of lifting equipment Annex K (Normative) Checklist for lifting operations under marginal weather conditions 152 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX A (NORMATIVE) ROLES AND RESPONSIBILITY Personnel shall be designated in order to address the roles described below. The designation of the responsible persons does not exempt the offshore installation manager, owner of the lifting equipment or the responsible company from legal liability. The roles can be filled by personnel who also have other duties, and the personnel do not need to be employed in the responsible company. The responsible persons shall have adequate training and experience in accordance with the requirements in Annex B. The company shall • implement this NORSOK standard, have internal competence to set requirements in the discipline area in accordance with statutory requirements, • have at its disposition adequate and qualified enterprise of competence (person), • have at its disposition adequate and qualified operational and technical support, • carry out verifications in the discipline area. Offshore installation manager shall • ensure compliance with this NORSOK standard and that all statutory requirements are obeyed, • establish, implement and maintain installation-specific governing documents, • ensure that there are sufficient and qualified personnel available to carry out lifting operations safely, • designate technical and operational responsible persons for all lifting appliances and lifting operations on the installation. The responsibility shall be linked to job position(s) on board the installation, • designate responsible person for loading and unloading operations with the vessel as described in OLF/NR 06, • ensure that the responsible persons have the proper authority. Technical responsible person shall • address the technical condition of lifting equipment, • ensure that the necessary maintenance programme is established, implemented, completed and maintained in accordance with the manufacturer’s instructions and experiences with this type of equipment, see Annex G regarding maintenance, • ensure that the necessary competent control is carried out and followed up in accordance with Annex H regarding enterprise of competence, • ensure that the necessary documentation for lifting equipment is available in accordance with Annex E regarding documentation and marking, • assess the need for, and recommend replacement and modifications of lifting equipment in consultation with users. 153 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Operational responsible person shall • ensure that this NORSOK standard and installation-specific governing documents are obeyed, • exercise overall operational management of the lifting operations, • ensure overall planning and execution of lifting operations in different areas and assess the safety in connection with simultaneous operations, • ensure sufficient information exchange between shifts, • ensure that the lifting operations are executed with sufficient and qualified personnel, • ensure that the requirements to storing loose lifting equipment in this standard are abided by, • designate mentors, • approve the operation of the offshore crane for training purposes, • assess whether a lifting appliance can be classified as a “simple lifting appliance”. Lifting appliance operator shall • be in charge of and ensure the safety of each and every lift, • plan each lifting operation, see 4.4, • select appropriate lifting gear, • ensure that the lifting appliance and lifting gear are in good condition for their purpose and in accordance with the manufacturer’s instructions for use, specifications and instructions, • ensure that the lifting appliance is maintained in accordance with the maintenance programme, • carry out first line maintenance, or ensure that first line maintenance is carried out, in accordance with the maintenance programme, • carry out pre-use check of the lifting appliance, • ensure necessary announcement of ongoing lifting operations, • ensure that necessary communication is established between all personnel involved in the operation, • coordinate the lifting operation in relation to other ongoing activities, • operate the lifting appliance and lifting gear correctly in accordance with the manufacturer’s instructions for use, this NORSOK standard and the company’s governing documents, • abide instructions and signals from signaller, and obey stop signal no matter who gives it, • operate the equipment in accordance with the capacities and limitations that apply for the lifting appliance, • stop a lifting operation if there is doubt about safety. The operation shall not recommence before safety is addressed and re-established, • not participate in lifting operations if he feels physically or mentally unwell, • not participate in other tasks that can distract him during the operation of the lifting appliance, • carry out post-use check of the lifting appliance, 154 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 • keep a daily log where this is a requirement, • report any undesirable events. Signaller shall • participate in the planning of each lifting operation, • clear the travel path and ensure necessary barriers to keep • clear the travel path and ensure necessary barriers to keep personnel who are not involved in the lifting operation outside the exposed area, • ensure that the slinger is in a safe area when lifting and lowering load, • maintain visual or radio contact with the lifting appliance operator and with the slinger at the beginning and end of the lift, • give the start signal and direct the safe movement of the lifting appliance and hook load in accordance with this NORSOK standard and the company’s governing documents, • communicate in accordance with requirements in this NORSOK standard, • inform all persons involved in the lifting operation about the identity of the new signaller when changing over. New signaller shall confirm that he is taking over responsibility. Slinger shall • participate in the planning of each lifting operation, • select and use lifting gear in accordance with the manufacturer’s instructions for use, this NORSOK standard and the company’s governing documents, • carry out pre-use and post-use check of the lifting gear, • ensure that load and load carrier are properly prepared and secured before the lifting operation commences, • hook on and unhook slings to and from the load, and to and from the crane hook or lifting gear, • notify the signaller when the load is ready for lifting, and when the hook is released after the load has been landed. Deck operator shall • carry out the tasks of the slinger and/or signaller in connection with lifting operation with the offshore crane. Mentor shall • be responsible for instruction and training in accordance with the relevant training plan or training programme, • assess at all times the type of tasks the trainee can perform without assistance, and monitor the performance of these tasks, • be responsible for operating the crane in the period when new lifting appliance operators are under training, • confirm that the training has been implemented in a satisfactory way, and verify that the trainee has achieved a level of competence in accordance with the relevant training plan or training programme. 155 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Examiner shall • evaluate and approve new offshore crane operators through the implementation of a practical test in accordance with guidelines provided by KOSAR. Rigger shall • approve and issue a tag for temporary lifting appliances with SWL below 2 tonnes in accordance with the procedure in 8.4. If several persons participate in setting up a temporary lifting appliance, a responsible rigger shall be designated. Duty navigator (Captain) • See OLF/NR 061 Vessel deck crew shall • carry out the tasks of the slinger and/or signaller in connection with lifting operation with the offshore crane, • secure load with seafastenings. 156 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX B (NORMATIVE) TRAINING REQUIREMENTS B.1 General The offshore installation manager shall ensure that all personnel who are involved in lifting operations, or with maintenance of the lifting equipment, are able, competent and adequately trained to carry out the tasks and address the areas of responsibility. Competence requirements for the different roles and recognised training standards are described in Table B.1. Training of lifting appliance operators can take place within the company or under the direction of external training enterprise. The training shall be in accordance with training plans approved by DAT and published on Samordingsrådet’s web site. Reference is also made to specific training plans published on KOSAR’s web site. Where recent training plans are not available, previous syllabus established by the Norwegian Ministry of Education and Research can be used. For personnel who are involved in the use of offshore cranes, training can be based on OMHEC’s “Training standard for offshore crane operators and banksman”. NOTE Industry partners have established “Samordningsrådet for kran, truck og masseforflytningsmaskiner” (The coordinating committee for cranes, forklift trucks and earth moving machinery) in order to ensure an overall implementation/coordination of the user training and competent control of construction machinery, cranes and lifting and stacking trucks in accordance with DAT Regulation no. 608, order no. 555. Personnel under training shall only be assigned tasks that are appropriate for their competence at the time, as assessed by the mentor and operational responsible person. The responsible company, normally the operator or shipowner, is responsible for verifying that personnel with non-Norwegian certificates of competence satisfy the competence requirements stated in this NORSOK standard. 157 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Table B.1 - Competence requirements Role Competence requirements Offshore installation manager Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Technical responsible person Knowledge of applicable technical requirements to lifting appliances, including relevant requirements in NORSOK R-CR-002 with associated technical standards. Knowledge of enterprise of competence and necessary documentation as described in statutory requirements, this NORSOK standard and installation-specific governing documents. Knowledge of maintenance programmes and maintenance systems used for the lifting appliances. Knowledge of maintenance, repair and replacement of lifting equipment. Relevant technical background. Operational responsible person Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Operational knowledge and experience to be able to manage and guide personnel who are involved in lifting operations. Knowledge of methods to ensure that the lifting operations are executed in accordance with statutory requirements, this NORSOK standard and installation-specific governing documents. Knowledge of dangers connected with lifting operations and use of risk mapping as described in Annex I. 158 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Lifting appliance operator Documented training in accordance with Table B.2. Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Mentor Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Mentors for offshore cranes shall have at least three years’ experience as offshore crane operator. Mentors for other lifting appliances shall have at least one year’s practical experience. The ability to pass on knowledge, guide personnel and assess level of competence. Examiner – offshore crane G5 Authorised examiner, registered in industry register. Knowledge of statutory requirements and this NORSOK standard. Participation in specialist meetings for examiners or equivalent documented training at least every four years. Relevant practical experience in lifting operations offshore. Knowledge of relevant crane type and installation-specific governing documents for lifting operations. Knowledge of and experience in use of examination forms and the ability to assess the candidate’s level of knowledge. 159 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Deck operator Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Knowledge in the use of simple lifting appliances, training module O-2.2 or equivalent, see Table B.2. Knowledge regarding the handling of dangerous goods (IMDG code). Documented training in the use of, and safe communication by means of, VHF/UHF radio. Documented training in the rigging up/down of temporarily set-up lifting appliances, training module O-3.2. Documented practical training under mentor guidance. Signaller Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Knowledge of statutory requirements, this NORSOK standard and installation- specific governing documents for lifting operations. Slinger Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Rigger Documented training in accordance with training module no. O-3.2. 160 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Maintenance personnel Be in possession of relevant trade certificates related to the specialist areas in which the personnel shall operate, as well as training in accordance with any special instructions the manufacturer of the equipment may have issued. The syllabus for trade certificates shall be established by the Norwegian Ministry of Education and Research. Additional training in hydraulics for personnel who shall carry out maintenance on hydraulic machinery. Future training should follow a curriculum that is in accordance with guidelines and requirements prepared by CETOP, minimum CETOP competence level 2. The curriculum should also be approved by the hydraulics industry in Norway (Hydraulics and Pneumatics Association). Vessel deck crew Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Knowledge of statutory requirements, this NORSOK standard and local governing documents for lifting operations. Knowledge in the use of simple lifting appliances, training module O-2.2 or equivalent, see Table B.2. Knowledge in the handling of dangerous goods (IMDG code). Documented training in the use of, and safe communication by means of, VHF/UHF radio. Documented practical training under mentor guidance. 161 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Enterprise of competence Competence (theoretical knowledge and practical experience) to understand the design, calculations and manner of operation of lifting equipment and to carry out the necessary examinations and tests, as well as issue the prescribed certificates. Documented competence as stated in OMHEC’s “Standard for competence and skills for an enterprise of competence – Offshore cranes”, for enterprise of competence that shall carry out tasks in connection with offshore cranes. Inspectors shall be authorised by the enterprise of competence and have documented competence in the relevant classes of lifting equipment. Authorised as competent person by the Norwegian Maritime Directorate or in accordance with the flag state’s requirements for the relevant crane type and task, for personnel who shall carry out inspections on mobile installations. B.2 Training of the lifting appliance operator The requirements to the training of lifting appliance operators are considered fulfilled when the training is implemented in accordance with Table B.2. All training that is implemented after the standard was published shall be in accordance with training plans where these have been prepared. Previous training in accordance with syllabus as stated in Table B.2 will remain valid. Training in accordance with training plans and training modules shall be documented through certificates of competence issued by the industry register, which shall be authorised by ‘Samarbeid for sikkerhet’ (Collaboration for Safety). NOTE ‘Samarbeid for sikkerhet’ is a collaboration project initiated within health, safety and the environment (HSE) in the oil and gas industry. Participants are oil companies and the supplies industry represented through the Norwegian Oil Industry Association (OLF), the Norwegian Association for Supervisors (Lederne), the Norwegian Oil and Petrochemical Workers’ Union (NOPEF), the Norwegian Confederation of Trade Unions, Industry section (LO Industri), Norwegian Shipowners’ Association, Federation of Norwegian Manufacturing Industries (TBL), and The Collaborating Organisations (DSO). The Petroleum Safety Authority Norway is participating in the project as observer. 162 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 U s e r o f C e r t i fi c a t e o f c o m p e t e n c e c a t e g o r y S y l l a b u s T r a i n i n g L i f t i n g a p p l i a n c e m o d u l e - s p e c i fi c t r a i n i n g O f f s h o r e c r a n e G 5 F - 2 6 8 9 ( 1 ) ( 3 ) X G a n t r y a n d o v e r h e a d c r a n e G 4 F - 2 6 9 3 ( 1 ) X G a n t r y a n d o v e r h e a d c r a n e , s i m p l e O - 2 . 2 o r o n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 F - 2 6 8 5 F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 O - 2 . 2 o r ( 1 ) B O P c r a n e G 4 F - 2 6 9 3 ( 1 ) X D r a w w o r k s O n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 i s u s e d F - 2 6 8 5 F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 ( 1 ) X u n t i l n e w t r a i n i n g p l a n i s e s t a b l i s h e d H y d r a u l i c w o r k b a s k e t O n e o f t h e f o l l o w i n g : G 1 , G 5 , G 8 , G 2 0 i s u s e d F - 2 6 8 5 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 ( 1 ) X u n t i l n e w t r a i n i n g p l a n i s e s t a b l i s h e d P e r s o n n e l l i f t e r s s u c h a s s c i s s o r l i f t s a n d s i m i l a r O n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 i s u s e d ( 1 ) X u n t i l n e w t r a i n i n g p l a n i s e s t a b l i s h e d P i p e h a n d l i n g c r a n e ( n o t g a n t r y o r o v e r h e a d c r a n e s ) O n e o f t h e f o l l o w i n g : G 1 , G 5 , G 8 , G 2 0 i s u s e d F - 2 6 8 5 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 ( 1 ) X u n t i l n e w t r a i n i n g p l a n i s e s t a b l i s h e d W e l l i n t e r v e n t i o n c r a n e O n e o f t h e f o l l o w i n g : G 1 , G 5 , G 8 , G 2 0 i s u s e d F - 2 6 8 5 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 ( 1 ) X u n t i l n e w t r a i n i n g p l a n i s e s t a b l i s h e d W e l l i n t e r v e n t i o n m a s t O n e o f t h e f o l l o w i n g : G 1 , G 5 , G 8 , G 2 0 F - 2 6 8 5 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 ( 1 ) X P e r s o n n e l w i n c h O n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 ( 2 ) F - 2 6 8 5 , F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 O - 3 . 3 X R i d i n g b e l t F - 2 7 0 2 1 . 1 + 2 . 3 X C a r g o w i n c h O n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 ( 2 ) F - 2 6 8 5 , F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 O - 2 . 3 X S i m p l e c a r g o w i n c h O - 2 . 3 o r o n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 F - 2 6 8 5 , F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 O - 2 . 3 o r ( 1 ) L o a d i n g b u o y c r a n e ( S P M m o u n t e d c r a n e ) O n e o f t h e f o l l o w i n g : G 1 , G 5 , G 8 , G 2 0 F - 2 6 8 5 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 ( 1 ) X u n t i l n e w t r a i n i n g p l a n i s e s t a b l i s h e d M O B d a v i t O - 3 . 3 o r o n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 F - 2 6 8 5 , F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 O - 3 . 3 o r ( 1 ) X M O B c r e w F - 2 7 0 2 1 . 1 + 2 . 3 X L i f e b o a t w i n c h C o x w a i n ’ s c o u r s e X L i f e r a f t d a v i t C o x w a i n ’ s c o u r s e X T a b l e B . 2 – R e c o g n i s e d t r a i n i n g s t a n d a r d s – L i f t i n g a p p l i a n c e o p e r a t o r 163 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 U s e r o f C e r t i fi c a t e o f c o m p e t e n c e c a t e g o r y S y l l a b u s T r a i n i n g L i f t i n g a p p l i a n c e m o d u l e - s p e c i fi c t r a i n i n g E s c a p e c h u t e w i n c h C o x w a i n ’ s c o u r s e X F i x e d c r a n e w i t h s l e w a n d / o r t e l e s c o p i c b o o m O n e o f t h e f o l l o w i n g : G 1 , G 5 , G 8 , G 2 0 F - 2 6 8 5 , F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 ( 1 ) X u n t i l n e w t r a i n i n g p l a n i s e s t a b l i s h e d S i m p l e s l e w i n g c r a n e O - 2 . 2 o r o n e o f t h e f o l l o w i n g : G 1 , G 4 , G 5 , G 8 , G 2 0 F - 2 6 8 5 , F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 O - 2 . 2 o r ( 1 ) M a n u a l / p n e u m a t i c p u l l e y l i f t i n g t a c k l e O - 2 . 2 o r o n e o f t h e f o l l o w i n g : : G 1 , G 4 , G 5 , G 8 , G 2 0 O - 2 . 2 o r ( 1 ) M o b i l e c r a n e G 1 F - 2 6 8 5 o r F - 2 6 8 6 ( 1 ) X L i f t i n g a n d s t a c k i n g t r u c k F o r k l i f t o p e r a t o r c e r t i fi c a t e ( 1 ) X B a t t e r y p o w e r e d p a l l e t t r u c k R e q u i r e m e n t s t o c o m p e t e n c e , u s e a n d c o n t r o l o f l i f t i n g a n d s t a c k i n g t r u c k s a r e b a s e d o n D A T R e g u l a t i o n n o . 6 0 8 , o r d e r n o . 5 5 5 . S u s p e n d e d w o r k p l a t f o r m R e q u i r e m e n t s t o c o m p e t e n c e , u s e a n d c o n t r o l o f s u s p e n d e d w o r k p l a t f o r m s a r e b a s e d o n D A T R e g u l a t i o n n o . 6 0 8 , o r d e r n o . 5 5 5 . T e m p o r a r i l y a s s e m b l e d l i f t i n g a p p l i a n c e O - 2 . 2 e l l e r e n a v f ø l g e n d e : G 1 , G 4 , G 5 , G 8 , G 2 0 F - 2 6 8 5 , F - 2 6 9 3 , F - 2 6 8 9 , F - 2 7 0 6 , F - 3 0 8 9 O - 2 . 2 o r ( 1 ) ( 1 ) C o m p l e t e d t r a i n i n g m o d u l e s r e q u i r e d f o r t h e r e l e v a n t c a t e g o r y o f c o m p e t e n c e . F o r a n o v e r v i e w o f o b l i g a t o r y t r a i n i n g m o d u l e s , r e f e r e n c e i s m a d e t o t r a i n i n g p l a n s a p p r o v e d b y D A T a n d p u b l i s h e d o n S a m o r d n i n g s r å d e t ’ s w e b s i t e , a n d t o s p e c i fi c t r a i n i n g p l a n s p u b l i s h e d o n K O S A R ’ s w e b s i t e . N O T E I n d u s t r y p a r t n e r s h a v e e s t a b l i s h e d “ S a m o r d n i n g s r å d e t f o r k r a n , t r u c k o g m a s s e f o r fl y t n i n g s m a s k i n e r ” ( T h e c o o r d i n a t i n g c o m m i t t e e f o r c r a n e s , f o r k l i f t t r u c k s a n d e a r t h m o v i n g m a c h i n e r y ) i n o r d e r t o e n s u r e a n o v e r a l l i m p l e m e n t a t i o n / c o o r d i n a t i o n o f t h e u s e r t r a i n i n g a n d c o m p e t e n t c o n t r o l o f c o n s t r u c t i o n m a c h i n e r y , c r a n e s a n d l i f t i n g a n d s t a c k i n g t r u c k s i n a c c o r d a n c e w i t h D A T R e g u l a t i o n n o . 6 0 8 , o r d e r n o . 5 5 5 . ( 2 ) F o r p e r s o n n e l h a v i n g a t l e a s t o n e y e a r ’ s d o c u m e n t e d e x p e r i e n c e i n t h e o p e r a t i o n o f t h i s e q u i p m e n t b e f o r e t h i s N O R S O K s t a n d a r d c a m e i n t o e f f e c t , i t i s s u f fi c i e n t t o h a v e o n e o f t h e a b o v e - m e n t i o n e d c e r t i fi c a t e s o f c o m p e t e n c e . N e w l i f t i n g a p p l i a n c e o p e r a t o r s s h a l l h a v e t r a i n i n g i n a c c o r d a n c e w i t h n e w t r a i n i n g m o d u l e s . ( 3 ) I n c o n n e c t i o n w i t h t h e t r a i n i n g o f o f f s h o r e c r a n e o p e r a t o r s ( G 5 ) , t h e r e i s n o r e q u i r e m e n t t h a t t h e t r a i n i n g e n t e r p r i s e h a s o r u s e s a c r a n e s i m u l a t o r . 164 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 B.3 Other lifting appliances As recognised standard for training of operators of lifting appliances other than the ones stated in Table B.2, the recognised syllabus or training plans for the specific types of lifting appliances apply. Lifting appliances for which there are no recognised syllabus or training plans available, shall only be operated by personnel with documented training in accordance with the training plan developed by the company. The plan shall be based on the manufacturer’s recommendations, the company’s own experiences and official syllabus or training plans for the most similar types of crane. B.4 Simple lifting appliances Table B.2 differentiates between simple lifting appliances and other lifting appliances for certain types of crane. For classification, see 3.1.4 and 6.7. B.5 Certified and documented training Certified training enterprise shall be responsible for all training in according with syllabus, training modules and training plans, in accordance with requirements in DAT Regulation no. 608, order no. 555. Where reference is made to training modules published on KOSAR’s web site, there is no requirement that the training enterprise is approved by KOSAR. Other training shall be documented. B.6 Lifting appliance – specific training The specific training shall include as a minimum • relevant requirements in this NORSOK standard, • installation-specific governing documents for lifting operations, • planning, organising and execution of relevant operations, • communication, • technical structure, for example hydraulics, control system etc., • safety functions such as overload system, emergency stop, limit switches, alarms etc., • load chart, • instructions for use, crane manual and other technical documentation, • emergency procedure, • operational limitations, • assembly of tools and extra equipment, including slinging methods etc., • pre-use and post-use check, • routines for, and content of, first line maintenance, • routines for maintenance and control, • operation of the appliance. The training shall be carried out with mentor, and documented such that both the trainee and mentor confirm that the training has been completed in a satisfactory manner. 165 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 B.7 Mentor arrangement B.7.1 Training new lifting appliance operator Training of new operators shall follow relevant syllabus/training plans and the mentor (instructor) shall fulfil any additional requirements in these. Mentor shall be responsible for crane operations in the training period. When the trainee operates the crane, he shall be under the supervision of the mentor the entire time. During training in the operation of the offshore crane, the mentor shall sit next to the trainee in the cabin until the mentor considers it safe to supervise operations from the deck. When the mentor is not in the cabin, he shall work as deck operator and maintain radio contact with, and supervision of, his trainee the entire time. When crane operations are carried out to and from vessels, the mentor shall remain in the cabin the entire time. B.7.2 New personnel on the installation In order to ensure that personnel who shall take part in operations with the offshore crane (lifting appliance operator and deck operators) have adequate knowledge about the relevant cranes and the installation, new personnel shall complete installation-specific training together with the mentor. On floating installations that move this training period should be at least two weeks if the personnel do not have experience from the same type of installation. In this period, the personnel shall have documented the training in the applicable installation-specific requirements. B.8 Maintenance of competence All competence that is required in accordance with this annex shall be maintained. The following areas should receive particular focus in refresher training: • applicable regulations and standards; • internal governing documents; • emergency procedures; • correcting of undesirable behaviour. Maintenance of competence can be done internally in the company or through an external training enterprise. Maintenance of competence shall be documented. For offshore crane operators, regular refresher training should be carried out at least every three years. Crane simulator should be used during the training. 166 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 For deck operators and vessel deck crew who are involved in lifting operations with offshore crane, a simulator can also be used during the refresher training. B.9 Verification of competence All training and maintenance of competence shall be verified. The verifications of accomplished competence can include direct observation, practical tasks, answering written and oral questions, simulation or a combination of these methods. If there is a requirement for an examiner, this person shall not have been involved in the training of the candidate. 167 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX C (NORMATIVE) REQUIREMENTS TO LOCAL PROCEDURES Procedures shall be prepared for each installation covering the following areas: • necessary operational limitations for each lifting appliance, weather, boat calls etc.; • allocation of roles (related to job position); • material handling plan; • prohibited zones for lifting operations (crane limitation chart); • lifting over pressurised area, dangerous goods etc.; • deck load limitation chart; • placement and handling of different types of load, chemicals, radioactive sources, trace elements, explosives etc.; • access to dangerous goods in the event of need to move it as a result of an emergency situation, e.g. fire etc.; • simultaneous operations; • special lifting operations; • necessary barring off areas on the travel path; • radios and use of correct channel; • crane operations in connection with helicopter traffic; • maintenance, inspection and control of lifting equipment and lifting gear; • lifting operations related emergency situations; • storage and follow-up of loose lifting equipment; • emergency procedures; • plan for bad weather; • pipe handling in the drilling area and lifting to and from the drill floor. 168 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX D (NORMATIVE) LOGISTICS D.1 General All links in the logistics chain shall be familiar with the roles they shall fill and the responsibility they shall assume. The individual shall act in a way that enables the other links in the chain to perform their duties safely. In general, the following applies to all links in the chain • transport of dangerous goods shall be in accordance with the IMDG code and the regulations stipulated by the Norwegian Maritime Directorate, • Position of for heavy lifts shall be agreed between the supply base, vessel and installation in each and every case, • receiving of containers for radioactive sources and trace elements shall be dealt with by designated responsible person on the installation or at the supply base, or by supplier or subcontractor, • in connection with the sending of temporary equipment, checklists in NORSOK Z-015 shall be used. D.2 Requisitioner Requisitioner shall specify that the equipment shall be delivered in a suitable load carrier. Prior to heavy or special lifts, the requisitioner shall contact the operational responsible person on the installation. Operational limitations and other special conditions related to the lift shall be clarified. When loading containers and load carriers at the supply base, consideration shall be given to the ability of the installation to empty these by means of forklift truck or similar. Only chemicals that are authorised for use on the relevant installation shall be ordered. D.3 Supplier Focus should be given to packing the load in such a way as to optimise the utilisation of the load carrier. Load carriers shall, to the extent possible, be appropriate for the dimensions and weight of the load. Load in open load carriers (tanks, special containers, modules etc.) shall be secured in a way that ensures that the sling arrangement/pennant cannot snag. Netting or canvas can be used as covering, or cable ties can be attached to secure the legs of the slings. Load shall be secured with seafastenings. 169 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 The sling arrangement should be parted so that it can be set to each side to enable unloading of the basket. When sending radioactive sources or trace elements, the supplier or subcontractor shall send a written notification to the supply base orinstallation. Supplier or subcontractor shall issue a special consignment note for radioactive sources or trace elements. D.4 Supply base A loading plan should be prepared to take into account the relevant installation in the sailing plan, in terms of the design of the installation, and capacity and span of the cranes. The plan should be prepared in consultation with the installations and the vessel captain. Before the load is placed on the vessel, the operational responsible person on the installation shall be informed about heavy lifts and load that is not packed in load carrier (not applicable to tubulars). The purpose of this is to clarify the location, shape, slinging and other conditions that are relevant to the lifting operation. On cranes with 15 tonnes auxiliary lift, preparations should be made for heavy lifts for loads exceeding approximately 12 tonnes, or 3 m significant wave height. Lifting equipment that is sent between the supply base and the installation, and lifting equipment that is pre-installed on hired equipment, shall be inspected in order to confirm compliance with statutory requirements and safe use before being sent offshore. Before load carriers are sent offshore, the supply base should, to the extent possible, assess whether there is sufficient time remaining before the next periodic control. D.5 Vessel For each sailing, a loading plan shall be prepared in accordance with OLF/NR 061. D.6 Utilisation of vessel deck area The following shall be addressed in connection with loading and unloading of supply vessel: Safety zones Safety zones shall be defined for each and every vessel. Load shall not be placed in the safety zones, and the areas shall be marked with white stripes. Relevant areas are the forward part of the work deck, aft part of the deck and areas around hose stations etc. 170 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Escape routes Loading and unloading of the work deck shall be planned with escape routes that provide the crew with the possibility to access and evacuate the area. These areas will vary with the amount of load, composition of the load on the sailing route upon departure from the supply base and from each installation. Necessary open area The responsible person at the supply base shall prepare the sailing plan and loading plan in consultation with the captain, with an overview of the load and backload from each installation. The plans shall take into account the installations’ need to transfer the backload before new load can be taken onboard. Available deck space on the vessel upon arrival at or departure from each installation shall be such that there is sufficient room for the manifested backload from the installations. D.7 Installation The placement of load on the installation shall be planned such that the loading and backloading operation can be carried out quickly and efficiently. In order to prepare efficient loading and backloading operations, it can be appropriate to place the backload in one area before the vessel arrives at the installation. In order to achieve safe and efficient logistics operations and reduce the vessel’s exposure time at the installation, efforts should be made to prioritise lifting operations to and from the vessel in respect of other work with the crane. For each installation, an updated deck plan shall be available, showing where different loads shall be placed and how the deck area shall be utilised in order to achieve safe and efficient loading operations. The deck plan should include information about • how much load the individual areas can withstand, • the working radius of the different cranes, • where dangerous goods shall be stored, • storage areas and placement of load carriers in these areas, • utilisation of storage area for tubulars. Notification shall be sent to the supply base when radioactive sources, trace elements or explosives are returned to land. 171 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX E (NORMATIVE) DOCUMENTATION AND MARKING E.1 Requirements to user documentation - lifting equipment put into use after 8 April 1995 The requirements to marking and documentation below shall apply for lifting equipment on fixed installations that became operational after 8 April 1995. All lifting equipment shall be accompanied by a declaration of conformity and shall be CE marked in accordance with DAT Regulation no. 820, order no. 522. All lifting equipment shall be accompanied by instructions for use in accordance with DAT Regulation no. 820, order no. 522. A All lifting equipment shall be accompanied by a certificate from an enterprise of competence. Temporarily set-up lifting appliances shall have documentation in accordance with the requirements in 8.4. E.2 Requirements to user documentation - lifting equip- ment put into use before 8 April 1995 except for lifting equipment in the drilling area The requirements to documentation below shall apply for lifting equipment on fixed installations that became operational before 8 April 1995. The same requirements shall apply for lifting equipment on installations that follow maritime standard, irrespective of when they became operational. A manual for each lifting appliance shall be available on the installation. This shall contain information about the operation, maintenance, assembly, disassembly and transport. In this respect, reference is made to requirements to content in FOR 1986-01-13 no. 31. All lifting equipment shall be accompanied by a certificate from an enterprise of competence. E.3 Requirements to user documentation - lifting equipment in the drilling area put into use before 8 April 1995 Requirements to documentation below shall apply for lifting equipment in the drilling area on fixed installations that became operational before 8 April 1995. The same requirements shall apply for lifting equipment in the drilling area on installations that follow maritime standard, irrespective of when they became operational. A manual for each lifting appliance shall be available on the installation. This shall contain information about the operation, maintenance, assembly, disassembly and transport. 172 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 The lifting equipment shall, as a minimum, be documented through a Design Verification Report or similar. In addition, it shall be documented that the equipment has been tested and found to be safe in use after being installed on the installation. E.4 Control register Inspections, examinations, repairs and modifications shall be entered in a control register or on a control card. An electronic system that provides a similar overview can be used. On mobile installations that follow a maritime operational concept, a competent person shall sign the control book. The information shall be kept as long as the equipment is in use and be available. E.5 Logbook In order to satisfy the requirements to experience transfer between shifts and in connection with crew change, a logbook should be kept for offshore cranes. The logbook should contain information to the incoming lifting appliance operator or shift about conditions that can influence the further operation of the lifting appliance. The logbook can be integrated in electronic systems if these are easily accessible and contain necessary information for the lifting appliance operator. The logbook does not replace reporting of incidents, faults and defects in the company’s system for this. E.6 Marking and labelling Lifting equipment shall be marked in accordance with DAT Regulation no. 820, order no. 522, or other regulations that apply for the relevant lifting appliance. On installations with several cranes of the same type, these shall be clearly marked with identification number in order to prevent mix-up. Where appropriate, lifting appliances can be marked with the regulations that apply for the use of the lifting appliance. The regulations can include; • competence requirements to the user, • technical and operational responsible person for the lifting appliance, • user control, • operational limitations, • instructions for safe use, • any emergency procedures. For offshore cranes, drawworks and other cranes with permanent operator, this necessary information can often be covered by other user documentation. 173 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 E.7 Documentation for load carriers All offshore freight containers for dangerous goods shall be certified by a classification society that is authorised by the certifying authority. Other offshore freight containers shall be constructed and certified in accordance with DNV Certification Note CN 2.7-1, DNV Certification Note CN 2.7-2 or NS-EN 12079 (does not cover multi-legged sling). The following certificates and documentation shall be available: • manufacturer’s certificate; • certificate from classification society, competent person or enterprise of competence; • declaration of conformity for permanently attached multi-legged sling. 174 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX F (NORMATIVE) HAND SIGNALS For directing lifting operations with personnel winch, separate hand signals have been established and are described in OLF/NR 078. For other lifting operations, the following hand signals shall be used: Bruk tungløftkroken Teleskopisk bom ut Kjøreretning Bruk hurtigkroken Teleskopisk bom inn Stans Nødstopp Hiv lasten Lår lasten Hev bommen Senk bommen Use main block Use whip line Extend telescopic boom Retract telescopic boom Swing Stop Emergency stop Raise the load Lower the load Raise the boom Lower the boom 175 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX G (NORMATIVE) MAINTENANCE Maintenance is a combination of all technical, administrative and managerial measures taken throughout the equipment’s lifespan with the aim of re-establishing the condition of the equipment whereby it can perform the intended functions. Maintenance can include preventive activities, monitoring, inspection, testing, repair, replacement, cleaning and tidying. Maintenance shall be in accordance with the manufacturer’s instructions. The maintenance programme shall focus on preventing failure in components that would result in a high risk of hazardous situations. Consideration shall also be given to the company’s experiences, as well as standards for safe use of lifting appliances referred to in this NORSOK standard. Maintenance shall be developed and improved continuously based on experiences made during the operation and maintenance of the equipment. Where appropriate, the lifting appliance operator can perform first-line maintenance on the lifting appliance he operates. This contributes to greater knowledge about, and ownership in, the lifting appliance. Before carrying out maintenance on lifting appliances, a ‘Do not operate’ or similar warning sign shall be placed by the controls, which should preferably be locked out. The lifting appliance shall not be operated before the warning sign has been removed by the person responsible for the maintenance activity. Before the lifting appliance is put into operation, the person responsible for the maintenance activity shall ensure that testing is carried out in accordance with the manufacturer’s instructions for use, and that all safety systems are set for normal operations. After the maintenance has been carried out, and before the lifting appliance is used, the lifting appliance operator shall perform a user check and ensure that the functions have been returned to normal operational status. If the scope of the maintenance is limited, it is sufficient to control the functions related to the maintenance carried out. After maintenance has been carried out on crane boom, the lifting appliance operator shall check the boom visually before it is raised. In particular, he shall check for loose parts, that the wire rope is laying correctly in the sheaves and that wire locks are correctly installed. Before controls carried out by enterprise of competence and sizeable maintenance activities on complex lifting appliances such as offshore cranes, a pre-job talk shall be held by the personnel involved. If, in connection with these activities, testing is to be carried out beyond what is described in the programme, an SJA should be carried out. 176 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 The general responsibility that the lifting appliance operator has for the crane operation, also applies in connection with maintenance activities and controls carried out by enterprise of competence. If safety is called into question, the lifting appliance operator shall halt the operation. The maintenance and the technical condition of lifting equipment shall also be monitored through the enterprise of competence carrying out the following activities: • control upon start-up of new lifting appliance; • periodic control; • control after the lifting appliance has been used for significant periods; • control following damage or important modifications; • control in connection with extension of lifespan. Organisation, duties and scope of enterprise of competence are described in Annex H. 177 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX H (NORMATIVE) ENTERPRISE OF COMPETENCE H.1 Enterprise of competence Enterprise of competence shall verify the lifting equipment’s technical safety and thereby act as an extra safety barrier. The company shall quality assure the organisation and work performance of the enterprise of competence that the company uses. Enterprise of competence that carries out tasks on fixed installations shall be organised in accordance with requirements in DAT Regulation no. 608, order no. 555. Control of offshore cranes shall also be based on the OMHEC standard for enterprise of competence. If an external enterprise of competence is used, this enterprise shall be certified in accordance with the certification scheme established by DAT through requirements in DAT Regulation no. 608, order no. 555. On mobile installations, requirements in the Norwegian Maritime Directorate’s regulations can be followed if the technical specification of the equipment was based on these requirements. Reference is made to relevant Petroleum Safety Authority Norway regulations that describe when maritime regulations can form the basis. In such circumstances, a competent person authorised by the Norwegian Maritime Directorate shall be used. For lifting appliances in the drilling area, the same requirements to the use of enterprise of competence apply as on fixed installations. Classification societies that are recognised by the Norwegian Maritime Directorate and that inspect lifting equipment as part of the class notation “DRILL N” and “CRANE” on an installation can carry out control as enterprise of competence, provided that the control is implemented and reported in accordance with requirements in this NORSOK standard. The company shall describe how to address requirements to enterprise of competence. The description shall, as a minimum, include • responsibility and roles, • organisation, • any use of external enterprise of competence, • impartiality. Enterprise of competence shall be sufficiently independent such that the appraisal of the equipment is not influenced by other factors. In this respect, reference is made to NS-EN 45004, which describes general requirements to bodies that carry out inspections. 178 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 In connection with competent control, competent personnel connected to the enterprise of competence can function test a lifting appliance without having the certificate of competence for operating the appliance. This shall be approved by the operational responsible person. H.2 Initial control Prior to initial use, after each set-up of a lifting appliance at a new workplace, and in connection with modifications resulting in a new set-up, the lifting appliance shall be controlled by an enterprise of competence. The purpose of the control is to verify compliance with statutory requirements, safe set-up and safe functioning. This control supplements the testing carried out by the manufacturer at the fabrication site. For temporarily assembled lifting appliance, the requirement to initial control by enterprise of competence is considered fulfilled upon implementation of the procedure described in 8.4. H.3 Periodic control Lifting appliances and lifting gear shall be controlled periodically by enterprise of competence. As a general rule, periodic control shall be carried out every twelve months, but no later than in the same month one year after the previous control. A programme shall be prepared describing competent control for each type of lifting appliance and lifting gear. The periodic control shall comply with the manufacturer’s instructions for use and shall as a minimum include; • control of documentation, certificates etc., • review of report from enterprise of competence, maintenance and equipment history from latest control period, • use of lifting appliance in relation to design lifespan and assess the need for initiating lifespan analysis, • condition control (including marking), • function testing, • reporting and signing for completed control. Offshore containers shall be inspected annually in accordance with MSC/Circ.860. Use, maintenance, storage, checking and other inspections and examinations of offshore containers shall comply with the recognised standards, manufacturer’s instructions and statutory regulations. H.4 Extraordinary control Enterprise of competence shall perform extraordinary control of lifting appliances and lifting gear • following exposure to, or there is suspicion of, overloading or damage, • following significant repairs or modifications, • upon change in owner of lifting appliances, 179 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 • upon start-up of lifting appliances after more than six months non- use, • when more frequent controls are required as a result of the environment in which the lifting equipment is placed. The scope of the extraordinary control depends on the situation and the reason for the control. Enterprise of competence determines the scope of the control in consultation with the manufacturer and technical responsible person. H.5 Inspection at the end of the design lifespan or safe work period When lifting equipment is approaching the end of its design lifespan or safe work period as stated by the manufacturer, an evaluation of a new lifespan shall be carried out in accordance with recognised standards before the lifting equipment can be approved for continued use. This assessment shall be verified by enterprise of competence. H.6 Safety assessment A safety assessment shall be carried out on lifting appliances and lifting gear that show an increasing frequency of failure, cause serious incidents, are at a risk of fatigue fracture, or create other reasonable doubt about safety through continued use. Depending on the need, the safety assessment can include causal analysis, lifespan analysis, gap analysis against current requirements, classification and establishment of barriers, operational risk analysis, consideration of amended application, working environment study etc. The safety assessment shall be carried out by enterprise of competence or others that have thorough competence in the relevant equipment. H.7 Documentation following control Documentation following control carried out by enterprise of competence and any safety assessments shall be available on the installation. Initial control shall be documented in the form of certificate and control book, control card or similar for recording subsequent controls. The documentation can be available in electronic format. The certificate shall include, as a minimum; • product information, test load and allowable working load, • references to regulations and standards, • description of control scope, including references to other certificates etc., • operational limitations or annotations, • signature of enterprise of competence. 180 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 After periodic or extraordinary control has been carried out, enterprise of competence shall issue a report that clearly states • the controlled lifting equipment (identification number/ description of the assembled lifting appliance), • reference to control programmes used, • failures and defects revealed, • consequences for continued use of the lifting appliance, • corrective measures, both technical and operational, • deadline for fixing faults, • name of person carrying out the control, • date of control. Enterprise of competence should use the following codes to grade faults and defects revealed during the control. 181 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Table H.1 - Grading of faults and defects C o d e D e s i g n a t i o n S t a t u s C o n s e q u e n c e w i t h r e g a r d t o u s e A c t i o n M i n i m u m r e q u i r e m e n t s t o s a f e t y l e v e l a r e n o t f u l fi l l e d . T h e c o d e i n d i c a t e s a n a s s e s s m e n t w h e r e b y t h e o v e r a l l t e c h n i c a l c o n d i t i o n o f t h e e q u i p m e n t i n t e r m s o f d e s i g n , a s s e m b l y , s e t - u p a n d m a i n t e n a n c e d o n o t s a t i s f y t h e s t a t u t o r y r e q u i r e m e n t s . S p e c i fi e d r e q u i r e m e n t s a r e f u l fi l l e d , b u t t h e c o n d i t i o n c a n d e v e l o p n e g a t i v e l y . S t o p u s e i m m e d i a t e l y , c o m p l e t e l y o r p a r t i a l l y f o r c e r t a i n o p e r a t i o n s . U s e c a n c o n t i n u e w i t h s p e c i a l c a u t i o n p r o v i d e d t h a t m e a s u r e s a r e i m p l e m e n t e d . R e p a i r , o p e r a t i o n a l r e s t r i c t i o n s o r a p p l y f o r d e v i a t i o n . M e a s u r e s a n d / o r r e p a i r . R e c t i fi c a t i o n o f a d i r e c t i v e s h a l l b e g i n i m m e d i a t e l y a n d b e c o m p l e t e d w i t h i n t h e s t a t e d d e a d l i n e . I f t h e d e a d l i n e c a n n o t b e k e p t , a n e w d e a d l i n e s h a l l b e a p p r o v e d b y e n t e r p r i s e o f c o m p e t e n c e . U s e c a n c o n t i n u e w i t h s p e c i a l c a u t i o n p r o v i d e d t h a t m e a s u r e s a r e i m p l e m e n t e d . S p e c i a l m o n i t o r i n g a n d r e p a i r / m e a s u r e s i f o r w h e n n e c e s s a r y . G e n e r a l c o m m e n t s , r e p a i r s c o m p l e t e d o r o t h e r f a c t o r s t h a t a r e h i g h l i g h t e d . N o n e . A n y a c t i o n s d e p e n d o n w h a t t h e c o m m e n t s r e f e r t o . N o c o m m e n t s . ( O n l y u s e d w h e n o t h e r c o d e s a r e n o t s t a t e d ) N o n e . S p e c i fi c r e q u i r e m e n t s a r e n o t f u l fi l l e d . N O N - C O N F O R M I T Y R E C O M M E N - D A T I O N M E M O R - A N D U M C O M M E N T S N C R C M O C O K 182 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Repair means complete restoration to original condition. Measure is a temporary or permanent alternative to repair, for example operational restriction, other technical solution, precautionary measures, etc. For transportable lifting appliances and lifting gear with unique marking, the periodic control shall be documented through signing the control card and marking the equipment with the year’s colour. For lifting gear without unique marking, the periodic control shall be documented through marking the lifting gear with the year’s colour and control report stating type and number of controlled units. Slings, with the exception of pennants, with SWL/WLL less than 8 tonnes, can follow the same procedure even if they have a unique number from the supplier. The marking shall be clearly visible and permanent. For marking slings, a cable tie and suitable adhesive label stating the control month can be used. The following colours shall be used: Year: Colour: 2004 Blå 2005 Rød 2006 Gul 2007 Grønn 2008 Blå etc. etc. White indicates that the equipment shall not be used. H.8 Follow-up of directives from enterprise of competence The technical responsible person is responsible for ensuring that faults and defects reported by enterprise of competence are followed up. 183 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX I (NORMATIVE) RISK MAPPING I.1 Purpose In order to achieve safe lifting operations, it is necessary that all involved parties are aware of and can reduce the hazards inherent in the operation. In this respect, different types of risk mapping can be used, depending on the complexity of the operations to be performed. The purpose of risk mapping is to try to identify all potential hazards under all imaginable conditions and initiate measures to reduce or eliminate these. The different methods of risk mapping (see I.3) can be used for all types of lifting operations. This mapping is particularly relevant • if available procedures and work descriptions are inadequate, • if the operation involves new and unpredictable risk elements, • if it is proposed to alter equipment, develop new equipment, or assess the interaction between new solutions and the equipment already in operation, • when ensuring that the equipment used is suitable for the purpose, and that the equipment is used correctly, • when there is an increasing fault frequency or increased risk during certain operations. With all risk mapping, it is particularly important to involve personnel with operational experience. I.2 Identification of risk elements Risk elements means all factors that directly or indirectly can influence the risk of fatality or injury, damage to the environment, or material damage or losses. Identifying risk elements is important. If the risk elements are not identified, there will be no possibility of systematically eliminating or reducing them. A successful identification of risk elements is based on • knowledge of procedures, systems, equipment and components, • knowledge of activities and operations, • knowledge of accidents, • knowledge of undesirable events and near-miss accidents, • systematics and analysis methods. 184 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 I.3 Methods In order to ensure that risk mapping is carried out systematically, different methods have been developed, including: Pre-job talk A pre-job talk is a non-documented review before a concrete work task or operation. Everyone who is directly involved in the operation shall participate. Checklists can be used in this connection. Participants in a pre- job talk should always consider the need for a SJA. Safe job analysis (SJA) A SJA is a systematic and documented review of all risk elements before a concrete work task or operation, such that measures can be initiated in order to eliminate or control the identified risk elements during the preparations for, and execution of, the work task or operation. Hazard and operability study (HAZOP) by a competence group HAZOP by a competence group is a systematic and documented review by means of predefined keywords, and is implemented by personnel with special competence within the relevant specialist areas. For lifting operations, obvious group members can be the lifting appliance operator, slinger, signaller, technical and operational responsible persons, equipment suppliers, vessel crew, etc. The group shall be headed by a person with sufficient competence to carry out this type of risk mapping. 185 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX J (NORMATIVE) EXAMPLES OF LIFTING EQUIPMENT J.1 Lifting appliances covered by this NORSOK standard (examples) Cranes - all types Gantry girders Lifting davits Lifting tackle - all types Personnel winches Tuggers Lifeboat davits Overhead trolleys Hydraulic work baskets Beam clamps (used as attachments for temporarily set-up lifting appliance) Elevating platforms J.2 Lifting equipment in the drilling area covered by this NORSOK standard (examples) Crown block Travelling block Block-to-hook adapter Link adapter Drilling hook Tubing hook Elevator link (Bails) Various elevators for tubulars Gripping claw Swivel Heave compensator Deadline anchor Drawworks Topdrive rotary system Pipe handling crane Lifting nipples and lifting caps J.3 Lifting gear covered by this NORSOK standard (examples) Lifting beams Shackles Blocks Slings - fibre/chain/wire rope Load and service containers Slings – single/multi-leg Baskets Single/multi-sheave blocks Work baskets Swivels Waste containers Rings Eye bolts/Eye nuts Turnbuckles Beam clamps Web belts Hooks Links Wedge sockets Pendants J.4 Examples of detachable lifting equipment Typical examples of detachable lifting equipment for which European standards have been prepared: Clamps Grabs Grab buckets Vacuum elevators Lifting magnets C-hooks Lifting forks Lifting beams 186 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 ANNEX K (NORMATIVE) CHECKLIST FOR LIFTING OPERATIONS UNDER MARGINAL WEATHER CONDITIONS This checklist shall always be used in the event of stoppage as a result of the operational limitations in subsection 6.1.3. The checklist is applicable for both internal lifting, and lifting between supply boats and the installation. Checklists shall be available both on the vessel and in the offshore crane. For lifting operations between the vessel and installation, the checklist is reviewed by radio between the crane operator, duty navigator, operational responsible person, vessel deck crew and deck operators. For lifts on the installation, use the fields in the list marked with *. For internal lifts, the crane operator, operational responsible person and deck operators as a minimum shall participate in the assessment. Based on this joint review, a decision is taken whether the entire or parts of the operation can begin/continue. Under no circumstances shall operations exceed the limitations applicable for the vessel, crane or installation. Completed checklists shall be kept for at least one week. CHECKLIST FOR LIFTING OPERATIONS UNDER MARGINAL WEATHER CONDITIONS TO BE REVIEWED BY RADIO BETWEEN INVOLVED PARTIES. Vessel Installation Date Time Waves Wind Involved Duty navigator Vessel deck crew Crane operator Deck operator Operation responsible person Cross off Condition Description Assessme nt by vessel Assessm ent by crane Comments WEATHER Is visibility adequate for vessel? Operation low side (see OLF/NR 061)? Is the sea hitting the cargo deck? Is there imminent danger of sea hitting cargo deck? Are there extreme wind forces on vessel? INSTALL- ATION Communic. bridge, crane, deck checked? * Is visibility adequate for crane? * Can crane operator see the vessel deck crew? Can load be handled safely in wind gusts? * Are installation movements acceptable? * Is there room for safe landing of load? * Is lifting speed sufficient in terms of waves? LOAD Can deck load be handled safely? Can backload be handled safely? Can bulk hoses be handled safely? Special lifts, wind gusts, length etc.? * Can heavy lifts be handled safely? * Can hazardous cargo be handled safely? * VESSEL Is there sufficient deck area available? Is the load suitably located? Are the escape routes clear on deck? Are the vessel’s movements acceptable? VARIOUS CONCLUSION: Sign. vessel:_______________ Sign. crane:______________ Date:________ Time:________ PURPOSE, SCOPE AND STRUCTURE Purpose • Provide requirements and instructions for safe use of lifting equipment in accordance with statutory requirements and BP’s own requirements • Contribute to the establishment, maintenance and further development of an acceptable safety level for personnel, the environment and material assets in the planning and performance of lifting operations Scope • This directive applies to all BP-operated installations and contracted installations on the Norwegian continental shelf • Contractors of contracted installations who have a system that satisfies the requirements in this directive may use their own system provided this has been clarified upon implementation Structure • BPN’s lifting operations directive consists of the following: 1. Purpose, scope and structure 2. BPN’s requirements additional to NORSOK R-003 3. NORSOK R-003 “Safe use of lifting equipment” BPN’s additional requirements apply in addition to, or replace, the requirements stated in NORSOK R-003. These are operational requirements, as well as requirements for roles and duties, and competence. • • Field- and installation-specific governing documentation relating to lifting is available in the HSE instructions for Valhall/ Hod and Ula/Tambar The hierarchy of the governing documents for lifting operations is as follows 108 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 References • The Petroleum Safety Auhtority’s regulations • BP’s 8 Golden Safety Rules • BP’s NSLR (North Sea Lifting Rules) • HSE directive 1 - Work Permits • HSE directive 10 - Helicopter Operations • HSE directive 11 - Safe Job Analysis • 1.70.010 Lifting Equipment Manual • BP Drilling & well Operations Policy Web page for crane and lifting equipment BPN internal check list and instructions my be found on the BP 0-page on the intranet; Lifting Operations: http://stavanger.bpweb.bp.com/intranet/crane/ BPN’S REQUIREMENTS ADDITIONAL TO NORSOK R-003 “SAFE USE OF LIFTING EQUIPMENT” Below is an outline of BPN’s requirements additional to the following sections of the NORSOK standard: • • • • • SECTION 4 - SAFE USE OF LIFTING EQUIPMENT SECTION 6 - ADDITIONAL REQUIREMENTS FOR DIFFERENT LIFTING INSTALLATIONS SECTION 7 - ADDITIONAL REQUIREMENTS FOR DIFFERENT LIFTING EQUIPMENT APPENDIX A - ROLES AND RESPONSIBILITIES APPENDIX B - TRAINING REQUIREMENTS The sub-sections below refer to the sections in R-003 Section 4.4 Planning • Every lifting operation shall be planned in a safe manner and as a minimum the 4-point-check shall be filled in. The form is available on the intranet or as paper copy. Section 4.7 Communication • When performing lifting operations in very noisy areas, headset w/integrated telephone must be used • In case of disruption, unclear or failing communication, immediately stop the lifting operation until safe communication has been restored Section 4.8. Safe execution (please also see Norsok chapter 3.1.16) • Upon execution of safety critical tasks, installation specific work instructions shall be adhered to: Ula, Valhall. Section 4.8.2 Signaller and slinger • Lifting operations with offshore cranes or SIMOPS cranes must always be carried out with a minimum of three persons/ roles involved: the lifting appliance operator, signaller and slinger. HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 109 • • • • For all other permanent lifting appliances (BOP cranes, travelling cranes, wireline winches, personnel and work winches, etc.) a risk analysis defining the minimum number of staff required to perform lifting operations must be available No lifting operations with permanent lifting appliances must be carried out with fewer staff than the pre-defined minimum number. Whether extra personnel is required in addition to the minimum number must be considered during the planning of lifting operations. In operations where both the signaller and slinger are needed, these two must not change roles during the performance of a lifting operation If the lifting appliance operator has a good visual overview of the area, the slinger can, with clearance from the lifting appliance operator, handle and touch the load when it is under control and below hipheight (1,3m). Section 6 Additional requirements for different lifting appliances • • All types of jacking and chain hoists must be secured against overload. By an overload protection system. Fibre slings must not be used for lifting operations by offshore crane used between vessel and installation. Section 7 Additional requirements for different lifting gear • The lifting gear shall satisfy the requirements in BPN’s Lifting Equipment Manual • The following lifting equipment may not be used: o Plate clips o Magnetic yoke o Vacuum yoke o Pallet truck Section 7.5 Eye bolts and eye nuts • Eye bolts must be grade 80 and preferably RUD type in order to standardize the assortment. • Assembled and described units from vendors shall not be modified (e.g. change of eye bolts mounted on el. engines having eye bolts for material handling) Section 7.11 Load carriers • A deviation from the requirement that offshore containers must not be stacked on top of each other, can only be made when: o there is prior approval from the Business Unit Leader or a delegated person o The container is designed for stacking and labelled “Godkjent for stabling” (Approved for stacking) o the container is equipped with a crane pendant and/or lifting yokes that enable hooking up while standing on deck o stacking is limited to pre-defined areas o the risk assessment of the lifting operation shows that the 110 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 SAFETY & ENVIRONMENT HANDBOOK 2008 111 . • have at its disposition on adequate and qualified expertise (person) available. Engineering Authority. • carry out verifications in the discipline area. Description of roles and responsibilities onshore The company (Performance Unit Leader & Head of Country for BPN): • implement the NORSOK standard. instructions and specifications within his discipline and for ensuring that these are in line with the regulatory requirements • Responsible for giving advice regarding applications for exemptions and that they are acceptable in relation HEALTH. All references are to NORSOK R-003. In addition. • Ensure verification that the systems function (seen to by Compliance Coordinator) Technical Authority Lifting Equipment (TAL) • Compliance Coordinator for lifting equipment • Responsible for BPN’s directive.Roles and responsibilities The role and responsibility matrix below shows appendix A in NORSOK R-003. BPN-specific roles/responsibilities are indicated in italics. • have at its disposition on adequate and qualified operational and technical support available. have the internal expertise necessary to stipulate requirements for the discipline area. the doors must be closed with locking devices. EA: • Responsible for ensuring the availability of appropriate systems in order to maintain the technical integrity control of the installations • Define the “engineering” competence matrix and ensure TA’s competence • Make sure that BPN has an organized enterprise of competence within lifting • Responsible for ensuring that the regulatory requirements regarding competent control are met and that supervision takes place in accordance with own and regulatory requirements • Ensure that the organisation has competent personnel in the positions stated below.• risks of lifting the container up and down are as low as practically possible. in accordance with the statutory requirements. • Have the overall responsibility for ensuring that relevant requirements and guidelines are implemented into BPN’s projects and relevant contractor companies in order to secure proper risk control. spring hooks Appendix A . incl. and lower than the risks associated with other feasible alternatives o approved work permit level 1. with enclosed risk assessment and risk-reducing measures When the container is moved internally. procedures. See appendix G regarding maintenance. Job Officer (JO) / Responsible Engineer (RE) • Responsible for ensuring that BPN’s requirements regarding lifting equipment and operations are communicated to BPN’s suppliers and contractors • Responsible for ensuring that BPN’s suppliers and contractors are informed of any deviations and need for compensating. • consider the need for and recommend renewal and modifications of lifting equipment in consultation with the users. • Evaluate and reject/approve certificates • Give advice regarding the company’s own and regulatory requirements. Technical responsible person (mechanical discipline engineer) (see also Technical responsible person Offshore): • maintain the technical condition of the lifting equipment. SAFETY & ENVIRONMENT HANDBOOK 2008 . procedures and regulatory requirements Give advice to Operations Support Teams. and make sure that these requirements are met by the external enterprise of competence. corrective and preventive measures. carried out and maintained in line with the manufacturer’s instructions and experience with the use of this type of equipment. BPN’s projects and offshore personnel regarding the company’s own and regulatory requirements. instructions and guidelines for the work have been prepared. implemented. directives. • make sure that the necessary expert inspections are carried out and followed up in accordance with appendix H regarding expert activities. enterprise of competence. lifting.• to specifications. lifting • Responsible for all competent control/certifications performed by BPN’s internal enterprise of competence. procedures. • ensure that the necessary documentation for lifting equipment is available in accordance with appendix E regarding documentation and marking. • make sure the necessary maintenance program is established. • Responsible for ensuring that relevant requirements and procedures are implemented in BPN’s operating and maintenance systems and in relevant contractor companies. Operations Support Team Leader (OSTL): • Overall responsibility for securing sufficient lifting personnel and competence in OST. and make sure that they are complied with Internal Discipline Leader. as well. 112 HEALTH. • Responsible for ensuring that the planned quality level is achievable and for making sure that necessary specification. lifting. • consider whether a lifting appliance can be classified as a “simple lifting appliance” . • Establish. • ensure uniform planning and performance of lifting operations in different areas. SAFETY & ENVIRONMENT HANDBOOK 2008 113 . • be in charge of the overall and operational management of the lifting operations. implement and maintain installation-specific governing documentation • Make sure that there are sufficient and qualified personnel available to perform safe lifting operations.Description of roles and responsibilities offshore: The Offshore Installation Manager (OIM) shall • Ensure compliance with this NORSOK R-003 and make sure that all statutory requirements are met. The operational responsible person shall • make sure compliance with this NORSOK standard and installation-specific governing documentation . and evaluate safety in connection with simultaneous operations. • ensure sufficient exchange of information among the shifts. • consider the need for and recommend renewal and modifications of lifting equipment in consultation with the users. HEALTH. 061 • make sure the responsible persons have sufficient authority Technical responsible person Offshore (Responsible for the performance and experience transfer to Technical Leader Onshore) (see also Technical Leader Onshore) • maintain the technical condition of the lifting equipment. • make sure that the necessary expert inspections are carried out and followed up in accordance with appendix H regarding expert activities. The responsibility shall be linked to a position/positions onboard the installation • appoint a person with responsibility for loading and unloading operations with boats as described in OLF’s guideline no. • appoint mentors. • make sure that the standards’ requirements regarding storage of loose lifting equipment are met. • approve offshore crane operation practice. See appendix G regarding maintenance. • make sure that the lifting operations are carried out with sufficient and qualified personnel. • make sure the necessary planned maintenance is carried out according to the manufacturer’s instructions and experience with the use of this type of equipment. • Appoint technically and operationally responsible persons for all lifting appliances and lifting operations on the installation. e. enterprise of competence Onshore Technical Responsible Offshore Installation Manager Technical Leader. • carry out a pre-use check of the lifting appliance. The drilling contractor is also responsible for performing maintenance on and inspections of all loose lifting equipment in the drilling area. Definition: Drilling-related lifting equipment: Lifting equipment to be maintained by the drilling contractor. • select the appropriate lifting gear. 2007 Lifting Equipment Operational Manager Internal disipline leader. Hetland Sigmund Prestegaard Svein H. • make sure the necessary communication has been set up between everyone involved in the operation. • carry out first line maintenance or ensure that it is carried out in accordance with the maintenance programme. The drilling contractor is responsible for 1st line maintenance on offshore cranes on the drilling platforms. Hetland Eldar Larsen Svein H. • operate the lifting appliance and lifting gear correctly according to the manufacturer’s instructions. specifications and instructions. • plan each lifting operation. 114 HEALTH. The operator of the lifting appliance shall • lead and ensure safety for each lift. Dec. etc. Hetland Rig Owner Rig Owner Torger Gimre OIM Valhall OTL-V M/U * OLT-V M/U Torger Gimre OIM Valhall Torger Gimre OIM Valhall Arne Vargervik OIM Ula Arne Vargervik OIM Ula Arne Vargervik OIM Ula Rig Owner Rig OIM Rig Supt Rig Supt BP Drilling supervisior ** BP Drilling Supervisor OTL-V MU *** OTL-V MU *** OTL-V * OTL-V Seadrill Rig Supt ** Seadrill Rig Supt OTL-V *** OTL-V *** * Technical responsible person Offshore for all lifting equipment. Consists of pipehandling system. • take care of necessary alerts for lifting operations in progress. drawwork. only 1st line offshore crane maintenance ***NUI-Leader is delegated the operational and technical responsibility for lifting equipment and gear when the NUI is manned. Offshore Operationally Responseble Eldar Larsen Svein H. Hetland Sigmund Prestegaard Svein H. SAFETY & ENVIRONMENT HANDBOOK 2008 . used in connection with drilling.Description of roles on the different installations. see sec. i. this NORSOK standard and the company’s governing documents. • make sure the lifting appliance is maintained in accordance with the maintenance programme. except drilling-related lifting equipment ** Applies to drilling-related lifting equipment. BOP crane. Hetland Eldar Larsen Svein H. • coordinate the lifting operation with other ongoing activities. • make sure the lifting appliance and the lifting gear are in good working order and in accordance with the manufacturer’s instructions. Hetland Sigmund Prestegaard Svein H. 4.4 NORSOK R-003. halt a lifting operation if there is any doubt about the safety. not participate in lifting operations if he feels physically or mentally unfit. The operation must not be recommenced before safety has been re-established. • make sure the load and load carrier are carefully prepared and secured before the lifting operation is started. The signaller shall • participate in the planning of each lifting operation. • give the start-up signal for and direct the safe movement of the lifting appliance and the hook load in accordance with this NORSOK standard and the company’s governing documents. • check the lifting gear before and after use. report any undesirable incidents. The new signaller must confirm that he takes over the responsibility. • inform the signaller when the load is ready for lifting and when the hook is free again at the end of the lift. • supervise the lifting operation at all times • not touch the load. • not touch a load that is swinging or rotating. not participate in other activities which might divert his attention while operating the lifting appliance. and obey a stop signal regardless of who is giving it. carry out a check of the lifting appliance after it has been used. SAFETY & ENVIRONMENT HANDBOOK 2008 115 . • inform everyone involved in the lifting operation who the new signaller is. • hook the straps on and off the load and the crane hook or lifting gear. if a new signaller has to take over. HEALTH. • communicate in accordance with the requirements of this NORSOK standard. keep a daily log where this is a requirement. The slinger shall • participate in the planning of each lifting operation. this NORSOK standard and the company’s governing documents. • select and use lifting gear in accordance with the manufacturer’s instructions. • stay in visual and radio contact with the slinger at the begining and the end of operation. operate the equipment in accordance with the capacities and limitations that apply for the lifting appliance.• • • • • • • • follow instructions and signals given by the signaller.30 m) The deck operator shall • peform the slinger and/or signaller’s duties in connection with lifting operations with offshore cranes. • not physical touch a load that is above hip height (above 1. • clear the lifting route and ensure the necessary cordoning off to keep personnel not involved in the lifting operation outside the exposed area • make sure the slinger is in a safe area when the load is lifted and lowered. The mentor shall • provide instructions and training in accordance with the relevant training plan or training programme. enterprise of competence: • The Discipline Leader shall have the competence stipulated in Samordningsradet’s additional criteria for enterprise of competence 116 HEALTH. • secure the load. TAL: • Be updated on current lifting equipment rules • Good relevant technical background • Thorough knowledge of current requirements regarding lifting appliances. including relevant requirements in NORSOK R-003 and accompanying standards • Knowledge of enterprise of competence and necessary documentation as described in regulatory requirements. The navigator on duty (Captain) See OLF guideline no. The external examiner shall • evaluate and approve new offshore crane operators in connection with practical tests carried out in accordance with the instructions available in KOSAR. • confirm that the training has been carried out in an adequate manner and verify that the person concerned has obtained a competence level which is in line with the relevant training plan or training programme. Appendix B. 06 The seam shall • carry out the tasks of the slinger and/or signaller in connection with lifting operations with an offshore crane. standards and federal and local BP documents • Knowledge of maintenance programs and systems used for the lifting appliances Internal Discipline Leader. If more than one person takes part in the rigging of a temporary lifting appliance. The rigger shall • approve for use and issue tags for temporary lifting appliances with SWL less than 2 tonnes in line with the procedure in 8.4. SAFETY & ENVIRONMENT HANDBOOK 2008 . Training requirements The following skill requirements apply to the requirement stipulator: Technical Authority Lifting Equipment. • be responsible for the crane operation during periods where new lifting appliance operators are undergoing training. a responsible rigger shall be appointed. • consider at all times which tasks the person concerned can perform independently and supervise his/her performance of these tasks. the environment and material assets in the planning and execution of lifting operations. the relevant NORSOK standard will be withdrawn. H. I and K are normative. value adding and cost effectiveness for petroleum industry developments and operations. F G. informative.9 Skills verification • Offshore crane operators and deck crew shall undergo maintance and verification of competence with a crane simulator every three years • Operators of other types of motorised lifting appliances (other than offshore cranes) shall refresh and document the installation-specific training every three years NORSOK R003 SAFE USE OF LIFTING EQUIPMENT Foreword The NORSOK standards are developed by the Norwegian petroleum industry to ensure adequate safety. D.7 Mentor arrangement • Installation specific training and verification shall be documented in the database KOMPAS Appendix B. Annex J is . B. HEALTH. E. NORSOK standards are administered and published by Standards Norway. intended to replace oil company specifications and serve as references in the authorities’ regulations. maintain and further develop an acceptable level of safety for personnel. Subject to development and publication of international standards. This NORSOK standard shall help to establish. SAFETY & ENVIRONMENT HANDBOOK 2008 117 . The NORSOK standards are normally based on recognised international standards.Appendix B. as far as possible. Annexes A. Furthermore. NORSOK standards are. Introduction The intention of this NORSOK standard is to provide requirements and guidelines for the safe use of lifting equipment. NORSOK standards will be used to provide the Norwegian industry input to the international standardisation process. The NORSOK standards are developed according to the consensus principle generally applicable for most standards work and according to established procedures defined in NORSOK A-001. Where relevant.8 Skills maintenance and B. adding the provisions deemed necessary to fill the broad needs of the Norwegian petroleum industry. C. The NORSOK standards are prepared and published with support by The Norwegian Oil Industry Association (OLF) and Federation of Norwegian Manufacturing Industries (TBL). 1 Normative references DNV Certification Note CN 2. October 1997 are so extensive that it was not appropriate to mark them. consideration was given to Norwegian regulations. Standard Norge is secretariat for the revision group. Offshore Service Containers EFIBCA Standard 005. be revised on an annual basis by a revision group. 2. through references in this text.7-2. Use of work equipment (see NOTE below) FOR 1986-01-13 no. based on input from the users. 31 The Norwegian Maritime Directorate: Regulations for deck cranesetc. NORMATIVE AND INFORMATIVE REFERENCES The following standards includeregulations and guidelines which. 608. order no. Improvement proposals shall be coordinated by the individual company before being sent to the revision group. Offshore Containers DNV Certification Note CN 2. 2. 1. SAFETY & ENVIRONMENT HANDBOOK 2008 . This NORSOK standard shall. NOTE Examples of lifting equipment covered by this NORSOK standard can be found in Annex J. The latest versions of thereferences shall be used unless otherwise agreed. 1. OLF and NR guidelines. Amendments made to Rev. It does not include the use of lifts and fall protection equipment. 04 The Norwegian Maritime Directorate: Regulations for loading andunloading appliances on ships (see NOTE below) 118 HEALTH. on mobile installations (see NOTE below) FOR 1978-01-17 nr. Other recognised standards canbe used provided that it can be proven that they satisfy or exceed therequirements and guidelines in the standards referred to below. Single trip DAT Regulation no. In order to assist learning and experience exchange. 555. and the operator companies and shipowners’ internal specifications and procedures relating to the safe use of lifting equipment.During the preparation of this NORSOK standard. the improvement proposals and the revision group’s processing of these shall be made available.7-1. European and international standards. comprise theregulations and guidelines in this NORSOK standard. SCOPE This NORSOK standard embraces the safe use of lifting equipment used in connection with lifting operations in the petroleum activities. Sit harnesses NS-EN 12079. Implementation of NPD’s requirement set forth in the Facilitiesregulations Section 55 and the Activities regulations Section 80. marking and packaging. Offshore containers -Design. repair. inspection andmarking NS-EN 45004. 860.IMDG code. 1139. 820. NS-EN 813. 1455 The Norwegian Maritime Directorate: Regulations for equipment onships (see NOTE below) Note Unauthorisedtranslation of title. maintenance. construction. Recommended guidelines for the use of riding belt (see NOTEbelow) OLF/NR 081. Guidelines for the approval of offshore containers handled in openseas NORSOK R-CR-002.Rules for planning and execution of marine operations. order no. DAT Regulation no. Personal protective equipment for prevention of falls from aheight . Personal protective equipment against falls from a height -General requirements for instructions for use. periodicexamination. SAFETY & ENVIRONMENT HANDBOOK 2008 119 . General criteria for the operation of various types of bodiesperforming inspection OLF/NR 061. marking etc. Temporary equipment NS-EN 365. HEALTH. Guidelines for safety in the interaction between the installation. of dangerouschemicals (see NOTE below) MSC/Circ. with regardsto remote operated pipe handling FOR 1998-12-29 no. testing. Lifting Equipment NORSOK Z-015.supply base and offshore service vessel (see NOTE below) OLF/NR 078. Regulations for classification. Regulations for machinery (see NOTE below) DAT Regulation no. 522.2 Informative references DNV . 2. 120 HEALTH. suspended on rope. DEFINITIONS AND ABBREVIATIONS The following terms. 3. limitations and scope of use. monorail cranes. health and/or material assets 3. or that a certain course of action is preferred but not necessarily required NOTE The term ‘should’ means that other solutions can be chosen than the one recommended in the standard.7 pre-use and post-use check visual and functional assessment (not test) of the lifting equipment’s technical condition before and after use (without disassembly) 3.1. winches. TERMS.4 simple lifting appliances lifting appliances (overhead cranes.3 documented training training whereby it can be documented that the person who will use the lifting equipment has received practical and theoretical training that provides knowledge about its structure.) where use is not considered to involve a hazard to life. It shall be documented that the alternative solution provides an equivalent level of safety.3.6 fixed attachment point for lifting appliance pad eyes. etc. as well as maintenance and inspection in accordance with the requirements set for safe use and operation stipulated in regulations and instructions for use 3. chain hoists. definitions and abbreviations apply for this NORSOK standard. 3.1.5 dangerous goods load that is classified and marked in accordance with the IMDG code 3.1. winch and mobile crane foundations.2 should verbal form used to indicate that among several possibilities one is recommended as particularly suitable without mentioning or excluding others.1.1.1 blind lifts lifting operation whereby the lifting appliance operator does not have a direct view of the load or landing area NOTE Use of closed circuit television monitoring the work area is not considered to be direct view.1. operation.1.1.8 suspended work platform mechanically operated work platform that can move freely NOTE For example. lifting beams and beams for temporary attachment of beam clamps 3.1 Terms and definitions 3. applications. SAFETY & ENVIRONMENT HANDBOOK 2008 . 3. in addition to the vertical movement 3.1. SAFETY & ENVIRONMENT HANDBOOK 2008 121 . supply and standby boats are included in the definition of an installation.12 can verbal form used for statements of possibility and capability.3.1.15 crane lifting appliance whereby the load can be moved horizontally in one or more directions. service vessels etc. floating production. HEALTH. lift of special loads such as structures.1. physical or incidental 3. crane barges.14 controller person in enterprise of competence who has sufficient theoretical knowledge. limit switches and indicators NOTE Normally does not require disassembly. unless management on board has established other approval arrangements. 3. plant and other equipment for petroleum activities (however. 3. mobile cranes etc. and check of operating controls.16 critical lifting operations operations requiring a work permit and special safety measures in order to address the interface with adjacent activities NOTE These operations include. whether material. not ships that transport petroleum in bulk) NOTE In this NORSOK standard.9 installation facility. overload testing of the lifting appliance with SWL over 10 tonnes.1.10 inspection visual control of lifting equipment for defects. coordinated lift whereby the weight exceeds the maximum lifting capacity of one of the lifting appliances. practical experience and understanding to carry out control of lifting equipment in a satisfactory manner 3.1.1. but are not limited to • • • • • • • lift over critical areas.13 elevating work platform mechanically operated work platform that moves vertically in guides 3. process equipment and well equipment. heavy lifts that are not considered routine operations.1.11 snatch block lifting equipment consisting of at least one sheave in a frame with an attachment point for rope. barges. 3. storage and offshore loading (FPSO) vessels. Examples of installations include fixed installations. rigs. wire sling or chain that can be attached to a fixed point or to a movable point on the load. subsea operations using the offshore crane.1. personnel transport with the lifting appliance. boom configuration. used together or individually 3.1.17 load carrier all types of container. 3. • preparing for the use of lifting and stacking trucks. 122 HEALTH. etc. lifting appliances and lifting components. or used as part of a lifting gear. 3. side lead.22 lifting gear components or equipment used between the lifting appliance and the load or on the load to grip it. with or without horizontal movement NOTE Examples of lifting appliances are shown in Annex J. during and after a load is moved and until the lifting equipment is ready for a new load 3. wave height. etc. such as hooks.1.18 lifting and stacking truck forklift truck and similar mobile motorised work equipment for combined lifting.. 3. skids and frames that are used to transport load 3. • the need for loading and unloading areas.24 man overboard boat MOB boat for speedy rescue of personnel in the sea 3. 3.20 lifting operation all administrative and operational activities before. moving and stacking 3.19 lifting components parts of the structure of.1. among other things • the need for type and number of lifting and transport equipment. baskets. eye bolts.1.1.3. • access to areas and workplaces for operation and maintenance.1. rings. heel. tanks. radius.23 lifting equipment common term for lifting gear.1.1. trolleys etc. trim.21 lifting appliance combined unit that is used to lift loads. off lead.1.26 nominal capacity (R0 or Rn) the actual hook load that the crane is designed to lift in a given operating condition NOTE 1 For example.25 material handling plan plan for moving load on the installation to ensure a safe and efficient operation NOTE The material handling plan takes into account. shackles. number of lines.1. SAFETY & ENVIRONMENT HANDBOOK 2008 . but which is not an integrated part of the lifting appliance NOTE Examples of lifting gear are shown in Annex J. 3. emptying. filling.NOTE 2 Nominal capacity R0 is equivalent to SWL as defined in ILO conventions.1. NOTE 2 There are two categories of offshore container: 1. embedded.safety evaluation. • . 3. controls and issues tags for temporarily assembled lifting appliance 3. Offshore freight container a.1.31 competent control control carried out by an enterprise of competence in order to verify that lifting equipment satisfies relevant requirements and is designed. SAFETY & ENVIRONMENT HANDBOOK 2008 123 . tested. b. Freight container for non-hazardous load that is not covered by the IMDG code.1. mainly for temporary installation. 3.29 offshore installation manager overall manager on the installation NOTE On a vessel this will be the captain. a unit that can be handled in open sea to/from installations and vessels NOTE 1 The unit includes equipment for lifting. installed.28 offshore crane slewing crane for general use mounted on an installation and which is used to handle loads to and from supply boats. or in other companies or institutions. Offshore service container Service container produced and equipped for special use.periodic control. • .1. set up. handling. • . Nominal capacity for an offshore crane is stated in the crane’s load chart for different significant wave heights. cooling and heating etc.32 competent person person approved by The Norwegian Maritime Directorate to certify and perform competent control on installations that are subject to The Norwegian Maritime Directorate’s regulations 3. 3. Freight container for dangerous goods.1.1. that together have sufficient theoretical knowledge and practical experience to understand calculations for lifting equipment.1. and to carry out necessary examinations and tests in order to issue certificates HEALTH.30 rigger person who assembles. barges or semi-submersible installations 3.extraordinary control. its design and function.27 offshore container transportable unit for repeated transport of load or equipment. 2.33 enterprise of competence entity in the operator companies’ organisation. documented and maintained in such a way that use of the lifting equipment is fully justified NOTE There are four types of competent control: • initial control. 1.38 shall verbal form used to indicate requirements strictly to be followed in order to conform to the standard and from which no deviation is permitted. NOTE As a rule of thumb. embedded. NOTE 2 EU regulations Here. 555. depending on whether EU regulations or maritime regulations apply. significant wave height is about half the maximum wave height.37 safe working load SWL maximum load the lifting equipment is certified to withstand under normal use NOTE SWL is normally used by ILO and shall apply on all floating and other mobile installations and ships that are not covered by EU regulations. 3. NOTE 4 Previously. 522.35 certified safety training training provided by certified training enterprise in accordance with the requirements in section 49 and section 50 of DAT Regulation no. Previously issued Certificates of Use will remain valid documentation that use of the lifting equipment is fully justified. for a description of the scope of the control. the classification regulations or the declaration of conformity and control tagging in accordance with FOR 1998-12-29 no. unless accepted by all involved parties 124 HEALTH. the certificate is based on the manufacturer’s declaration of conformity and CE marking in accordance with DAT Regulation no. the term ‘Certificate of Use’ was used instead of ‘Certificate’. documented and maintained in such a way that use of the lifting equipment is fully justified. 555 3. FOR 1986-01-13 no. confirming that the lifting equipment meets statutory requirements and is designed. Reference is made to chapter IX of DAT Regulation no. 820. issued by the enterprise of competence/competent person. Similarly. 3. the certificate can be based on. SAFETY & ENVIRONMENT HANDBOOK 2008 . order no.1. typically measured over a period of three hours.36 significant wave height average height of the highest third of prevailing waves.34 certificate form based on ILO’s recommendation. 3. for example. installed.1. The certificate shall state the statutory requirements on which it is based NOTE 1 The scope of the control for certification purposes will vary. 1455 can form the basis where this applies. or FOR 1978-01-17 no. NOTE 3 Maritime regulations Here. tested.1. 608. set up. order no. order no.3.1. 608. 31. 04. in order to verify that they operate within the tolerance requirements NOTE An examination is more comprehensive than an inspection.43 examination function test of all safety devices.39 working load limit WLL maximum load that a sling or a lifting component is certified to withstand under normal use and in a given configuration 3. brakes. 3. i. shall provide an equivalent level of safety. The alternative solution. If other solutions are necessary.1. this shall be treated as a nonconformance and dealt with as a deviation according to company requirements.40 test specific operation of lifting equipment. clutches etc.1. SAFETY & ENVIRONMENT HANDBOOK 2008 125 . limiting and indicating equipment.NOTE This verbal form is used in connection with requirements that shall be fulfilled in order comply with this NORSOK standard. and thereby confirming that the design. 3. materials and manufacture comply with specification and statutory requirements 3. in order to determine whether the lifting equipment is suitable for use 3.1.1.42 heavy lift load that is handled with the offshore crane’s main block 3.e.41 test load specified load that the lifting equipment shall withstand within the manufacturer’s specified limits without resulting in permanent deformation or other defects. with or without a defined load.2 Abbreviations BOP blow out preventer (utblasingssikring) CE Conformite European (CE-merking som bekrefter overensstemmelse med grunnleggende krav i EUdirektiver) CETOP European Oil Hydraulic and Pneumatic Committee DAT Direktoratet for arbeidstilsynet DNV Det Norske Veritas EFIBCA European Flexible Intermediate Bulk Container Association HAZOPhazard and operability study IMDG International Maritime Dangerous Goods (Code) (Code) ILO International Labour Organisation KOSAR Kompetansesenteret for arbeidsutstyr AS MOB mann-over-bord-bat MSC The Maritim Safety Committee NR Norsk Rederiforbund OLF Oljeindustriens Landsforening OMHECOffshore Mechanical Handling Equipment Committee HEALTH.1. together with any compensating measures. 1 Overall requirements All use. When considered to be safer. This description applies to all types of lifting equipment used. 4. Lifting equipment shall only be used by personnel who have and can document competence as described in Annex B. Responsibilities of the company and personnel who are involved in lifting operations are described in Annex A. inspection and examination of lifting equipment shall comply with the manufacturer’s instructions for use. Lifting appliance operator is in charge of the individual lifting operation. and the requirements in this NORSOK standard with annexes. SAFETY & ENVIRONMENT HANDBOOK 2008 . checks. If. storage. there is a change in operational conditions or in the assumptions on which the risk mapping was based. the operation shall cease and the need for a new risk assessment and implementation of any corrective safety measures shall be considered. The lifting equipment shall not be modified for purposes other than those stated without the consent of the manufacturer and enterprise of competence.SJA SWL WLL UHF VHF sikker jobb analyse (safe job analysis) sikker arbeidsbelastning (safe working load) storste tillatte arbeidslast (working load limit) ultra high frequency very high frequency 4. during the execution of a lifting operation. he shall be responsible for directing the load. If a signaller is involved in the lifting operation. see NS-EN 365.3 Risk assessment All personnel involved shall assess the need for a pre-job talk. 4. a person other than the lifting appliance operator can be designated to be in charge of the lifting operation. 126 HEALTH.2 Management The operational responsible person shall manage all of the activities with lifting appliances within his area of responsibility. maintenance. 4. SJA or use of other risk analysis methods as described in Annex I. Subsequent sections state additional requirements that apply for different types of lifting equipment. SAFE USE OF LIFTING EQUIPMENT This clause describes the individual lift and how the persons involved shall carry it out. what lifting equipment to use. ensure that • all personnel involved are familiar with the task.e. • • • • • • • • • • • For subsea lifting operations. competent and sufficient personnel are present at all phases of the lifting operation. lifting appliances and lifting gear are suitable and will be used in accordance with the manufacturer’s instructions for use. barriers are in place to prevent personnel from walking or standing under suspended load. and the roles of the persons involved in the lifting operation. the travel path is clarified and any obstacles are removed before lifting commences. movements. landing areas. For repeated or routine operations. weather conditions. work permit is obtained for critical lifting operations. The planning shall be carried out by personnel who have the relevant competence. use of tag line is considered. including the capacity of the lifting equipment.6 User check User of lifting equipment shall check the lifting equipment and make sure that it is in a safe condition before and after use. 4. the landing area can accommodate the load in terms of size and weight. such planning is only necessary the first time. blind zones and other limitations as a result of the travel path. the lifting operation can be executed safely in relation to simultaneous operations.Rules for planning and execution of marine operations” in addition to this NORSOK standard . weight of the load.4. what is to be lifted. a recognised standard shall be applied. 4. such as “DNV . enterprise of competence is involved in tandem lifts where the weight can exceed the lifting capacity of one of the lifting appliances. personnel involved have sufficient competence and knowledge of the regulations and standards that govern the operation that is to be executed. method of communication is clarified. The planning of lifting operations shall. the travel path. i. provided that an operating procedure is in place or documented in another way. as a minimum. Periodic revisions shall be carried out to ensure that no critical factors have changed. HEALTH. SAFETY & ENVIRONMENT HANDBOOK 2008 127 .4 Planning Each lifting operation shall be planned in order to ensure safe execution and that all predictable risks are taken into consideration.5 Limitations The lifting appliance operator shall map and take into consideration limitations that can affect the lifting operation. the desired crane movement can be stated in metres. communication shall be in Norwegian. All unnecessary noise or activity that can distract the lifting appliance operator shall be avoided. • function test of the emergency stop device. confirmatory communication shall be used. Radio equipment appropriate for the relevant lifting operation shall be used. SAFETY & ENVIRONMENT HANDBOOK 2008 . In order to help the lifting appliance operator. Daily check routines of the lifting equipment can cover this user check requirement. Radio check shall be carried out prior to the start of the lifting operation. • report any faults or defects to the technical responsible person. • function test of the equipment in accordance with the manufacturer’s recommendations. Where appropriate. When directing the crane in blind zones. 4. instructions shall be clear and unambiguous. The lifting appliance operator shall stop immediately if he does not receive the signal.The pre-use and post-use checks should include the following: • visual check of the lifting equipment. Unnecessary use of radios shall be avoided. a communication method can be chosen whereby the signaller gives a continuous signal to continue the movement. All personnel who are involved shall be competent in the language chosen.7 Communication At all times there shall be adequate communication between all personnel who are involved in the lifting operation. Lifting appliances shall not be used if safety systems or parts of safety systems are not functioning or have been isolated. Unless otherwise agreed. 128 HEALTH. The lifting appliance operator can repeat the signaller’s instructions (confirmatory communication) to avoid any misunderstandings during lifting operations. The method of communication to be used shall be agreed as part of the pre-job talk or SJA. transporting personnel and other lifting operations where radio communication is of prime importance. When directing the load. When directing the crane. For transport of bulk loose material. a load carrier shall be used that is designed such that material cannot fall out during loading or unloading operations.8 Safe execution 4. load carriers should be used where practical.1 Fundamental safety requirements The load and any load carrier shall be properly secured and prepared before the lifting operation commences. see Annex C. 4. Relevant areas shall be barriered off before the lifting operation commences.8. the following instructions shall be used: Instruction Instruction (Norwegian) (English) Action Hiv Pick up lift the load Lår Lower lower the load Topp bom Boom up raise the boom Legg bom Boom down lower the boom Sving høyre Slew right slew to the right (from crane operator’s position) Sving venstre Slew left slew to the left (from crane operator’s position) Stans Stop stop the movement immediately Pent/fint/rolig Gently/slowly slow movement Slakk av Slack off release tension in the wire so that the hook can be release Fri krok Hook free lift up released hook If visual signals are used. On installations with significant movement. Procedures describing when and how this shall be carried out shall be available on each installation. loads shall be secured against unintentional displacement or overturning. For internal transport. Lifting appliance operator shall at all times be fully attentive to the operation. When using personnel winch. Loads shall not be transported over personnel. Liquid products shall be transported in sealed load carriers. the communication requirements in OLF/NR 078 shall be followed. HEALTH. SAFETY & ENVIRONMENT HANDBOOK 2008 129 . the hand signals shown in Annex F shall be used. when instructions are unclear. handle/manoeuvre the load when it is under control and below shoulder height. such as a reflective vest. The lifting operation shall cease immediately if safety is jeopardised. hardhat or similar. the slinger can. care shall be taken to ensure that the block and tackle/chain hoist does not become load bearing when the lifting appliance is in motion. Lifting appliance operator shall not leave the operator’s cabin or station with load hanging on the hook. Participants in lifting operations and their roles can be made known through the wearing of special clothing. Loads shall be attached to the lifting appliance and handled in such a way that the load remains stable throughout the entire lifting operation. SAFETY & ENVIRONMENT HANDBOOK 2008 . 4. the operation shall cease and the need for a new risk assessment and initiation of any corrective safety measures shall be considered. The slinger can manually guide the empty hook to and from the load or load carrier. or in the event of loss of communication. regardless of who gives this signal. with clearance from the lifting appliance operator. the lifting appliance shall be secured against unintentional use. The signaller and slinger shall stand in a safe area at all times when the crane and/or lifting wire is moving. If a block and tackle/chain hoist is used between the hook on the lifting appliance and the load in order to manoeuvre the load in connection with assembly or disassembly work. Lifting appliance operator shall only obey instructions from the designated signaller. If the lifting appliance operator has a good visual overview of the 130 HEALTH. know who is the signaller. If the assumptions on which the planning and risk assessment were based change during the operation.8. at all times. If a lifting appliance is used to hang off a snatch block or similar.Personnel shall not walk under suspended load. but shall obey the emergency stop signal at all times. If the lifting appliance operator has a good visual overview of the area. All personnel who are involved in the lifting operation shall ensure that they have an unrestricted escape route in all phases of the operation.2 Signaller and slinger All participants in a lifting operation shall. the signaller can carry out the slinger’s duties. the signaller should place himself in a position where he can give the stop signal manually in the event of radio failure. the lifting appliance operator shall ensure that the lifting appliance brake function is active and that any function for automatic overload protection is disconnected during the operation. and particular care and attention shall be exercised. with clearance from the lifting appliance operator. the requirements for blind lifts apply. 4. the risk of the load or load carrier snagging on hatch frames should be assessed.3. a signaller shall be present by the load or as close to the load such that he can direct the lifting appliance safely and thereby address the safety of other involved persons. If.3 Blind lifts In connection with blind lifts.4 Lifting operations through hatches and in shafts For lifting operations through hatches and in shafts. it is necessary to use tag lines.8. SAFETY & ENVIRONMENT HANDBOOK 2008 131 .area. there shall always be at least two persons (signaller and slinger) who have visual contact with the load and each other. Tag line should be used to keep control of a load.8. In particular. Tag lines should not be used for lifting operations to and from vessels.8. this shall be agreed between the vessel and lifting appliance operator. For internal movement of load. personnel who are not deck HEALTH. see Annex A. 4. but knots shall not be used at the free end of the rope. not to gain control over a load.5 Use of tag line Lifting appliance operator shall assess and approve the use of tag line. 4. however. The end of the rope shall be secured against fraying. the signaller can. tag line can be used. If load has to be be pushed or pulled into position manually. possibly through an SJA. Where possible. Lifting through several levels shall be covered by local procedures.8. handle/manoeuvre the load when it is under control and below shoulder height. see 4. and have radio contact with the lifting appliance operator. If several tag lines are necessary. and manually guide the empty hook to and from the load or load carrier. Any closed circuit television that monitors the work area is considered to be an aid. For crane operations in shafts. and not a replacement for either of these persons. In such circumstances. 4.7 Radioactive sources. and the personnel shall have undergone the necessary training related to the use of tag lines.8. 132 HEALTH. trace elements or explosives shall be dealt with by the designated person on the installation. SJA shall then be carried out. Receiving of containers for radioactive sources. The intention of the requirements below is to reduce the use of this type of personnel transport to a minimum. trace elements or explosives are sent ashore from the installation. 5.operators can be involved in the operation. any barriers shall be removed and the area tidied.6 Transport of scaffolding material and boards Where practically possible. trace elements and explosives Radioactive sources. nylon ratchet straps shall be used to prevent slipping. After the operation is completed. ADDITIONAL REQUIREMENTS FOR THE LIFTING OF PERSONNEL Moving personnel with the aid of lifting appliance involves a high risk. and to ensure that management on the installations are familiar with and follow up lifting of personnel. When moving scaffolding material and boards whereby load carrier cannot be used. SAFETY & ENVIRONMENT HANDBOOK 2008 .9 Completion and evaluation Any undesirable incidents taking place during the lifting operation shall be reported. the persons involved shall assess whether experience transfer or improvements to operational procedures are necessary. scaffolding material and boards shall always be transported in a dedicated load carrier.8. Such operations are only permitted when other transport or method is not possible or appropriate. trace elements and explosives shall be placed and handled in accordance with the material safety data sheets. 4. The slings shall be wrapped round twice and choked around the load. For lifting operations to and from vessels. marking on the load carrier and local procedures. When radioactive sources. The slings should be choked in the same direction. the vessel and supply base shall be notified. 4. After the lifting operation is completed. scaffolding material and boards should be transported in dedicated load carriers. For mobile installations that are registered in a national ship’s register. Secure locking device shall be used between the crane hook and the lifting gear. and that follow a maritime operating concept. 522: Safety in connection with personnel transport shall be reviewed and found acceptable by the company. The offshore installation manager shall.1. The lifting appliance operator shall have at least one year’s experience as operator of equivalent lifting appliances. SAFETY & ENVIRONMENT HANDBOOK 2008 133 . This applies for lifting equipment that comes under the scope of DAT Regulation no. order no.5. This can be done through locking the safety latch or by using safety wire. life vest or survival suit shall be worn. During operations involving the lifting of personnel over the sea . directly or through delegating. In this connection. This means that relevant requirements in DAT Regulation no. 820. annex 1.1 General requirements An ongoing assessment shall take place to determine whether routine work can be carried out more safely through establishing permanent access or by identifying other methods of performing the work tasks. 522. can form the basis.98: Type approved by Notified Body for personnel transport. All lifting of personnel with lifting appliance can be logged in order to maintain an overview of the scope of the lift and type of work operations.1. ‘approved’ means the following: • For lifting equipment put into operation after 14. MOB shall be on standby in accordance with requirements that apply for work over the sea. 820. an overall assessment of operational and technical conditions shall form the basis. This assessment shall be implemented in consultation with the safety delegate service and the operational responsible person. For lifting equipment put into operation before 14. The assessment shall be documented.98 and lifting equipment that does not come under the scope of DAT Regulation no. approve all personnel transport with lifting appliance. Lifting equipment shall be approved for the lifting of personnel. 522. All lifting of personnel with lifting appliance shall be voluntarily. according to the company’s assessment provide the same level of safety as DAT Regulation no. 820. order no. and relevant safety standards related to these regulations shall be taken into consideration. 522. In this respect. order no. HEALTH. relevant technical requirements in the Norwegian Maritime Directorate’s regulations which. order no. 820. • The review shall be performed based on technological developments. • lifting appliance operator shall be in charge of the transfer. measures shall be taken to ensure that there is no current leakage through the lifting appliance in order to prevent damage to crane components. fall protection equipment shall be used. • a pre-job talk involving relevant personnel shall be carried out. 134 HEALTH. tools shall be secured against fall.3 Transfer of personnel between installation and vessel Offshore installation manager and captain shall approve the transfer of personnel between the installation and vessel. the area below the work basket shall be barriered off. In connection with blind lifts. movements) permit a safe execution of the operation. • • • • the lifting appliance’s maximum allowable load shall be at least twice the weight of the work basket with maximum load. who in turn shall have eye contact with the personnel who are being lifted. 5. • the personnel transfer basket shall be able to function as a temporary life raft for the number of people it is designed for.Lifting appliance operator shall assess whether the operational conditions (weather. A checklist shall be used to ensure that the requirements to lifting of personnel are addressed. visibility. a SJA shall be carried out. the pick-up and lay-down areas for the personnel transfer basket shall be prepared to ensure adequate room to carry out a safe operation. Transfer shall be logged. In connection with welding work from the work basket. • MOB shall be on standby. the following applies: • transfer shall take place in good visibility with good lighting. lifting appliance operator and signaller. Before using work basket. Radio contact shall be established and maintained between one of the persons being lifted. 5. • duty navigator and lifting appliance operator shall maintain radio contact with each other throughout the entire operation.2 Use of work basket When transporting people with lifting appliances and work basket. SAFETY & ENVIRONMENT HANDBOOK 2008 . For this type of transfer. the lifting appliance operator shall have eye contact with the signaller. and only when weather conditions permit a safe transfer. • raising and lowering of the basket shall insofar as possible take place over the open sea. • before the operation commences. the MOB shall only be launched in wind speeds below 13 m/s (25 knots) (at 10 m level) and significant wave height below 2. The procedure shall include. When using the traditional personnel net basket: • the net basket shall be maintained in good condition.MOB should not be used to transfer personnel between the installation and the vessel. The procedure shall include. • the net basket shall be stored together with life vests in a storage area where it cannot be damaged by equipment or chemicals. An operating procedure shall be prepared for handling the MOB with the offshore crane. • personnel who have not been transferred by personnel net basket previously shall be accompanied by a person who is very familiar with its use.5 m or allowable movements for the installation. order no. An elasticised pennant line or other suitable damping element should be used between the MOB hook and crane. 5. the crane.4 Handling of man overboard boat (MOB) with off shore crane When using the offshore crane to handle the MOB. HEALTH. the MOB t shall only be launched in wind speeds below 13 m/s (25 knots) (at 10 m level) and significant wave height below 2. SAFETY & ENVIRONMENT HANDBOOK 2008 135 . During exercises. but replaced with equipment for personnel transport that satisfied the requirements in DAT Regulation no. 522. Each installation shall define limit values for maximum allowable movements. It shall be tested every six months with a test load twice the maximum load. The result of the test shall be logged. with both hands free to secure a firm grip on the ropes. and how the personnel shall be evacuated in the event of davit failure. • personnel shall stand on the ring on the outside of ropes on the net basket. boat and pennant line shall be approved for such use. The traditional personnel net basket should not be used. During exercises. Each installation shall define limit values for maximum allowable movements. among other things. The approval shall refer to the relevant crane and the additional dynamic load applied by the crane and pennant line on the boat. how to place personnel in the boat. • measures shall be taken to ensure that the crane hook does not injure anyone using the personnel net basket by using an appropriate pennant line. and how the personnel shall be evacuated in the event of crane stoppage. 820. 5.5 m or allowable movements for the installation.5 Handling of man overboard boat (MOB) with davit An operating procedure shall be prepared for use of davit. among other things. descriptions of normal travel path. placing personnel in the boat. Other types of pin shall not be used. ADDITIONALREQUIREMENTS FOR DIFFERENT LIFTING APPLIANCES 6. Movable work platforms can be used without signaller or slinger.5. Normal operation of machinery or remotely operated equipment shall not take place while movable work platform is being operated in the area.1 Offshore crane 6. maintenance.1. Split pin shall be used on shackle nut between riding belt and winch wire. SAFETY & ENVIRONMENT HANDBOOK 2008 . OLF/NR 078 should be used. The outgoing shift shall also inform the incoming shift about any incidents. Use. 6. and shall be subject to requirements to safety outfitting as other personnel transport equipment.1. storage. Work platform operator shall carry out relevant parts of the tasks that would otherwise be carried out by the slinger and signaller. 136 HEALTH.1 Shift handover The outgoing shift shall inform the incoming shift about significant ongoing and planned work relevant to the operation. in addition to relevant requirements in this NORSOK standard.7 Use of movable work platforms Movable work platforms shall be considered as lifting equipment. It shall not be possible for the split pin to fall out during use. 6.6 Use of personnel winch and riding belt For use of personnel winch. see NS-EN 813 and NS-EN 365. inspection and examination of riding belts shall as a minimum comply with manufacturer’s instructions for use. check. Fall protection equipment shall be used in connection with use of movable work platform. Operator shall be approved by the operational responsible person. Tools shall be secured against fall. There is no requirement for one-year’s experience for operators of movable work platforms.2 Necessary personnel There shall be two deck operators available at all times during operations with the offshore crane. 5. The deck area below the work platform shall be barriered off. Movable work platforms shall be mechanically secured when in the parked position. 3 Operational limitations Operations with the offshore crane shall be halted when • the crane operator considers further operation unsafe. see Annex K. • large movements on mobile installations. See also requirements in 4. The review shall be carried out by the involved persons.2.1. The one who is not involved shall wear normal work clothes and be equipped with radio on the crane channel. SAFETY & ENVIRONMENT HANDBOOK 2008 137 . • narrow landing areas. If the crane operator or one of the deck operators has a good visual overview (not via closed circuit television) of the area. • use of tag line. In order to address the principle of two safety barriers when lifting and landing. such as a reflective vest. duty navigator on the vessel. 6. the operation can only be resumed after reviewing the ‘Checklist for lifting operations under marginal weather conditions’. In such circumstances. There shall be at least two deck operators directly involved in the operation during • blind lifts. • wind speed or wave height exceeds 80 % of the crane’s design limit. • heavy lifts. HEALTH. hardhat or similar. Crew on the vessel can participate via radio. Each installation shall determine limit values for movements. deck operator and operational responsible person. at least two persons shall at all times have the load under visual contact in the event that the operation has to be stopped. • movements on the mobile installation make it difficult to carry out the operation in a safe and controlled manner. assembly lift and |asymmetric lifts. Each installation shall determine limit values for movements and identify landing areas that require the direct involvement of at least two deck operators in the operation.8. • complex lifts such as tandem lifts. Participants in lifting operations and their roles can be made known through the wearing of special clothing. In such circumstances. there shall be a clear division between the roles. as a minimum the crane operator.The crane operator and deck operators can assess whether the operation can be carried out safely without the direct involvement of both deck operators. the signaller can carry out the slinger’s tasks. An SJA shall then be carried out. Safety factor shall be selected in accordance with requirements in NORSOK R-CR-002. Fixed hook with Clevis connection on chain shall only be used internally on the installation. If use of other lifting gear of lifting components is deemed unsafe. 138 HEALTH.6. unsuitable or could damage the load. Plates can be lifted in and out of load carrier through the use of chain or wire slings.1. • for assembly. the lift shall not exceed shoulder height. Since it can be difficult to determine material/steel quality of equipment and machinery. In such circumstances. a higher safety factor for lifting gear used for lifts between the vessel and the installation shall be applied. eyebolts/nuts can be used in accordance with the following principles: • for lifts from vessel to installation. If the crane has two independent lifting systems. Plate clamps shall not be used in connection with lifting with the offshore crane. Special care shall be exercised when using eye bolts and eye nuts. The latch on the main hook and whip-line hook shall always be fitted with lock-pin to prevent unintentional opening of the latch. • for lifts in/out of load carriers. • for internal transport with the offshore crane. primary load carrier is used. fibre slings can be used in lifting operations between the vessel and installation. SAFETY & ENVIRONMENT HANDBOOK 2008 . If eyebolts are included as part of the equipment that is intended for lifting with the offshore crane on the installation and to/from the vessel.4 Use of lifting gear In order to address additional dynamic loads. use suitable load carrier or slings. use eye bolts and eye nuts in accordance with supplier’s recommendations. this shall be stated on the certificate. use eye bolts and eye nuts in accordance with supplier’s recommendations. loose lifting gear should be removed from the hook that is not in use. for example by means of a through bolt which is secured with nut or split pin. The crane ball or block shall be painted in a colour that is easily visible. Fibre slings should not be used in lifting operations between the vessel and installation. Plates shall be transported in baskets or by drilling holes in the plates to accommodate shackles. where this is considered to be the safest lifting method. 6. the loading and backloading operation shall cease. Crane operator shall enter relevant significant wave height and shall not lift loads that exceed the crane’s nominal capacity (Rn) stated in the dynamic load chart. Duty navigator is responsible for safe positioning of the vessel. transport documents shall be transferred between the installation and vessel. positioning of load. This should however be carried out in consultation with the crane operator. Everyone who is involved in the loading and unloading operation shall be equipped with a radio..1. Vessel deck crew and deck operators on the installation shall wear radio with headset and integrated microphone. In addition. duty navigator on the vessel shall ensure that safe zone and escape route are known to the crew on the vessel and crane operator. e.g. an announcement can be made over the public address and alarm system that the vessel is laying to the installation. the installation can have three extra UHF radios set to the crane channel for the purpose of loan to the vessel. • bulk delivery. Before the operations commence. Before loading. number of hoses that shall be used and need for manned crane. • information exchange about personnel under training or other factors that shall be taken into consideration. preferably UHF In order to ensure . • transfer of material safety data sheets for loads requiring this. HEALTH.5 Loading and unloading of supply boat Dynamic load chart shall be used for all lifting operations involving vessels. isotopes etc. SAFETY & ENVIRONMENT HANDBOOK 2008 139 . The talk should include • a review of the extent of the operation. communication with vessels that do not have such radios. backload etc. If discharges from the installation interfere with vessel operations. In order to prevent spillage over the vessel. For landing load on vessel and how much load area that can be used. or other discharges from interfering with vessel operations. acid. material safety data sheets shall accompany loads where this is a requirement. Crane operator and duty navigator on the vessel shall carry out a pre-job talk before the loading and backloading operation commences. see Annex D. • any seafastenings. • any heavy lift or other loads that require special precautions.. • operational conditions that can create difficulties for the execution of the operation. 6 Loading and unloading when using load carriers “Load picking” shall not take place. 30 cm soft eye Wire rope type 6 x 36 + 1FC Safety factor 6 Choking SWL of the sling shall be reduced by 25 % when choking. the slinger shall ensure that protectors are firmly in place. 140 HEALTH.1. When lifting tubulars. slings shall be wrapped around twice. 6.Signal for when to hook on and off shall be agreed beforehand between crane operator and crews. this area shall be inspected thoroughly in connection with pre-use check. hook and load on the vessel deck. Slings should be choked in the same direction.7 Loading and unloading of drill pipe and casing When preparing to carry out the lift. choked and secured. To ease the working of slinging up pipe bundles. General requirements to use of load carriers are described in 7 . Length of pennant should be at least 7 m. Load should be lifted and lowered over the sea when possible. efforts should be made to use only one type of sling for all transport of drill pipe and casing to an installation.11. Pennant shall be of an adequate length to ensure the safety of the crew on the vessel at all times. Loose pennants that are not in use represent a safety risk to the crew on the vessel. Barrel lifters and pallet trucks shall only be used to handle load in and out of load carriers. The number of pennants and allowable working load shall be appropriate for the load. Due to the small bend diameter when choking. Nor is it allowed to extract load from a load carrier on the vessel deck. Visibility (not via closed circuit television) shall always be such that the crane operator can see the deck crew. and which requires crew to climb on other load carriers or expose themselves to other hazard in order to hook on the load. SAFETY & ENVIRONMENT HANDBOOK 2008 . length 8 m.1. the following standard wire rope can be used: Wire rope dimension O20 mm. 6. “Load picking” means taking load carriers that are positioned in between other loads. Load shall never be swung over the wheelhouse or crew on the vessel. the vessel should move as little as possible and not follow the movement of the load. To prevent mixing and incorrect use of slings. During crane operations. SAFETY & ENVIRONMENT HANDBOOK 2008 141 . Hoses that are used simultaneously should be the same length. continuous radio contact shall be maintained between the vessel. transport documents shall be exchanged between the installation and vessel. Care shall be taken to ensure that bulk hoses do not snag on the installation structure thereby causing additional strain force. Deck operator shall check buoyancy elements and marking. If bulk transfer is carried out under difficult weather conditions. HEALTH.Locating sling on load Angle Working angle Securing Slings shall be placed 1/4 of the pipe length from the end of the load. 6. After the slings are tight. Each installation should use valve diagrams and checklists for this preparation.1. Working angle should not exceed 45?. a safety clamp shall be fitted and tightened.8 Receiving and return of bulk Systems for receiving bulk and fluid on the installation shall be ready before the vessel arrives. the crane should be manned. Bulk hoses shall be sent to the vessel by means of the crane. Guidelines should be prepared for how many tubulars of each type can be lifted in one load. Bulk hoses should be vented before and after use. This is important in order to avoid misunderstandings and errors when transferring bulk. Hoses. and make sure that the hoses are without visible damage that can lead to a leak. In addition. Prior to loading and unloading. Crane operator can only leave the crane during the bulk operation if consent is given from the duty navigator on the boat. The hose should normally be hooked on at the end. bulk hoses should be fitted with a swivel between the hose and the installation. material safety data sheets shall be exchanged where this is a requirement. the crane operator shall remain in the crane until the operation is complete. Two deck operators should be used when handling bulk hoses. hose connections and buoyancy elements shall comply with the requirements in OLF/ NR061 and be colour coded. crane operator and person receiving/sending bulk on the installation. Sling angle through the choke shall not exceed 120?. In the event of wind speeds exceeding 15 m/s (about 30 knots) and significant wave height over 4 m. Where appropriate. Throughout the bulk transfer operation. 2 Overhead crane If the overhead crane is located in an area with a good overview. Before the hook or load is brought into the drill floor area. the lifting operation shall be cleared with the responsible person on the drill floor. the crane operator should retrieve the hose.1. 142 HEALTH.11 Transport of chemical tanks Crane operator and deck operators shall know the contents of the tank. all personnel involved shall be on the same radio channel. hazards and material safety data sheets.10 Lifting operations to and from the drill floor During lifting operations on the drill floor. 6.9 Lifting in connection with assembly and disassembly work Specialist personnel with knowledge of the equipment shall be involved in connection with the planning of the work operation and handling of own equipment.1. the weight indicator should be monitored closely to ensure that it does not exceed the stated or assumed weight of the load. shall participate.1. In connection with assembly and disassembly lifts.As soon as loading or unloading is complete. When operating an overhead crane or bridge crane with two speeds. SAFETY & ENVIRONMENT HANDBOOK 2008 . 6. a pre-job talk or SJA shall be completed. In connection with assembly and disassembly lifts. the lifting appliance operator can carry out the lifting operation alone through dealing with the slinger and signaller’s tasks. the slinger shall check that covers are in place on drains and discharge points. 6. To prevent overloading lifting equipment in connection with disassembly. Specialist personnel with knowledge of the equipment to be lifted. the instructions for use from the equipment supplier shall be followed. Before transport. and that the tank is otherwise ready for the lift. that the outside surface of the load carrier is not contaminated by substances or chemicals. Chemical tanks shall be placed and dealt with in accordance with transport documents and local procedures. as well as the crane operator and deck operators. the load should be stabilised and secured by commencing the lifting operation at crawl speed. 6. The slinger shall pay particular attention to ensure that the load is completely free before lifting commences. and there is no blind lifts involved. Winch operator shall never use his hands to guide the wire rope onto the drum while it is in motion. the lifting appliance operator can carry out the lifting operation alone through dealing with the slinger and signaller’s tasks. reference is made to OLF/NR 081 . The operator shall ensure that the gripping arrangement is in the correct position and properly secured. The crane path shall be free of obstacles and supply cables shall run freely.8. Before commencing the lift. Other types of pin shall not be used. For requirements to blind lifts. see 4. the lifting appliance operator shall make sure that the correct gripping arrangement has been selected and that the claw or magnet is in the correct position and is correctly secured to the load. the winch operator shall check that the hook and swivel are in order and that nut and split pin are used on shackles.4 Cargo winch (tugger) As part of the pre-use check. HEALTH. When barrier off the area. Only personnel who are cleared by the operational responsible person can be present in the drilling area. special attention shall be given to the fact that tubulars can slip out and represent a hazard for surrounding areas. Winch operator shall make sure that the wire rope is undamaged.6. If lifting appliances are located in an area with a good overview. A local procedure shall be in place for the number and type of tubulars that can be lifted safely in one bundle. and there is no blind lifts involved. When lifting tubulars with the claw or magnet.3. Pipe handling in the drilling area to and from deck shall be carried out in accordance with local procedures.3 Pipe handling on pipe deck and in the drilling area This subclause deals with the use of the drawworks or similar lifting equipment for lifting of top-driven rotation system in coordination with other pipe handling equipment. and that it is spooled correctly to prevent bunching up on the drum which could cause the load to slip. For requirements to remotely-operated pipe handling. 6. Split pin shall not be capable of falling out during use. the work area shall be barriered off and no personnel shall be in the vicinity. The operator shall ensure that the lifting appliance and guiding device are coordinated. SAFETY & ENVIRONMENT HANDBOOK 2008 143 . When using lifting and stacking trucks on offshore installations. SAFETY & ENVIRONMENT HANDBOOK 2008 . adequate consideration shall be given to the installation’s movements. order no.1 Storage of loose lifting equipment All installations shall have dedicated area(s) where loose lifting equipment not in use shall be stored. An updated index should be kept of the issue and return of lifting 144 HEALTH. 6. order no. adequate consideration shall be given to weather conditions and the installation’s movements. When using suspended work platform and elevating work platform on installations. use and control of lifting and stacking trucks are based on DAT Regulation no.7 Simple lifting appliances The operational responsible person shall assess whether a lifting appliance can be classified as simple. internal load carriers and similar shall insofar as practically possible. The assessment shall focus on • special requirements to competence. • simultaneous operations. pendants. 555. relevant parts of recognised training material used by certified training enterprises can be referred to. the lifting appliance operator can carry out the lifting operation alone. slippery deck and narrow loading areas. • use of several signallers. In addition. 608. including the slinger and signaller’s tasks. 7. 608.6 Suspended work platform and elevating work platform Requirements to competence.5 Lifting and stacking truck Requirements to competence. • operation in critical area. Loose lifting equipment shall be protected against the weather and other harmful conditions during storage. • lifting in blind zones. and there is no blind lifts involved. Sizeable lifting gear such as lifting beams. 6. use and control of suspended work platform and elevating work platform are based on DAT Regulation no. be protected against harmful conditions during storage. 7. 555.6. ADDITIONAL REQUIREMENTS FOR DIFFERENT TYPES OF LIFTING GEAR Use and daily check of lifting gear shall be in accordance with the manufacturer’s instructions for use. If simple lifting appliances are located in an area with a good overview. • tonnage and lifting height. and requirements in this NORSOK standard with annexes. If shackle without rotating bolt is used in lifting arrangement. the bolt shall be properly secured to withstand any rotating forces transferred to the shackle bolt.3 Chain Special care shall be exercised when using chain. For securing static loads. The sling shall be tensioned with care. and a check shall be carried out to ensure that the bend diameter complies with the manufacturer’s instructions for use. possible overload. Defect and damaged loose lifting equipment shall be marked and set aside at a designated place clearly identified for this purpose. if possible. HEALTH. Other types of pin shall not be used.2 Slings The load shall be attached to the hook by means of slings or other suitable lifting gear. The sling shall be wrapped twice around the object to be lifted. If several slings are used in the same eye or hook they shall not lay on top of each other. for example nut plus split pin or screwed connection with split pin. The user shall inspect loose lifting equipment for the correct marking. other types of shackle can be used. SAFETY & ENVIRONMENT HANDBOOK 2008 145 .4 Shackles For all lifts of material or personnel. wear and damage. When slings or chains are used. the angle and other factors that alter the capacity of the sling.equipment used in connection with setting up of temporary lifting appliances as described in this NORSOK standard. The user is responsible for returning loose lifting equipment to the storage area after use. and not jerked. Shackles without rotating bolt should not be used in permanently installed lifting arrangement due to the danger of transferring rotating forces to the shackle bolt. before and after use. 7.5 Eye bolts and eye nuts Eye bolts and eye nuts shall always be screwed in to the point where the entire collar is in contact with the surface. Protective material shall be placed between the slings and any sharp edges. Care shall be taken to ensure that the load is distributed evenly between the legs. 7. consideration shall be given to the number of legs. 7. 7. only shackles with double locking shall be used. The pre-use check shall focus in particular on corrosion and flexibility of each link. locking and safety pins are in place and in good condition. When moving load with lifting nipple or lifting cap. and that the thread dimension and type are the same. 7.10 Single and multi-sheave block When securing snatch block to the load bearing structure. and the correct number of clamps shall be used. the minimum breaking load of the wire rope shall be reduced in accordance with manufacturer’s instructions for use.7 Beam clamps and trolleys If trolleys are used. end stops on beam shall be installed. 146 HEALTH. The user shall ensure that the load bearing structure is strong enough to withstand the resultant force (load plus wire tension and any friction forces) and that the snatch block is correctly positioned such that the wire rope does not rub against the side plates. the operator shall ensure that all split pins. 7. When using wire rope clamps.8 Turnbuckles If turnbuckles are used in the lifting arrangement.6 Wire rope clamps Wire rope clamps shall be of a type with two gripping surfaces. Trolleys without automatic brake shall always be secured against unintentional movement during and after use.9 Lifting nipples and lifting caps Lifting nipples and lifting caps shall be certified and approved for lifting. and not be subjected to load beyond the stated load angles. they shall be certified and approved for lifting. Before use. 7. that the lifting equipment is correctly installed. an enterprise of competence should verify the correct set-up and calculations of resultant forces.Pre-use check shall include a check of the threads in the material in which the eyebolt will be mounted. the area below the travel path shall be barriered off. and that the thread dimension and type are the same. For complex arrangements. Beam clamps shall be installed as described in the manufacturer’s instructions for use. SAFETY & ENVIRONMENT HANDBOOK 2008 . a check shall always be carried out to ensure that the thread section on the pipe and on the lifting nipple or lifting cap are undamaged. 7. U-bolt clamps shall not be used on lifting equipment. 7. • pallets or timber are always used on the floor of the basket. • multi-leg chain slings are not crossed when attached to load. can be stacked into f each other.7. an exception can be made for empty garbage containers which. • heavy and/or unstable items are secured by means of tensioning arrangement. However. and to ensure prevention of damage to the slings. Net or canvas can be used as covering. • dangerous goods is marked with the correct hazard sticker on all four sides in accordance with the DAT Regulation no. SAFETY & ENVIRONMENT HANDBOOK 2008 147 . • tags on load carriers show the correct destination and are signed. if hooking on can be done from deck level. All load carriers shall be placed such that the slings can be hooked on from deck level. in accordance with the instructions for use. particular attention shall be given to increased windbreak. • equipment is always placed on pallets when loading containers. declarations etc. The check shall ensure that • load carrier has been controlled and approved.. • type of dangerous goods is stated on the manifest. Load carriers shall not be stacked on top of each other. • load is stamped as necessary when using pallets etc. • no loose items that could fall down are in the forklift pockets. • containers are sealed with a seal having a unique number. the slinger shall check that the load carrier and attached lifting set are suitable and that the load is satisfactorily secured. • all load is positioned such that it is easy and safe for the receiver to handle the material when unloading the load carrier. either on the installation or on the vessel. • required material safety data sheets. HEALTH. In connection with this stacking. tanks. • there are no loose parts on the load that could fall off during the lift.11 Load carriers Before use. it shall also be ensured that • all load are registered on a manifest. Stacking shall be limited to a maximum of three empty garbage containers. • multi-leg sling on open load carriers. • all load is secured in such a way that it cannot move around. special containers and modules are secured against snagging the load etc. When lifting to vessels. • safety net is used to prevent load from falling out of load carriers with doors. 1139. • load does not stick out over the sides of the load carrier. or the legs of the slings can be secured with cable ties. always accompany dangerous goods. It is not allowed to climb onto the top of the load carrier to hook on the sling. 1 Permanent attachment point for lifting appliance Before a permanent attachment point (typically lifting pad.13 Big bags Big bags for repeated use shall be documented as lifting gear. routines shall be prepared with measures to address safety in this event. lifting beam) for a lifting appliance is used for the first time. Normally. Any restrictions on use of permanent attachment points shall be specified in the confirmation and be legible on/ near the attachment point. or if a container shall be installed for a longer period on an installation. SAFETY & ENVIRONMENT HANDBOOK 2008 . Big bags for single use shall have a type certificate in accordance with EFIBCA Standard 005. permanent attachment points for lifting appliances will be designed for maximum 10 % lateral load (see NORSOK R-CR-002). Big bags shall only be used in connection with lifting of load to/ from load carrier. Heavy loads should be placed at the bottom of containers. or be made known to the user in another way.Load carriers should not be placed on tubulars. PERMANENT ATTACHMENT POINTS AND TEMPORARILY ASSEMBLED LIFTING APPLIANCES 8. Extreme caution shall be taken when opening doors on load carriers in case there are loose objects that could fall out. the load shall be set down on pallets/timber and secured. 8. 7. 7.12 Load carriers for gas bottles Gas bottles shall be transported with fitted protection cap in load carrier designed for the purpose. an enterprise of competence shall issue a confirmation that it is ready for use. “Single use” means transport from the manufacturer via the supply base to the installation. On installation where this is unavoidable. Load in load carriers shall not be lifted when personnel are in the load carrier. Other load shall not be placed on top of load carriers. When placing load in load carrier. Lifting set for offshore containers (sling assembly and shackles) should not be removed except for inspection and maintenance. The weight shall be distributed evenly in the load carrier insofar as possible. All permanent attachment points for load shall be clearly marked with SWL and identification number 148 HEALTH. There is no requirement for certification or control of such lifting points by enterprise of competence.3 Attachment points for pulling and seafastenings Strength of attachment points for pulling and seafastenings shall be documented. Pre-use and post-use check of such lifting points shall be carried out. The execution of pulling operations should be based on relevant parts of this NORSOK standard.2 Lifting point on lifted component Use of lifting point on component which is designed to lift only weight of the component itself.3 and 4. Load test or periodic control is not required unless the enterprise of competence has made this a requirement. 8. The following applies for use of temporarily assembled lifting appliances:. a permanent attachment point should be installed for the lifting appliance. 8.1. There is no requirement for certification or control of attachment points for pulling and seafastenings.Lifting equipment that is used on a permanent attachment point. 8. Pre-use and post-use control of attachment points for pulling and seafastenings shall be carried out. should be removed after use. the attachment point shall be subject to the requirements in 8. SAFETY & ENVIRONMENT HANDBOOK 2008 149 . If vertical movement of the load occurs in connection with pulling. and which is not in regular use. it can nevertheless hang on the permanent attachment point over a longer period.4 in particular. HEALTH.4 Temporarily set-up lifting appliance Use of lifting appliances attached to temporary attachment points should be limited. Pre-use and post-use check of the attachment point shall always be carried out. shall be described in the manufacturer’s instructions for use or documented in another way. see 4.. Where the environment is suitable for storing the equipment and the equipment does not otherwise represent a hazard. If there is a repeated need to lift components in connection with maintenance etc. perform calculations in order to document the strength of the temporary attachment point.1 regarding permanent attachment points for lifting appliance. Execution: Reference is made to 8. issues certificate or other user use. If the rigger leaves the workplace. SAFETY & ENVIRONMENT HANDBOOK 2008 Documentation Confirmation from enterprise of competence that the attachment point is ready for use. The tag shall state . If necessary.e. If calculation competence is considered necessary.2 Documented training in accordance with training plan no. proceed as for loads greater than 2 tonnes. The responsible rigger tags the temporary lifting Enterprise of competence. If rigger is present throughout the work operation. . .area/module.total temporary lifting appliance can beused. and this is a continuous operation. Qualified person shall for each and every case verify the set-up. Rigging from temporary attachment point where confirmation has not been given by enterprise of competence that the attachment point is ready for use.description of hang-off point. i. O-2. use and rigging down. . See table for recognised standard for training in Annex B. . rigging up.date and rigger’s signature. . In order to help the user. Forces on the lifting gear can be determined based on lift technical tables.150 Permanent attachment point for lifting appliance Temporary attachment point for lifting appliance Loads greater than Loads less than or 2 tonnes equal to 2 tonnes Rigging where calculation competence is required for approving temporary attachment point or for calculating forces on lifting appliance or lifting gear.weight of documentation that confirms that the load to be lifted. lifting capacity.limitations of use. . as described in appliance confirming that the equipment is ready for Annex H. including instructions for use or operation procedure. Rigger assesses whether temporary attachment point is strong enough. Competence for approval: Attachment point: enterprise of competence Assembling: Documented training in accordance with training plan no. Description Installation or reassembly of equipment where confirmation has been given by enterprise of competence that the attachment point is ready for use. there is no tag requirement. O-3.2 Enterprise of competence Competence for user: HEALTH. the equipment shall be tagged with “Not approved for use” . tables stating capacities for different profile types can be prepared. HSE DIRECTIVE 4 LIFTING OPERATIONS ATTACHMENTS Annex A (Normative) Roles and responsibility Annex B (Normative) Training requirements Annex C (Normative) Requirements to local procedures Annex D (Normative) Logistics Annex E (Normative) Documentation and marking Annex F (Normative) Hand signals Annex G (Normative) Maintenance Annex H (Normative) Enterprise of competence Annex I (Normative) Risk mapping Annex J (Normative) Examples of lifting equipment Annex K (Normative) Checklist for lifting operations under marginal weather conditions . implement and maintain installation-specific governing documents. and the personnel do not need to be employed in the responsible company. The company shall • implement this NORSOK standard. The designation of the responsible persons does not exempt the offshore installation manager. • designate responsible person for loading and unloading operations with the vessel as described in OLF/NR 06. • establish. • ensure that the necessary documentation for lifting equipment is available in accordance with Annex E regarding documentation and marking. SAFETY & ENVIRONMENT HANDBOOK 2008 . • assess the need for. The responsible persons shall have adequate training and experience in accordance with the requirements in Annex B. implemented. • ensure that the necessary maintenance programme is established. completed and maintained in accordance with the manufacturer’s instructions and experiences with this type of equipment. • have at its disposition adequate and qualified enterprise of competence (person). see Annex G regarding maintenance. • have at its disposition adequate and qualified operational and technical support. • designate technical and operational responsible persons for all lifting appliances and lifting operations on the installation. The roles can be filled by personnel who also have other duties. Technical responsible person shall • address the technical condition of lifting equipment. • ensure that the necessary competent control is carried out and followed up in accordance with Annex H regarding enterprise of competence. and recommend replacement and modifications of lifting equipment in consultation with users. • ensure that there are sufficient and qualified personnel available to carry out lifting operations safely. Offshore installation manager shall • ensure compliance with this NORSOK standard and that all statutory requirements are obeyed. The responsibility shall be linked to job position(s) on board the installation. • carry out verifications in the discipline area. owner of the lifting equipment or the responsible company from legal liability. have internal competence to set requirements in the discipline area in accordance with statutory requirements. • ensure that the responsible persons have the proper authority.ANNEX A (NORMATIVE) ROLES AND RESPONSIBILITY Personnel shall be designated in order to address the roles described below. 152 HEALTH. specifications and instructions. SAFETY & ENVIRONMENT HANDBOOK 2008 153 . and obey stop signal no matter who gives it. • carry out pre-use check of the lifting appliance. see 4. • ensure overall planning and execution of lifting operations in different areas and assess the safety in connection with simultaneous operations. • not participate in other tasks that can distract him during the operation of the lifting appliance. • exercise overall operational management of the lifting operations. • ensure that the requirements to storing loose lifting equipment in this standard are abided by. or ensure that first line maintenance is carried out.Operational responsible person shall • ensure that this NORSOK standard and installation-specific governing documents are obeyed.4. • assess whether a lifting appliance can be classified as a “simple lifting appliance” . • stop a lifting operation if there is doubt about safety. HEALTH. The operation shall not recommence before safety is addressed and re-established. • ensure sufficient information exchange between shifts. • designate mentors. this NORSOK standard and the company’s governing documents. Lifting appliance operator shall • be in charge of and ensure the safety of each and every lift. • coordinate the lifting operation in relation to other ongoing activities. • plan each lifting operation. • ensure necessary announcement of ongoing lifting operations. • ensure that the lifting appliance is maintained in accordance with the maintenance programme. • carry out first line maintenance. • carry out post-use check of the lifting appliance. in accordance with the maintenance programme. • select appropriate lifting gear. • not participate in lifting operations if he feels physically or mentally unwell. • operate the equipment in accordance with the capacities and limitations that apply for the lifting appliance. • operate the lifting appliance and lifting gear correctly in accordance with the manufacturer’s instructions for use. • ensure that the lifting operations are executed with sufficient and qualified personnel. • ensure that necessary communication is established between all personnel involved in the operation. • approve the operation of the offshore crane for training purposes. • ensure that the lifting appliance and lifting gear are in good condition for their purpose and in accordance with the manufacturer’s instructions for use. • abide instructions and signals from signaller. • communicate in accordance with requirements in this NORSOK standard. and when the hook is released after the load has been landed. • confirm that the training has been implemented in a satisfactory way. • carry out pre-use and post-use check of the lifting gear. • clear the travel path and ensure necessary barriers to keep • clear the travel path and ensure necessary barriers to keep personnel who are not involved in the lifting operation outside the exposed area. Deck operator shall • carry out the tasks of the slinger and/or signaller in connection with lifting operation with the offshore crane. Mentor shall • be responsible for instruction and training in accordance with the relevant training plan or training programme. New signaller shall confirm that he is taking over responsibility. • select and use lifting gear in accordance with the manufacturer’s instructions for use. and to and from the crane hook or lifting gear. this NORSOK standard and the company’s governing documents. • be responsible for operating the crane in the period when new lifting appliance operators are under training. • hook on and unhook slings to and from the load. • notify the signaller when the load is ready for lifting. • give the start signal and direct the safe movement of the lifting appliance and hook load in accordance with this NORSOK standard and the company’s governing documents. and monitor the performance of these tasks. SAFETY & ENVIRONMENT HANDBOOK 2008 . • ensure that load and load carrier are properly prepared and secured before the lifting operation commences. • assess at all times the type of tasks the trainee can perform without assistance. • ensure that the slinger is in a safe area when lifting and lowering load. Slinger shall • participate in the planning of each lifting operation. • inform all persons involved in the lifting operation about the identity of the new signaller when changing over. and verify that the trainee has achieved a level of competence in accordance with the relevant training plan or training programme. • maintain visual or radio contact with the lifting appliance operator and with the slinger at the beginning and end of the lift. report any undesirable events. 154 HEALTH. Signaller shall • participate in the planning of each lifting operation.• • keep a daily log where this is a requirement. Examiner shall • evaluate and approve new offshore crane operators through the implementation of a practical test in accordance with guidelines provided by KOSAR. HEALTH. If several persons participate in setting up a temporary lifting appliance. • secure load with seafastenings. SAFETY & ENVIRONMENT HANDBOOK 2008 155 . Rigger shall • approve and issue a tag for temporary lifting appliances with SWL below 2 tonnes in accordance with the procedure in 8. Duty navigator (Captain) • See OLF/NR 061 Vessel deck crew shall • carry out the tasks of the slinger and/or signaller in connection with lifting operation with the offshore crane.4. a responsible rigger shall be designated. SAFETY & ENVIRONMENT HANDBOOK 2008 . are able. Reference is also made to specific training plans published on KOSAR’s web site. truck og masseforflytningsmaskiner” (The coordinating committee for cranes.1. The training shall be in accordance with training plans approved by DAT and published on Samordingsrådet’s web site. order no. cranes and lifting and stacking trucks in accordance with DAT Regulation no. forklift trucks and earth moving machinery) in order to ensure an overall implementation/coordination of the user training and competent control of construction machinery. previous syllabus established by the Norwegian Ministry of Education and Research can be used.ANNEX B (NORMATIVE) TRAINING REQUIREMENTS B. training can be based on OMHEC’s “Training standard for offshore crane operators and banksman” . Personnel under training shall only be assigned tasks that are appropriate for their competence at the time. 608. Training of lifting appliance operators can take place within the company or under the direction of external training enterprise. competent and adequately trained to carry out the tasks and address the areas of responsibility. NOTE Industry partners have established “Samordningsrådet for kran. or with maintenance of the lifting equipment.1 General The offshore installation manager shall ensure that all personnel who are involved in lifting operations. For personnel who are involved in the use of offshore cranes. Where recent training plans are not available. as assessed by the mentor and operational responsible person. is responsible for verifying that personnel with non-Norwegian certificates of competence satisfy the competence requirements stated in this NORSOK standard. 555. normally the operator or shipowner. The responsible company. 156 HEALTH. Competence requirements for the different roles and recognised training standards are described in Table B. Competence requirements Role Competence requirements Knowledge of statutory requirements.Table B. SAFETY & ENVIRONMENT HANDBOOK 2008 157 . including relevant requirements in NORSOK R-CR-002 with associated technical standards. Knowledge of enterprise of competence and necessary documentation as described in statutory requirements. this NORSOK standard and installation-specific governing documents. this NORSOK standard and installation-specific governing documents for lifting operations. Operational knowledge and experience to be able to manage and guide personnel who are involved in lifting operations. Operational responsible person Knowledge of methods to ensure that the lifting operations are executed in accordance with statutory requirements. this NORSOK standard and installation-specific governing documents for lifting operations. Offshore installation manager Technical responsible person HEALTH. repair and replacement of lifting equipment. Knowledge of dangers connected with lifting operations and use of risk mapping as described in Annex I. Relevant technical background. Knowledge of maintenance.1 . Knowledge of maintenance programmes and maintenance systems used for the lifting appliances. Knowledge of applicable technical requirements to lifting appliances. Knowledge of statutory requirements. this NORSOK standard and installation-specific governing documents. Lifting appliance operator Documented training in accordance with Table B.2. Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Mentors for offshore cranes shall have at least three years’ experience as offshore crane operator. Mentors for other lifting appliances shall have at least one year’s practical experience. The ability to pass on knowledge, guide personnel and assess level of competence. Authorised examiner, registered in industry register. Knowledge of statutory requirements and this NORSOK standard. Participation in specialist meetings for examiners or equivalent documented training at least every four years. Mentor Examiner – offshore crane G5 Relevant practical experience in lifting operations offshore. Knowledge of relevant crane type and installation-specific governing documents for lifting operations. Knowledge of and experience in use of examination forms and the ability to assess the candidate’s level of knowledge. 158 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Knowledge in the use of simple lifting appliances, training module O-2.2 or equivalent, see Table B.2. Deck operator Knowledge regarding the handling of dangerous goods (IMDG code). Documented training in the use of, and safe communication by means of, VHF/UHF radio. Documented training in the rigging up/down of temporarily set-up lifting appliances, training module O-3.2. Documented practical training under mentor guidance. Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Signaller Knowledge of statutory requirements, this NORSOK standard and installationspecific governing documents for lifting operations. Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Slinger Knowledge of statutory requirements, this NORSOK standard and installation-specific governing documents for lifting operations. Documented training in accordance with training module no. O-3.2. Rigger HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 159 Be in possession of relevant trade certificates related to the specialist areas in which the personnel shall operate, as well as training in accordance with any special instructions the manufacturer of the equipment may have issued. The syllabus for trade certificates shall be established by the Norwegian Ministry of Education and Research. Maintenance personnel Additional training in hydraulics for personnel who shall carry out maintenance on hydraulic machinery. Future training should follow a curriculum that is in accordance with guidelines and requirements prepared by CETOP minimum CETOP , competence level 2. The curriculum should also be approved by the hydraulics industry in Norway (Hydraulics and Pneumatics Association). Documented training in accordance with training plan modules 1.1 + 2.3 (F-2702). Knowledge of statutory requirements, this NORSOK standard and local governing documents for lifting operations. Knowledge in the use of simple lifting appliances, training module O-2.2 or equivalent, see Table B.2. Knowledge in the handling of dangerous goods (IMDG code). Documented training in the use of, and safe communication by means of, VHF/UHF radio. Documented practical training under mentor guidance. Vessel deck crew 160 HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 Competence (theoretical knowledge and practical experience) to understand the design, calculations and manner of operation of lifting equipment and to carry out the necessary examinations and tests, as well as issue the prescribed certificates. Documented competence as stated in OMHEC’s “Standard for competence and skills for an enterprise of competence – Offshore cranes” for , enterprise of competence that shall carry out tasks in connection with offshore cranes. Inspectors shall be authorised by the enterprise of competence and have documented competence in the relevant classes of lifting equipment. Authorised as competent person by the Norwegian Maritime Directorate or in accordance with the flag state’s requirements for the relevant crane type and task, for personnel who shall carry out inspections on mobile installations. B.2 Training of the lifting appliance operator The requirements to the training of lifting appliance operators are considered fulfilled when the training is implemented in accordance with Table B.2. All training that is implemented after the standard was published shall be in accordance with training plans where these have been prepared. Previous training in accordance with syllabus as stated in Table B.2 will remain valid. Training in accordance with training plans and training modules shall be documented through certificates of competence issued by the industry register, which shall be authorised by ‘Samarbeid for sikkerhet’ (Collaboration for Safety). NOTE ‘Samarbeid for sikkerhet’ is a collaboration project initiated within health, safety and the environment (HSE) in the oil and gas industry. Participants are oil companies and the supplies industry represented through the Norwegian Oil Industry Association (OLF), the Norwegian Association for Supervisors (Lederne), the Norwegian Oil and Petrochemical Workers’ Union (NOPEF), the Norwegian Confederation of Trade Unions, Industry section (LO Industri), Norwegian Shipowners’ Association, Federation of Norwegian Manufacturing Industries (TBL), and The Collaborating Organisations (DSO). The Petroleum Safety Authority Norway is participating in the project as observer. HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2008 161 Enterprise of competence G4. F-2706. G8. G4. G8. G5. G8. F-2706. F-2689. G20 G4 One of the following: G1. F-2693. G8.1 + 2. F-2689. G20 is used until new training plan is established Well intervention crane One of the following: G1. F-3089 F-2685. F-2689.3 1.1 + 2. G5. F-3089 F-2685. F-2706. G5. F-2689. F-2689. G5. G5. F-3089 F-2685. G20 is used until new training plan is established Hydraulic work basket One of the following: G1. G4. G8. G20 MOB crew Lifeboat winch Coxwain’s course Life raft davit Coxwain’s course Offshore crane Gantry and overhead crane Gantry and overhead crane. F-2706. F-2706. F-2689. F-3089 (1) F-2685.3 O-2. G20 is used until new training plan is established Well intervention mast One of the following: G1. F-3089 F-2702 F-2685. G20 is used until new training plan is established Personnel lifters such as scissor lifts and similar One of the following: G1.2 or (1) (1) X Table B. G5. F-3089 (1) (1) F-2685. G4. G5. F-2693. F-2689. G8. F-3089 F-2702 (1) (1) (1) O-3.162 Syllabus Lifting appliance . G8.specific training X X X F-2689 F-2693 F-2685 F-2693. G20 (2) Riding belt Cargo winch One of the following: G1. F-2693. G20 Personnel winch One of the following: G1.3 X X X X X X X X X X X X X Training module (1) (3) (1) O-2. F-2689. F-2689. G5.3 or (1) (1) O-3. G20 is used until new training plan is established Pipe handling crane (not gantry or overhead cranes) One of the following: G1.3 or one of the following: G1. G4. G4. simple BOP crane Drawworks HEALTH. G8. G20 Loading buoy crane (SPM mounted crane) One of the following: G1.3 O-2. G5.2 – Recognised training standards – Lifting appliance operator User of Certificate of competence category G5 G4 O-2. F-3089 F-2685. F-3089 F-2693 F-2685 F-2693.3 or one of the following: G1. G8. F-2693. F-2706. F-2706. F-2706. F-2706. G20 until new training plan is established MOB davit O-3. F-2706.3 or (1) 1. G5. G8. F-2689. G8. F-2689. G20 (2) Simple cargo winch O-2. G5. SAFETY & ENVIRONMENT HANDBOOK 2008 .2 or one of the following: G1. G8. G5. F-2706. F-3089 F-2685. F-3089 F-2685. G4. New lifting appliance operators shall have training in accordance with new training modules. G8. SAFETY & ENVIRONMENT HANDBOOK 2008 (3) In connection with the training of offshore crane operators (G5).2 or (1) (1) Completed training modules required for the relevant category of competence. 555. it is sufficient to have one of the above-mentioned certificates of competence. 608.User of Certificate of competence category Syllabus Training module Escape chute winch Fixed crane with slew and/or telescopic boom Lifting appliance . G5.specific training X X Simple slewing crane Manual/pneumatic pulley lifting tackle Mobile crane Lifting and stacking truck Battery powered pallet truck Suspended work platform Temporarily assembled lifting appliance Coxwain’s course One of the following: G1. forklift trucks and earth moving machinery) in order to ensure an overall implementation/coordination of the user training and competent control of construction machinery.2 or one of the following: G1. HEALTH. Requirements to competence. F-2693. 555. NOTE Industry partners have established “Samordningsrådet for kran. order no. G5. F-2706.2 or (1) O-2. and to specific training plans published on KOSAR’s web site. cranes and lifting and stacking trucks in accordance with DAT Regulation no. 608. G4. there is no requirement that the training enterprise has or uses a crane simulator. G20 F-2685. F-3089 (1) until new training plan is established O-2. G8. F-2706.2 or one of the following:: G1. G4. F-2693.2 or (1) G1 F-2685 or F-2686 (1) X Forklift operator certificate (1) X Requirements to competence. F-3089 O-2. F-2706. O-2. F-3089 O-2. order no.2 eller en av følgende: G1. F-2689. G5. G20 O-2. 555. (2) For personnel having at least one year’s documented experience in the operation of this equipment before this NORSOK standard came into effect. reference is made to training plans approved by DAT and published on Samordningsrådet’s web site. truck og masseforflytningsmaskiner” (The coordinating committee for cranes. For an overview of obligatory training modules. G8. G20 F-2685. G8. G20 F-2685. 163 . G5. F-2693. G4. order no. use and control of suspended work platforms are based on DAT Regulation no. 608. F-2689. F-2689. use and control of lifting and stacking trucks are based on DAT Regulation no. including slinging methods etc. routines for. communication. SAFETY & ENVIRONMENT HANDBOOK 2008 . assembly of tools and extra equipment. control system etc..4 and 6. training modules and training plans. operational limitations. emergency procedure. first line maintenance..7 . organising and execution of relevant operations. instructions for use. 555. Other training shall be documented. the recognised syllabus or training plans for the specific types of lifting appliances apply.3 Other lifting appliances As recognised standard for training of operators of lifting appliances other than the ones stated in Table B. shall only be operated by personnel with documented training in accordance with the training plan developed by the company.6 Lifting appliance – specific training The specific training shall include as a minimum • • • • • • • • • • • • • • • relevant requirements in this NORSOK standard. 164 HEALTH. The training shall be carried out with mentor. planning. in accordance with requirements in DAT Regulation no. routines for maintenance and control.1.. alarms etc. technical structure. there is no requirement that the training enterprise is approved by KOSAR.2 differentiates between simple lifting appliances and other lifting appliances for certain types of crane. The plan shall be based on the manufacturer’s recommendations. order no. installation-specific governing documents for lifting operations.4 Simple lifting appliances Table B. for example hydraulics. B.5 Certified and documented training Certified training enterprise shall be responsible for all training in according with syllabus. B. see 3. B. emergency stop.B. and documented such that both the trainee and mentor confirm that the training has been completed in a satisfactory manner. limit switches. the company’s own experiences and official syllabus or training plans for the most similar types of crane. For classification. and content of. Where reference is made to training modules published on KOSAR’s web site. operation of the appliance. pre-use and post-use check. Lifting appliances for which there are no recognised syllabus or training plans available. 608.2. crane manual and other technical documentation. load chart. safety functions such as overload system. correcting of undesirable behaviour. B. his trainee the entire time.B. During training in the operation of the offshore crane.7 Mentor arrangement B. the mentor shall sit next to the trainee in the cabin until the mentor considers it safe to supervise operations from the deck.8 Maintenance of competence All competence that is required in accordance with this annex shall be maintained. Maintenance of competence can be done internally in the company or through an external training enterprise.2 New personnel on the installation In order to ensure that personnel who shall take part in operations with the offshore crane (lifting appliance operator and deck operators) have adequate knowledge about the relevant cranes and the installation. In this period. the mentor shall remain in the cabin the entire time. When crane operations are carried out to and from vessels. When the trainee operates the crane. B. When the mentor is not in the cabin. new personnel shall complete installation-specific training together with the mentor. internal governing documents. Maintenance of competence shall be documented. SAFETY & ENVIRONMENT HANDBOOK 2008 165 . On floating installations that move this training period should be at least two weeks if the personnel do not have experience from the same type of installation.7. HEALTH. emergency procedures. Mentor shall be responsible for crane operations in the training period. he shall be under the supervision of the mentor the entire time.1 Training new lifting appliance operator Training of new operators shall follow relevant syllabus/training plans and the mentor (instructor) shall fulfil any additional requirements in these. he shall work as deck operator and maintain radio contact with. Crane simulator should be used during the training. and supervision of.7. For offshore crane operators. the personnel shall have documented the training in the applicable installation-specific requirements. regular refresher training should be carried out at least every three years. The following areas should receive particular focus in refresher training: • • • • applicable regulations and standards. 166 HEALTH. a simulator can also be used during the refresher training.9 Verification of competence All training and maintenance of competence shall be verified. answering written and oral questions. this person shall not have been involved in the training of the candidate. If there is a requirement for an examiner. B. practical tasks. simulation or a combination of these methods.For deck operators and vessel deck crew who are involved in lifting operations with offshore crane. SAFETY & ENVIRONMENT HANDBOOK 2008 . The verifications of accomplished competence can include direct observation. radioactive sources. boat calls etc. e.. emergency procedures. maintenance. access to dangerous goods in the event of need to move it as a result of an emergency situation. material handling plan. radios and use of correct channel. inspection and control of lifting equipment and lifting gear. deck load limitation chart. lifting operations related emergency situations. trace elements.g... prohibited zones for lifting operations (crane limitation chart). explosives etc. allocation of roles (related to job position). pipe handling in the drilling area and lifting to and from the drill floor. crane operations in connection with helicopter traffic. SAFETY & ENVIRONMENT HANDBOOK 2008 167 . HEALTH. dangerous goods etc. placement and handling of different types of load.. simultaneous operations. special lifting operations. fire etc. plan for bad weather. chemicals. necessary barring off areas on the travel path. lifting over pressurised area. storage and follow-up of loose lifting equipment.ANNEX C (NORMATIVE) REQUIREMENTS TO LOCAL PROCEDURES Procedures shall be prepared for each installation covering the following areas: • • • • • • • • • • • • • • • • • • • necessary operational limitations for each lifting appliance. weather. The individual shall act in a way that enables the other links in the chain to perform their duties safely. Load carriers shall. special containers.) shall be secured in a way that ensures that the sling arrangement/pennant cannot snag.2 Requisitioner Requisitioner shall specify that the equipment shall be delivered in a suitable load carrier. vessel and installation in each and every case. consideration shall be given to the ability of the installation to empty these by means of forklift truck or similar. Netting or canvas can be used as covering. in connection with the sending of temporary equipment. to the extent possible. or cable ties can be attached to secure the legs of the slings. SAFETY & ENVIRONMENT HANDBOOK 2008 . • D. Load shall be secured with seafastenings. Position of for heavy lifts shall be agreed between the supply base. When loading containers and load carriers at the supply base. Operational limitations and other special conditions related to the lift shall be clarified. checklists in NORSOK Z-015 shall be used. 168 HEALTH. receiving of containers for radioactive sources and trace elements shall be dealt with by designated responsible person on the installation or at the supply base.3 Supplier Focus should be given to packing the load in such a way as to optimise the utilisation of the load carrier. the requisitioner shall contact the operational responsible person on the installation. be appropriate for the dimensions and weight of the load. Load in open load carriers (tanks. or by supplier or subcontractor. In general.1 General All links in the logistics chain shall be familiar with the roles they shall fill and the responsibility they shall assume. D. Only chemicals that are authorised for use on the relevant installation shall be ordered.ANNEX D (NORMATIVE) LOGISTICS D. modules etc. the following applies to all links in the chain • • • transport of dangerous goods shall be in accordance with the IMDG code and the regulations stipulated by the Norwegian Maritime Directorate. Prior to heavy or special lifts. and the areas shall be marked with white stripes. Lifting equipment that is sent between the supply base and the installation. SAFETY & ENVIRONMENT HANDBOOK 2008 169 . When sending radioactive sources or trace elements. aft part of the deck and areas around hose stations etc. the supplier or subcontractor shall send a written notification to the supply base orinstallation.4 Supply base A loading plan should be prepared to take into account the relevant installation in the sailing plan. in terms of the design of the installation. Before load carriers are sent offshore. The plan should be prepared in consultation with the installations and the vessel captain.The sling arrangement should be parted so that it can be set to each side to enable unloading of the basket. and lifting equipment that is pre-installed on hired equipment. Relevant areas are the forward part of the work deck. D. slinging and other conditions that are relevant to the lifting operation. the supply base should. and capacity and span of the cranes. shape. preparations should be made for heavy lifts for loads exceeding approximately 12 tonnes. Supplier or subcontractor shall issue a special consignment note for radioactive sources or trace elements. assess whether there is sufficient time remaining before the next periodic control. to the extent possible. Before the load is placed on the vessel. a loading plan shall be prepared in accordance with OLF/NR 061.5 Vessel For each sailing. On cranes with 15 tonnes auxiliary lift. The purpose of this is to clarify the location. shall be inspected in order to confirm compliance with statutory requirements and safe use before being sent offshore. D. D. or 3 m significant wave height.6 Utilisation of vessel deck area The following shall be addressed in connection with loading and unloading of supply vessel: Safety zones Safety zones shall be defined for each and every vessel. the operational responsible person on the installation shall be informed about heavy lifts and load that is not packed in load carrier (not applicable to tubulars). HEALTH. Load shall not be placed in the safety zones. the working radius of the different cranes.7 Installation The placement of load on the installation shall be planned such that the loading and backloading operation can be carried out quickly and efficiently. For each installation. Available deck space on the vessel upon arrival at or departure from each installation shall be such that there is sufficient room for the manifested backload from the installations. In order to prepare efficient loading and backloading operations. The plans shall take into account the installations’ need to transfer the backload before new load can be taken onboard. D. it can be appropriate to place the backload in one area before the vessel arrives at the installation. efforts should be made to prioritise lifting operations to and from the vessel in respect of other work with the crane. Necessary open area The responsible person at the supply base shall prepare the sailing plan and loading plan in consultation with the captain. Notification shall be sent to the supply base when radioactive sources.Escape routes Loading and unloading of the work deck shall be planned with escape routes that provide the crew with the possibility to access and evacuate the area. storage areas and placement of load carriers in these areas. where dangerous goods shall be stored. utilisation of storage area for tubulars. with an overview of the load and backload from each installation. These areas will vary with the amount of load. showing where different loads shall be placed and how the deck area shall be utilised in order to achieve safe and efficient loading operations. In order to achieve safe and efficient logistics operations and reduce the vessel’s exposure time at the installation. SAFETY & ENVIRONMENT HANDBOOK 2008 . trace elements or explosives are returned to land. 170 HEALTH. The deck plan should include information about • • • • • how much load the individual areas can withstand. composition of the load on the sailing route upon departure from the supply base and from each installation. an updated deck plan shall be available. assembly. 522.1 Requirements to user documentation . SAFETY & ENVIRONMENT HANDBOOK 2008 171 . maintenance. 820. maintenance.lifting equipment put into use before 8 April 1995 except for lifting equipment in the drilling area The requirements to documentation below shall apply for lifting equipment on fixed installations that became operational before 8 April 1995. Temporarily set-up lifting appliances shall have documentation in accordance with the requirements in 8. assembly. A manual for each lifting appliance shall be available on the installation. order no. order no.lifting equipment in the drilling area put into use before 8 April 1995 Requirements to documentation below shall apply for lifting equipment in the drilling area on fixed installations that became operational before 8 April 1995. reference is made to requirements to content in FOR 1986-01-13 no.ANNEX E (NORMATIVE) DOCUMENTATION AND MARKING E. disassembly and transport. HEALTH. All lifting equipment shall be accompanied by instructions for use in accordance with DAT Regulation no. All lifting equipment shall be accompanied by a declaration of conformity and shall be CE marked in accordance with DAT Regulation no. irrespective of when they became operational. A All lifting equipment shall be accompanied by a certificate from an enterprise of competence. E.lifting equipment put into use after 8 April 1995 The requirements to marking and documentation below shall apply for lifting equipment on fixed installations that became operational after 8 April 1995. E. irrespective of when they became operational. This shall contain information about the operation. All lifting equipment shall be accompanied by a certificate from an enterprise of competence. This shall contain information about the operation. 522. A manual for each lifting appliance shall be available on the installation.2 Requirements to user documentation .3 Requirements to user documentation . In this respect. The same requirements shall apply for lifting equipment in the drilling area on installations that follow maritime standard.4. 820. The same requirements shall apply for lifting equipment on installations that follow maritime standard. 31. disassembly and transport. or other regulations that apply for the relevant lifting appliance. any emergency procedures. • • • • • • competence requirements to the user. drawworks and other cranes with permanent operator.The lifting equipment shall. SAFETY & ENVIRONMENT HANDBOOK 2008 . operational limitations. The logbook should contain information to the incoming lifting appliance operator or shift about conditions that can influence the further operation of the lifting appliance. In addition. E. technical and operational responsible person for the lifting appliance. An electronic system that provides a similar overview can be used. E. For offshore cranes. order no. a competent person shall sign the control book. examinations. this necessary information can often be covered by other user documentation.5 Logbook In order to satisfy the requirements to experience transfer between shifts and in connection with crew change. user control. 820. E. The information shall be kept as long as the equipment is in use and be available. Where appropriate. 172 HEALTH.6 Marking and labelling Lifting equipment shall be marked in accordance with DAT Regulation no. The logbook does not replace reporting of incidents. 522. these shall be clearly marked with identification number in order to prevent mix-up. repairs and modifications shall be entered in a control register or on a control card.4 Control register Inspections. be documented through a Design Verification Report or similar. instructions for safe use. faults and defects in the company’s system for this. it shall be documented that the equipment has been tested and found to be safe in use after being installed on the installation. lifting appliances can be marked with the regulations that apply for the use of the lifting appliance. as a minimum. a logbook should be kept for offshore cranes. The logbook can be integrated in electronic systems if these are easily accessible and contain necessary information for the lifting appliance operator. The regulations can include. On mobile installations that follow a maritime operational concept. On installations with several cranes of the same type. • certificate from classification society.7 Documentation for load carriers All offshore freight containers for dangerous goods shall be certified by a classification society that is authorised by the certifying authority.7-1.7-2 or NS-EN 12079 (does not cover multi-legged sling). DNV Certification Note CN 2. • declaration of conformity for permanently attached multi-legged sling. Other offshore freight containers shall be constructed and certified in accordance with DNV Certification Note CN 2.E. competent person or enterprise of competence. The following certificates and documentation shall be available: • manufacturer’s certificate. SAFETY & ENVIRONMENT HANDBOOK 2008 173 . HEALTH. separate hand signals have been established and are described in OLF/NR 078.ANNEX F (NORMATIVE) HAND SIGNALS For directing lifting operations with personnel winch. the following hand signals shall be used: Use hurtigkroken Bruk tungløftkroken Bruk whip line Use main block Teleskopisk bom ut boom Teleskopisk bom innboom Extend telescopic Retract telescopic Swing Kjøreretning Stop Stans Nødstopp Emergency stop Hiv lasten Raise the load Lår lasten Lower the load Hev bommen Raise the boom Senk bommen Lower the boom 174 HEALTH. SAFETY & ENVIRONMENT HANDBOOK 2008 . For other lifting operations. the lifting appliance. the lifting appliance operator shall check the boom visually before it is raised. as well as standards for safe use of lifting appliances referred to in this NORSOK standard. it is sufficient to control the functions related to the maintenance carried out. and that all safety systems are set for normal operations. that the wire rope is laying correctly in the sheaves and that wire locks are correctly installed. Where appropriate. inspection. SAFETY & ENVIRONMENT HANDBOOK 2008 175 . Maintenance shall be developed and improved continuously based on experiences made during the operation and maintenance of the equipment. The maintenance programme shall focus on preventing failure in components that would result in a high risk of hazardous situations. he shall check for loose parts. the lifting appliance operator shall perform a user check and ensure that the functions have been returned to normal operational status. Consideration shall also be given to the company’s experiences. Before carrying out maintenance on lifting appliances. the lifting appliance operator can perform first-line maintenance on the lifting appliance he operates. replacement.ANNEX G (NORMATIVE) MAINTENANCE Maintenance is a combination of all technical. a ‘Do not operate’ or similar warning sign shall be placed by the controls. the person responsible for the maintenance activity shall ensure that testing is carried out in accordance with the manufacturer’s instructions for use. Before controls carried out by enterprise of competence and sizeable maintenance activities on complex lifting appliances such as offshore cranes. and before the lifting appliance is used. and ownership in. Maintenance can include preventive activities. Maintenance shall be in accordance with the manufacturer’s instructions. Before the lifting appliance is put into operation. This contributes to greater knowledge about. testing. repair. After the maintenance has been carried out. testing is to be carried out beyond what is described in the programme. administrative and managerial measures taken throughout the equipment’s lifespan with the aim of re-establishing the condition of the equipment whereby it can perform the intended functions. In particular. in connection with these activities. The lifting appliance shall not be operated before the warning sign has been removed by the person responsible for the maintenance activity. which should preferably be locked out. If the scope of the maintenance is limited. If. an SJA should be carried out. HEALTH. a pre-job talk shall be held by the personnel involved. After maintenance has been carried out on crane boom. cleaning and tidying. monitoring. the lifting appliance operator shall halt the operation. control after the lifting appliance has been used for significant periods. control following damage or important modifications. 176 HEALTH.The general responsibility that the lifting appliance operator has for the crane operation. The maintenance and the technical condition of lifting equipment shall also be monitored through the enterprise of competence carrying out the following activities: • • • • • control upon start-up of new lifting appliance. periodic control. If safety is called into question. control in connection with extension of lifespan. also applies in connection with maintenance activities and controls carried out by enterprise of competence. Organisation. SAFETY & ENVIRONMENT HANDBOOK 2008 . duties and scope of enterprise of competence are described in Annex H. In this respect. SAFETY & ENVIRONMENT HANDBOOK 2008 177 . requirements in the Norwegian Maritime Directorate’s regulations can be followed if the technical specification of the equipment was based on these requirements. Enterprise of competence that carries out tasks on fixed installations shall be organised in accordance with requirements in DAT Regulation no. impartiality. Classification societies that are recognised by the Norwegian Maritime Directorate and that inspect lifting equipment as part of the class notation “DRILL N” and “CRANE” on an installation can carry out control as enterprise of competence. order no. 608. On mobile installations. any use of external enterprise of competence. reference is made to NS-EN 45004. HEALTH. The company shall quality assure the organisation and work performance of the enterprise of competence that the company uses. Enterprise of competence shall be sufficiently independent such that the appraisal of the equipment is not influenced by other factors. 555. If an external enterprise of competence is used.1 Enterprise of competence Enterprise of competence shall verify the lifting equipment’s technical safety and thereby act as an extra safety barrier. 608. which describes general requirements to bodies that carry out inspections. The company shall describe how to address requirements to enterprise of competence. For lifting appliances in the drilling area. Reference is made to relevant Petroleum Safety Authority Norway regulations that describe when maritime regulations can form the basis. provided that the control is implemented and reported in accordance with requirements in this NORSOK standard. In such circumstances.ANNEX H (NORMATIVE) ENTERPRISE OF COMPETENCE H. the same requirements to the use of enterprise of competence apply as on fixed installations. 555. Control of offshore cranes shall also be based on the OMHEC standard for enterprise of competence. as a minimum. order no. The description shall. this enterprise shall be certified in accordance with the certification scheme established by DAT through requirements in DAT Regulation no. include • • • • responsibility and roles. a competent person authorised by the Norwegian Maritime Directorate shall be used. organisation. Use. overloading or damage.2 Initial control Prior to initial use.4. reporting and signing for completed control. This shall be approved by the operational responsible person. or there is suspicion of. Offshore containers shall be inspected annually in accordance with MSC/Circ. • • • • • • control of documentation. safe set-up and safe functioning. condition control (including marking). maintenance and equipment history from latest control period. storage. the requirement to initial control by enterprise of competence is considered fulfilled upon implementation of the procedure described in 8. manufacturer’s instructions and statutory regulations. 178 HEALTH. SAFETY & ENVIRONMENT HANDBOOK 2008 . For temporarily assembled lifting appliance. H. The periodic control shall comply with the manufacturer’s instructions for use and shall as a minimum include. the lifting appliance shall be controlled by an enterprise of competence. following significant repairs or modifications. This control supplements the testing carried out by the manufacturer at the fabrication site. H.4 Extraordinary control Enterprise of competence shall perform extraordinary control of lifting appliances and lifting gear • • • following exposure to. The purpose of the control is to verify compliance with statutory requirements. H. maintenance.In connection with competent control. A programme shall be prepared describing competent control for each type of lifting appliance and lifting gear. function testing. certificates etc. after each set-up of a lifting appliance at a new workplace. but no later than in the same month one year after the previous control. competent personnel connected to the enterprise of competence can function test a lifting appliance without having the certificate of competence for operating the appliance.3 Periodic control Lifting appliances and lifting gear shall be controlled periodically by enterprise of competence.. and in connection with modifications resulting in a new set-up. periodic control shall be carried out every twelve months. upon change in owner of lifting appliances.860. review of report from enterprise of competence. checking and other inspections and examinations of offshore containers shall comply with the recognised standards. use of lifting appliance in relation to design lifespan and assess the need for initiating lifespan analysis. As a general rule. Enterprise of competence determines the scope of the control in consultation with the manufacturer and technical responsible person. lifespan analysis. H. gap analysis against current requirements. The scope of the extraordinary control depends on the situation and the reason for the control. The certificate shall include. an evaluation of a new lifespan shall be carried out in accordance with recognised standards before the lifting equipment can be approved for continued use. operational limitations or annotations. description of control scope. H. are at a risk of fatigue fracture. including references to other certificates etc. This assessment shall be verified by enterprise of competence.. control card or similar for recording subsequent controls.• • upon start-up of lifting appliances after more than six months nonuse. cause serious incidents. classification and establishment of barriers. consideration of amended application.5 Inspection at the end of the design lifespan or safe work period When lifting equipment is approaching the end of its design lifespan or safe work period as stated by the manufacturer. Depending on the need. The safety assessment shall be carried out by enterprise of competence or others that have thorough competence in the relevant equipment. HEALTH. the safety assessment can include causal analysis. as a minimum. or create other reasonable doubt about safety through continued use. working environment study etc. H. The documentation can be available in electronic format. test load and allowable working load. SAFETY & ENVIRONMENT HANDBOOK 2008 179 . signature of enterprise of competence. when more frequent controls are required as a result of the environment in which the lifting equipment is placed. operational risk analysis.7 Documentation following control Documentation following control carried out by enterprise of competence and any safety assessments shall be available on the installation. • • • • • product information. Initial control shall be documented in the form of certificate and control book.6 Safety assessment A safety assessment shall be carried out on lifting appliances and lifting gear that show an increasing frequency of failure. references to regulations and standards. deadline for fixing faults. failures and defects revealed. Enterprise of competence should use the following codes to grade faults and defects revealed during the control. consequences for continued use of the lifting appliance. corrective measures. SAFETY & ENVIRONMENT HANDBOOK 2008 .After periodic or extraordinary control has been carried out. 180 HEALTH. name of person carrying out the control. date of control. both technical and operational. reference to control programmes used. enterprise of competence shall issue a report that clearly states • • • • • • • • the controlled lifting equipment (identification number/ description of the assembled lifting appliance). SAFETY & ENVIRONMENT HANDBOOK 2008 OK No comments. If the deadline cannot be kept. set-up and maintenance do not satisfy the statutory requirements.Grading of faults and defects C COMMENTS General comments. None. (Only used when other codes are not stated) 181 . None. completely or partially for certain CONFORMITY are not fulfilled. assembly. but the condition can develop negatively.Specific requirements are not fulfilled. Use can continue with special caution provided that measures are implemented. Consequence with regard to use Action NC NONMinimum requirements to safety level Stop use immediately. MO MEMORANDUM Specified requirements are fulfilled. Any actions depend on what the comments refer to. Rectification of a directive shall begin immediately and be completed within the stated deadline. HEALTH.1 . a new deadline shall be approved by enterprise of competence. RC RECOMMEN. Measures and/or repair. assessment whereby the overall technical condition of the equipment in terms of design. operational restrictions or apply for deviation. Table H. repairs completed or other factors that are highlighted.Code Designation Status Repair. Special monitoring and repair/measures if or when necessary. The code indicates an operations. DATION Use can continue with special caution provided that measures are implemented. SAFETY & ENVIRONMENT HANDBOOK 2008 . The following colours shall be used: Year: 2004 2005 2006 2007 2008 etc.Repair means complete restoration to original condition. with the exception of pennants. for example operational restriction. a cable tie and suitable adhesive label stating the control month can be used. The marking shall be clearly visible and permanent. For marking slings. White indicates that the equipment shall not be used. Colour: Blå Rød Gul Grønn Blå etc.8 Follow-up of directives from enterprise of competence The technical responsible person is responsible for ensuring that faults and defects reported by enterprise of competence are followed up. with SWL/WLL less than 8 tonnes. H. For transportable lifting appliances and lifting gear with unique marking. etc. precautionary measures. For lifting gear without unique marking. Slings. the periodic control shall be documented through signing the control card and marking the equipment with the year’s colour. the periodic control shall be documented through marking the lifting gear with the year’s colour and control report stating type and number of controlled units. can follow the same procedure even if they have a unique number from the supplier. Measure is a temporary or permanent alternative to repair. 182 HEALTH. other technical solution. HEALTH.ANNEX I (NORMATIVE) RISK MAPPING I. A successful identification of risk elements is based on • knowledge of procedures. there will be no possibility of systematically eliminating or reducing them. In this respect. different types of risk mapping can be used. and that the equipment is used correctly. Identifying risk elements is important. The purpose of risk mapping is to try to identify all potential hazards under all imaginable conditions and initiate measures to reduce or eliminate these.3) can be used for all types of lifting operations. or assess the interaction between new solutions and the equipment already in operation. • knowledge of activities and operations. develop new equipment. equipment and components. it is necessary that all involved parties are aware of and can reduce the hazards inherent in the operation. • if the operation involves new and unpredictable risk elements. With all risk mapping. depending on the complexity of the operations to be performed. • when there is an increasing fault frequency or increased risk during certain operations.1 Purpose In order to achieve safe lifting operations. I. systems.2 Identification of risk elements Risk elements means all factors that directly or indirectly can influence the risk of fatality or injury. • knowledge of accidents. • when ensuring that the equipment used is suitable for the purpose. • systematics and analysis methods. or material damage or losses. damage to the environment. • knowledge of undesirable events and near-miss accidents. SAFETY & ENVIRONMENT HANDBOOK 2008 183 . • if it is proposed to alter equipment. it is particularly important to involve personnel with operational experience. If the risk elements are not identified. This mapping is particularly relevant • if available procedures and work descriptions are inadequate. The different methods of risk mapping (see I. The group shall be headed by a person with sufficient competence to carry out this type of risk mapping.3 Methods In order to ensure that risk mapping is carried out systematically. different methods have been developed. slinger. 184 HEALTH. Checklists can be used in this connection. SAFETY & ENVIRONMENT HANDBOOK 2008 . etc. Everyone who is directly involved in the operation shall participate. vessel crew. such that measures can be initiated in order to eliminate or control the identified risk elements during the preparations for. and execution of. For lifting operations. Safe job analysis (SJA) A SJA is a systematic and documented review of all risk elements before a concrete work task or operation. technical and operational responsible persons. obvious group members can be the lifting appliance operator. signaller. and is implemented by personnel with special competence within the relevant specialist areas. the work task or operation.I. equipment suppliers. Participants in a prejob talk should always consider the need for a SJA. Hazard and operability study (HAZOP) by a competence group HAZOP by a competence group is a systematic and documented review by means of predefined keywords. including: Pre-job talk A pre-job talk is a non-documented review before a concrete work task or operation. 3 Lifting gear covered by this NORSOK standard (examples) Lifting beams Shackles Blocks Slings . SAFETY & ENVIRONMENT HANDBOOK 2008 185 .fibre/chain/wire rope Load and service containers Slings – single/multi-leg Baskets Single/multi-sheave blocks Work baskets Swivels Waste containers Rings Eye bolts/Eye nuts Turnbuckles Beam clamps Web belts Hooks Links Wedge sockets Pendants J.1 Lifting appliances covered by this NORSOK standard (examples) Cranes .2 Lifting equipment in the drilling area covered by this NORSOK standard (examples) Crown block Travelling block Block-to-hook adapter Link adapter Drilling hook Tubing hook Elevator link (Bails) Various elevators for tubulars Gripping claw Swivel Heave compensator Deadline anchor Drawworks Topdrive rotary system Pipe handling crane Lifting nipples and lifting caps J.ANNEX J (NORMATIVE) EXAMPLES OF LIFTING EQUIPMENT J.all types Personnel winches Tuggers Lifeboat davits Overhead trolleys Hydraulic work baskets Beam clamps (used as attachments for temporarily set-up lifting appliance) Elevating platforms J.4 Examples of detachable lifting equipment Typical examples of detachable lifting equipment for which European standards have been prepared: Clamps Grabs Grab buckets Vacuum elevators Lifting magnets C-hooks Lifting forks Lifting beams HEALTH.all types Gantry girders Lifting davits Lifting tackle . deck checked? * Is visibility adequate for crane? * Can crane operator see the vessel deck crew? Can load be handled safely in wind gusts? * Are installation movements acceptable? * Is there room for safe landing of load? * Is lifting speed sufficient in terms of waves? Can deck load be handled safely? Can backload be handled safely? Can bulk hoses be handled safely? Special lifts. For internal lifts. the crane operator. vessel:_______________ Sign. and lifting between supply boats and the installation. the checklist is reviewed by radio between the crane operator. a decision is taken whether the entire or parts of the operation can begin/continue. The checklist is applicable for both internal lifting. Vessel Involved Cross off Condition WEATHER Duty navigator Installation Vessel deck crew Crane operator Date Time Waves Wind Deck operator Operation responsible person Comments Description Is visibility adequate for vessel? Operation low side (see OLF/NR 061)? Is the sea hitting the cargo deck? Is there imminent danger of sea hitting cargo deck? Are there extreme wind forces on vessel? Communic.1. length etc. crane. use the fields in the list marked with *. Checklists shall be available both on the vessel and in the offshore crane. For lifts on the installation. Under no circumstances shall operations exceed the limitations applicable for the vessel. CHECKLIST FOR LIFTING OPERATIONS UNDER MARGINAL WEATHER CONDITIONS TO BE REVIEWED BY RADIO BETWEEN INVOLVED PARTIES.3. Based on this joint review. crane:______________ Date:________ Time:________ 186 HEALTH.ANNEX K (NORMATIVE) CHECKLIST FOR LIFTING OPERATIONS UNDER MARGINAL WEATHER CONDITIONS This checklist shall always be used in the event of stoppage as a result of the operational limitations in subsection 6. For lifting operations between the vessel and installation. duty navigator. operational responsible person. bridge. operational responsible person and deck operators as a minimum shall participate in the assessment. Completed checklists shall be kept for at least one week. SAFETY & ENVIRONMENT HANDBOOK 2008 . crane or installation.? * Can heavy lifts be handled safely? * Can hazardous cargo be handled safely? * Is there sufficient deck area available? Is the load suitably located? Are the escape routes clear on deck? Are the vessel’s movements acceptable? Assessme nt by vessel Assessm ent by crane INSTALLATION LOAD VESSEL VARIOUS CONCLUSION: Sign. wind gusts. vessel deck crew and deck operators.