GU-611 - PDO Guide to Engineering Standards and Procedures

March 29, 2018 | Author: MuhammadSaim | Category: Pipe (Fluid Conveyance), Pump, Gas Compressor, Heat Exchanger, Power Supply


Comments



Description

PDO ENGINEERING STANDARDS AND PROCEDURESPROJECT MANAGEMENT – CFDH: UEP - (Julian Masters) MECHANICAL STATIC EQUIPMENT ENGINEERING – CFDH: UEP1S - (Abdulnabi Balushi) Doc. ID Document Title Project Engineering – Additional Notes Rev./DEM Date Doc. ID Document Title SP-1188 SP-1200 SP-1201 SP-2020 SP-2039 SP-2044 SP-2051 Chemical Injection Skids Procurement Specifications for Pipeline Check Valves Procurement Specification for Pipeline Ball Valves Flange Connections - Bolt Tourquing & Tensioning Mechanical Standard Drawings Specification for Screwed Fittings Specification for Flushing, Pressure Testing, Pickling and Sensitive Leak Testing of Mechanical Equipment and Piping Mechanical Engineering - Specification for Pressure Vessels Mechanical Engineering - Specification for Air Cooled Heat Exchangers CP-117 CP-122 CP-131 CP-206 Project Engineering Code of Practice Health, Safety and Environment Management System Manual Risk and Opportunity Management Code of Practice Management of Change Code of Practice Rev. 5.0 Ver. 5.0 Ver. 3.0 Rev. 1.0 Jan-12 Jul-11 Dec-06 Nov-11 PR-1150 PR-1153 PR-1247 PR-1358 PR-1979 Project Close Out Procedure – Engineering CAPEX & OPEX Projects Field Trouble Report Procedure Project Management of Change Procedure Procedure for Concept Selection and Preparing a Basis for Design Procedure for Project Delivery Assurance Boards (PDAB’s) Ver. 3.0 Ver. 2.0 Ver. 4.1 Ver. 2.0 Rev. 1 Apr-04 Feb 06 May-12 Dec-04 Mar-11 SP-1134 SP-2050 SP-2100 Specification for Detailed Design and Engineering of Oil & Gas Facilities Specification for Construction Activities on Oil, Gas and Utility Facilities Projects Contract Cost Engineering Specification Rev. 1.0 Ver. 1.0 Ver. 1.0 Aug-06 Jul-06 Dec-09 GU-484 GU-556 GU-569 GU-663 Project Engineering – Scheduling & Reporting Guideline Guideline for Vendor Project Document Deliverables Project Cost Engineering Project Controls Plan Guideline Ver.2.0 Rev.1.0 Rev.1.0 Rev. 0 Feb-11 Feb-07 Jan-07 Jun-11 DEP 00.00.07.10 DEP 01.00.09.10 (Ι) DEP 30.10.01.10 DEP 70.10.90.11 (Ι) DEP 82.00.10.12 Design Class Tables Operational Tagging Requirements Requisitions Index Spares Parts Life Cycle Costing (Endorsement of ISO 15663-1) Complex and/or High Value projects only - Evaluate & justify on case by case basis Sept-11 Feb-12 Feb-12 Feb-12 Feb-11 Design / Drafting – SP-1131 SP-1132 SP-2047 Specification for Hand Over and As Built Documentation Specification for Plant Design Reference Manual Specification for the Preparation and Content of Engineering Drawings Ver. 3.0 Ver. 3.0 Ver. 2.0 May-06 Apr-06 Feb-10 PR-1666 Project Drawing Procedure Ver. 1.0 May-06 DEP 00.00.06.06 DEP 00.00.07.30 (Ι) Standard Drawings Index Application of a functional specification (endorsement of ISO 13879, ISO 13880 and ISO/TR 13881) Preparation & Microfilming of Technical Drawings DEP 02.00.00.10 Sep-12 Sep-12 Amended by Circulars 15/99, 64/01 & 56/03 Oct-95 Standards Administration – PR-1561 WinPCS Procedure Rev. 0 Mar-04 GU-453 Guidelines for WinPCS Users Rev. 02 Jul-06 ORM Opportunity Realisation Manual Apr-10 DEP 00.00.00.30 (Ι) DEP 00.00.05.05 DEP 00.00.10.05 DEP 00.00.20.10 Procedure for Global Technical Standards Publications Global Technical Standards Index Standard Forms Index The Use of SI Quantities – Endorsement of ISO-31, ISO-1000 & ISO 80000 Sep-12 Sep-12 Sep-12 Feb-11 INFORMATION MANAGEMENT / ENGINEERING DESIGN SYSTEMS – UEPI (Philippa De Glanville) CP-139 Corporate Data Management Ver. 3.0 SP-2065 SP-2067 SP-2099 SP-2122 SP-2133 SP-2144 Document Management for Projects PDMS Model Specification 2D Drafting Specification Project IM Specification Project ‘Engineering Design Systems’ (EDS) Specification Project Engineering – Engineering Project IM ‘Scope of Work’ – Tender Contract Input DEP 82.00.10.30 (Ι) Engineering Information Specification (EIS) NEW REQUIREMENT NEW REQUIREMENT NEW REQUIREMENT Rev. 4.0 Rev A02 Ver. 1.0 Ver. 1.0 Ver. 1.0 Rev. 1 Feb-09 Aug-12 Oct-12 Jul-12 Oct-11 Feb-12 Aug-12 Feb-12 QUALITY MANAGEMENT– CFDH: UEQ - (Gary Briston) PL-15 Quality Management Policy CP-190 Project Engineering: Quality Management System for Project Delivery: Code of Practice PR-1858 PR-1866 PR-1964 PR-1984 Material Handling, Storage and Preservation Procedure Quality Audit Procedure Equipment and/or Materials Receipt Inspection Procedure Criticality Rating Procedure SP-1122 SP-1171 Specification for Project Quality Plan Specification for Quality Management System Requirements for Product and Service Functional Technical Directorates - Technical Authority System SP-2061 GU-398 Guidelines on Scope and Areas Covered During Vendor/Contractor Evaluation & Assessment DEP 82.00.10.10 Project Quality Assurance 2008 Edition Ver. 1 NEW REQUIREMENT NEW REQUIREMENT Rev. 0 Rev. A01 Rev. A1 Ver. 1.0 Oct-09 Mar-10 Dec-10 Jun -11 Ver. 2.02 Ver. 3,0 Feb-08 Jun-12 Rev. 2.0 Jun-10 Rev. 2.0 Apr-09 Feb-12 SP-1251 Training Requirements for Lifting Operations Personnel Ver. 4.0 Sep-11 PR-1708 Lifting & Hoisting Procedure – Part 1: Framework – Part 2: Inspection, Testing and Certification Lifting & Hoisting – Lift Planning / Execution Procedure Lifting Equipment Numbering Ver. 1 Sep-11 Ver. 1 Ver. 0 Sep-11 Apr-12 NEW REQUIREMENT SAFETY ENGINEERING – CFDH: MSE4 - (Anthony Sipkema) Doc. ID Document Title Additional Notes Rev./DEM Date Human Factors Engineering DEP 30.00.60.10 DEP 30.00.60.13 DEP 30.00.60.14 DEP 30.00.60.15 DEP 30.00.60.16 DEP 30.00.60.18 DEP 30.00.60.19 DEP 30.00.60.20 DEP 30.00.60.21 (Ι) (Ι) (Ι) (Ι) (Ι) (Ι) (Ι) Human Factors Engineering in Projects Human Factors Engineering – Valve Analysis Human Factors Engineering – Application During Construction Human Factors Engineering – Control Room Design Human Factors Engineering – Human / Machine Interface Design for Situation Awareness Human Factors Engineering – Design and Procurement of Skid-Packaged Units Human Factors Engineering – Design for Process Safety Critical Tasks Human Factors Engineering – Workspace Design Human Factors Engineering – Labeling of Facilities, Equipment & Piping Feb-11 Sep-11 Sep-12 Feb-12 Aug-09 Sep-12 Feb-11 Sep-11 Feb-12 Owner: Control and Automation DEP 30.06.10.11 DEP 30.06.10.12 DEP 30.06.10.13 DEP 30.06.10.18 DEP 30.48.60.13 (Ι) (Ι) (Ι) (Ι) Equipment in LPG Installations Pressurised Bulk Storage Installations for LPG LPG Bulk Transfer & Transportation Pressurised Bulk Storage Installations for LPG – At Customer Premises Design and installation of chemical-resistant brick lining for Process equipment (based on EN 14879-Parts 1, 4 and 6) DEP 30.75.10.10 (Ι) Steam, Condensate and Boiler Feed Water Systems DEP 30.75.10.30 Water Tube Boilers DEP 31.06.11.11 (Ι) Loading Facilities for Bulk Road Vehicles DEP 31.10.03.10 Symbols & Identification System – Mechanical DEP 31.20.20.31 Internals for Columns DEP 31.21.01.11 (Ι) Printed Circuit Heat Exchangers – Selection & Application DEP 31.21.01.12 (Ι) Shell & Tube Heat Exchangers – Selection & Application DEP 31.21.01.13 (Ι) Welded Plate-Bloc Heat Exchangers – Application, Design & Fabrication DEP 31.21.01.30 (Ι) Shell & Tube Heat Exchangers - Amendments/Supplements to ISO 16812 DEP 31.21.01.32 (Ι) Plate & Frame Heat Exchangers- Amendments/Supplements to ISO15547-1:2005 DEP 31.21.01.33 (Ι) Printed Circuit Heat Exchangers – Design & Fabrication DEP 31.21.01.36 (Ι) Heat Exchangers for Packaged Equipment – Design & Fabrication DEP 31.21.70.10 (Ι) Air-Cooled Heat Exchangers; Selection and Application DEP 31.21.70.31 (Ι) Air-cooled Heat Exchangers - Amendments/Supplements to ISO13706 DEP 31.22.10.35 Manufacturing Report for Pressure Vessels DEP 31.22.20.31 (Ι) Pressure Vessels - Based on ASME Section VIII DEP 31.22.30.14 Glass-Fibre Reinforced Plastic Vessels DEP 31.24.00.30 (Ι) Fired Heaters - Amendments/Supplements to ISO13705 DEP 31.24.00.31 Calculation of Heater-Tube Thickness- Endorsement of ISO 13704 DEP 31.24.40.12 Fabric Expansion Joints- Endorsement of RAL-GZ719 DEP 31.27.21.10 (Ι) Filters for Removing Particles from Hydroprocessor Feeds - Type Selection and Design Rules DEP 31.36.10.30 (Ι) Hydraulic Systems for the Operation of On/Off Valves in Protective Functions DEP 31.37.00.11 (Ι) Instrument Air Supply DEP 31.38.01.10 (Ι) Piping Classes – Basis of Design DEP 31.38.01.11 (Ι) Piping - General Requirements DEP 31.38.01.12 (Ι) Piping Classes - Refining And Chemicals DEP 31.38.01.13 Compilation of Bill of Material for Piping Isometrics DEP 31.38.01.15 (Ι) Piping Classes – Exploration and Production DEP 31.38.01.21 Compilation of a Specification For Piping Systems DEP 31.38.01.29 Pipe Supports DEP 31.38.60.10 (Ι) Hot Tapping on Pipelines, Piping and Equipment DEP 31.46.00.31 (I) Acoustic Insulation for Piping- Amendments/Supplements to ISO 15665 DEP 34.51.01.31 (I) Vertical Steel Storage Tanks – Selection & Design (Amendments/Supplements to EN14015:2004) DEP 34.51.11.30 (Ι) Mounded Horizontal Cylindrical Vessels for Pressurised Storage of LPG at Ambient Temperatures (Endorsement of EEMUA 190) DEP 34.51.90.10 Demolition of Storage Tanks (Endorsement of EEMUA 154) DEP 70.08.10.11 Mechanical Maintenance Equipment and Tools DEP 70.10.80.11 Cleaning of Equipment DEP 74.00.10.10 (Ι) Shop & Field Pressure Testing of Piping Systems DEP 80.36.00.30 (Ι) Relief Devices - Selection, Sizing and Specification DEP 80.46.30.11 (Ι) Interlocking Systems for Safety/Relief Valves Rev./DEM Date Rev. 5 Ver. 2.0 Ver. 2.0 Ver. 0 Ver. 1.0 Rev. 1.0 Ver. 2.0 May-10 Sep-11 Sep-11 Jan-06 Sep-05 Nov-05 May-10 Ver. 0 Ver. 1 Sep-08 Jun-10 DEM-1 DEM-1 DEM-1 Feb-11 Feb-11 Feb-11 Feb-12 Sep-12 Amended by Circular 58/11 Amended by Circular 34/11 DEM-1 Amended by Circular 48/12 Amended by Circular 83/11 DEM-1 Amended by Circular Sep-12 DEM-1 DEM-1 Amended by Circular 13/12 Amended by Circular 44/11 DEM-1 DEM-1 DEM-1 Amended by Circular 98/11 Amended by Circular 08/12 DEM-1 DEM-1 Amended by Circular Sep-12 DEM-1 Amended by Circular 97/11 DEM-1 Amended by Circular 65/11 DEM-1 DEM-1 DEM-1 DEM-1 DEM-1 Amended A01 – Sep-12 Document Title SP-1252 SP-2013 SP-2030 SP-2033 SP-2045 SP-2054 Specification for Instrument Air Compression Package High Energy ( ≥500kW) Centrifugal Pumps Low Energy (≤500kW) Centrifugal Pumps Functional Specification for PDO Machinery Health Monitoring Systems - MHMS Procurement Specification for Beam Pump Units Specification for Centrifugal Compressor Packages PR-1565 GU-396 GU-397 Fire Engineering Date Vers 1.0 Jun-04 Engineering of Process Pumps Guideline Engineering of Process Gas Compression Guideline Ver. 1.0 Ver. 1.0 May-05 May-05 Nov-08 Sep-11 Jul-08 Feb-12 Amended by Circular 98/08 DEM-1 WITHDRAWN Feb-11 Amended by Circular 85/11 Amended by Circular 52/11 Feb-12 Sep-12 Feb-11 Feb-11 DEM-1 Amended by Circulars 01/02, 25/04, 50/04 & 84/08 Amended by Circular 86/11 Amended by Circular 82/11 Dec-99 DEM-1 DEM-1 Feb-12 Sep-11 Feb-11 Feb-11 Feb-12 Sep-11 Feb-12 Amended by Circular 80/11 Amended by Circular 64/11 DEM-1 Feb-12 Feb-11 DEM-1 Sep-11 Sep-11 Feb-11 Feb-11 Dec-00 Mar-01 MATERIALS SELECTION & CORROSION ENGINEERING – CFDH: UEOC - (Nasser Behlani) DEM-1 DEM-1 DEM-1 Sep-11 Feb-11 Feb-11 Sep-11 Doc. ID General - Document Title Additional Notes Rev./DEM Date CP-208 Corrosion Management Code of Practice NEW REQUIREMENT Ver. 1.0 Jul-12 Feb-12 SP-1128 SP-1129 SP-1130 SP-1136 SP-1189 SP-1195 Ver. 2.0 Ver. 2.0 Rev. 1.0 Ver. 2.0 Ver. 1.0 Ver. 1.0 Dec 05 Sep-05 Sep-99 Dec 05 Dec-00 Jan-01 Ver. 2.0 Apr-10 Ver. 1.0 Sep 05 SP-2041 SP-2092-1 SP-2094 SP-2095 Specification for Cathodic Protection Design Specification for Construction, Installation and Commissioning of Cathodic Protection Systems Specification for Cathodic Protection Materials and Equipment Cathodic Protection Drawings Specification for Duplex Stainless Steel Line Pipe - Amendments/Supplements to API 5LC REPLACES DEP 31.40.20.34 Specification for the Wall Thickness Measurement of Pipelines by Automated Ultrasonic Techniques Specification for Painting and Coating of Oil and Gas Production Facilities (Parts 1 to 5) Specification for Internal FBE Coating of Line Pipe (Amendments/Supplements to API REP 5L7) Specification for Cracking Resistant Materials in H2S Containing Environment GRP Specification – Part 1 (Qualification & Manufacturing) Specification for Polyethylene Liners in Carbon Steel Flowlines & Pipelines Internal Liquid Coating for Carbon Steel Piping and Line Pipes Ver. 2 Ver. 0 Ver. 0 Ver. 1.0 Mar-11 Jan-10 Aug-10 Sept-09 PR-1180 PR-1234 PR-1503 PR-2006 Performance Testing of Coating Systems for Pipeline Rehabilitation Safe Working Procedures for Cathodic Protection Systems Procedure for Determining Pipeline’s Assessed Corrosion Rate (ACR) Replacement (Like/Like) of Carbon Steel / Other Spools Connected to GRP Lines Ver. 2.0 Ver. 2.0 Ver. 2.0 Ver. 1.0 Nov-05 Mar-01 Dec-09 Nov-11 GU-368 GU-475 GU-486 GU-637 Guidelines For The Protection Of Buried Sections of Surface Laid Pipelines/Flowlines Corporate Flowline Materials Selection Guideline Screening & Monitoring Bacteria Guidelines Sour Wells Completion, Material Selection Guidelines Rev. 0 Ver. 1.0 Ver. 1.0 Ver. 1.0 May-00 Sep-04 Oct 05 May-10 DEP 34.17.10.35 (Ι) Siting of Onshore Occupied Portable Buildings DEP 80.00.10.10 (Ι) Area Classification DEP 80.00.10.11 (Ι) Layout of Onshore Facilities Ver. 3.0 Ver 3.0 Owner: Civil Amended by Circular 63/12 Amended by Circular 68/11 & 43/12 and Amendment A03 Sep-12 DEM-1 DEM-1 DEM-1 Oct-10 Sep-11 Feb-11 Feb-11 Feb-11 SP-2034 HEMP/HSE Cases SP-1258 SP-2062 Technical Safety Engineering - Quantitative Risk Assessment Specification Specification for HSE Cases PR-1696 HAZOP Procedure GU-648 Guide for Applying Process Safety in Projects EP95-0230 EP2005-0300 EP2009-9009 EP95-0312 EP95-0314 HSES Guideline – Design Hazard and Effects Management Process (HEMP) – General Requirements Safety Critical Element Management Manual HAZID Physical Effects Modelling Owner: Process Engineering Rev. 3.0 Ver. 1 Jul-10 Mar-11 Rev. 3 Jun-12 Rev. 1 Dec-10 Ver. 1 2nd Edition Rev. 0 Rev. 0 1995 Aug-04 Feb-09 Sep-95 Oct-98 Ver. 5.0 Rev. 3 Jun 12 Aug-12 Other Health & Safety SP-1232 SP-1234 Public Health HSE Specification - Personal Protective Equipment PR-1232 NEW REQUIREMENT (Owner MCOH) (Owner MSE1) Process Safety Review (Formerly Design Integrity Review) DEP 31.10.00.31 (Ι) Ver. 2.0 Feb-12 Noise Control (Amendments/Supplements to ISO 15664) Feb-12 ANSI/1SEA Z358.1-2009 American National Standard for Emergency Eyewash and Shower Equipment Sep-09 PROCESS ENGINEERING – CFDH: OSE/1 - (Said Alawi) Doc. ID Document Title CP-200 Rev./DEM Date Water Management Code of Practice Ver. 1.0 Nov-11 SP-1125 SP-1126 SP-1166 SP-1190 Isolation of Process Equipment Specification Drain Systems Specification Specification for Identification of On-Plot Pipework Design for Sour Service Specification Owner: Safety Engineering Rev. 4.0 Ver. 3.0 Ver. 2.0 Ver. 3.0 Jun-12 Jun-12 Sep-04 Sep-11 PR-1696 HAZOP Procedure Contact OSE/1 & MSE4 Before Use Rev. 3 Jun-12 GU-665 Water Treatment Strategy Ver. 0 Oct-11 DEM-1 DEM-1 DEM-1 DEM-1 DEM-1 DEM-1 Feb-12 Feb-11 Feb-11 Jan-05 Feb-11 Feb-11 Feb-11 Feb-12 Feb-12 Feb-12 Feb-12 Feb-12 Feb-12 Sep-12 Feb-12 Feb-12 Feb-11 DEM-1 Feb-11 Ver 2.0 Rev. 0 Rev. 0 Dec-10 Sep-95 Oct-95 Dec-98 Feb-99 Sep-99 DEP 01.00.01.30 DEP 01.00.02 11 DEP 01.00.02.12 DEP 20.04.10.10 DEP 20.05.50.10 DEP 20.05.60.10 DEP 20.21.00.31 DEP 30.05.10.30 DEP 30.10.05.11 DEP 30.75.10.10 DEP 31.22.05.11 DEP 31.22.05.12 DEP 37.05.10.11 DEP 80.10.10.31 DEP 80.45.10.10 DEP 80.45.10.11 DEP 80.45.10.12 Definition & Determination of Temperature, Pressure and Toxicity Levels Preparation of Process Flow Schemes & Process Engineering Flow Schemes Preparation of Safeguarding Memoranda & Process Safeguarding Flow Schemes Glycol Type Gas Dehydration System (Ι) Heat Transfer Fluid (HTF) Systems (Ι) Fuel Systems Fouling Resistance For Heat Transfer Equipment (Ι) Nitrogen / Oxygen Supply & Distribution System Plant Model Construction & Review (Ι) Steam, Condensate and Boiler Feed Water Systems Gas/Liquid Separators - Type Selection and Design Rules Liquid/Liquid and Gas/Liquid/Liquid Separators - Type Selection and Design Rules (Ι) Diesel Oil Systems (Ι) Breathing Air & Supply Systems (Ι) Design of Pressure Relief, Flare and Vent Systems (Ι) Overpressure and Under-pressure – Prevention and Protection (Ι) Emergency Depressuring and Sectionalizing Additional Notes (Ι) (Ι) (Ι) DEP 80.45.11.12 (Ι) Flare Details (Amendments/Supplements to ISO 25457) De-oiling Manual Hazard Identification Technique Hazard & Operability Technique Best Practices Guide - Gas Sweetening Technology Removal of Heavy Metals from Waste Water – Desk Study Key Multiphase and Hydrate Learning Points from the Main Gas Condensate Systems in the Shell Group EP 99-5806 Best Practice in Produced Water Treatment EP 2003-5184 Shell Expro Topsides Solids Management Guide EP 2007-5644 EP Guideline on Process Safeguarding EPTL-GL-PRO-0001 Global Process Engineering Guideline – Facility Line Sizing GS 06.53139 Guide for Fluid Characterization using C7PLUS Method in HYSYS GS 08.53105 Hydrate Guidelines GS 09.50282 Flow Assurance Guideline GS 09.51858 Guidelines for the Hydraulic Design and Operation of Multiphase Flow Pipeline Systems GS 09.53369 Plant and Pipeline Depressuring Guideline GS 10.50828 Heat Exchanger Selection Guideline SR 11.11103 Guide for Fluid Characterization using C7PLUS Method in UNISIM Amended by Circulars 50/06, 74/08 & 05/10 Amended by Circular 42/11 Amended by Circular 27/11 DEM-1 DEM-1 DEM-1 DEM-1 DEM-1 NEW REQUIREMENT – TBC Amended A01 – Sep-12 Amended by Circular 77/12 Amended A03 – Sep-12 Amended by Circular 01/12 (No Doc No) EP 95-0312 HAZID EP 95-0313 HAZOP EP 98-5632 EP 99-5266 EP 99-5508 SP-1246 Dec-99 Sep-03 Nov-07 Dec-08 Dec-06 Aug-08 Jan-09 May-09 Dec-09 Apr-10 Apr-11 Previously GS.06.50701 Previously EP 2005-5186 DEP 30.10.02.11 DEP 30.10.02.13 DEP 30.10.02.14 DEP 30.10.02.31 DEP 30.46.00.31 DEP 30.48.00.31 DEP 30.48.00.32 DEP 30.48.30.31 DEP 30.48.40.31 DEP 30.48.41.31 DEP 30.48.60.10 DEP 31.10.00.10 DEP31.24.40.31 DEP 31.40.10.20 DEP 31.40.20.32 DEP 31.40.30.31 (Ι) (Ι) (Ι) (Ι) Protective Coatings for Onshore Facilities Coating of Fasteners Cement Lining of Pipes (Based on EN 10298) Thermal Spray Coatings of Aluminium Electroless Nickel Plating - Amendments/Supplements to ASTM B 733 Rubber-Lined Process Equipment (Ι) Positive Material Identification (PMI) Program (Ι) Materials for High Temperature Conversion Process Furnace Parts Spoolable Fibre-Reinforced Plastic Pipes (I) CRA Clad or Lined Steel Pipe - Amendments/Supplements to API Spec 5LD (Ι) External Polyethylene & Polypropylene Coating for Line Pipe - Amendments/Supplements to ISO/DIS 21809-1:2009 DEP 31.40.30.32 External Fusion-Bonded Epoxy Powder Coating for Line Pipe - Amendments/Supp;ements to ISO 21809-2:2007 DEP 31.40.30.34 Thermoplastic Lined Pipelines DEP 31.40.30.35 Internal Coating of Line Pipe for Non-Corrisive Gas Transmission Service - Amendments/Supplements to ISO 15741 DEP 31.40.30.37 External Field Joint and Rehabilitation Coating Systems for Line Pipe DEP 39.01.10.11 (Ι) Selection Of Material For Life Cycle Performance (Upstream Facilities) - Materials Selection Process DEP 39.01.10.12 (Ι) Selection of Materials for Life Cycle Performance (Upstream Facilities) – Equipment DEP 39.01.10.32 (Ι) Specification of nickel base alloy 718 (UNS N07718) for oil and gas drilling and production equipment (amendments/supplements to API spec 6A718) DEP 70.10.70.11 (Ι) Preservation of New and Old Equipment Standing Idle Additional Notes Rev./DEM Date SP-1089 SP-1090 SP-1206 SP-1243 SP-1245 SP-2098 SP-2121 Instrument Impulse Lines Instrument Signal Lines C & A Standard Drawings Corporate Philosophy for Control and Automation Fieldbus Control System Specification Smart Plant Instrumentation Specification DACA PCD Systems Access & Control Management WITHDRAWN – Replaced by DEP 32.37.10.11 Based on DEP 32.37.20.10 (May 2004) Ver 1.0 Ver. 2.0 Ver. 2.0 Ver. 2.0 Ver. 3.0 Ver. 2.0 Ver. 1.0 Jan 01 Dec 05 Dec-10 Jun-11 Dec-10 May-12 Dec-11 PR-1094 PR-1293 PR-1304 PR-1315 PR-1619 PR-1620 PR-1809 PR-1995 PR-1996 Instrumented Protective Functions Test Procedure Main Oil Line (MOL) Metering Systems Verification Procedure Product Flow Measurement Measurement Equipment Calibration/Recertification Procedure Mina Al Fahal Terminal Oil Material Balance Mina Al Fahal Terminal Dip Procedure Production Measurement Management System Procedure DACA PCDP & PCD Systems Access Request Procedures Venturi Based Wet Gas Meter (WGM) Sizing, Commissioning, Update & Review Rev. 1.0 Rev. 1 Rev. 3.0 Rev. 2.0 Rev. 1.0 Rev. 2.0 Ver 1.0 Ver. 1.0 Rev. 1.0 Aug-04 May-09 Jul-11 Aug-11 Mar-11 Sep-10 Nov-08 Dec-11 Nov-11 GU-437 GU-513 GU-656 Amended & Supplemented by SP-1246 DEM-1 Jan-09 Feb-12 Sep-12 Feb-12 Jan-08 Sep-12 Sep-11 Feb-12 Sep-12 Sep-11 Feb-11 Feb-11 Amended by Circulars 05/02 & 39/08 Dec-99 Sep-12 Amended by Circular 35/12 DEM-1 Jan-08 Feb-11 Amended by A01 Sep-12 DEM-1 Feb-12 Amended by Circular 36/12 DEM-1 Feb-11 Feb-11 SP-1097 Specification for Welding of Duplex Stainless Steel Pipelines - Amendments/Supplements to API Std 1104 Specification for Welding on Pressurised Pipes Specification for Welding on On-Plot Pipe-Work - Amendments/Supplements to ASME B31.3 Specification for Welding of Class 2 & Class 3 Pipelines - Amendments/Supplements to API Std 1104 Specification for Welding of Class 1 Pipelines - Amendments/Supplements to API Std 1104 SP-1167 SP-1173 SP-1174 SP-1177 PR-1272 PR-1274 PR-1276 PR-1659 Standard Welding Procedure Qualification Records for On-Plot Piping Standard Welding Procedure Qualification Records For Class 2 Pipelines Standard Procedure Qualification Records for Welding on to Pressurised Pipes Pipeline Emergency Repair PQR’S Welding / Pipeline Procedures DEP 30.10.60.18 Welding of Metals - Amendments/ Supplements to API RP 582 Welding on Pressurised Pipes - Amendments/Supplements to ANSI / API RP 1107 Oxidation of Stainless Steel Weldments Welding of Pipelines and Related Facilities (Amendments/Supplements to ISO 13847:2000) DEP-30.10.60.30 (Ι) DEP-30.10.60.31 DEP 61.40.20.30 (Ι) NEW REQUIREMENT Ver. 2.0 Ver. 2.0 Rev. 1.0 REPLACES SP-1192 Amended by Circular 50/11 DEM-1 DEM-1 Amended by Circular 74/11 Amended by Circular 72/12 DEM-1 DEM-1 DEM-1 DEM-1 NEW REQUIREMENT – TBC Amended by Circular 73/11 & 46/12 Amended by Circular 47/12 Amended by Circular 11/10 Amended by Circular 06/12 & (A03 – Sep-12) DEM-1 NEW REQUIREMENT – Replaces SP-1089 Amended by Circular 49/11 Amended by Circular 72/11 Amended by Circular 43/11 DEM-1 DEM-1 DEM-1 Amended by Circular 11/12 DEM-1 May-09 Dec-09 Sep-11 Feb-12 Aug-09 Feb-11 Feb-12 Feb-11 Feb-12 Feb-11 Feb-12 Feb-11 Sep-11 Feb-12 Sep-11 Sep-11 Feb-12 Sep-12 Feb-11 Sep-11 Sep-11 Sep-12 Sep-12 Sep-12 Jun-07 Feb-11 Sep-12 Feb-11 Feb-11 Feb-11 Feb-12 Feb-11 Jul-08 Mar-04 May-06 Apr-06 SP-1112 SP-1113 SP-1114A Ver. 4.0 Ver. 4.0 Apr-06 Apr-08 SP-1114B Ver. 4.0 Ver 2.0 May-08 May-08 SP-1114C Ver. 2 Dec-10 SP-1115 SP-1116 SP-1117 SP-1118 SP-1119 SP-1120 SP-1121 SP-1144 Ver 2.0 Ver. 3.0 Ver. 4.0 Ver. 2.0 Ver. 4.0 Ver. 3.0 Ver 4.0 Ver. F Jun-04 Jan-07 Nov-03 Oct-04 Jun-06 Jun-04 Jun-05 May-05 SP-1242 SP-1267 Ver 4.0 Ver.2.0 Oct-04 Jun-06 Power Systems – Emergency Response Procedure Volume VII: Power Systems Operstions Interior Infrastructure Management Procedure Procedures for Maintaining Power System Network Models Electrical System Faults & Analysis Procedure Infrastructure Power Systems Department MHEW Interconnector Operation Maintenance Procedure Procedure for Assessment of Protection Relay Testing Engineers Ver 7.0 Mar-09 PR-1259 PR-1265 PR-1353 PR-1421 Ver. 2.0 Ver. 2.0 Ver. 4.0 Ver 3.0 Sep-99 Nov-06 Jun-05 Dec-04 PR-1613 Ver. 2.0 Jun-10 Ver. 2.0 Ver. 3.0 Apr-06 May-06 DEM 1 Feb-11 Sep-11 Sep-11 DEP 33.64.10.33 DEP 33.65.11.31 (I) DEP 33.65.11.32 DEP 33.65.40.31 (I) (Ι) (Ι) (I) (I) DEP 33.66.05.33 (I) DEP 33.67.01.31 (Ι) DEP 33.67.51.31 (I) DEP 33.68.30.32 DEP 33.68.30.33 DEP 63.10.08.11 (I) Amended & Supplemented by SP-1103 Amended and Supplemented by SP-1267 Sep-12 Feb-12 Amended and Supplemented by SP-1117 Apr-03 Sep-11 DEM-1 DEM-1 Amended and Supplemented by SP-1119 Feb-11 Feb-11 Feb-12 Feb-12 Amended and Supplemented by SP-1121 Feb-12 Feb-11 Amended and Supplemented by SP-1120 Feb-12 Sep-10 Nov-06 Sep-11 SP-1145 Guide to Safety Operability (SAFOP) Studies on Electrical Systems Ver. 3.0 Oct-03 PR-1947 PR-1948 Electrical Safety Rules Electrical Safety Operating Procedures Ver. 8.0 Ver. 9.0 Aug-10 May-10 REPLACES DEP 31.38.01.31-GEN & Amend/Supl’t DEP 30.10.60.18-GEN Document Title Rev./DEM Date SP-1032 Specification for the Design, Operation, Maintenance & Inspection of Pipeline Block Valve Stations Procurement Specification for Pipeline Split Tees Pipeline Construction Specification Pipeline Operations and Maintenance Onshore Pipeline Engineering DEP 31.40.40.38-PDO Hydrostatic Pressure Testing of New Pipelines DEP 31.40.60.12-PDO Pipeline Repairs (Supplement to ASME B31.4 & B31.8) DEP 31.40.21.31-PDO Pipeline Isolating Joints - Amendments/Supplements to MSS SP-75 Ver. 3.0 Sep-11 Ver. 2.0 Ver. 3.0 Ver. 2.0 Ver. 3.0 Rev. 2.0 Rev. 2.0 Ver. 1.0 May-11 Mar-11 Dec-03 Jan-11 Mar-11 Mar-11 Dec 02 Ver. 8.0 Jul-09 Ver. 3.0 Rev. 02 Rev. 02 Rev. 1 Rev. 0 Dec-06 Jun-08 Jun-08 Mar-03 Feb-02 Rev. 01 Rev. 1.0 Ver. 2.0 Ver. 2.0 Oct-02 May-12 Dec-09 Dec-09 PR-1799 Infrastructure - Emergency Response Document Part III Contingency Plans - Vol. 4: Main Oil Line Engineering and Operations - Flowline Cold Cutting Procedure Main Oil Line System - Management Procedure South Oman Gas Line System - Management Procedure Procedures for the Use of Pipe-RBA Methodology Facilities Change Proposal Procedure for Main Oil Line, South Oman Gas Line and MAF Terminal Pipeline Hot Tap Management Procedure Procedure for Analysis of Pipeline Road Crossing Installation of Epoxy Grouted Sleeve & Clock Spring Repairs Procedure for “COSASCO” Retrieving Equipment Operation, Corrosion Monitoring and Weight Loss Coupon Analysis Procedure for Emergency Pipeline Repair Material Management Ver. 1.0 Sep-08 GU-379 GU-501 Pipeline Emergency Repair Manual (Class 1 Pipelines) Excavation and Working Around Live Pipelines Rev. 5.0 Rev. 2.0 May-12 Sept-11 Amended by Circular 76/11 Amended by Circular 19/12 Amended by Circular 84/11 DEM-1 DEM-1 DEM-1 Amended by Circular 102/11 & 56/12 Amended by Circular 100/11 DEM-1 DEM-1 Feb-11 Feb-11 Feb-11 Apr-06 Feb-11 Feb-11 Jun-07 Sep-11 Sep-11 Jun-07 SP-1199 SP-1208 SP-1210 SP-1211 SP-1212 SP-1235 SP-1236 PR-1146 PR-1235 PR-1236 PR-1416 PR-1504 PR-1506 PR-1522 PR-1629 PR-1642 DEP 31.38.60.10 DEP 31.40.10.12 DEP 31.40.10.13 DEP 31.40.10.16 DEP 31.40.20.33 DEP 31.40.20.37 DEP 31.40.21.30 DEP 31.40.21.31 DEP 31.40.21.33 DEP 31.40.21.34 Hot Tapping on Pipelines, Piping and Equipment - Owner – Mechanical Static Design Of Multiple-pipe Slug Catchers Design of Pipeline Pig Trap Systems Upheaval Buckling of Pipelines Line Pipe Induction Bends - Amendments / Supplements to ISO 15590-1 Line Pipe for Critical Service - Amendments / Supplements to ISO 3183:2007 Pipeline Fittings- Amendments / Supplements to ISO-15590-2 Pipeline Isolation Joints - Amendments / Supplements to ISO 15590-2 Pig Signallers : Intrusive Type Carbon And Low Alloy Steel Pipeline Flanges For Use in Oil & Gas Operations - Amendments/Supplements to ISO 15590-3 Pre-commissioning of Pipelines Pipeline Leak Detection (Ι) (Ι) (Ι) (Ι) (Ι) DEP 31.40.50.30 (I) DEP 31.40.60.11 Sep-11 Sep-02 Amended by Circular 41/08 Doc. ID Document Title Civil / Structures - Additional Notes Rev./DEM Date SP-1143 SP-1274 SP-1275 SP-1277 SP-1279 Specifications for Earthmoving & Construction Equipment Specification for Civil & Buildings Construction - Materials Testing Specification & Criteria for Design of Civil & Building Works Specification for Transportable Accommodation Units Specification for Civil & Building Construction NEW REQUIREMENT Rev. 2 Ver. 2.0 Ver. 2.0 Ver. 2.0 Ver. 2.0 May-12 Dec-09 Dec-09 Dec-09 Dec-09 SP-1281 SP-1282 SP-1284 Engineering Specification for Safe Road Works Specification for Reinforced Concrete - Production & Construction Specification for Sign & Signboards - Standard Signs Catalogue Ver. 2.0 Ver. 2.0 Ver. 2.0 Dec-09 Dec-09 Dec-09 GU-628 GU-629 GU-630 GU-631 Guide to Civil & Buildings Standard Drawings Guideline for Application & Selection of Standard Pipe Supports Guideline to Design & Construction of Swimming Pools Guideline for Sunshade – Specification, Design Requirements & Standard Drawings Ver 2.0 Ver 1.0 Ver 2.0 Ver 1.0 Dec-09 Dec-09 Dec-09 Dec-09 DEP 34.00.01.30 DEP 34.11.00.10 DEP 34.11.00.11 DEP 34.11.00.12 (I) (I) (I) (Ι) Structural Design & Engineering of Onshore Structures Onshore & Nearshore Site Investigations Site Preparations & Earthworks Including Tank Foundations and Tank Farms Geotechnical & Foundation Engineering – Onshore DEP 34.13.20.31 DEP 34.14.20.31 DEP 34.17.00.32 DEP 34.17.10.30 DEP 34.17.10.31 DEP 34.17.10.33 DEP 34.17.10.35 DEP 34.19.20.11 DEP 34.19.20.31 DEP 34.24.26.31 (I) (Ι) (Ι) (Ι) Road Paving , Surfacing, Slope Protection & Fencing Drainage systems and primary treatment facilities Design & Engineering of Buildings Design of Blast Resistant Onshore Buildings, Control Rooms, & Field Auxiliary Rooms Laboratories Portable Blast-Resistant Modules Siting of Onshore Occupied Portable Buildings Fireproofing of Steel Structures Reinforced Concrete Structures Chimneys selection, design and engineering (based on EN 1992-1-1, EN 1993-3-2, EN 1443, EN 13084 Parts 1, 2, 4, 5, 6, 7 and 8) Onshore Steel Structures Onshore Ancillary Steel Structures (Ι) (Ι) (Ι) (I) DEP 34.28.00.31 (I) DEP 34.28.00.33 (I) Sep-11 Sep-11 Sep-11 Feb-11 Amended by Circular 99/11 & 68/12 & Amendment A03-Sep-12 Amended by Circular 55/11 DEM-1 Amended/Supplemented by SP-1275 DEM-1 Amended by Circular 71/11 & 42/12 Amended by Circular 03/12 DEM-1 DEM-1 DEM-1 Sep-11 Feb-11 Sep-12 Feb-12 Sep-12 Feb-11 Feb-11 Feb-11 Sep-11 Sep-12 Sep-11 Sep-11 Amended by Circular 52/12 Building Services SP-1285 Specification for Civil & Building Services DEP 31.76.10.10 DEP 31.76.10.11 DEP 34.14.20.31 (Ι) Heating, Ventilation and Air Conditioning for Plant Building Installation, Testing and Balancing, and Commissioning of HVAC Systems Drainage systems and primary treatment facilities Ver. 2.0 Dec-09 DEM-1 Jul-98 Apr-06 Feb-11 Amended by Circular 43/08 Ver. 2.0 Dec-04 Ver. 2.0 Oct-05 Ver. 2.0 Ver. 2.0 Ver. 2.0 Ver. 1.0 Jun-05 Jun-05 Jun-05 Oct 05 FEED OFFICE ENGINEERING – Manager: UEP1 - (Paul Bennington) ** FOR USE IN FEED OFFICE ONLY** Feb-12 Doc. ID Document Title FEED Office Management DEM 1 Feb-11 DEM 1 Dec-98 Feb-11 Date Rev. A06 Rev. A02 Rev. A03 Rev. A04 Rev. A02 Rev. A01 Apr-12 Apr-11 May-11 Apr-11 May-11 Feb-12 FEED Office – Managing Safety During Visits to Vendor and Contractor Sites FEED Office - HSE Action Close-out Procedure Rev. A02 Rev. A02 May-11 May-11 SP-2067 FEED Office - PDMS Model specification Rev. A01 Sept-08 PR-1727 PR-1728 PR-1729 PR-1730 PR-1733 PR-1734 PR-1735 PR-1736 PR-1749 PR-1750 PR-1752 PR-1768 PR-1773 PR-1778 PR-1938 PR-1939 FEED Office - Preparation of "Basis for Design" Procedure FEED Office - Preparation of Project Specification (FEED Output) Procedure FEED Office - Technical Integrity During Design & Execution Phase Procedure FEED Office - Engineering & Projects Calculation Procedure FEED Office – Technical Information Note Procedure FEED Office – Process System Design Review Procedure FEED Office - Codes and Standards Procedure FEED Office - Site Survey Procedure FEED Office - Register of Holds Procedure FEED Office - Contract and Third Party Services Management Procedure FEED Office – Project Execution Procedure (Define Phase) FEED Office - Project Deliverables - Checking and Approval Procedure FEED Office - Equipment Supplier Document Requirements Procedure FEED Office - Standard Calculation Spreadsheet QC Procedure FEED Office – Change Control Procedure FEED Office – Multi-Discipline Equipment Data Sheet Specification Procedure Rev. A02 Rev. A02 Rev. A02 Rev. A02 Rev. A04 Rev. A02 Rev. A01 Rev. A03 Rev. A02 Rev. A04 Rev. A02 Rev. A03 Rev. A04 Rev. A02 Rev. A01 Rev. A01 May-11 May-11 Oct-09 May-11 Oct-12 May-11 May-11 Oct-12 Sep-11 Apr-11 Nov-09 Jun-10 May-12 May-11 Apr-10 Apr-10 GU-603 FEED Office - Project Deliverables Guideline ORP Phase 3: Define Rev. A02 Apr-11 PR-1737 PR-1738 PR-1746 PR-1770 PR-1771 FEED Office - Finance Flow Procedure FEED Office - Business Review Procedure FEED Office - Time writing Procedure FEED Office - Planning & Progress Reporting Procedure FEED Office - Cost Planning Work-flow Procedure Rev. A02 Rev. A02 Rev. A02 Rev. A02 Rev. A02 Apr-10 Feb-12 May-11 Apr-10 May-11 GU-616 GU-640 FEED Office - Standard CTR Catalogue FEED Office – CTR Catalogue Template (Minor Projects) Rev. A03 Rev. A01 Apr-10 Nov-10 Rev. A04 Rev. A04 Rev. A03 Rev. A03 Apr-12 Apr-12 Apr-12 Apr-12 PR-1741 PR-1742 PR-1743 PR-1764 PR-1765 PR-2004 GU-256 GU-363 GU-432B Static Equipment Inspection Guideline Guideline for the Use of Scaffolding Guideline for Automated Ultrasonic Testing Scope Definition for Class 1 Piggable Pipelines Guideline for Inspection and Integrity Assessment of Carbon Steel Non-Piggable Pipelines Ver. 2.0 Ver. 1.0 Ver. 1.0 May-05 Aug-00 May-03 PR-1744 PR-1776 Ver. 1.0 Nov-03 Feb-12 Feb-11 Doc. ID Document Title Additional Notes Rev./DEM Date SP-1279 SP-2084 Specification for Civil & Building Construction – Owner: Civil Engineering Specification for IP Video Surveillance, Perimeter Security & Access Control Systems Chapter P – Fences & Gates Ver. 2.0 Ver. 2 Dec-09 Jul-12 TELECOMS - UIID (Said Shidhani) Ver. 2.0 Ver. 2.0 Ver. 5.0 Ver. 2 Aug-08 Aug-06 Jul-12 Jul-12 DEM-1 Feb-10 May-04 Dec-08 Additional Notes FEED Office - Quality Management System Manual FEED Office - Risk & Opportunity Management Procedure FEED Office - Project On-Boarding Procedure FEED Office - New entrant Induction Program Procedure FEED Office - Knowledge Management (Lessons Learned) FEED Office – Monthly Project Review Procedure HSE/Technical Safety Validation of NDE for Fabrication Inspection Field Inspection prior to Commissioning of Mechanical Equipment Amended by Circular 55/11 Rev./DEM May-05 NEW REQUIREMENT NEW REQUIREMENT NEW REQUIREMENT Based on DEP 31.40.40.38-Gen (Jan-10) Based on DEP 31.40.60.12-Gen (Jan-10) Based on DEP 31.40.21.31-Gen (1999) CIVIL ENGINEERING – CFDH: UEP1C (UEB) - (Hilal Aghbari) Ver. 3.0 NEW REQUIREMENT Additional Notes Oct-06 May-08 Amended by Circular 60/11 Amended by Circular 07/12 Doc. ID Ver. 2.0 Ver. 1.3 Amended and Supplemented by SP-1173 Amended and Supplemented by SP-1167 PIPELINE & FLOWLINE ENGINEERING – CFDH: UIPT(UEL) - (Said Asmi) Static Equipment Inspection and Maintenance Procedure DEP 32.71.00.10 (Ι) Plant Telecommunication DEP.32.71.00.11 Telecommunications Standards DEP.32.71.00.14 Telecommunications Tower and Guyed Masts Amend’t/Suppl’t to DEP-33.65.11.31-Gen (Jan 99) Electrical Safety Operational Procedures (ESOP’s)– PR-1013 Specification for ADSS Fibre-Optic Cables and Key Accessories Specification for Installation of ADSS Fibre Optic Cables Fibre Optic Cable Installation Specifications Specification for IP Video Surveillance, Perimeter Security & Access Control Systems Amend’t/Suppl’t to DEP 33.66.05.31-Gen (Jan-99) Amend’t/Suppl’t to DEP 33.67.51.31-Gen (Jul-98) Amend’t/Suppl’t to DEP 33.67.01.31-Gen (Jan-98) May-05 Inspection- SP-1265 SP-1266 SP-2004 SP-2084 Amend’t/Suppl’t to DEP-33.65.40.31-Gen (Oct-01) Ver. 2.0 SECURITY– CFDH: UIC (Salim Ambusaidi) SIL Assessment & Implementation Guidelines Guidelines for Alarm Management and Rationalisation Guideline for the use of Level Measuring Instruments Human Factors Engineering – Control Room Design Human Factors Eng. – Human/Machine Interface Design for Situation Awareness Quarter Turn Actuators for On/Off Valves Process Control Domain - Enterprise industrial automation information technology and security DEP 32.01.23.17 (Ι) Process Control Domain – Security Requirements for Suppliers DEP 32.01.40.31 (Ι) Requirements for Real-Time Production Operations and Production-Critical Real-Time Data DEP 32.10.03.10 (Ι) Instrument Symbols and Identification on Process Engineering Flow Schemes DEP 32.24.20.44 (Ι) Instrumentation Control & Protection for Fired Equipment DEP 32.29.20.10 (I) Safeguarding & Instrumented Protective Functions for Rotating Equipment DEP 32.30.20.11 (I) Fire, Gas and Smoke Detection Systems DEP 32.30.20.14 (I) Instrument Asset Management DEP 32.30.20.15 (I) DCS Basic Application Standards DEP 32.30.20.16 Baselayer Control Applications DEP 32.30.20.17 Integration Of Motor Controls Into BPCS DEP 32.30.20.18 Real Time Optimisation Project Standards DEP 32.31.00.32 (Ι) Instruments for Measurement and Control DEP 32.31.00.34 (I) Instrumentation Documents and Drawings DEP 32.31.09.31 (I) Instrumentation for Equipment Packages DEP 32.31.50.10 On-line Process Analysers DEP 32.31.50.13 Analyser Housing DEP 32.32.00.11 Turbine Fiscal Metering Systems for Liquid Hydrocarbons DEP 32.32.00.12 Fiscal Flow Measurement of Natural Gas DEP 32.36.01.17 (Ι) Control Valves – Selection, Sizing & Specifications DEP 32.37.10.11 (Ι) Installation of On-Line Instruments DEP 32.45.10.10 (Ι) Instrumentation of Depressuring Systems DEP 32.80.10.10 (Ι) Instrumented Protective Functions (IPF) DEP 32.80.10.14 (I) Alarm Management DEP 61.38.10.10 Shop and Field Fabrication of Orifice Meter Runs DEP 62.10.08.11 (Ι) Inspection & Functional Testing of Instruments DEP 30.00.60.15 (Ι) DEP 30.00.60.16 DEP 31.40.70.30 (Ι) DEP 32.01.20.12 DEM-1 DEM-1 Feb-12 Feb-12 Feb-11 Feb-11 Sep-12 Welding - DEP 30.55.03.30 DEP 61.10.08.11 Doc. ID Document Title Instrument Equipment Amended by Circular 59/11 Amended by Circular 70/12 Revised by Amendment A02 – Sept-12 (Ι) (Ι) GU-450 CONTROL & AUTOMATION ENGINEERING – CFDH: UEOA2 (UES) - (Salim Hinai) Metallic Materials-Selected Standards Non-Metallic Materials-Selection & Application Carbon Steel Corrosion Engineering Manual for Upstream Facilities Metallic Materials-Prevention of Brittle Fracture in New Assets Thermal Insulation Ver. 3.0 Ver. 4.0 Ver. 5.0 Ver 4.0 PR-1067 Feb-12 Jul-02 Specification for Facility Siting, Layout & Spacing Design for Sour Service Specification Oct-11 May-06 May-08 Dec-07 Rev. 2.0 SP-1127 SP-1190 Ver. 5.0 Ver. 4.0 Ver. 2.0 Amend’t/Suppl’t to DEP 33.64.10.10-Gen (Feb-11) Feb-11 Fire & Explosion Risk Management Guidelines Facility Layout SP-1107 SP-1109 SP-1110 SP-1111 DEP 33.65.50.31 DEP 33.65.50.32 DEP 33.65.60.30 DEP 33.66.05.31 GU-230 DEP 80.47.10.33 (Ι) SP-1103 SP-1105 SP-1106 DEM-1 DEM-1 DEM-1 Jul-02 Amended by Circular 72/12 Amended by Circular 38/11 Amended by Circular 51/11 & 38/12 Dec-10 Sep-12 Sep-11 Jan-98 Feb-12 Feb-12 Feb-11 Rev. 2.0 Fire, Gas and Smoke Detection Systems - Owner: C&A Assessment of the Fire Safety of Onshore Installations Active Fire Protection Systems and Equipment for Onshore Facilities Fire Fighting Agents and Portable/Mobile Fire Fighting Equipment for Onshore Applications Fire Fighting Vehicles and Fire Stations Ver. 7.1 Electrical Engineering Design Electrical Supply and Generation-Design and Operation Electrical Network Monitoring and Control System for Industrial Networks - Specification Electromagnetic Compatibility (EMC) Synchronous AC Machines – Amendments/Supplements to IEC 60034-1 & IEC 60034-14 Packaged Unit AC Generator Sets Power Transformers – Amendments/Supplements to IEC 60076-01 & IEC 60076-11 Static DC Uninterruptible Power Supply (DC UPS) Units Static AC Uninterruptible Power Supply Unit (Static A.C.UPS unit) Solar Power Systems Electrical Machines - Cage-Induction Types – Amendments/Supplements to IEC 60034-1 & IEC 60034-14 AC Electrical Variable Speed Drive Systems Low Voltage Switchgear & Control Gear Assemblies – Amendments/Supplements to IEC 60439-1 High-Voltage Switch Gear and Control Gear Assemblies for Rated Voltages between 1kV & 52kV – Amendments/Supplements to IEC 62271-200 Electrical Trace Heating Electrical Process Heaters Field Commissioning & Maintenance of Electrical Installations & Equipment HSE Specification – Fire and Explosion Risk Management (Ι) (Ι) (Ι) (Ι) Aug-08 DEP 33.64.10.10 (Ι) DEP 33.64.10.12 (I) DEP 33.64.10.32 (I) String/Performance Tests Procedure for Centrifugal Pumps Amended by Circular 62/11 & A01 – Sep-12 Ver. 6.0 Feb-11 SP-1075 DEP 32.30.20.11 DEP 80.47.10.30 DEP 80.47.10.31 DEP.80.47.10.32 SP-1102A DEM-1 Sep-10 Oct-11 Jun-05 Jun-05 May-12 Aug-08 Hoisting Facilities And Weather Protection For Rotating Equipment Installation of Rotating Equipment - Amendments /Supplements to API RP 686 Oil Mist Lubrication Systems Special Purpose Gear Units for Petroleum, Chemical & Gas Industry Services - Amendments / Supplements to API 613 DEP 31.29.00.33 (Ι) Shaft Sealing Systems for Centrifugal and Rotary Pumps - Amendments/Supplements to ISO 21049:2004 DEP 31.29.00.36 Flexible Couplings for Mechanical Power Transmission – Special Purpose Applications - Amendments/Supplements to ISO 10441 DEP 31.29.00.39 Shaft Sealing Systems for Centrifugal and Rotary Pumps - Selection, Testing & Installation DEP 31.29.00.41 Gears – Selection, Testing & Installation DEP 31.29.02.11 Pumps – Selection, Testing & Installation DEP 31.29.02.30 (Ι) Centrifugal Pumps - Amendments/Supplements to ISO-13709:2003 DEP 31.29.06.30 Centrifugal Submerged Motor Pumps (in Refrigerated Product or Pressurised Storage Service) DEP 31.29.12.30 Reciprocating Positive Displacement Pumps and Metering Pumps - Amendments/Supplements to API 674 and API 675 DEP 31.29.22.11 (I) Positive Displacement Pumps – Rotary (Amendments/Supplements to API 676) DEP 31.29.40.10 Compressors Selection, Testing & Installation DEP 31.29.40.30 (Ι) Axial, Centrifugal & Expander Compressors - Amendments/Supplements to API Std 617 DEP 31.29.40.31 (Ι) Reciprocating Compressors - Amendments/supplements to API 618 DEP 31.29.40.33 Packaged, Integrally Geared, Centrifugal Plant and Instrument Air Compressors - Amendments/Supplements to API 672 DEP 31.29.42.30 Liquid Ring Vacuum Pumps And Compressors - Amendment/Supplements to API Std 681 DEP 31.29.47.30 Centrifugal Fans - Amendments/Supplements to ISO 13705, Annex E DEP.31.29.47.31 Centrifugal fans for petroleum, chemical, and gas industry services (amendments/supplements to API 673) DEP 31.29.47.32 Fans – Selection, Testing & Installation DEP 31.29.60.32 (Ι) Lubrication, Shaft-Sealing and Control Oil System and Auxiliaries - Amendments/Supplements to ISO 10438 DEP 31.29.60.33 (Ι) Lubrication, Shaft-Sealing and Oil-Control System – Selection, Testing & Installation DEP 31.29.70.11 Combustion Gas Turbines - Selection, Testing & Installation DEP 31.29.70.31 (Ι) Gas Turbines for the Petroleum, Chemical and Gas Industry Services - Amendments/Supplements to API 616 DEP 31.29.70.32 Gas Turbine Combustion Air Intake And Exhaust Systems DEP 31.29.80.30 Diesel Engines DEP 31.29.90.30 Spark Ignited Gas Fuelled Engines Dec-06 Jun 04 May-08 DEM-1 Rev./DEM Amend’t/Suppl’t to DEP 31.29.02.30-Gen Ver. 5.0 Ver. 3.0 Ver. 2.0 Electrical Infrastructure - Specification for Electrical Installation Practice Specification for Testing & Commissioning of Electrical Equipment Electrical Infrastructure Specification for installation of Overhead Transmission Lines Electrical Infrastructure Specification for Design of 33kV Overhead Power Lines on Wooden Poles Electrical Infrastructure Specification for Design of 33kV Overhead Power Lines on Concrete Poles Electrical Engineering Guidelines Electrical Infrastructure - Electrical Standard Drawings List Electrical Infrastructure - Specification for Coding and Identification of Overhead Line Systems Electrical Infrastructure - Specification for Electrical Protection System Specification for Earthing and Bonding Electrical Infrastructure - Specification for Electrical Supplies for Mobile Camps Electrical Infrastructure - Specification for Temporary Electrical Supplies for Construction & Maintenance Work Electrical Infrastructure - Electrical Specification for Drilling Rigs Electrical Infrastructure - Specification for 132kV Substation Electrical Infrastructure - Specification for Design of 132kV Overhead Power Lines on Wooden Poles Electrical Infrastructure Specification for Design of 132/220 kV Overhead Power Lines on Steel Towers Electrical Infrastructure – Specification for Design of TWIN ELM 132kV Overhead Power Lines on Concrete Poles Specification for Digital Power Line Carrier Communication System Electrical Infrastructure - Specification for SCADA of Electrical System Specification for Power Transformers Specification for Power Station Specifications for Electrical Machines Cage Induction Types Specifications for High Voltage Switchgear and Control Assemblies Specifications for Low Voltage Switchgear and Control Assemblies Infrastructure Power Systems Department – Oil and Gas Directorate Service Level Agreement HSE Specification for Activities in the Vicinity of Overhead Power Lines Specification for Synchronous AC Machines Infrastructure Power Systems Department – Power Systems Asset Management Infrastructure Power Systems Department - Key Business Control Documentation Guidelines WITHDRAWN Additional Notes Date GU-290 GU-323 DEM-1 Amended A01 – Sep-12 Amended by Circular 66/11 & 66/12 Rev./DEM PR-1168 Ver. 3 Ver. 2.0 Ver. 0 Rev. 02 Rev. 5 Rev. 3 DEP 31.25.00.10 DEP 31.29.00.10 DEP 31.29.00.30 DEP 31.29.00.32 SP-1099 SP-1100 SP-1101 Additional Notes Feb-11 Feb-12 Feb-12 Feb-12 Feb-12 Feb-12 Feb-12 Sep-11 Feb-12 Feb-11 Feb-12 Feb-11 DEM-1 Amended by Circular 76/11 Feb-12 Dec-08 Feb-11 Feb-12 Feb-12 Feb-12 Feb-12 Feb-12 Feb-11 Feb-12 Feb-11 Feb-12 Feb-11 Feb-11 Sep-12 Feb-12 Sep-12 Feb-11 Dec-07 Sep-12 Feb-12 MECHANICAL ROTATING EQUIPMENT ENGINEERING – CFDH: UEP1R – (Saad Harrasy) Doc. ID Doc. ID Document Title Electrical Equipment – SP-1102B Oct-09 Lifting & Hoisting – PR-1709 PR-1710 SP-2069 SP-2070 Additional Notes ELECTRICAL ENGINEERING – CFDH: UIE (UEE2) - (Mohammed Aghbari) Engineering Cost & Planning Quality Management Notes: 1. 2. This Document can be accessed from LiveLink: DEP’s (V35 – Sep-12) are Shell Documents and can be accessed from: a) 3. http://swwep-deps.shell.com/ Note: as of v32, new/revisions to DEP’s are split into ‘Specification’ and ‘Informative’ – See Tabs at top of DEP web-page (Ι) denotes the DEP’s where this Specification and Informative split has been implemented PDO Management System Documents are available on Livelink: http://sww4.pdo.shell.om/CMFportal/Default.aspx PDO Hierarchy: a) CMF b) PL c) CP d) SP e) PR f) GU 4. 5. 6. http://sww4.pdo.shell.om/CMFportal/Default.aspx Corporate Management Framework Policy Code of Practice Specification Procedure Guideline Mandatory Mandatory Mandatory Mandatory Mandatory Non-Mandatory The Hardcopy of this Document (Wall Chart) is issued every 6 Months in Arrears – The document may be revised between hard-copy issues – please check Livelink for latest revision All changes since last revision are shown in BOLD Please notify UEPI of any revisions required to this wallchart Document Owner: UEPI PR-1726 PR-1745 PR-1756 PR-1772 FEED Office - Control of QMS Documents Procedure FEED Office - Customer Feedback Procedure FEED Office - Control of Non-Conformance, Corrective and Preventative Actions FEED Office - Management Review Procedure Information Management PR-1722 PR-1723 PR-1725 PR-1761 FEED Office - Information Management Services to FEED Office Procedure FEED Office - Information Documents and Records Procedure FEED Office - Supplier document Procedure FEED Office - Hand-over Documentation Procedure Rev. A02 Rev. A03 Rev. A02 Rev. A02 Feb-11 Jun-10 Jun-11 May-11 GU-600 FEED Office - Live link &Assai Usage Rev. A02 Feb-11 CAUTION MAKE SURE YOU HAVE LATEST REVISION (CHECK IN LIVELINK or SHELL DEP WEBSITE) Document No: GU-611 Revision: 18a Issue Date: Nov 2012
Copyright © 2024 DOKUMEN.SITE Inc.