fssd-fcchk

March 28, 2018 | Author: Lawrence Law | Category: Elevator, Door, Pump, Fire Sprinkler System, Valve


Comments



Description

FSSD FC ACS AIR-CONDITIONING SYSTEMName of Building: A i ii iii iv v AHU Smoke cut-off system provided within return air stream of AHU Activation of smoke-cut-off system shuts down AHU Manual reset provision for AHU No storage in AHU room Smoke detector provided and tested in order * Status of Inspection Yes N.A. * Status of Inspection Yes N.A. B i ii iii iv v FIRE DAMPERS Fire Dampers are properly installed Motorised Fire dampers operate upon activation of auto fire alarm detectors No obstruction to dampers louver (blades) movement Access door for inspection of Fire dampers provided Fire dampers of approved rating and with PSB label Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 FSSD FC ASCS ATRIUM SMOKE CONTROL SYSTEM Name of Building: S/N o. i ii iii iv v vi vii viii ix x DETAILS:Smoke detectors provided at the perimeter of the Atrium Separate manual reset switch provided Functions under Secondary supply provided Auto supply mode activated by fire alarm system (where applicable) under Secondary power supply Manual activation provision installed System extraction air fan operate upon activation of fire alarm Smoke curtains operate upon activation of fire alarm Ventilation louvers operation by fire alarm and under secondary power supply are in order All fire scenarios where is / are designed under the engineered smoke control system has / have been tested Air-condition cut-off upon activation of fire alarm * Status of Inspection Yes N.A. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 FSSD FC AFAS AUTOMATIC FIRE ALARM SYSTEM Name of Building: Name of Monitoring Company: S/N o. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 . i ii iii iv v vi vii viii ix x xi xii xiii HEAT / SMOKE DETECTOR TEST Sufficient coverage Detector points not painted Detector points unobstructed System connected to monitoring company / 995 Alarm signal transmission received by monitoring company Zone tested is indicated correctly on main-alarm panel Audible fault alarm & fault indication light provide at main-alarm panel Zoning diagram provided next to the main-alarm panel Zone tested is indicated correctly on sub-alarm panel Audible fault alarm & fault indication light provide at sub-alarm panel Zoning diagram / mimic panel provided next to the sub-alarm panel Alarm bells in operational condition Alarm general sounding throughout the building Building Code No: * Status of Inspection Yes N.A. A. * Status of Inspection Yes N. * Status of Inspection Yes N.A. * Status of Inspection Yes N.A. B i ii iii iv C i ii iii iv D i ii iii iv v SCDF/FSSD/FC Dec 03 .FSSD FC AFSS AUTOMATIC FIRE SUPPRESSION SYSTEM FOR COOKING HOOD Name of Building: A i ii iii iv GENERAL System connected to Main / Sub Fire Alarm Panel Automatic cut-off device for gas fuel supply provided Emergency manual release for extinguishing agent provided Sign “IN CASE OF FIRE – PULL TO RELEASE”CALL 995 is provided CYLINDER FOR EXTINGUISHING AGENT PSB Approved label provided Rigidly mounted Service by fire safety work contractor (competent personnel) Date of service NOZZLE & PIPE WORKS Rigidly mounted Free of grease (internal & external) Free of obstruction Double layer provided HEAT ACTIVATING DEVICE Fusible link enclosed in piping Free of obstruction Free of grease Properly installed Ensure in functioning condition (conduct simulated test) Date of inspection and testing of system: * Status of Inspection Yes N.A. FSSD FC CPSES CAR PARK SMOKE EXTRACT SYSTEM Name of Building: S/N o. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 .A. i ii iii iv DETAILS:Intake / discharge location with at least 5m separation Exhaust discharge directed to external Connected to secondary power supply & fire alarm system Failure of the Exhaust Fan will cut off the corresponding supply fan * Status of Inspection Yes N. A.FSSD FC DRS DRY RISER SYSTEM Name of Building: DRY RISER: size 2 way (100mm) No.76m above finished floor level Labelled “DRY RISER INLET” and differentiated Inlet painted in yellow colour RISER Not passing through unprotected area / Fire rated Air release valve provided Earthling provided LANDING VALVE 0.A. A i ii iii iv v vi B i ii iii C i ii iii iv v vi vii D i ii BREECHING INLET Inlet housed in glass fronted protective enclosure Properly installed / secured Clear of Obstruction About 0. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 .A. /4 way (150mm) No. * Status of Inspection Yes N. * Status of Inspection Yes N.A.76m to 1m above finished floor level Condition of hand wheel satisfactory Blank Cap provided Strapped and padlocked in closed position Labelled / Numbered Clear of Obstruction Landing valve painted in yellow colour TESTING OF HYDROSTATIC PRESSURE Pressure constant at 21 bar or 300 psi for 30 minutes Air release valve functioning * Status of Inspection Yes N. * Status of Inspection Yes N. i ii iii iv v vi vii viii DETAILS:Separate manual reset switch provided Functions under secondary supply provided Auto supply mode activated by fire alarm system under normal power supply Auto supply mode activated by fire alarm system under secondary power supply Manual activation provision installed Air exhaust fan operate upon operation of fire alarm Air condition system cut-off upon activation of system Smoke curtain operate upon activation of system * Status of Inspection Yes N.FSSD FC ESCS ENGINEERED SMOKE CONTROL SYSTEM Name of Building: S/N o.A. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 . A.4 litre / sec Pump Pump can be manually tested Auto changeover from normal to secondary power supply Auto changeover from duty to standby pump operation in order Differentiated * Status of Inspection Yes N.A.A. * Status of Inspection Yes N. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 . * Status of Inspection Yes N.FSSD FC HRS HOSE REEL SYSTEM (WITH PUMP) Name of Building: A i ii iii iv v vi vii viii ix B i ii C i ii iii iv Hose Non-kinking reinforced rubber Length of hose (30m) Nozzle condition satisfactory Locking device provided in-order Condition of stop cock satisfactory Clear of obstruction Labelling provided for cabinet Labelling provided for instruction signage No locking device provided Testing No Leakage detected 6m throw achievable or flow rate of 0. FSSD FC LIFT LIFT Name of Building: (No. * Status of Inspection Yes N. lighting and fan in order Lift differentiated with numbers Storey Numbering for lift lobbies provided Lifts home at designated floor Fire Lift (Size & Capacity __________________________) Lift travel from ground to top level within 1 minute Fire lift operated under fire switch in order Labelled “FIRE LIFT” Fire switch properly enclosed in labelled glass fronted cover No combustible furnishing * Status of Inspection Yes N.A. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 . of Passenger Lift ______________ Cargo Lift ______________ Fire Lift ______________) A i ii iii iv v vi vii viii B i ii iii iv v Passenger and Fire Lift Lift homing under fire alarm activation in order (Clause 26.A.3) Lift homing under secondary power supply (Clause 26.2) Warning notice for fire situation provided (Clause 26.8) PSB (SISIR) approved EBOPS provided (Clause 25) EBOPS supply to lift car bell. FSSD FC OSF OTHER SYSTEMS AND FIXTURES 1) A i ii iii iv v vi vii iv HOSE REEL (without pump) Hose Non-kinking reinforced rubber Length of hose (30m) Nozzle condition satisfactory No locking device provided Condition of stop cock satisfactory Clear of obstruction Labelling provided for cabinet Labelling provided for instruction signage * Status of Inspection Yes N.A. S/No Details: i Properly hung on bracket ii iii iv v Clear of obstruction Service by licensed contractor PSB label Date of service Date of inspection: SCDF/FSSD/FC Dec 03 .A.A.4 l/sec * Status of Inspection Yes N. B i ii Testing No Leakage detected 6m throw achievable/0. Date of inspection and testing: 2) PORTABLE FIRE EXTINGUISHER * Status of Inspection Yes N. 4m from floor level Alarm bell in operational condition The fire alarm sounding distinguishable from any other alarm system Audible fault alarm & fault indication light provided at sub / main panel Zone tested is indicated correctly on the fire alarm main / sub panel “IN CASE OF FIRE CALL 995” signage provided Date of inspection and testing: 4) A i EXIT SIGN AND EMERGENCY LIGHTING Exit Sign / Exit Directional Sign Exit Sign adequately provided along :a) Staircase b) Escape Routes c) Public Area Exit Sign Visible Directional Exit Sign provided where necessary Exit Sign operation in order Exit Sign connected to secondary power supply tested in order Exit sign complied with CP 19 colour code (green and white combination) * Status of Inspection Yes N.A.conduit and trunking are painted red ii Clear of obstruction iii iv v vi vii viii ix x Fire alarm zoning diagrams provided near fire alarm panel General sounding throughout the building Located about 1. S/No Details: i The colour for all fire alarm panels.A. ii iii iv v vi SCDF/FSSD/FC Dec 03 .FSSD FC OSF 3) MANUAL ALARM SYSTEM (CALL POINT) * Status of Inspection Yes N. bell . A.FSSD FC OSF B i Emergency Lighting Emergency Lighting provide along :a) Staircase b) Escape Route c) Public Area d) Essential plant rooms Automatic operation tested in order Emergency lighting provided is sufficient Identification ( Cl 7.8 CP 19 ) Emergency Lighting connected to secondary power supply * Status of Inspection Yes N.A. ii iii iv v vi vii viii ix x SCDF/FSSD/FC Dec 03 . ii iii iv v Date of inspection and testing: 5) A i FIRE DOOR AND EXIT DOOR Fire Door Fire door installed at follow location are in order a) Staircases b) Escape Routes c) Public Area Fire doors provided with PSB label Swing of door in direction of escape No stopper detected Self-closer provided Doors are closed fitting Clear of obstruction Panel above the door same rating as the wall No locking device for doors passing to the fire fighting staircase Viewing glass panel at fire rated door does not exceed 650 cm2 * Status of Inspection Yes N. S/No Details: i Clear of obstruction internal and external ii (Red or Orange) External marking provided iii Signage “Fire Fighting Access – Do Not vi Obstruct” provided Readily open from inside and outside Date of inspection: SCDF/FSSD/FC Dec 03 .FSSD FC OSF B i ii Exit Door Doors unlocked during operating hour Clear of obstruction * Status of inspection Yes N. S/No Details: i Fire stopped accordingly ii iii Protected by fire-resisting enclosure No Storage Date of inspection: 7) STAIRCASE (ENCLOSED OPEN ) S/No Details: i Standard Stairway Numbering System ii iii vi v provided Clear of obstruction No combustible furnishing Fully compartmented Service pipe (gas.A. oil and ventilation) other that water pipe not passing through protected staircase.A.A. lobbies area * Status of Inspection Yes N. Date of inspection: 6) DUCT RISER * Status of inspection Yes N.A. Date of inspection: 8) EXTERNAL FIRE FIGHTING ACCESS OPENING * Status of Inspection Yes N. B i ii iii Iv STAGE Provided with self-closing fire rated door Fire extinguisher provided No storage Smoke curtain provided C I Ii Iii Iv V Vi PROJECTION ROOM Provided with self-closing fire rated door Fire extinguisher provided Emergency lighting tested in order Emergency message slide / public address system tested in order Shutter operated smoothly / fire rated glass Installed No smoking sign displayed * Status of Inspection Yes N.FSSD FC OSF 9) THEATRE A i ii iii iv v vi vii v AUDITORIUM Approved occupant load Seats firmly fixed Exit doors provided with panic bolts Hose reel tested in order Exit signs in good working order Exit signs provide with secondary power supply Complying with CP 19 Beacon light operation in order Emergency lighting auto changeover tested in Order * Status of Inspection Yes N. Date of inspection and testing: SCDF/FSSD/FC Dec 03 .A.A.A. * Status of Inspection Yes N. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 . I Ii Iii Iv V Vi Vii Viii DETAILS:Separate manual reset switch provided Fan operation at high speed under fire alarm (if single) Both fans operating under fire alarm (if double) Fan operating upon secondary power supply (Fire mode) Fan in operation can only be stopped manually Average air velocity not less than 1 m/s Force require to open any door is not more than 110 N Independent system for smoke lobby / protected corridor connected to secondary power supply * Status of Inspection Yes N.FSSD FC PS PRESSURISATION SYSTEM Name of Building: Location of Fans Fans supply to (staircase / lift lobby / corridor / ) S/N o.A. A.: A I Ii Iii Iv V Vi F I HYDRANT Rigidly mounted on ground Cover for spindle chamber visible Spindle depth not more than 1 metre Blank cap provided Spindle chamber and Hydrant clear of obstruction Hydrant painted with yellow colour band TESTING OF STATIC PORESSURE AND FLOW RATE HYDRANT NO. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 .FSSD FC PHS PRIVATE HYDRANT SYSTEM Name of Building: HYDRANT No. STATIC PRESSURE FLOW RATE IN L/SEC REMARKS * Status of Inspection Yes N. Homing of lifts .Atrium fan Ventilation .Fire pump rooms .Operation of fire lift Mechanical .Generator / switch rooms .Pressurisation fan .Common corridor / staircases lighting .Car park smoke extract system fan .Smoke stop lobby Public addressing system * Status of Inspection Yes N. Smoke exhaust in-order No storage GENERATOR SET TESTED ON FULL LOAD SUPPLY TO THE FOLLOWING SYSTEMS SIMULTANEOUSLY Emergency .Wet riser transfer pump .Engineered smoke control system system fan .Hose reel pump Lift system .Illuminated exit / directional exit signs Fire pump .Sprinkler main pump . I Ii Iii Iv V Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 . * Status of Inspection Yes N.Wet riser main pump system .FSSD FC SGS STANDBY GENERATOR SET Name of Building: Location of Standby generator set(s): A I ii Iii B GENERATOR OPERATION Automatically changeover within 15 sec.A.Fire pump room fan .A.Sprinkler transfer pump . A. Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 .FSSD FC VCS VOICE COMMUNICATION SYSTEM Name of Building: A I Ii Iii Iv One-way Communication Operational test in order Standby battery provided Secondary power supply provided Over riding switch provided at Fire Command Center (FCC) B I Ii Iii Iv V Vi Vii Two-way communication Operation tested in order Standby battery provided Secondary power supply provided Provided at Strategic Location To label & colour in red 1.A.5m above the floor Operational test is indicated correctly at panel in FCC * Status of Inspection Yes N. * Status of Inspection Yes N. A. * Status of Inspection Yes N.76m above finished floor level Labelled “WET RISER INLET” and differentiated RISER Earthing provided Air release valve provided Not passing through unprotected area / fire rated LANDING VALVES 0.A. * Status of Inspection Yes N. * Status of Inspection Yes N.A.A. * Status of Inspection Yes N. . * Status of Inspection Yes N.76m to 1m above finished floor level Condition of hand wheel satisfactory Blank Cap provided Strapped and padlocked in closed position Labelled / Numbered Clear of Obstruction WATER TANK Overflow pipe provided Inflow pipe provided Compartmented TRANSFER PUMP Pump can be manually tested Auto changeover from normal to secondary power supply in order Auto changeover from duty to standby pump operation in order F I PUMP OPERATION CONTROL PANEL Pump numbering tallied with actual control panel indicator SCDF/FSSD/FC Dec 03 Nos. * Status of Inspection Yes N.A.FSSD FC WRS WET RISER SYSTEM Name of Building: WET RISER: Size: A I Ii Iii Iv V B I Ii Iii C I Ii Iii Iv V Vi D I Ii Iii E I Ii Iii BREECHING INLET Inlet housed in glass fronted protective enclosure Properly installed / secured Clear of Obstruction About 0.A. 5 bar to 5.Ii Iii Iv Clear from drain off test facilities Power to pump indicator light “on” Sheltered / weather proof FSSD FC (02 .A. * Status of Inspection Yes N. * Status of Inspection Yes N. FLOW RATE TEST ON WET RISER SYSTEM STACK NO STOREY TESTED STATIC PRESSURE FLOW RATE IN L/SEC PUMP(P)/ GRAVITY (G) FEED REMARKS Date of inspection and testing of system: SCDF/FSSD/FC Dec 03 .A.A.02) G i ii iii iv v H i ii I i PUMP Auto changeover from normal to secondary power supply in order Auto changeover from duty to standby pump operation in order All valves to pumps kept strapped and padlocked Top most landing valve fully opened (under pump gravity feed) and flow rate in order Discharge for the test drain pipe provided TESTING OF STATIC PRESSURE AND FLOW RATE Running pressure in between 3.5 bar Static pressure less than 8 bar PUMP ROOM VENTILATION Mechanical ventilation fan provided are in working order * Status of Inspection Yes N. * Status of Inspection Yes N. C i Spray-On Material No alterations and additions work to the spray-on material (unless approval is obtained) Check for any damages or tempering to the spray-on material ii Date of inspection and testing of system: ______________________________________ SCDF/FSSD/FC Dec 03 .FSSD FC PFP PASSIVE FIRE PROTECTION TO STRUCTURAL STEEL COLUMNS AND BEAMS Name of Building: A i ii iii iv v Intumescent Paint provided with signage Name of Supplier Fire resistance rating of the intumescent paint Date of painting Expected date of re-painting Caution notice: “Caution: No other paint/coating shall be applied to the Surfaces of the structural steel members protected by vi the intumescent paint system” No storage of highly flammable/combustible materials within the vicinity of Structural steel members protected by the intumescent paint B i ii Dry Board No alterations and additions work to the dry board (unless approval is obtained) Check for any damages or tempering to the dry board * Status of Inspection Yes N. * Status of Inspection Yes N.A.A.A.
Copyright © 2024 DOKUMEN.SITE Inc.