ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) CONTENIDO I CAPITULO INFORMACIÓN GENERAL.........................................1 1.1 NOMBRE DEL PROYECTO, LOCALIZACIÓN, CLASIFICACIÓN SECTORIAL, COMPONENTES DEL PROYECTO, FASE QUE POSTULA, UNIDAD PROMOTORA, EJECUTORA Y OPERADORA.............................................................................1 1.2 TIPO DE PROYECTO..............................................................................1 1.3 OBJETIVOS.........................................................................................2 OBJETIVO GENERAL:.................................................................................2 OBJETIVOS ESPECÍFICOS:.........................................................................2 1.4 JUSTIFICACIÓN.....................................................................................3 1.5 MARCO LÓGICO..................................................................................6 1.6 INSTITUCIONES INVOLUCRADAS...............................................................9 1.7 LOCALIZACIÓN....................................................................................9 1.8 DESCRIPCIÓN DEL ÁREA DEL PROYECTO..............................................12 ÁREA DE INFLUENCIA DIRECTA...................................................................15 II ESTUDIOS BÁSICOS............................................................17 II. 1 ESTUDIOS SOCIOECONÓMICOS.............................................................17 II.1.2 Aspectos Demográficos...........................................................17 II.1.2 Aspectos Socioeconómicos......................................................22 ASPECTO ORGANIZATIVO.......................................................26 II. 1.3 Aspectos Relacionados con la Fase de Operación del Proyecto .........................................................................................................27 II. 1.4 Disponibilidad de Materiales de Construcción y Mano de Obra Locales.............................................................................................28 III. ESTUDIOS TÉCNICOS.........................................................29 III. 1. EVALUACIÓN DE LOS SISTEMAS DE AGUA POTABLE Y/O ALCANTARILLADO SANITARIO EXISTENTES..............................................................................29 III. 2. EVALUACIÓN DE LAS FUENTES DE AGUA...............................................29 III. 3. CALIDAD DE LAS AGUAS...................................................................30 III. 4. RECONOCIMIENTO GEOLÓGICO Y ESTUDIOS DE SUELOS Y GEOTÉCNICOS...30 III. 5. TRABAJOS TOPOGRÁFICOS.................................................................30 III. 6. ESTUDIOS AMBIENTALES...................................................................30 IV. DESCRIPCIÓN DE ALTERNATIVAS........................................32 IV. 1. RESULTADO DE LA EVALUACIÓN DE ALTERNATIVAS..................................32 IV. 2. ASPECTOS LEGALES.........................................................................34 V. INGENIERIA DEL PROYECTO................................................37 V. 1. MEMORIA DESCRIPTIVA................................................................37 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS TARIJA” 1 ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) v. 1.1 Parámetros Básicos de Diseño...............................................37 V. 1.2 Cálculo Hidráulico...................................................................44 V. 1.3 Cálculo Estructural.................................................................49 VI. GESTION DE LOS SERVICIOS..............................................61 VI. VI. VI. VI. 1. ORGANIZACIÓN DE LA EPSA.............................................................61 2. DIAGNÓSTICO INSTITUCIONAL Y RECOMENDACIONES...............................63 3. COSTOS DE ADMINISTRACIÓN............................................................64 4. COSTOS DE OPERACIÓN, MANTENIMIENTO Y REPOSICIÓN........................65 Costos de Inversión, Costos de Operación y Mantenimiento.........66 VI. 5. ANÁLISIS TARIFARIO.........................................................................66 VII. DESARROLLO COMUNITARIO.............................................67 VIII. PRESUPUESTO DEL PROYECTO.........................................71 VIII. 1. PRESUPUESTO GENERAL.................................................................71 IX. EVALUACIÓN DEL PROYECTO.............................................74 IX. 1. EVALUACIÓN FINANCIERA PRIVADA DEL PROYECTO.................................74 IX. 1. EVALUACIÓN SOCIOECONÓMICA..........................................................79 IX. 3. ANÁLISIS DE SENSIBILIDAD................................................................85 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS TARIJA” 2 ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) ESTUDIO INTEGRAL TÉCNICO - ECONÓMICO - SOCIAL Y AMBIENTAL TESA: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS - TARIJA” I CAPITULO INFORMACIÓN GENERAL 1.1 Nombre del Proyecto, Localización, Clasificación sectorial, Componentes del Proyecto, Fase que postula, Unidad Promotora, ejecutora y operadora Nombre del Proyecto: “Construcción del Sistema de Agua Potable Urbanización las Barrancas Tarija” 1.2 Tipo de Proyecto Clasificación Sectorial: Sector: Saneamiento Básico Subsector: Agua Potable Tipo de Proyecto: Social Componentes del Proyecto: CUADRO 1 N° Componentes 1 Infraestructura 2 Supervisión Fase que Postula: Inversión – Ejecución 1.3 Objetivos PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS TARIJA” 1 ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Objetivo general: “Mejorar las condiciones de vida, bienestar y salud de los vecinos de la Urbanización Las Barrancas de la ciudad de Tarija, mediante la Construcción de un Sistema de Agua Potable, para satisfacer las demandas del servicio de agua, de manera eficiente y contínua, conforme los requerimientos de las Normativas y Reglamentos Bolivianos Vigentes del Sector” Objetivos Específicos: Preservar la salud de los habitantes de la Urbanización Las Barrancas. Brindar un servicio adecuado de dotación de agua potable, con una presión y servicio constante de agua potable. Mejorar las condiciones y calidad de vida de los vecinos de la Urbanización Las Barrancas. Dotar de la infraestructura básica de agua potable que permita satisfacer la demanda de los pobladores. Metas: Construir un sistema de agua potable con infraestructura óptima y adecuada. Cubrir con la cobertura del 100% en la dotación de agua potable de la población de la zona. Implementar 445 conexiones domiciliarias de las viviendas hasta la matriz principal de agua potable, incluyendo micromedidores. Implementar macromedición a la salida del Tanque de Agua Potable, para controlar el caudal y la distribución del líquido elemento en forma eficiente. Construir el sistema de agua potable en 295 días calendario. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS TARIJA” 2 la demanda de agua se está incrementando exponencialmente. Es en este sentido la demanda de agua se está incrementando exponencialmente. En la actualidad los vecinos están en la necesidad de coordinar y gestionar proyectos de gran necesidad para sus barrios. así mismo coadyuvan al desarrollo de la ciudad de Tarija. La necesidad existente en la población en general de la ciudad de Tarija es la dotación de los servicios básicos. para generar el bienestar de sus habitantes. es por eso que el uso de un sistema de distribución de agua potable. En el caso específico de la directiva de la urbanización Las Barrancas. Justificación: PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS TARIJA” 3 . es por eso que el uso de un sistema de distribución de agua potable. solo se cuenta con tanques plásticos para almacenar agua. que desarrolla diferentes actividades en favor de su barrio. debido a que en la zona no existen redes de distribución de agua. es imprescindible para los vecinos. es imprescindible para el desarrollo de las zonas que se encuentran ubicadas en áreas periurbanas. La necesidad existente entre los vecinos en general de “La Urbanización La Barrancas” es la dotación de los servicios básicos. para que posteriormente los vecinos recojan el agua en función a sus necesidades.ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 1. principalmente para tener una buena calidad de vida. El principal problema identificado en el proyecto es el deficiente estado del servicio de agua potable.4 Justificación Problemas: El agua es un recurso limitado y con el fuerte crecimiento de la población y de la economía regional. pero estos proyectos deben tener un alto grado de participación. comunitaria y el fortalecimiento de programas educativos en temas de higiene y comportamiento al cuidado del medio ambiente. puesto que su diseño y sus cálculos para la elaboración del presupuesto se tomaran en cuenta el costo mínimo social. Los riesgos de transmisión de enfermedades relacionadas con el agua y saneamiento hacen necesario desarrollar programas de apoyo a la educación sanitaria. La eliminación de los riesgos de salud ambientales requiere programas más comprensivos y participativos que ayuden a las personas a encontrar soluciones accesibles y apropiadas a todo el complejo de riesgos de transmisión de enfermedades en su medio ambiente. lo cual hace que el proyecto sea financiado y así mismo se PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS TARIJA” 4 . La importancia de una buena red de distribución de agua potable para reducir la incidencia de enfermedades es difícil de ser alcanzada debido a la baja prioridad que se le da a los servicios básicos en el ámbito de las poblaciones periurbanas. debido a la falta de una educación sanitaria. No tiene sentido medir los impactos de salud cuando son eliminados apenas uno o dos de una serie de riesgos de transmisión de enfermedades relacionadas a la falta de la dotación de agua potable. La introducción de sistemas de agua potable y una educación ambiental con concienciación puede dar cobertura a cambiar las condiciones y prácticas de higiene local actual. Las razones económicas que justifican el proyecto es por un lado que no incurrirá en grandes costos.ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) El éxito de un proyecto depende de la manera cómo es tratada la pobreza y la falta de sensibilidad. ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) tomaran los parámetros establecidos por el SNIP tales como aquellos que se refieren a la inversión por familia o habitante. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS TARIJA” 5 . deben estar entre los rangos determinados. para la operación y mantenimiento y de esta manera el proyecto será sostenible durante su vida útil. La implementación del DESCOM se garantiza la sostenibilidad del Proyecto a largo plazo. Es decir que la inversión por habitante o familia no debe superar los parámetros o indicadores establecidos. lo que le permite a la población beneficiaria con el proyecto pagar una tarifa al menos mínima por el servicio. Visitas a la zona de estudio. bienestar y salud de los vecinos de Las Barrancas. Se cumplen los objetivos el proyecto. Cobertura del servicio del 100%. SUPUESTOS IMPORTANTES La Urbanización tiene el servicio de agua potable adecuado. Cobertura actual servicio del 0%. del MEDIOS Y/O FUENTES DE VERIFICACIÓN Informes mensuales de la entidad ejecutora.TARIJA” 6 . con una dotación constante de agua potable. Informes de la comunidad. Mejorar las condiciones y calidad de vida de los vecinos de las Barrancas.ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 1. OBJETIVOS ESPECÍFICOS: Preservar la salud de los habitantes de la población de La Barrancas Brindar un servicio adecuado del servicio básico primordial.5 Marco Lógico OBJETIVOS OBJETIVO GENERAL: Mejorar las condiciones de vida. El sistema de agua potable es dotación continua. INDICADORES VERIFICABLES SIN PROYECTO CON PROYECTO 445 familias no cuentan con el servicio de agua potable continuo. Visitas a la zona de estudio. Entrevistas a los hogares. etc. participativo). Entrevistas en los hogares. Los beneficiarios mantienen en condiciones óptimas el sistema. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Se construirá el sistema de agua potable. La población participa activamente. (transversalidad de género. Varias conexiones no cuentan con un adecuado sistema de agua potable. Se dotara con el servicio a 445 familias y a 1 infraestructura. Informes de la Directiva. Informes de la entidad ejecutora. Dotar de la infraestructura básica de agua potable que permita satisfacer la demanda de los pobladores. Capacitación en DESCOM aplicada en su integralidad. mediante la Construcción de un sistema de agua potable. Los beneficiarios cumplen con las tarifas para el mantenimiento. eficiente. Se presentan amenazas a la salud de la población. Informes de seguimiento. preventivo. mantenimiento del sistema (Infraestructura). capacitación en operación.ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) METAS/RESULTADOS ESPERADOS: Dotar de un sistema de agua potable con infraestructura óptima y adecuada. Entrega oficial de la obra. Construir el sistema de agua potable en 295 días calendario. Entrega oficial de la obra. La empresa que realiza la del Informes de construcción sistema de agua seguimiento. Durante el mantenimiento. Se tienen conexiones domiciliarias en óptimas condiciones de funcionamiento. ACTIVIDADES DEL PROYECTO Durante la construcción del sistema. Durante la operación. Red de Distribución de agua potable. La empresa constructora cumple con el diseño del sistema y las especificaciones. La construcción del sistema cumple de acuerdo a las especificaciones técnicas. potable cumple con supervisión y el cronograma visitas de propuesto en el campo. El sistema de agua potable cumple con los objetivos previstos. Los beneficiarios realizan el mantenimiento de las obras. rutinario y de emergencia del sistema. proyecto. En la Urbanización actualmente existe sistema inadecuado que no cumple con las demandas de la población. se prevé las siguientes actividades: Trabajos Previos. Conexiones Domiciliarias y Cámaras de válvulas. limpieza. Se tiene un sistema adecuado con dotación continua de agua potable. Cubrir con la cobertura del 100% de la población de la zona Implementar 445 conexiones domiciliarias de las viviendas hasta la matriz principal de agua potable.TARIJA” 7 . El cronograma de ejecución no sufre alguna alteración. supervisión y visitas de campo. Se tiene un sistema de agua potable y adecuado en óptimas condiciones. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . TARIJA” 8 .18 123148.24 . PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .059 COSTO TOTAL 2586109.ESTUDIO INTEGRAL TECNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) COMPONENTES Y PRESUPUESTO DEL PROYECTO: COMPONENTES: MONTO Bs CONSTRUCCION DE OBRAS SUPERVISION 2462961. Mapa N01: Localización del Proyecto a Nivel Departamental PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 1.6 Instituciones Involucradas Entidad Promotora. ejecutora y operadora: • Entidad Promotora Gestión Social Vecinos Las Barrancas • Entidad Ejecutora Unidad de Proyectos Especiales UPRE • Entidad Operadora COSAALT Ltda.TARIJA” 9 . 1.7 Localización Localización: El Proyecto: “Construcción del Sistema de Agua Potable Urbanización Las Barrancas” se encuentra ubicado al norte de la ciudad Tarija de la Provincia Cercado del Departamento de Tarija. TARIJA” 10 .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Mapa N02: Localización del Proyecto a Nivel Provincial Mapa N03: Localización del Proyecto a Nivel Municipal Ubicación Geográfica del Proyecto PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . 5 7621390.528 1935.19 8 25 319696.945 1921.21 9 49 319366.269 1922.25 5 49 319413.888 1921.6 7620879.75 7 69 319708.00 3 50 319236.999 1933. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .7 7621200.183 1924.333 1918.83 6 72 319417.00 2 64 318752.7 7621485.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Nro.3 7621106.TARIJA” 11 .348 1918.6 7621114.4 7621646.8 Descripción del Área del Proyecto La ciudad de Tarija se encuentra ubicada en la Provincia Cercado que constituye el Municipio de Cercado y la Ciudad de Tarija.28 PUNT 83 1.430 1925. UTM X UTM Y ALTITUD Z O 1 312785.02 4 93 319174.3 7620813.0 7621246. El departamento de Tarija se ve influenciado por cordilleras con pequeñas elevaciones. y del Plan de Desarrollo Municipal de la Ciudad de Tarija y la Provincia Cercado (PDM 2010 . Debido a que hasta la fecha todavía no se cuenta con los datos del censo 2012 respecto a la población desagregada por barrios de la ciudad de Tarija. Tiene una extensión de 37.957 m. al sur con la República de Argentina al este con la República de Paraguay y el oeste con Chuquisaca y Potosí. La capital del departamento es la ciudad de Tarija (1. O’Connor y Gran Chaco).m) situada entre los 21° 32' 12" de latitud sur y los 64° 47' 12" de longitud oeste del meridiano de Greenwich con una población de 135. limita al norte con el departamento de Chuquisaca. sur. por lo tanto la mancha urbana va en un progresivo crecimiento y ensanchamiento. éste estudio combina la información del censo 2012 con la información del Diagnóstico Urbano y Rural del Municipio de Cercado de Tarija 2006. y una población de 391. su crecimiento y expansión es inminente y sorprendente por los distintos cuatro puntos cardinales tanto por el norte. terrenos agrícolas y áreas erosionados.226 habitantes (censo 2001).s. rebasado los límites de la planificación urbana que existía hace unos años atrás. Departamento de Tarija: Geográficamente el departamento de Tarija está localizado al sur del Estado Plurinacional de Bolivia. paulatinamente se están incorporando al territorio urbano áreas de comunidades rurales vecinas. quebradas.783 habitantes (censo 2001). Avilés. rebasando ríos. Arce. comprende una extensa mancha urbana. cuenta con 6 provincias (Cercado.TARIJA” 12 . Méndez.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Se puede observar que el espacio territorial de la ciudad de Tarija.2014).n. este y oeste. es decir.623 km2. 11 municipios y 157 cantones. La totalidad de sus ríos son afluentes de la PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) cuenca del Plata siendo los más importantes el Río Guadalquivir y el Río Bermejo. Aguas Blancas-Pocitos-Yacuiba. Encontramos también uno de los recursos piscícolas más importantes del país. asimismo. ha rebasado el primer y único Plan Regulador del área urbana y todas las previsiones con respecto a su crecimiento. restos de animales prehistóricos con importantísimos datos paleontológicos y. en el que se conjuga la poesía. conectada mediante la red troncal de la carretera en su mayor parte asfaltada hacia el sector norte del país (Potosí.TARIJA” 13 . por el este sector también existe la posibilidad de conexión con dos ciudades importantes de la región del Chaco Tarijeño como Yacuiba y Villamontes. por su la naturaleza en con fértiles valles. La Paz). por el otro. pertenecientes a la cuenca del río de La Plata. mientras que por el sur mediante la carretera asfaltada a la ciudad de Bermejo que permite al país establecer la conexión con la República Argentina. extensas llanuras y ríos de aguas cristalinas. ya sea por la ruta Bermejo-San Antonio o por el sector de la Argentina. hospitalidad y alegría de su gente. canto y danza. tierras fértiles de viñedos abundantes y producción de ricos y finos vinos. por un lado. se encuentra situada en la parte central del departamento. incorporando al territorio áreas dispersas como son las PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . como son los caudalosos ríos Pilcomayo y el Bermejo. Ciudad de Tarija: La ciudad capital del departamento de Tarija. que va creciendo por ambos márgenes del Río Guadalquivir al interior de la Provincia Cercado. El departamento conocido como la Andalucía de Bolivia. agradable y benigno. caracterizado por la amabilidad. El espacio territorial del municipio de la ciudad de Tarija y la provincia Cercado compuesto por una extensa mancha urbana. Se pueden encontrar en Tarija. con un clima variado dominando en los valles el templado. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) comunidades rurales aledañas. está alcanzando dimensiones inesperadas. la misma que partiendo de las orillas del Guadalquivir. Ubicación Política de Tarija U PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Esta conectividad ha permitido que otros asentamientos rurales menores ubicados en el trayecto entre Tarija y estas comunidades. terrenos agrícolas. etc. se estuviesen concentrando y agrandando debido al impacto y otros efectos que les estuviese generando el proceso de la urbanización de los terrenos rurales. La estructura urbana de la ciudad de Tarija traducida en una gran mancha urbana. ha expandido sus brazos hacia los cuatro puntos cardinales. consolidando la expansión de esta manera y poco a poco la mencionada conurbación. suelos erosionados. quebradas. rebasando ríos.TARIJA” 14 . ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Ubicación Geográfica del Proyecto Área de Influencia Directa PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .TARIJA” 15 . ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Municipio de la Ciudad de Tarija PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .TARIJA” 16 . ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) II ESTUDIOS BÁSICOS II.2 Aspectos Demográficos Según los registros del Censo Nacional de Población. cuyo detalle se indica en el siguiente cuadro: Ciudad de Tarija: Número de Distritos y Barrios 2007 Nº de Nº Distrito de Barrios Barrio Població Nº de n Famili PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .1. 1 Estudios Socioeconómicos II. que conforman 13 distritos.TARIJA” 17 . en la Ciudad de Tarija existen 87 barrios. Fuente: FEDJUVE lista de barrios y Distritos de la Ciudad de Tarija Población Beneficiaria (Directa e Indirecta) Según el Censo Nacional INE y otros estudios. consta de 11 barrios de las cuales los barrios beneficiados por el proyecto son 4 pertenecientes a este distrito.298 18. IV Centenario. Població n Total PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . ubicados en la Zona las Barrancas. Zona las Barrancas: Población Beneficiaria Beneficiarios Nº de Flias.432 3686 Oscar Zamora. María de Los Ángeles.886 habitantes.432 habitantes. Las Pascuas.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) as 13 87 Barrios de la Ciudad de Tarija Defensores del Chaco.489 34. 101 familias . 171. lo que significa que 462 familias se beneficiarían con este proyecto. 20 de enero. 3 de mayo. 19 de marzo. Según datos de boletas levantadas en el mes octubre 2014. 4 de Julio. 15 de junio.TARIJA” 18 . Los Chapacos. 12 de 7 13 octubre. la población del distrito 7 tiene 18. la zona de las Barrancas tiene una población de 2. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Indirectos Directos Distrito 7 Zona las Barrancas 3.686 18. podemos decir que cada familia está constituida entre 5 a 6 miembros. Municipio de Cercado. estas cifras se incrementaran cuando el área del proyecto esté completamente poblada.564 2. Población Área de Influencia Área de Influencia 7 de Octubre 15 de Junio II Tarija la Nueva Chapacos II Total Nº de Població Nº de Vivienda n Familias s 356 383 583 1. se tomara en cuenta el número de viviendas existentes actualmente (445).TARIJA” 19 . y un promedio familiar de 462.432 462 2.886 habitantes.886 Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia El proyecto “Construcción Sistema de Agua Potable Urbanización las Barrancas”. que cuenta con una población de 2.886 78 99 92 193 462 78 83 92 192 445 Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Tamaño Promedio de las Familias Beneficiadas Los barrios a ser beneficiados con el proyecto se encuentran ubicadas en la Zona las Barrancas del distrito 7. Población Beneficiaria: Tamaño Familiar PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . para fines de proyecciones el tamaño familiar será 5 miembros por familia. tiene previsto beneficiar de manera directa a 462 familias lo que corresponde a 445 viviendas existentes actualmente. Para cálculos técnicos y económicos del proyecto. 00 Tarija la Nueva 279.72 Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia En relación a la población por sexo de cada barrio del área de estudio es la siguiente.93 44% 1.10 5.284.00 Chapacos II Total Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Así mismo. donde existe mayor porcentaje de mujeres representado porcentualmente en un 64%.564. Población por Sexo del Área de Estudio Barrios Beneficiados Població n Población por sexo Hombres % Mujeres % Total 7 de Octubre 136.56 3.601. y el restante 44% son hombres.07 56% 2.87 6.84 48% 303.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Barrios Beneficiados 7 de Octubre 15 de Junio II Tarija la Nueva Chapacos II Total Nº de Flias Tamaño Població Promedi n Total o 78 356 99 383 92 583 193 1.92 38% 219.00 15 de Junio 180.99 53% 383.34 8.00 688. done se aprecia una población PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .00 1.16 52% 583. se tiene la distribución piramidal de la población de las familias beneficiadas por edades y sexo.16 44% 875.564 462 2.886 TAMAÑO FAMILIAR (PROMEDIO) 4.01 47% 202.08 62% 356.84 56% 1.886.TARIJA” 20 . Para el presente diagnóstico se ha optado para la estimación de la población el método de los componentes. Distribución piramidal de la población por edades y sexo 60-+ 56-60 51-55 46-50 41-45 36-40 31-35 Grupos de Edad 26-30 21-25 16-20 11-15 6-10 0-5 0.05 0. es decir se puede mencionar que es una población joven. teniendo muy poca población senil (50-60 años).ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) de 44% varones y el 56% mujeres. de los cuales en mayor porcentaje de la población está entre los 11 y 20 años.TARIJA” 21 .10 Porcentajes Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Tasa de crecimiento Según datos del CNPV el año 2001.77%. lo cual hace ver una población bastante activa. Crecimiento poblacional Área urbana Crecimient PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .10 Mujeres 0.43 % anual. seguido de 21 y 30 años.00 0. los mismos que prevén que la población de la ciudad Capital Tarija creció en mayor medida. se pudo establecer que el Departamento de Tarija tiene un crecimiento poblacional de 3. debido a que se están registrando cambios en los diferentes indicadores demográficos. con un índice de crecimiento urbano de 4.05 0. Cabe hacer notar que en un mayor porcentaje de la población femenina mayor de PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . de la cual para el año 2034 se tendrá una población de 2995 habitantes. 1.5 % 20 años Cálculos que servirán para los estudios técnicos y económicos del proyecto.58%. II. y el resto de población se distribuye en variadas actividades con menor incidencia en un porcentaje inferior al 15 %.69 %. comprende principalmente trabajadores de la construcción o albañilería en un 37 %. técnicos y profesionales de apoyo en un 25.1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) o Crecimiento Poblacional Índice Crecimiento Urbano 3.43% Fuente: INE CNPV Con relación a cálculos de la proyección de la población para el proyecto se utilizará los siguientes datos: Po= Población inicial i= Índice Crecimiento Urbano (Adoptado) t= Años de vida útil del proyecto 2.TARIJA” 22 .225 Hab. trabajadores de servicio y vendedores del comercio en un 20.2 Aspectos Socioeconómicos Aspectos Económicos En la ciudad de Tarija.77% 4. la población ocupada (mayor de 10 años) según actividad ocupacional. 21% Tecnico. Ocupación Principal del Jefe de Familia Albañil.TARIJA” 23 . son amas de casa y la población de 25años atrás son estudiantes. En la que indica que las familias beneficiadas con el proyecto no cuentan con este servicio.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 20 años. Cobertura de Agua Potable PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Por lo tanto no existe una cobertura total porque ninguna vivienda cuenta con este servicio. 2% Empleado privado. 5% Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Aspectos Sociales (Servicios Básicos) Agua Potable El cuadro abajo muestra la disponibilidad de agua potable en la vivienda. 5% Empleado publico. estos se proveen de agua potable de piletas públicas existentes en cada barrio. 37% Chofer. 14% Trabajadora del hogar. 7% Comerciante. 5% Obrero. 4% Artesano. Lo que significa que las familias hacen colas largas para aprovisionarse de este servicio.TARIJA” 24 .P. por lo que mencionan que están dispuestos a pagar por el servicio de 10 a 35 Bs por mes.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Agua Potable Barrios Vivienda Viviend Beneficiado s Con as Sin s A. A. o en su caso según tarifas establecidas por COSAALT de acuerdo al consumo que realizará cada vivienda. según la información recogida mediante boletas. Las familias que acceden a las piletas públicas para proveerse de agua potable pagan 8 Bs/mes. Con el proyecto las familias tendrán cobertura total del servicio. La provisión de este servicio es de 6 a 8 horas al día. 7 de Octubre 0 78 15 de Junio 0 83 Tarija la Nueva 0 92 Chapacos II 0 192 Total 445 Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia En cuanto al Costo por el Servicio de Agua Potable. las familias de la zona se proveen de agua potable de 8 piletas públicas que están estratégicamente ubicadas y al alcance de las familias. Costo por Mes del Servicio Agua Potable Comunida d 7 de Octubre 15 de Junio Tarija la Nueva Tipo de Red 1 Pileta publica 2 Pileta publica 2 Pileta publica Costo por consumo (Bs/Mes) Sin Con proyecto proyecto 8 15 a 30 3-5 10 a 20 8-12 10 a 35 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .P. que en su mayoría es a partir de las 4 a 8 de la mañana. las viviendas no disponen de alcantarillado sanitario.TARIJA” 25 . Energía Eléctrica Barrios Beneficiado s 7 de Octubre 15 de Junio Tenencia en Porcentaje Si Tiene No Tiene 99% 1% 100% 0% PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Chapacos II 3 Pileta publica Promedio 8 15 a 20 8.30 Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Saneamiento Básico .80 23. las viviendas que no tienen acceso a este servicio tienen como sistema de drenaje los pozos ciegos que de una u otra forma se constituyen en focos de infección de enfermedades diarreicas agudas.Alcantarillado Sanitario En cuanto a la disponibilidad de baños. a acepción de una de octubre no dispone de este servicio. existe cobertura total de energía eléctrica. para los niños/as. Alcantarillado Sanitario Tenencia Pozo ciego Alcantarillado No Tiene TOTAL Porcentaje 98% 0% 2% 100% Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Servicio de Energía Eléctrica En cuanto a la disponibilidad de luz eléctrica en los diferentes domicilios de las familias beneficiarias directos. Barrio Chapacos II existen 78 viviendas del Tipo I y II Tipo de Vivienda Barrios Nº de Beneficiado viviend Tipo de Viviendas PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Tarija la Nueva 100% 0% Chapacos II 100% 0% Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Residuos Sólidos La disposición de los residuos sólidos que realiza la población. Tipo II: La pared es de adobe. Tipo III: La pared es de palo apique o piedra. Vivienda Para entender mejor la composición del tipo de viviendas se ha realizado la clasificación de las viviendas en tres tipos: Tipo I: La pared es de ladrillo. existen 78 viviendas del Tipo I y II. el piso de mosaico y el techo de teja o chapa. existen 445 viviendas en la zona. Barrio 15 de Junio hay 83 viviendas del Tipo I y II Barrio Tarija la Nueva existen 78 viviendas del Tipo I y II. el piso de tierra y el techo de tierra Con la clasificación mencionada. el piso de cemento y el techo de teja o chapa.TARIJA” 26 . es quemarlo y la mayor parte de ellos lo botan a campo abierto sin ningún tratamiento a arroyos y terrenos vecinos. se tiene los siguientes resultados. de tipo I y II. Se desarrolla a detalle la cantidad de viviendas que existe por barrio: Barrio 7 de Octubre. viviendas del Tipo III no existen. TARIJA” 27 .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) s as 7 de Octubre 78 15 de Junio 83 Tarija la Nueva 92 Chapacos II 192 Total 445 Tipo I Tipo II 86% 91% 90% 92% 14% 9% 10% 8% Fuente: Boletas Socioeconómicas 2014 Elaboración: Propia Aspecto Organizativo Los barrios beneficiarios por el proyecto están organizados de una Mesa Directiva. se incrementa el costo de los terrenos ubicados en la zona de PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . 1. La Mesa Directiva consta de la siguiente estructura: Presidente Vicepresidente Secretario General Secretaría de Hacienda Secretaría de Actas Secretaría Organización Secretaría Deportes Vocales II.3 Aspectos Relacionados con la Fase de Operación del Proyecto El estudio de sostenibilidad de un proyecto es el resultado del análisis desarrollado en función a los ingresos y costos corrientes del proyecto. La sostenibilidad se identifica cuando los ingresos corrientes cubren por lo menos los costos de operación y mantenimiento. quienes velan y gestiona proyectos para satisfacer las necesidades colectivas del barrio. En el presente caso los beneficios que se obtendrían con el proyecto serian. además de que cuentan con una Gerencia Administrativa y Financiera quien se encarga atender los tramites de administrativos a solicitud de los usuarios.TARIJA” 28 . En este caso los beneficiarios del proyecto estarán incorporados en la base de datos de acuerdo a la normativa vigente quienes recibirán mes a mes su proforma de consumo de acuerdo a su categoría inscrita. asimismo la calidad de vida de los vecinos mejora considerablemente. el ente operador será COSAALT.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) influencia del Proyecto. estas obras pasaran a ser operadas por COSAALT. quien a través de la parte técnica serán los responsables de hacer un seguimiento a la dotación del servicio y mantenimiento preventivo del proyecto. donde se contempla una estructura funcional que garantice la sostenibilidad del proyecto. Por la característica del proyecto que implica. Dicha institución cuenta con personal calificado y de experiencia en el manejo administrativo y financiero de operación de los servicios. Una vez realizada las inversiones del proyecto. La operación del proyecto está definida por la prestación del servicio de manera eficiente y permanente. Los cobros son mensuales. que se encuentran establecidos en el contrato de prestación de servicio que firman la empresa con los beneficiarios y es de cumplimiento obligatorio. La tarifa está establecida por la parte de la gerencia técnica y aprobado mediante Resolución Administrativa de la institución. la misma es una institución legalmente reconocida y creada en el marco de los instrumentos legales. Es necesario mencionar que las instituciones prestadoras de servicios básicos es una institución establecida y reconocida para operar con la dotación de agua potable y alcantarillado. sin riesgos para la salud. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . III. Con lo que respecta a la Mano de Obra. En cuanto al mantenimiento del proyecto. ESTUDIOS TÉCNICOS III. En la actualidad existen piletas públicas que abastecen del líquido elemento a los vecinos de la zona de las Barrancas. se encuentran a disposición y al alcance dentro del Mercado Comercial de la ciudad de Tarija. asimismo tampoco presente redes de alcantarillado sanitario. se cuenta con mano de obra calificada para realizar las actividades programadas en el tiempo establecido. 1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) El incumplimiento de cualquiera de las cláusulas establecidas en el contrato. es decir que los cortes y/o imperfectos que ocurran en alguno de los servicios y sean ocasionados fuera de las viviendas privadas estas serán atendidas por el personal técnico – operativo de la institución así como el mantenimiento de las redes matrices de los servicios básicos será realizado por COSAALT que consiste en la realización de un mantenimiento preventivo y correctivo. II. mismas que solo abastecen en determinadas horas. Evaluación de los Sistemas de Agua Potable y/o Alcantarillado Sanitario Existentes Como se mencionó anteriormente en la zona de influencia del Proyecto no se cuenta con ningún sistema de distribución de agua potable.4 Disponibilidad de Materiales de Construcción y Mano de Obra Locales Los Materiales de Construcción para el presente Proyecto.TARIJA” 29 . será definido de acuerdo al área de acción. y sin brindar un servicio continuo ni eficiente. 1. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . por lo que el beneficiario deberá cumplir con las cláusulas establecidas en el contrato de prestación del servicio. será sujeto de cortes y/o en su caso de corte definitivo del servicio. es un pozo que presenta un caudal disponible de 3.TARIJA” 30 . Calidad de las Aguas En función al análisis de calidad de agua realizado de acuerdo a los parámetros básicos exigidos por la NB 512 . y poder distribuir agua potable a los vecinos de la zona de las Barrancas. 2. Reconocimiento Geológico y Estudios de Suelos y Geotécnicos Ver ANEXOS del Presente Documento.89 l/s (según estudio técnico realizado por COFADENA Ver ANEXOS del Presente Documento). para llegar a la dosis mínima exigida de 0. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . 4. se necesita colocar un dosificador de cloro.2 mg/l y cumplir con lo especificado en la Normativa Vigente. III. en lo que respecta a requisitos de calidad de agua. III.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) III. Evaluación de las Fuentes de Agua La fuente disponible para abastecer la demanda de agua para los vecinos del lugar. 3. Una Evaluación de Impacto Ambiental suele comprender una serie de pasos: 1) Un examen previo. es decir. III. 4) El estudio en sí. consistente en meticulosas investigaciones para predecir y/o evaluar el impacto y la propuesta de medidas preventivas. 5. denominado Identificación de Impactos Ambientales (IIA). para enfocar con mayor precisión los Estudios de Evaluación de Impacto Ambiental (EEIA). 2) Un estudio preliminar. para decidir si un proyecto requiere un estudio de impacto y hasta qué nivel de detalle. garantizando equidad e imparcialidad en el procedimiento. ha tenido exitosa aplicación en Bolivia.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) III. para garantizar que la EIA se centre en cuestiones clave y determinar dónde es necesaria una información más detallada. 6. que sirve para identificar los impactos claves y su magnitud. la implantación de políticas y programas o la puesta en marcha de proyectos de desarrollo. la legislación Ambiental Boliviana considera un paso previo a la EEIA de los proyectos públicos y privados. Bajo este principio. una estructura de cuatro categorías para clasificar a los diversos proyectos.TARIJA” 31 . protectoras y correctoras necesarias para eliminar o disminuir los efectos de la actividad obra o proyecto a implementarse. significado e importancia. se ha diseñado un sistema que está contenido en la reglamentación de la Ley Nº 1333 de Medio Ambiente y que desde 1996 al presente. Estudios Ambientales En un proceso de gestión ambiental es importante que todos los proyectos de inversión puedan ser categorizados bajo las mismas condiciones. 3) Una determinación de su alcance. primero se registra al proyecto en la base de datos del Sistema Nacional de Evaluación de Impacto Ambiental (SNEIA) a través de la denominada Ficha Ambiental (FA) que es llenada por el promotor del proyecto con la ayuda de un programa computacional desarrollado PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . han establecido hace varios años atrás. La Evaluación de Impacto Ambiental (EIA). mediante el cual. es un proceso formal empleado para predecir las consecuencias ambientales de una propuesta o decisión legislativa. las principales entidades financieras internacionales como el Banco Interamericano de Desarrollo (BID) y el Banco Mundial (BM). Tomando en cuenta estos antecedentes. Trabajos Topográficos Ver ANEXOS del Presente Documento. Por otra parte. Categoría 4: No requieren de EEIA. La Ficha Ambiental del Proyecto se encuentra en presentada en las instancias correspondientes para la revisión y emisión de la categoría respectiva conforme lo estipule la Autoridad Ambiental Competente.TARIJA” 32 . DESCRIPCIÓN DE ALTERNATIVAS IV. La categorización de los proyectos está de acuerdo a las siguientes definiciones: Categoría 1: Requieren de Evaluación de Impacto Ambiental Analítica Integral. nivel que por el grado de incidencia de efectos en el ecosistema. utilizando la metodología denominada ETE. una vez presentada la FA a la Autoridad Ambiental. biológico. ésta establece la categoría del proyecto. Categoría 2: Requieren de Evaluación de Impacto Ambiental Analítica Específica. los proyectos. necesite sólo la adopción de medidas precisas para evitar. deberá incluir en sus estudios el análisis detallado y la evaluación conjunta de todos los factores del sistema ambiental: físico. nivel que por las características conocidas de los proyectos. Categoría 3: Requieren la preparación del Plan de Aplicación y Seguimiento Ambiental (PASA). obras o actividades. nivel que por el grado de incidencia de efectos en algunos de los factores ambientales del ecosistema. 1. IV.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) para el efecto y segundo. obras o actividades que no están considerados dentro de las tres categorías anteriores. considera en sus estudios el análisis detallado y la evaluación de uno o más de los factores señalados en la categoría I. Resultado de la Evaluación de Alternativas Como es un proyecto de bienestar social y por decisiones de los pobladores se hizo el levantamiento del eje del sistema de agua potable PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . socioeconómico. mitigar o compensar efectos adversos. 5 Hp.06 2.TARIJA” 33 . con la finalidad de controlar el caudal que ingresa a la red de distribución.462. PRESUPUESTO ALTERNATIVA 1 COMPONENTES CONSTRUCCION DE OBRAS SUPERVISIÓN COSTO TOTAL COSTO Bs.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) consensuando las alternativas más viables con el supervisor y los beneficiarios de modo tal que son las calles y/o zonas donde se dimensionará.5 l/s. El material de la tubería de la red de distribución de agua potable es de PVC Clase – 9 con diámetros de 1”. Alternativa 1: Esta alternativa consiste en dimensionar y construir un sistema de agua potable. en todo el tendido de la red se contempla la instalación de válvulas y accesorios de FG y PVC. el nuevo sistema de agua potable. El proyecto contempla la conexión de 445 instalaciones domiciliarias con la implementación de micromedidores con sus correspondientes cajas y accesorios. de modo que se pueda dar cobertura a todas las zonas que están proyectados como áreas urbanas. la fuente de abastecimiento proviene de un pozo existente con una rata de bombeo de 3. el mismo contempla el tendido de las redes de agua potable con un tanque de almacenamiento de 120 metros cúbicos de Hormigón Armado.586.961. 2”.18 123. Asimismo se pretende colocar un dosificador de cloro. A la salida de la tubería del Tanque de almacenamiento se dispone a colocación de un macromedidor.109. que tiene una bomba de 7.148.24 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . 2. para la desinfección del caudal antes de su distribución. 3”. como también cámaras para la colocación de válvulas. pero se pretende realizar el tendido de la red de distribución con tubería de material de FG. Aspectos Legales La Ley 1333 de Medio Ambiente. económica más conveniente es la alternativa 1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Alternativa 2: La alternativa número dos consiste en construir los mismos componentes presentados en la alternativa uno. La presente Ley tiene por objeto la protección y conservación del medio ambiente y los recursos naturales regulando las acciones del hombre con relación a la naturaleza y promoviendo el desarrollo sostenible con la finalidad de mejorar la calidad de vida de la población. Se considera que la construcción del sistema de alcantarillado sanitario produciría efectos mínimos para lo cual se la califica como categoría 3. se determina que la alternativa técnica.30 Factores analizados que determinan la elección de la Alternativa.842. Artículo 1.67 142. IV.Realizando una comparación de costos de cada una de las alternativas presentadas. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .984. 2”. PRESUPUESTO ALTERNATIVA 2 COMPONENTES CONSTRUCCION DE OBRAS SUPERVISIÓN COSTO TOTAL COSTO Bs.128.TARIJA” 34 . 3”. Con relación al dimensionamiento hidráulico de los diámetros técnicamente se mantienen de de 1”. 2.572.701. la cual rige los efectos que provocan la ejecución de los proyectos. 2.63 2. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Reglamento a ley del medio ambiente en materia de contaminación hídrica De la Autoridad Departamental Artículo 10. departamental, Para efectos el Prefecto del presente (Gobernador) Reglamento tendrá las y a nivel siguientes atribuciones y funciones: Ejecutar las acciones de prevención de la contaminación de los cuerpos de agua, saneamiento y control de la calidad de los recursos hídricos, así como las actividades técnicas ambientales en coordinación con los Organismos Sectoriales competentes y los Gobiernos Municipales. Establecer objetivos en materia de calidad de recurso hídrico. Identificar las principales fuentes de contaminación tales como las descargas de aguas residuales, los rellenos sanitarios activos e inactivos, las escorias y desmontes mineros, los escurrimientos de áreas agrícolas, de las áreas geográficas de intensa erosión de los suelos y las de inundación masiva. Que el Artículo 232 de la Constitución Política del Estado, establece que la Administración Pública se rige por los principios de legitimidad, legalidad, imparcialidad, publicidad, compromiso e interés social, ética, transparencia, igualdad, competencia, eficiencia, calidad, calidez, honestidad, responsabilidad y resultados. Que el inciso c) del Artículo 1 de la Ley N° 1178, de 20 de julio de 1990, de Administración y Control Gubernamentales, dispone que todo servidor público, sin distinción de jerarquía, asuma plena responsabilidad por sus actos rindiendo cuenta no sólo de los objetivos a que se destinaron los recursos públicos que le fueron confiados, sino también de la forma y resultado de su aplicación. Que el Artículo 21 del Decreto Supremo N° 0772, de 19 de enero de 2011, que reglamenta la aplicación de la Ley N° 062, de 28 de PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS - TARIJA” 35 ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) noviembre de 2010, del Presupuesto General del Estado – Gestión 2011, determina que los recursos que deriven de débito automático por incumplimiento de competencias y por afectación al Patrimonio Estatal, deberán ser transferidos a una libreta de la Cuenta Única del Tesoro – CUT, aperturada bajo la denominación de “Bolivia Cambia”. Que el Decreto Supremo N° 29091, de 4 de abril de 2007, crea la Unidad de Proyectos Especiales – UPRE dependiente del Ministro de la Presidencia, con la finalidad de apoyar funcionalmente en la parte técnica, logística y operativa a los proyectos especiales que el Presidente del Estado Plurinacional de Bolivia llevará a cabo durante su gestión. Que el Parágrafo III del Artículo 2 de la Ley Nº 3351 de 21 de febrero de 2006, de Organización del Poder Ejecutivo dispone que el Poder Ejecutivo establecerá por Decreto Supremo la estructura jerárquica interna de los Ministerios y entidades dependientes. Que el Artículo 4 de la Ley Nº 3351, establece las atribuciones del Ministerio de la Presidencia, entre las que se encuentran la de formular, ejecutar y coordinar políticas dirigidas a fortalecer la gestión y el desarrollo departamental y municipal, con las prefecturas, gobiernos municipales, naciones y comunidades originarias, con presencia equilibrada y equitativa de todas las culturas y comunidades lingüísticas, en la administración pública nacional. Que el Artículo 31 del Decreto Supremo Nº 28631 de 8 de marzo de 2006, Reglamento a la Ley de Organización del Poder Ejecutivo, establece las características de las instituciones públicas desconcentradas y su forma de constitución. Que el Plan Nacional de Desarrollo tiene entre sus objetivos el fortalecimiento en la gestión del desarrollo departamental y municipal, por lo que se requiere contar con una unidad desconcentrada bajo dependencia del Ministerio de la Presidencia. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS - TARIJA” 36 ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) La Unidad de Proyectos Especiales, responde al compromiso del Presidente Evo Morales de desarrollar en Bolivia la revolución democrática, productiva, comunitaria e intercultural en la perspectiva de construir un Estado social comunitario, descolonizado e incluyente. Ésta Unidad, promueve una nueva forma de gestión gubernamental de bienes públicos a favor de sectores sociales a partir de la reducción de trámites burocráticos y recuperación. Valores de honestidad, eficiencia, celeridad y transparencia en el manejo de los recursos para la ejecución de obras de infraestructura básica y de servicios, promoviendo a su vez el control social en las diferentes etapas del proceso. La Unidad de Proyectos Especiales se crea mediante Decreto Supremo N°29091 en fecha 4 de abril de 2007, como institución pública desconcentrada con independencia de gestión administrativa, financiera, legal y técnica, bajo dependencia del Ministro de la Presidencia. La Unidad tiene la finalidad de apoyar funcionalmente tanto la parte técnica, logística y operativa de los proyectos especiales que el Presidente del Estado Plurinacional de Bolivia llevará a cabo durante su gestión. “De la creación del proyecto, de los antecedentes, de la normativa Legal vigente se establece que es procedente y por demás justificada ejecución del proyecto, pero sobre todo es procedente y se encuentra legalmente establecido en el DS Nº 29091.” V. INGENIERIA DEL PROYECTO V. 1. MEMORIA DESCRIPTIVA v. 1.1 Parámetros Básicos de Diseño PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS - TARIJA” 37 ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) El proyecto básicamente consiste en la construcción de la red de agua potable, que consta de un tanque de almacenamiento de H° A° de 120 m3, cámaras de inspección de ubicación de válvulas y las respectivas conexiones domiciliarias. Con la implementación del sistema de alcantarillado, la Urbanización Las Barrancas, podrá contar con un sistema óptimo de distribución de agua potable, la misma reunirá las características físicas, químicas y organolépticas conforme la NB 512, con esto se beneficiara al 100% de la población del lugar. Por otra parte la implementación del proyecto permitirá superar los problemas de contaminación, que se dan por la falta de un adecuado sistema de agua potable. Con la implementación del proyecto las familias serán capacitadas en los usos del sistema de agua potable y las formas de operación, mantenimiento y administración del mismo. La inversión en el Proyecto es de 2’586109,24 Bs. (Dos Millones quinientos ochenta y seis mil ciento nueve 24/100 Bolivianos). Con la implementación del proyecto se beneficiaran 445 familias, las cuales podrán contar con un sistema en óptimas condiciones que les permita tener un servicio de agua potable adecuado y con una dotación de las 24 horas del día. A continuación se presenta todos los datos básicos sobre la producción y consumo de agua potable, la producción con las actuales y futuras redes de agua potable hasta el 2034. La dotación son datos proporcionados y asumidos por la NB – 689 zona (Valles). PROYECCION DE LA POBLACION TOTAL e= Po = i= Do= 2.718281828 2,225 (Población Inicial) 1.50% 100 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS - TARIJA” 38 225 2.51 121.585 2.5 1. 24 Norma 689) DESDE 2013 HASTA 2033 CRITERIO DE USO DE FORMULAS: HASTA 20 AÑOS (EXPONENCIAL) (2033).258 2.952 2.5 1.492 2.5 1.469 2.359 2.5 1.292 2.90 124.471 2.397 2.660 2.435 2.5 1.12 108.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) AÑO t (Años)= 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DOTACIO Poblacio ARITM GEOMET EXPONEN N n Coeficien ETICO RICO CIAL (lit/hab.00 3.726 2.506 2.397 2.997 2.866 2.829 2.292 2.782 2.759 2.433 2.362 2.00 3.5 1.00 3.433 2.00 3.909 2.5 1.5 1.04 106.398 2.959 3.525 2.893 2.00 104.823 2.664 2.325 2.258 2.692 2.5 1.293 2.00 3.62 114.997 1.00 3.d Definida te k1 ia) (Hab) 2.003 100.425 2.5 Coficien te k2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 PERIODO DE DISEÑO = 20 AÑOS (Pag.327 2.00 3.392 2.509 2.00 3.782 2.259 2.582 2.00 3.952 2.TARIJA” 39 Coefic nte d Variac n de Caud (k1*k 3.5 1.82 129.82 145.00 3.700 2.00 3.659 2.02 142.5 1.859 2.225 2.225 2.5 1.5 1.00 3.741 2.327 2.34 126.547 2.00 3.741 2.592 2.59 2.68 148.41 112.621 2.00 3.00 3.00 102.5 1.292 2.704 2.506 2.00 3.786 2.5 1.745 2.909 2.362 2.544 2.95 134.5 1.559 2.626 2.5 1.459 2.24 110.00 3.823 2.87 117.225 2.5 1.792 2.826 2.59 137.866 2.621 2.17 119.660 2.582 2.469 2.871 2. MAS DE 20 AÑOS (GEOMETRICO) CÁLCULO DE DOTACIONES Y CAUDALES Cálculo de Dotaciones: Nro familias 445 c/f 5 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .00 .363 2.915 2.00 3.5 1.36 131.544 2.00 3.624 2.28 140.00 3.258 2.700 2.5 1.327 2. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Poblacion Inicial: 2.74 (l/habdia) 90.00 Habitantes La dotación media diaria adoptada para el Proyecto es de 90 (l/hab-dia) Cálculo de la Dotacion Futura: Donde: Df= Dotación Futura en l/hab-d Do= Dotación inicial en l/hab-d Variación annual de la dotacion en d= porcentaje t= Número de años de estudio en años Df= 133.TARIJA” 40 .225.00 2 (%) años 20 (l/hab-dia) Cálculo de la Población Futura: PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . 225.TARIJA” 41 . 2.2 K1= 1.00 133.2 Qmd= Caudal medio diario l/s Qmax.d= 5. Variación annual de la dotacion en i= porcentaje t= Número de años de estudio en años Pf= 2997.d= Caudal máximo diario l/s Coeficiente de Caudal Máximo Diario (1.74 l/s Cálculo del caudal Máximo Diario: Donde: Qmax.5 (%) años 20 (hab) Cáculo del Caudal Medio Diario: Donde: Qmd= Caudal Medio Diario en l/s Pf= Población futura en hab.568 (l/habdia) l/s PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .00 Po= Población inicial en hab.5) 1.00 1.64 2997.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Donde: Pf= Población Futura hab. Df= Dotación futura en l/hab-d Qmd= 4. ) Pi= Poblacion del area de infuencia en el nudo "i" en hab.h= Caudal Máximo horario en l/s K2= Coeficiente de Caudal Máximo Horario (población) Qmax. V.8 l/s Método de Longitud Unitaria: Donde: Qi= Caudal en el nudo "i" (l/s) Qp= Caudal unitario poblacional (l/s .TARIJA” 42 .h= 10. Donde: Donde: Qt= Caudal máximo horario en l/s Pt= Poblacion Total del Proyecto en hab.d= Caudal Máximo diario en l/s Qmax.2 Cálculo Hidráulico PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .hab. 1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Cálculo del caudal Máximo Horario: Donde: Qmax.0224 1. 030 1937.250 33.780 1950.301 0.840 20.140 25.650 15.100 23.170 1918.490 1950.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) PRESION EN LOS NUDOS Nodos T 1 2 3 4 5 6 7 8 9 a 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Elevación [mts] 1938.250 1933.000 1923.050 28.070 30.242 0.510 20.710 14.910 1948.800 20.610 33.420 14.720 22.820 1929.340 1949.540 1949.800 30.090 1947.200 1913.180 26.670 1949.280 20.314 0.540 1949.800 16.960 28.880 1948.780 30.400 1948.070 16.500 25.290 1917.560 1948.260 1949.330 1937.000 0.000 14.281 0.030 1951.030 1949.840 1918.200 1913.690 24.169 0.130 1929.170 0.049 0.201 Piezométrica [mts] 1954.050 1920.163 0.830 1935.860 1935.220 20.500 1949.124 0.490 1917.570 1949.510 1948.341 0.440 1925.590 Presión [mts] 16.840 1934.261 0.470 32.200 1934.000 1950.320 1947.690 1929.000 13.310 25.170 1915.330 1949.600 34.500 1930.339 0.510 1923.520 Artefacto Tanque PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .130 1928.059 0.350 1949.270 22.330 1951.147 0.271 0.150 29.012 0.960 32.202 0.610 1926.610 1949.450 1947.270 1948.131 0.250 1949.268 0.130 1947.010 1946.203 0.970 1948.146 0.410 1912.TARIJA” 43 .540 1933.340 19.330 1921.279 0.530 1923.268 0.360 1914.301 0.010 1948.820 1948.128 0.600 1927.810 1946.401 0.820 1927.510 1919.650 1924.010 15.263 0.301 0.203 0.830 1947.023 0.012 0.070 Demanda [lts/seg] 0.170 0. 69 50.67 0.170 1918.380 1921.15 0.330 1917.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1916.95 7. [mts] [mm] 17.560 1921.35 1.16 2.380 1945.8 92.410 1944.38 0.82 50.82 50. Inici al T 1 2 3 5 9 a 10 6 7 8 1 1 16 15 32 N.440 1946.52 Hf x 1000 m 147.166 0.740 1945.68 0.91 11.190 34.12 1.150 1944.55 0.210 1945.56 0.06 0.54 50.5 96.8 83.890 1943.740 1920.35 0.67 0.368 0.33 0.550 24.85 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .45 1.510 22.TARIJA” 44 Hf [mts] 2.540 1911.700 1945.55 50.200 31.390 1946.85 2.41 2.040 23.366 0.27 .04 0.11 0.56 0.130 1923.820 31. Fin al 1 2 3 4 4 5 9 a 10 6 7 8 16 15 32 31 Diám Long.8 Rugosid ad 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 Q [lts/seg ] 9.23 25. .04 V [m/seg] 3.156 0.870 1946.23 63.4 36.750 1946.182 0.13 0.900 VELOCIDADES EN LAS TUBERIAS Tramo s T-1 1-2 2-3 3-4 5-4 9-5 a-9 10-a 6-10 7-6 8-7 1-8 1-16 16-15 15-32 32-31 N.65 0.280 22.376 0.176 1947.03 0.20 0.47 1.91 50.09 19.092 0.91 0.93 0.05 25.5 72.200 1917.350 1923.5 72.8 76.35 1.11 0.8 39.087 0.83 0.05 1.40 0.8 127.880 1944.8 71.41 0.320 1922.38 0.04 8.030 25.570 32.56 2.56 0.47 0.164 0.8 55.308 0.96 1.79 11.160 30.110 28.05 0.010 26.09 1.4 57.075 0.130 1921.195 0.58 15.640 1913.57 1.07 50.300 0.4 36.200 1943.28 0.16 0.07 0.85 25.92 1.820 23.45 0.950 27.93 0.84 50.191 0.880 1913.06 1.730 1945.750 21.4 71.85 1.72 63.92 63.00 6.8 25.75 11.02 63.04 0.22 0.09 4.376 0.580 1914.5 70.54 1. 53 0.55 1.91 91.19 0.8 50.47 0.02 110.78 0.8 50.8 50.24 72.91 1.44 3.54 4.25 0.96 114.00 0.26 71.62 0.71 1.61 5.52 0.43 0.45 0.50 0.98 0.03 5.45 0.8 50.8 50.46 0.8 50.8 50.61 102.8 50.35 0.31 0.35 7.83 0.30 0.8 50.83 81.78 70.67 0.84 0.50 0.8 50.33 0.55 0.01 6.70 3.33 88.31 0.26 0.5 98.42 0.43 0.02 0.16 70.91 0.93 0.35 0.34 4.53 111.65 7.72 0.86 12.91 0.67 2.8 50.23 2.48 74.21 0.33 1.52 2.14 0.8 50.10 1.56 93.74 93.8 50.04 10.58 4.42 90.34 74.67 73.06 69.35 0.39 0.63 1.52 0.98 81.71 9.56 91.54 0.01 50.00 0.8 50.45 0.99 92.31 4.8 50.82 5.57 0.11 0.47 0.8 25.61 0.48 0.8 50.42 0.8 50.39 11.11 0.33 0.71 0.50 3.4 25.28 0.64 74.61 .31 0.4 50.81 1.46 0.4 50.85 102.45 0.60 4.04 2.34 8.71 1.43 0.29 0.29 71.55 99.TARIJA” 45 0.8 50.71 3.19 0.31 6.16 1.97 0.41 20.00 1.98 0.31 72.00 0.44 0.8 50.8 50.06 1.04 2.49 112.60 0.8 50.07 1.8 50.58 4.4 25.8 50.64 0.38 3.60 0.8 25.51 3.27 0.38 0.28 0.74 0.71 0.33 41.24 0.7 94.2 114.32 1.25 91.45 0.54 90.67 0.8 50.39 3.41 0.10 0.20 0.36 0.35 0.56 6.11 0.40 0.84 0.12 0.30 0.95 1.68 0.31 0.8 63.53 0.08 86.37 0.30 0.39 0.51 92.66 0.43 1.14 0.32 0.31 0.88 92.8 50.31 0.35 0.5 50.42 7.59 0.86 0.19 0.61 0.62 0.8 50.47 0.8 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 0.03 112.4 50.31 0.8 50.10 0.34 6.51 1.70 2.05 0.92 40.59 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .8 25.08 0.8 50.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 31-34 34-35 35-36 36-38 38-47 47-46 46-45 45-44 43-44 42-43 39-40 37-39 28-37 27-28 26-27 25-26 24-25 4-11 6-3 3-12 12-18 7-2 2-13 13-19 19-24 14-15 14-13 13-12 1-14 14-20 20-25 15-21 21-26 20-21 19-20 18-19 21-33 33-30 30-35 26-29 31 34 35 36 38 47 46 45 43 42 39 37 28 27 26 25 24 4 6 3 12 7 2 13 19 14 14 13 1 14 20 15 21 20 19 18 21 33 30 26 34 35 36 38 47 46 45 44 44 43 40 39 37 28 27 26 25 11 3 12 18 2 13 19 24 15 13 12 14 20 25 21 26 21 20 19 33 30 35 29 113.98 5.03 0.56 92.63 0.8 50. 31 0.64 1.4 50.39 0.23 0.31 69.12 0.63 4.25 0.39 0.30 0.4 25.24 0.26 DISEÑO DE TANQUE DE ALMACENAMIENTO PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .30 0.59 72.02 0.28 0.11 0.16 0.21 0.8 25.8 25.26 2.11 0.33 3.44 3.89 3.38 0.65 2.64 2.01 0.78 69.57 71.4 25.54 0.45 0.12 0.4 25.8 25.31 0.42 0.31 91.35 0.30 0.4 25.72 0.65 91.22 0.34 0.4 50.13 0.91 73.8 25.48 0.83 50.27 0.72 0.03 3.22 72.74 71.8 50.43 0.29 0.02 0.48 90.34 0.13 0.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 29-36 36-37 32-33 31-30 30-29 29-28 39-38 40-47 45-42 6-5 17-22 18-17 12-11 11-17 23-24 22-23 18-23 41-42 40-41 41-46 29 36 32 31 30 29 39 40 45 6 17 18 12 11 23 22 18 41 40 41 36 37 33 30 29 28 38 47 42 5 22 17 11 17 24 23 23 42 41 46 112.29 0.40 0.4 25.4 25.TARIJA” 46 0.41 110.46 .4 50.21 72.34 0.13 0.17 0.4 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 0.44 0.4 25.19 0.20 0.32 3.10 0.64 71.10 0.14 2.62 4.62 72.8 25.43 71.85 68.15 0.18 0.06 0.95 0.36 0.10 0.4 25.85 72.09 0.07 0.01 1.19 0.41 0.46 71.52 0.26 0.23 112.11 0.77 2.04 6.4 50.23 0.64 4.36 0.4 25.53 8. 54 101.60 * Qi *t 10.34 b) VOLUMEN CONTRA INCENDIOS : Qi = t= V (inc) = V (res) = Vi = 3.TARIJA” 47 .00 [m3] c) VOLUMEN DE RESERVA : Qmax-d = t= [l/s] [m3/dia] (entre 15 .86 [l/s] 3.29 [m3] V total = 120.20 0.00 [l/s] 2.60 * Qmax-d * t 10.29 [m3] VOLUMEN TOTAL DEL TANQUE ASUMIDO V total = 117.25 % para sistemas por bombeo) [dia] [m3] Vr = 3.00 [hr] 117.00 [hr] (para poblaciones con densidad de poblacion 100hab.30 0.3 Cálculo Estructural PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .86 938.00 [m3] V./Has) 72. 1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) a) VOLUMEN DE REGULACION : Qmax-d Qmax-d C t V (reg) = = = = = V(reg) = C * Qmax-d * t 10. VIGA 1 C=+3.00 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .00 Y:1.10 0.00m FUNDACIONES C=-2. BASE TANQUE C=+12.00m PL. TAPA TANQUE C=+16.10 Viento Norma Genérica Curva de presiones seleccionada: CERRO Factor de Forma: X:1.10 0.00m PL. VIGA 3 C=+9.68m PL.10 0.10 0.20m PL. VIGA 2 C=+6.10 0.C.10 Cargas muertas (t/m²) 0.10 0.00m PL.20 Y:1.50m S.10 0.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) DATOS GENERALES DE LA ESTRUCTURA Proyecto: "DISEÑO DE TANQUE ELEVADO 120 m3" Clave: EDFTC-120-02 NORMAS CONSIDERADAS Hormigón: CBH 87 Aceros conformados: AISI Aceros laminados y armados: AISC ASD 89 ACCIONES CONSIDERADAS Gravitatorias Planta PL.U (t/m²) 0. BAJA C=+0.10 0.10 0.10 0.15 0.10 0.TARIJA” 48 .20 Factor de Ráfaga: X:1. 872 VIGA 1 C=+3. PL.00m 1.20m 2. PL.866 2.00 +Y: 1.00 Se realiza análisis de los efectos de 2º orden Valor para multiplicar los desplazamientos 1.TARIJA” 49 . PL.792 BASE TANQUE C=+12.00 -Y:1. Cargas de viento Viento X Planta (t) TAPA TANQUE C=+16.872 1.656 BAJA C=+0. PL.158 1. PL.158 VIGA 2 C=+6.00m 2.00m 1.00 8.59 Coeficientes de Cargas +X: 1.00 PL.68m 1.656 0.866 VIGA 3 C=+9.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Plantas Anchos de banda Ancho de banda Y Ancho de banda X (m) (m) En todas las plantas 8.000 Viento Y (t) 1.792 2.000 Sismo Sin acción de sismo Hipótesis de carga Automáticas Peso propio Cargas muertas Sobrecarga de uso Viento +X Viento -X Viento +Y Viento -Y PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .00m 0.00 -X:1. 27.63) ( 5. -0.63) ESTADOS LÍMITE E.L. -5. de rotura. 0.22.28) 0.13) ( 5.03) 0.20 ( 5.03) ( 0.03.22) 5. 0.63) ( 5. t/m y t/m²) Grupo Hipótesis 5 Sobrecarga de uso 6 Tipo Superficial Cargas muertas Cargas muertas Lineal Lineal Valor 3.48) ( 5. -5.20 ( Coordenadas 5.U.63.U.63. Hormigón E.00 ( ( ( ( 0.63) ( -0.13.13) Cargas muertas Lineal 0.13) -0.48) -0.13.20 ( 0. -5. -0.47. 0.63.48) ( 5.02) ( 0.L. -0.47. 0. de rotura.20 ( -0. -5.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Adicionales Referencia PPM CV Descripción PESO DE MUROS Carga Viva Naturaleza Peso propio Sobrecarga de uso Empujes en muros Empuje de Agua Carga:Sobrecarga de uso Nivel freatico: Cota 16. Daños de tipo medio Exposición al viento: Normal Acciones características PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . -5.13. Hormigón en cimentaciones Tensiones sobre el terreno Desplazamientos CBH 87 Control de la ejecución: Normal Daños previsibles: B.63. -5. -5.13) Cargas muertas Lineal 0. -5.03.TARIJA” 50 . -0.47.50 m Listado de cargas Cargas especiales introducidas (en t.13.03. Coeficiente parcial de seguridad de las acciones variables de acompañamiento i Coeficientes parciales de seguridad () y coeficientes de combinación () Para cada situación de proyecto y estado límite los coeficientes a utilizar serán: E. las combinaciones de acciones se definirán de acuerdo con los siguientes criterios: j 1 Gj Gkj QiQki i1 .440 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) SITUACIONES DE PROYECTO Para las distintas situaciones de proyecto.925 1.L.U. Hormigón: CBH 87 E. Hormigón en cimentaciones: CBH 87 Situación 1 Coeficientes parciales de seguridad () Favorable Desfavorable Carga permanente (G) 0.Donde: Gk Acción permanente Qk Acción variable G Coeficiente parcial de seguridad de las acciones permanentes Q.600 Viento (Q) Situación 2 Coeficientes parciales de seguridad () Favorable Desfavorable Carga permanente (G) 0. de rotura. de rotura.900 1.600 Sobrecarga (Q) 0.000 1. Coeficiente parcial de seguridad de la acción variable principal 1 Q.U.L.TARIJA” 51 . 000 Sobrecarga (Q) 0.440 1.000 1.000 1.000 1.000 Desplazamientos Acciones variables sin sismo Coeficientes parciales de seguridad () Favorable Desfavorable Carga permanente (G) 1.000 Combinaciones n Nombres de las hipótesis PP CM PPM Peso propio Cargas muertas PESO DE MUROS PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .000 Sobrecarga (Q) 0.000 Viento (Q) 0.000 1.440 Tensiones sobre el terreno Acciones variables sin sismo Coeficientes parciales de seguridad () Favorable Desfavorable Carga permanente (G) 1.TARIJA” 52 .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Sobrecarga (Q) Viento (Q) Situación 2 Coeficientes parciales de seguridad () Favorable Desfavorable 0.000 Viento (Q) 0.000 1.000 1.000 1.440 1. 600 0.440 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .600 1.600 0.600 0.600 0.600 0.440 PPM 0.900 1. de rotura.900 1.900 1.900 1.440 1.600 1.900 0.600 1.600 1.900 1.600 1. de rotura.600 1.600 1.900 1.900 1.600 1.600 1.600 0.925 1.600 0.900 1.440 1.900 1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 PP 0.440 0.900 1.600 1.440 Qa CV V(+X) V(-X) V(+Y) V(-Y) 1.900 1.U.600 1.900 1.900 0.600 1.600 0. Hormigón n E.L.440 0.600 1.925 1.440 1.600 0.600 0.600 0.L.600 0.925 1.600 0.900 1.600 1.U.600 0.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Qa CV V(+X) V(-X) V(+Y) V(-Y) Sobrecarga de uso Carga Viva Viento +X Viento -X Viento +Y Viento -Y n E.600 0.900 1.600 1.900 1.900 1.440 CM 0.600 1.TARIJA” 53 .440 1.900 0.600 0.600 0.900 0. Hormigón en cimentaciones Comb.600 1.925 1.600 0.600 1.600 1.925 0.900 1.900 1.925 1.600 0.600 1.600 0.900 1.900 1. 440 0.440 1.925 PPM 0.440 1.440 1.440 0.925 1.440 1.440 1.925 0.440 0.925 1.925 1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Comb.440 1.925 1.440 1.925 0.440 1.440 1.925 1.440 0.440 0.440 1.925 1.440 1.440 1.440 0.925 Qa 1.440 1.925 0.TARIJA” 54 .925 0.440 1.440 0.925 0.440 1.440 1.925 1.925 1.440 1.440 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .925 1.440 0.440 0.440 0.440 1.925 1.925 0.925 1.925 1.440 1.440 1.440 0.440 1.440 1.440 1.925 1.440 1.925 1.925 1.925 1.440 1.925 1.440 1.440 0.440 0.440 1.925 1.440 1.440 1.440 V(+X) 1.440 1.440 0.440 1.440 V(-X) V(+Y) V(-Y) 1.925 1.440 0.925 1.440 1.440 0.440 1.440 0.440 1.925 1.440 0.440 1.440 0.440 1.440 1.440 0.440 0.440 0.440 1.925 1.440 1.925 1.925 1.440 1.440 1.925 1.440 1.925 1.440 1.440 1.440 0.440 0.440 0.925 1.925 1.440 1.440 0.440 1.440 1.440 0.440 0.440 1.440 1.440 0.925 1.925 1.925 1.440 0.440 0.440 1.440 0. 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 PP 0.925 1.440 0.440 1.440 1.440 1.440 1.925 1.440 1.440 0.925 0.925 1.925 1.440 1.440 0.440 1.440 0.440 1.925 1.925 1.925 0.440 1.440 0.925 1.440 CV 1.440 1.440 1.440 1.440 1.925 1.925 0.925 CM 0.440 1.440 0.440 1.925 1.440 1.440 1.440 1.440 0.440 1.440 0.925 1.440 0.440 1.440 0.925 1.925 1.440 0.440 1.440 1.440 0.440 1.925 1.440 1.440 1.440 1.440 0.440 1.925 1.440 1.440 1. 000 1.000 1.440 0.440 0.440 1.925 1.440 0.440 1.925 1.440 1.000 V(-X) 1.440 1.440 0.440 1.440 1.000 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .925 1.440 1.440 PPM 0.440 1.925 1.000 1.440 1.925 1.440 1.925 0.440 0.440 1.000 1.440 1.440 1. 1 2 3 4 5 6 7 V(+X) V(+X) V(-X) V(+Y) V(-Y) 1.440 1.440 Qa 1.000 1.925 1.440 0.440 0.440 1.440 0.440 0.440 0.440 1.440 1.440 1.925 1.440 0.440 1.925 1.925 1.440 1.000 1.440 1.000 1.TARIJA” 55 .440 1.000 1.440 1.440 0.000 1.925 1.925 0.925 1.000 1.440 1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Comb.440 1.440 0.925 1.440 Tensiones sobre el terreno PP 1.440 1.440 0.000 1.440 0.440 1.000 V(+Y) 1.440 1.440 0.440 0.440 1.000 1.000 1.000 1.440 1.440 1.440 PPM Qa CV 1.440 1.440 1.440 1.440 1.440 1.440 1.925 1.440 0.925 0.000 1.925 1.925 0.925 1.440 1.440 1.440 1.925 1.440 0.000 1.440 0.000 1.440 1.440 n Comb.440 0.440 1.925 1.440 0.925 1.440 0.925 1.000 1.000 1.925 1.925 1.440 0.925 1.000 1.440 0.925 1.925 0.000 1.440 1.925 1.925 1.440 CV 1. 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 PP 1.440 1.440 1.000 1.440 0.925 1.000 1.000 1.925 1.925 1.000 1.440 1.440 1.440 CM 1.000 1.440 1.440 1.440 1.440 n Desplazamientos CM 1.440 0.440 1.000 V(-Y) 1. 000 PPM 1.00 9.00m 3 PL.000 1. TAPA TANQUE C=+16. BAJA C=+0.000 1.000 1.000 1.000 V(+X) 1.000 1.48 16.000 1. BAJA C=+0.000 1.000 1.68m 5 PL.000 1. VIGA 2 C=+6.000 1. VIGA 3 C=+9.50m Plant Nombre planta a 6 PL.000 1.000 1.000 1.000 1.00 3.000 1.000 1. TAPA TANQUE C=+16.000 1. BASE TANQUE C=+12.000 1. VIGA 1 C=+3.00 6.000 1.000 1.000 1.000 1.00 2.000 1.000 V(-X) V(+Y) V(-Y) 1.000 1.000 1.68m 5 PL.000 1.000 1.2 0 3.000 1.20m 4 PL.00m Altur Cota a 4.000 1.6 8 3.000 1.000 1.000 1.000 1.TARIJA” 56 .000 1.000 1.000 1.00 3.000 1.00 2.000 1.000 1.000 1.000 1. 8 9 10 11 12 13 14 15 16 17 18 19 20 PP 1.000 1. VIGA 3 C=+9.000 1. PANTALLAS Y MUROS PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .000 1.000 1.60 DATOS GEOMÉTRICOS DE PILARES.000 1. VIGA 1 C=+3.000 1.000 1.000 CM 1.000 1.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Comb.000 1. BASE TANQUE C=+12.000 1.00m 2 PL.00 3.000 1. VIGA 2 C=+6.00m 3 PL.000 1.20m 4 PL.60 0.000 1.000 DATOS GEOMÉTRICOS DE GRUPOS Y PLANTAS Grup Nombre del grupo o 6 PL.000 1.00m 1 PL.00m 1 PL.000 1.000 1.000 1.00m 0 FUNDACIONES C=-2.000 1.000 1.20 12.000 Qa CV 1.00m 2 PL. 2 armado -0. -5.63. -5.1+0.1+0.63) Empujes y zapata del muro Referencia Empujes Zapata del muro M1 Empuje izquierdo: Sin vinculación exterior Sin empujes Vuelos: izq.0 Centro Muros .1+0.05 canto:0.00) ( 5.1=0.00) M4 Muro de hormigón 5-6 ( -0.50.00. 0. Datos geométricos del muro Referen Tipo muro GIVértices Plan Dimensiones cia GF Inicial ta Izquierda+Derech Final a=Total M1 Muro de hormigón 5-6 ( -0.00) ( 0.2 armado ( 5.13.13) M3 Muro de hormigón 5-6 ( 5.50.50) ( 6 0.00) M2 Muro de hormigón 5-6 ( 0.13) 6 0.63.Las dimensiones están expresadas en metros.GF Vinculación exterior 0-5 Sin vinculación exterior 0-5 Sin vinculación exterior 0-5 Sin vinculación exterior 0-5 Sin vinculación exterior Ang.50) 6 0. -5.13. 0.2 armado ( 5.00 der.50.1+0. -5.50) ( 5.TARIJA” 57 .0 Centro 0.50) Datos de los pilares GI.00. 0.2 armado ( 5. 0.00.:0. 0. -5.1=0.1=0.:0. -5.1=0.0 Centro 0. Punto fijo 0.63) 6 0. .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Pilares GI: grupo inicial GF: grupo final Ang: ángulo del pilar en grados sexagesimales Referencia P1 P2 P3 P4 Coord(P.0 Centro 0.Fijo) ( 0. 0.00.Las coordenadas de los vértices inicial y final son absolutas.50.55 Empuje derecho: Empuje de Agua PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . 50 0.05 der.00 2.00 1.00 0.00 Coeficiente de pandeo X Y 0.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Referencia Empujes M2 Empuje izquierdo: Sin empujes Empuje derecho: Empuje de Agua M3 Empuje izquierdo: Empuje de Agua Empuje derecho: Sin empujes M4 Empuje izquierdo: Empuje de Agua Empuje derecho: Sin empujes Zapata del muro Sin vinculación exterior Vuelos: izq.50 0.00 1.50 Coeficiente de rigidez axil 2.55 Sin vinculación exterior Vuelos: izq.50 0.00 1.:0.05 canto:0.50 0.:0.50 0.30 1.00 1.50 0.00 2.00 1.00 2.05 der.00 canto:0.30 0.50 0.00 LOSAS Y ELEMENTOS DE CIMENTACIÓN Losas cimentación Todas Canto (cm) 50 Módulo balasto (t/m³) Tensión Tensión admisible admisible en situaciones en situaciones persistentes accidentales (kp/cm²) (kp/cm²) 10000.00 der.55 DIMENSIONES.60 MATERIALES UTILIZADOS PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .:0.:0.00 1.50 0.TARIJA” 58 .00 1.00 canto:0. COEFICIENTES DE EMPOTRAMIENTO Y COEFICIENTES DE PANDEO PARA CADA PLANTA Pilar Pla nta Dimens iones (cm) 5 4 3 2 1 45x45 45x45 45x45 45x45 45x45 Para todos los pilares Coeficiente de empotramiento Cabeza Pie 0.00 1.:0.:0.00 2.55 Sin vinculación exterior Vuelos: izq.50 0. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Hormigones Elemento Todos Hormigón H-20 . Control Normal fck c (kp/cm²) 1.TARIJA” 59 . Control Normal fyk (kp/cm²) 4077 s 1.15 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .5 204 0 Tamaño máximo del árido (mm) 15 Aceros por elemento y posición Aceros en barras Elemento Todos Acero AH-400 . ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .TARIJA” 60 . ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) VI.. 1. El proyecto determina costos de mantenimiento preventivo y correctivos de acuerdo a las políticas internas de la institución.TARIJA” 61 .. Personería Jurídica. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .Se refiere a que COSAALT cuentan con Personería Jurídica y está legalmente establecida en el País mediante decreto supremo y cuenta con todos los documentos legales que garantiza la consolidación de una institución legal y reconocida a nivel Departamental.. Organización de la EPSA Plan de Administración y Gestión del Servicio.Por otro lado la institución operadora es conocida por los beneficiarios y cuenta con la confianza en todos sus procesos de administración y gestión del servicio. De manera resumida se indica que la entidad operativa está legalmente establecida y creada mediante instrumentos técnico legales que le permite operar el proyecto. Confiabilidad por parte de los beneficiarios. ya que actualmente viene operando en la dotación del servicio hace muchos años.Dicha institución cuenta con una estructura organizacional sólida que garantiza el funcionamiento de la misma y tiene capacidad de gestionar los recursos tanto financieros como humanos. La administración y gestión del proyecto estará a cargo de COSAALT que es la institución responsable de la operación de dotación de los servicios básicos de agua potable y alcantarillado. GESTION DE LOS SERVICIOS VI. Organización y Capacidad de Gestión. La institución tiene la capacidad de programar y planificar actividades de tal manera PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Sistema de Control Técnico Contable.. Coordinar y Ejecutar Actividades tendientes a Fortalecer el Desarrollo del Proyecto.Dichas institución cuentan con sistemas contables y cuenta con el perfil profesional adecuado con el objeto de tener un buen manejo de los flujo de recursos es decir de las entradas y salidas financieras con el objeto de que esta información financiera esté disponible para cualquier momento..ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Estructura Orgánica. Además cuenta con manual de funciones donde se delega responsabilidades de cada repartición y personal de la entidad.. técnico y operativo cuenta con toda la experiencia y tiene una íntima relación con las actividades de la gestión del servicio.Los profesionales con los que cuenta la institución en el ámbito administrativo. Adecuación del Perfil Profesional. desde los rangos más jerárquicos hasta los niveles inferiores incluyendo personal de servicios y otros.Su estructura orgánica de las institución prestadora del servicio básico están bien definida.financiero.. Capacidad de Planificar.TARIJA” 62 . Procesos y Procedimientos.Cuenta con una repartición de asesoría legal u tiene la capacidad de seguir procesos de orden legal y jurídico en el marco de la normativa vigente en cuanto a la gestión y administración del proyecto. La tarifa está establecida por la parte de la gerencia técnica y aprobado mediante Resolución Administrativa de la institución. Dicha institución cuenta con personal calificado y de experiencia en el manejo administrativo y financiero de operación de los servicios. Es necesario mencionar que las instituciones prestadoras de servicios básicos es una institución establecida y reconocida para operar con la dotación de agua potable y alcantarillado. VI. además de que cuentan con una Gerencia Administrativa y Financiera quien se encarga atender los tramites de administrativos a solicitud de los usuarios.TARIJA” 63 .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) que enriquezcan la buena administración y ejecución del proyecto y la perduración de la vida útil del proyecto. La operación del proyecto está definida por la prestación del servicio de manera eficiente y permanente. En este caso los beneficiarios del proyecto estarán incorporados en la base de datos de acuerdo a la normativa vigente quienes recibirán mes a mes su proforma de consumo de acuerdo a su categoría inscrita. la misma es una institución legalmente reconocida y creada en el marco de los instrumentos legales. quien a través de la parte técnica serán los responsables de hacer un seguimiento a la dotación del servicio y mantenimiento preventivo del proyecto. Diagnóstico Institucional y Recomendaciones Por la característica del proyecto que implica. el ente operador será COSAALT. donde se contempla una estructura funcional que garantice la sostenibilidad del proyecto. 2. estas obras pasaran a ser operadas por COSAALT. Dicho personal se encuentra en la estructura organizacional de la entidad operadora del proyecto. Los cobros son PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Una vez realizada las inversiones del proyecto. En cuanto al mantenimiento del proyecto. Los cobros son mensuales.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) mensuales. será sujeto de cortes y/o en su caso de corte definitivo del servicio. que se encuentran establecidos en el contrato de prestación de servicio que firman la empresa con los beneficiarios y es de cumplimiento obligatorio.TARIJA” 64 . será sujeto de cortes y/o en su caso de corte definitivo del servicio. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . VI. será definido de acuerdo al área de acción. El incumplimiento de cualquiera de las cláusulas establecidas en el contrato. 3. Costos de Administración La tarifa está establecida por la parte de la gerencia técnica y aprobado mediante Resolución Administrativa de la institución. por lo que el beneficiario deberá cumplir con las cláusulas establecidas en el contrato de prestación del servicio. por lo que el beneficiario deberá cumplir con las cláusulas establecidas en el contrato de prestación del servicio. es decir que los cortes y/o imperfectos que ocurran en alguno de los servicios y sean ocasionados fuera de las viviendas privadas estas serán atendidas por el personal técnico – operativo de la institución así como el mantenimiento de las redes matrices de los servicios básicos será realizado por COSAALT que consiste en la realización de un mantenimiento preventivo y correctivo. que se encuentran establecidos en el contrato de prestación de servicio que firman la empresa con los beneficiarios y es de cumplimiento obligatorio. El incumplimiento de cualquiera de las cláusulas establecidas en el contrato. sino es responsabilidad del usuario. contempla que el mismo se realizará en las redes principales de distribución de los servicios básicos.TARIJA” 65 . El mantenimiento de las redes internas no es competencia de la entidad. quien deberá realizar el mantenimiento de los servicios a través de la contratación de personal capacitado como las microempresas existentes para cada servicio básico. es decir que los cortes y/o imperfectos que ocurran en alguno de los servicios y sean ocasionados fuera de las viviendas privadas estas serán atendidas por el personal técnico – operativo de la institución así como el mantenimiento de las redes matrices de los servicios básicos será realizado por COSAALT que consiste en la realización de un mantenimiento preventivo y correctivo. La etapa de mantenimiento. La entidad que operara y realizará el mantenimiento de la dotación de servicios básicos a la zona de influencia del proyecto por COSAALT. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Es importante adicionar al mismo tiempo que esta institución monopólica en lo que se refiere la dotación del servicio cuentan con un personal administrativo encargado de garantizar la operación del servicio a través de la asignación de presupuesto que generan a través del cobro de las facturas de consumo de servicios por parte de los beneficiarios. Costos de Operación.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) En cuanto al mantenimiento del proyecto. quienes serán los encargados de operar el servicio. 4. por lo que el personal técnico realiza un mantenimiento de acuerdo a la solicitud de los beneficiarios. Mantenimiento y Reposición Plan de Operación y Mantenimiento. Dichas institución cuenta con un plantel de personal en la parte técnica. será definido de acuerdo al área de acción. VI. se detalla en el siguiente cuadro: PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .2 0 0 1.0 31.005 Total .00 0 5.00 VI.000. hacer notar que estas tarifas sufrirán incrementos ya que están sujetas al consumo.0 1 mes 12 Municipal) 0 0 38.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Costos de Inversión.400.000.000. impresora.475. Costos de Operación y Mantenimiento COSTOS DE OPERACIÓN Y MANTENIMIENTO POR AÑO ALTERNATIVA 1 PRECIO N UNIDA CANTID TOTAL DESCRIPCION UNITAR o D AD (Bs.00 0 112. el mismo que se proyectó hasta la vida útil de proyecto.680.000 lit) lit 5.000.) gbl 1 5.000.0 36.325.000.TARIJA” 66 .Plomero (Empleado 3.0 4 Reparacion de Roturas gbl 1 1. Como se puede ver en el cuadro uno de los criterios de identificación de ingresos es la tarifa básica del servicio de agua potable y alcantarillado sanitario. 5.0 2 Hipoclorito de Sodio (1 lit para 10.0 5 Varios (Papel. se consideró algunos criterios técnicos que permitió identificar los ingresos por cada servicio básico.5 HP) Kwh 2.0 3 Energia Electrica (Bomba de 5. Estructura tarifaria de la cooperativa COSAALT Ltda.) IO Operador-Encargado. Análisis Tarifario Para determinar la generación de los ingresos con proyecto.00 7 0 14. que se muestra en los cuadros siguientes. etc. 53 Bs mensuales por concepto de agua potable y un pago de 22.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) De acuerdo a datos proporcionados y a las características del proyecto. se plantean siete Líneas de Acción. con la transversalidad de la perspectiva de género. si bien el mismo ya contempla de colocación de micromedidores en los domicilios sin embargo. Por lo tanto si consideramos un pago mensual de 30.TARIJA” 67 .90 Bs. por concepto de servicio de alcantarillado. la estructura tarifaria para éstos nuevos usuarios será la referente al sistema fijo y que corresponda a la categoría doméstica. que tienen como propósito generar las condiciones de sostenibilidad y el uso apropiado del servicio. DESARROLLO COMUNITARIO Para la implementación del DESCOM. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . VII. estos aspectos se describirán con más detalle más adelante. que la transversalidad de la perspectiva de Género se constituirá en parte principal de cada una de las Líneas de Acción planteadas. para que cumplan eficientemente con su trabajo. Educación Sanitaria y Ambiental Apoyo al Gobierno Municipal en Acciones del Sector. de PreInversión: Organización de la comunidad Fase II. Las siete Líneas de Acción que deberán ejecutarse en forma integral en la implementación de Proyectos de Agua y Saneamiento en relación a las Fases de ejecución.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Lo que significa.TARIJA” 68 . tanto en la ejecución de las obras del sistema de alcantarillado sanitario. Administración. permitirán desarrollar un proceso integrado y secuencial que tendrá como resultado una comunidad capaz de: 1. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Fase III de PostInversión: Refuerzo de Áreas Críticas de Desempeño. Estar movilizada y organizada para tomar decisiones colectivas. 3. Vigilar a las instituciones que intervienen con proyectos de desarrollo rural en su localidad. Operación y Mantenimiento. de Inversión: Movilización de la comunidad Fortalecimiento de la Gestión Comunitaria. Estas siete Líneas de Acción con la transversalidad de la perspectiva de género. o de control social. Ampliar la participación de las mujeres y hombres de la comunidad. 2. como en los puestos de representación ejecutiva de los comités de agua. son las siguientes: Fase I. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 4. Recuperar el principio de unidad para organizar a toda la comunidad en actividades. operar y mantener adecuadamente el servicio de agua y/o saneamiento. como ejercer el control social. en particular de los grupos organizados. 5. a. Administrar. la transversalidad de la perspectiva de género. se plantea como prioridad de la Guía de DESCOM. Desarrollar mecanismos de interacción entre la comunidad y las instituciones locales para lograr una mejora continua. 6. desde su contexto sociocultural. Establecer un nexo de apoyo institucional y técnico con su municipalidad. así como la participación activa de ambos. 7.TARIJA” 69 . en el proceso de DESCOM en Proyectos de Agua y Saneamiento para asegurar la participación equitativa de mujeres y hombres a través del fortalecimiento de sus capacidades de gestión y de decisión autónoma. 8. de acuerdo a la tecnología seleccionada. Transversalidad de la Perspectiva de Género Con el propósito de fortalecer la inclusión de criterios de equidad e igualdad de mujeres y hombres en los Proyectos de Agua y Saneamiento. Objetivo Lograr la transversalidad de la perspectiva de género. Planificar acciones de cambio que considere viable. internalizando nuevos conocimientos de autocuidado de la salud y de protección al medio ambiente. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . la comunidad con la participación equitativa de hombres y mujeres.TARIJA” 70 . mujeres y hombres de la comunidad han priorizado aquellos problemas que reflejan debilidades de: equidad en la organización de la comunidad. c. salud e higiene en las familias –sobre todo en los niños y niñas – cuidado y preservación del medio ambiente. las EPSA´s y promotores de salud. Con la priorización de estos problemas. Planificación y programación comunitaria: Basándose en el autodiagnóstico y la Línea de Base. tratamiento de las basuras. programaron las actividades que revirtieron sus debilidades en fortalezas. Resultado Esperado / Metas Mujeres y hombres de la comunidad han fortalecido sus habilidades y conocimientos para ejercer una gestión equitativa en los servicios de agua y saneamiento. Productos en la Transversalidad de la Perspectiva de Género. operación y mantenimiento de los sistemas construidos de alcantarillado sanitario. administración. Gestión de la comunidad: Las capacidades de decisión y posición de influencia en las decisiones relacionadas con los proyectos de agua y saneamiento. Fortalecimiento de habilidades. basada en las relaciones de respeto a las diferencias y la búsqueda de soluciones que satisfagan a ambos sexos con equidad. han ampliado la participación equitativa de mujeres y hombres en la elección y conformación del CIPA. ha sido equitativa PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . etc. capacidades y conocimientos: La participación activa en los talleres de capacitación en educación sanitaria.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) b. debido a que la Institución encargada de realizar el desarrollo y Fortalecimiento Institucional es COSAALT Ltda. Presupuesto General El costo de total del presente proyecto asciende a un total de: La inversión en el Proyecto es de 2’586109.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) para mujeres y hombres de la comunidad. (Dos Millones quinientos ochenta y seis mil ciento nueve 24/100 Bolivianos). crea la Unidad de Proyectos Especiales – UPRE dependiente del Ministro de la Presidencia. en la definición de las tarifas y en la revisión y aprobación de los estatutos y reglamentos. Mediante el Decreto Supremo N° 29091. Fuente de Financiamiento: En el presente Proyecto la principal fuente de financiamiento. Es la EPSA encargada y legalmente establecida de brindar los servicios de agua potable y alcantarillado sanitario dentro del área urbana de la ciudad de Tarija. 1. Social y Ambiental) éste acápite no contempla. El presente Estudio Integral TESA (Técnico. En la sección de anexos se presenta a detalle la metodología de capacitación en DESCOM. Económico. VIII. asimismo el detalle de la inversión requerida.TARIJA” 71 . en la conformación de la EPSA. de 4 de abril de 2007. así como la toma de decisiones en la elección de los niveles de servicio y opciones técnicas. PRESUPUESTO DEL PROYECTO VIII. con la finalidad de apoyar funcionalmente en la parte PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . proviene del estado Central.24 Bs. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . logística y operativa a los proyectos especiales que el Presidente del Estado Plurinacional de Bolivia llevará a cabo durante su gestión. a las entidades públicas beneficiarias. crédito y otros.Gestión 2011. Se autoriza al Ministerio de Economía y Finanzas Públicas. Se autoriza al Ministerio de Planificación del Desarrollo a través del Viceministerio de Inversión Pública y Financiamiento Externo.Gestión 2010. de 28 de noviembre de 2010.(REGISTRO DE PROYECTOS). Es necesario reglamentar el destino y el uso de los recursos públicos transferidos al Programa “Bolivia Cambia”.. ARTÍCULO 3. El Programa “Bolivia Cambia” se financiara con recursos provenientes de los débitos autorizados en el inciso b) del Artículo 29 del Presupuesto General del Estado . vigente por disposición del Artículo 41 de la Ley N° 062.Gestión 2010. dependiente del Ministerio de la Presidencia. los cuales se ejecutarán bajo la misma modalidad establecida en el inciso d) del Artículo 29 del Presupuesto General del Estado .TARIJA” 72 . del Programa “Bolivia Cambia” a solicitud de la Unidad de Proyectos Especiales – UPRE. I. vigente por disposición del Artículo 41 de la Ley Nº 062. ARTÍCULO 4. registrar en el Sistema de Información sobre Inversiones – SISIN proyectos de inversión. del Presupuesto General del Estado ..Gestión 2010. II.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) técnica. El Programa “Bolivia Cambia” también podrá ser financiado con recursos provenientes de donación.(ASIGNACIÓN DE RECURSOS). vigente por disposición del Artículo 41 de la Ley Nº 062. I. establecidos en el Artículo 29 del Presupuesto General del Estado . adjuntando el convenio con la entidad beneficiaria conforme a normativa vigente. a solicitud de la UPRE. asignar y transferir presupuestaria y financieramente los recursos señalados en el Artículo 2 del presente Decreto Supremo. 2’462.00 123.24 100 2’586109. Las solicitudes de recursos para programas de financiamiento a favor de entidades privadas.2’462. Porcentaje % 2’586109.06 6 TOTAL Bs.06 2’586109. vigente por disposición del Artículo 41 de la Ley Nº 062. 18 18 y 00.18 123.00 Consultorías 00.148. deberán enmarcarse en lo dispuesto por el Artículo 44 del Presupuesto General del Estado .24 00.TARIJA” 73 .961.961. PRESUPUESTO TOTAL DEL PROYECTO Organismo Financiador Gobierno Central del Estado Plurinacional de Bolivia Presupuesto Total Monto Bs.- 2’586109.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) II.24 100 PRESUPUESTO POR COMPONENTE COMPONENTES: CONSTRUCCION DE OBRAS SUPERVISIÓN MONTO Bs 2’462.148.Gestión 2010.148. 2’586109 24 .00 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .24 COSTO TOTAL PRESUPUESTO GENERAL POR COMPONENTE Y POR PARTIDA PRESUPUESTARIA DETALLE Componentes Infraestructura (Construcciones Edificaciones) Capacitación Asistencia Técnica Organización 20000 y PARTIDAS 30000 40000 TOTAL Bs.961.0 123. 70 2021 494 27.974.83 2018 472 25.145.) 2014 445 0. el ingreso mensual y anual proyectado para los siguientes 20 años es el siguiente.750.46 330.216.13 316. ESTIMACIÓN DE INGRESOS A PRECIOS PRIVADOS (Expresados en Bolivianos a Diciembre del 2014) AÑO Nº de Conexione s Tarifa Mensual (Bs.321.53 Bs/Mes por concepto de agua potable. se consideró algunos criterios técnicos que permitió identificar los ingresos por cada servicio básico.44 2017 465 25.) PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . la estructura tarifaria para éstos nuevos usuarios será la referente al sistema fijo y que corresponda a la categoría doméstica.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) IX.00 2015 452 0.06 325. Por lo tanto si consideramos un pago mensual de 30. De acuerdo a datos proporcionados y a las características del proyecto.117.20 302. EVALUACIÓN DEL PROYECTO IX. el mismo que se proyectó hasta la vida útil de proyecto.53 2020 486 26.00 0.22 2019 479 26.15 307.00 2016 458 25.593.693.544.360.740.594. 1.31 321. Evaluación Financiera Privada del Proyecto Identificación y Estimación de ingresos a precios privados.72 2022 501 27.43 311. Para determinar la generación de los ingresos.003. si bien el mismo ya contempla de colocación de micromedidores en los domicilios sin embargo.TARIJA” 74 .58 Tarifa Anual (Bs.00 0.533. considerando las actividades definidas en el presupuesto.29 2024 516 28.769.16 376.61 335.49 360.586.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) 2023 508 27.814.477.109.371.87 2032 578 31.043.96 365.013.57 340.81 371.08 2027 538 29.284.46 345.357. A continuación se presenta el presupuesto de los servicios considerados en el proyecto.290.46 2026 531 29.248.383.771..90 2025 523 28.TARIJA” 75 .917.85 2028 546 30.190.23 Bs.521.16 2033 587 32.32 355.735.270.357.50 2030 562 30.73 2031 570 31. El presupuesto de la inversión que requiere el proyecto para la implementación de la infraestructura de los servicios básicos asciende a 2.94 2029 554 30.74 387.10 381.614. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .257.363.948. además de considerar un presupuesto que garantice la operación del proyecto y mantenimiento del mismo para evitar el deterioro de la infraestructura y gastos de administración del proyecto a lo largo de la vida útil.34 350.90 Elaboración Propia Fuente: Evaluación Privada y Social del Proyecto Identificación y Estimación de Costos a precios privados La ejecución del proyecto requiere de un presupuesto que garantice la construcción de la infraestructura de los servicios básicos. 00 RELLENO COMP.22 EXCAVACION C/MAQUINARIA m³ HORMIGON POBRE DE NIVELACION m³ 614.42 1.00 5.600.00 4.37 849.646.RED DISTRIBUCION DE AGUA POTABLE REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML 6.TENDIDO DE TUBERIA 2 1/2" PVC C-9 (J.397.00 2.98 RELLENO COMPACTADO DE TERRENO CON SALTARIN m³ 592.020.639.69 LOSA RADIER DE Ho Ao m³ 87.MACROMEDIDOR D=2"+ACCES.85 COLUMNA DE HoAo m³ 14.483.10 61.) m 190.732.00 4.997.924.79 61.81 48.00 181.30 LETRERO OBRAS pza 2.70 9.71 324.12 3.) m 310.85 117.355.12 PROV.00 209.54 ACCESORIOS DE PVC P/RED DISTRIBUCION glb 1.165.478.48 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .15 61.082.E.58 M02 .42 61.198.180.20 9.00 12.907.45 498.751.00 PROV.42 29.81 12.00 53.085.14 26.87 CAMARA PARA VALVULA DE HoAo EN RED DISTRIBUCION pza 14.76 PROV.41 15.00 1.587 .706.40 4.42 154.00 107.96 118.98 VIGA DE FUNDACION DE HoAo m³ 15.00 1.726.41 1.584.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) PRESUPUESTO A PRECIOS DE MERCADO (Expresados en Bolivianos a Diciembre del 2014) Descripción Unida d Cantidad Precio Unitario M01 .67 20.604.397.109.TANQUE ELEVADO 120 M3 REPLANTEO DE ESTRUCTURAS m² 174.109.61 11.22 1.109.41 92.E.45 48.44 PROVISION Y COLOC.020.MANUAL-MAT.375.6 7 M03 .228.67 17.50 COLOCACION DE ARENA PARA TUBERIA m³ 319.79 59.79 49.907.153.96 262.25 PROVISION Y COLOC. TENDIDO DE TUBERIA 1" PVC E-40 (J.) m 1.) m 4.57 37.58 EXCAVACION C/MAQUINARIA m³ 3.OBRAS PRELIMINARES Total 15.555.TARIJA” 76 .74 ACCESORIOS FG P/COLOCACION DE VALVULAS glb 1.090. pza 1.MICROMEDIDOR D=1/2"+ACCES.30 4.27 PRUEBA HIDRAULICA DE TUBERIA ML 6.54 13.81 30.00 11.72 5.00 98.00 13.27 5.506.938.20 PROV.453.TENDIDO DE TUBERIA 3" FG m 25.34 RIOSTRAS DE HoAo m³ 12.E.55 64.71 10.96 36.243.412.78 20. pza 445.10 PROV.670.00 4.871.181.R.631.090.120.TENDIDO DE TUBERIA 3" PVC C-9 (J.919. TENDIDO DE TUBERIA 2 1/2" FG m 50.317.924.SELECCIONA-C/MAT m³ 959.00 62.00 1.40 PROV.13 RELLENO COMPACTADO DE TERRENO CON SALTARIN m³ 1. TENDIDO DE TUBERIA 2" PVC C-9 (J.52 INSTALACION DE FAENAS glb 1.355. 343.29 CERCO MALLA OLIMPICA C/POSTES FG=2 C/2.05 3.35 5.71 CUPLAS.768.32 PUESTA EN MARCHA Y CONEXION glb 1.00 398.00 581.14 PARED DEL TANQUE DE HoAo m³ 20.36 60.00 9.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) VIGA DE APOYO DEL TANQUE DE HoAo m³ 3.951.TARIJA” 77 .009.00 3.0 M ML PROV Y COLOC DE ALAMBRE DE PUAS m PORTON DE MALLA OLIMPICA C/CUADRO FG=2" D/PUERTAS PUERTA DE MALLA OLIMPICA C/MARCO FG=1" B=1 H=2.99 pza 1.00 8.0 m pza 3.35 ACOMETIDA ELECTRICA glb 1.587.00 123.586. DE ACCESORIOS glb 1.332.79 25.341.00 1.17 54.96 4.00 5.08 19.05 SUPERVISION glb 1.00 4.888.204.343.97 4.57 3.130.66 LIMPIEZA Y RETIRO DE ESCOMBROS m³ 148.64 6.163.00 587.0x1.38 TAPA METALICA DE VISITA m² 1.23 Elaboración Propia Fuente: Evaluación Privada del Proyecto “Construcción Sistema de Agua Potable Urbanización Las Barrancas” PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .00 REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES m² 225.10 57.676.54 23.102.00 3.227.587.57 REVOQUE ENLUCIDO EXTERIOR DE CEMENTO m² 175.43 996.99 4.692.10 352.D.06 TOTAL PRESUPUESTO: 123.97 154.41 3.05 PROV/COLOCACION HIPOCLORADOR EN LINEA ELECTRONICO pza 1.20 ESCALERA DE ACERO TANQUE ELEVADO (EXTERNA) m 15.912.417.52 4.64 CABLE DE CONTROL DE NIVEL HASTA TANQUE ELEVADO m 200.0 5 M06 .66 9.247.SISTEMA DE BOMBEO 26.00 HORMIGON CICLOPEO (1:3:4.5 HP TRIFASICA+PARADA EN SECO pza 1.130.00 4.535.109 .604.20 587.341.37 46.683.586.0 6 2.82 13. Y COLOC.341.00 4.82 109.89 LOSA DE TAPA DEL TANQUE DE HoAo m³ 6.05 154.23 CASETA PARA HIPOCLORADOR glb 1.082.29 156.15 CAMARA PARA VALVULA DE HoAo 1.621.586.79 28.749.00 6.CIERRE PERIMETRAL-TANQUE 41.01 8.163.50M.40 180.38 ESCALERA METALICA INTERIOR(ANCHO 0.676.LLAVE PASO 100M CABLE SUJ ACERAD juego 1.MITIGACION AMBIENTAL MITIGACION AMBIENTAL glb 1.178.55 REVOQUE INTERIOR DE CEMENTO IMPERMEABILIZANTE m² 155.NIPLE.27 4.47 950.00 1.30 4.81 LOSA DE FONDO DEL TANQUE DE HoAo m³ 6.148.109.40 9. m³ 3.99 TABLERO DE COMANDO 5.109.71 3.00 245.00 9.0 M04 .15 581.32 4.00 9.) m³ 9.44 1.00 pza 1.102.109.63 8.93 M05 .CODO.5 M H=2.40 1.486.38 1.79 84.749.00 4.45 PROV.000.963.00 1.148.75 EXCAVACION MANUAL TERRENO COMUN 0-2 MTS.50% P.009.00 MEDIDOR ENERGIA ELECTRICA CAJA PROTECCION INTERRUP glb 1.93 1.) pza 1.00 154.486.01 VENTILACION TANQUE SEGUN DISEÑO pza 1.963. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Los costos de operación y mantenimiento del Servicio de Agua Potable.000. etc. aplicados al mismo.000.000 lit) lit 3 Energia Electrica (Bomba de 5.) gbl 1.00 2.00 5. ingresos por tarifas mensuales y egresos operativos para realizar la evaluación del proyecto.00 14.680. Para ello se presenta a continuación dos acápites: el primero.Plomero (Empleado Municipal) UNIDA D CANTIDA D mes PRECIO UNITARI O PRECIO PRIVADO 12. donde se muestran y analizan los indicadores de evaluación.00 1. TIRP.00 7. IVANP) Se realizó el flujo de caja para el proyecto.000. INDICADORES FINANCIEROS Indicador Valor (Bs) PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . para ello se tomó en cuenta las inversiones.00 2 Hipoclorito de Sodio (1 lit para 10.00 5 Varios (Papel. se presentan a Continuación: COSTOS DE OPERACIÓN Y MANTENIMIENTO A PRECIOS DE MERCADO (Expresados en Bolivianos a Diciembre del 2014) N o 1 DESCRIPCION Operador-Encargado. CAEP.005.000.00 38. impresora.TARIJA” 78 .00 1.400.00 5.00 3.0 0 Total Elaboración Propia Fuente: Evaluación Privada del Proyecto “Construcción Sistema de Agua Potable Urbanización Las Barrancas” Criterios para la Toma de Decisiones (VANP.475.325.20 31.00 36. el segundo.00 112. considerando los beneficios y costos del proyecto a precios de mercado para un horizonte de evaluación de 20 años.5 HP) Kwh 4 Reparacion de Roturas gbl 1.000. donde se explica la construcción del flujo de caja.000.00 5. ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) VACP 3.70 -0. 1. así los precios de mercado serán corregidos en función a los valores descritos en el siguiente cuadro: Identificación y Estimación de Beneficios a precios sociales.81% RBC Privado IVANP Elaboración Propia Fuente: Evaluación Privada 6.615. se efectúa considerando las “Razones Precio Cuenta”. Por tanto se presenta a continuación la identificación y estimación de los beneficios considerando el aspecto social. El ajuste que se realiza a los precios de mercado. para los diferentes rubros de costos de inversión y operación del proyecto.32 TIRP 12.989.96 CAEP 455. Evaluación Socioeconómica Para establecer la conveniencia o no de la ejecución del proyecto desde el punto de vista de la economía en su conjunto se procede a evaluar el proyecto desde la óptica social.30 VANP -1.TARIJA” 79 .19% 0.998. la estructuración del flujo social del proyecto y finalmente los indicadores pertinentes.40 IX. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .024.381. para que de esta manera la población pueda destinar todo su tiempo y energía a generar alternativas productivas.TARIJA” 80 . El crecimiento económico. Una vez terminada la construcción y se inicie operaciones. en la situación sin proyecto los habitantes padecen PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Al consumir agua que no ha sido procesada y debido a la práctica del fecalismo. Al contar con una mayor cobertura en cuanto se refiere las redes principales dentro del área de concesión se garantiza un aprovisionamiento constante del servicio. Liberación del tiempo destinado a aprovisionarse de agua. El hecho de tener que trasladarse con el objetivo de aprovisionarse de agua representa un costo de oportunidad para las familias y forma parte de un elemento implícito de subdesarrollo que liga a la población con menores oportunidades de desarrollo. con un significativo incremento en el nivel de producción y cobertura de agua potable.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Al identificar los principales beneficios sociales del proyecto. Incremento en el nivel de producción y cobertura. Reducción de enfermedades de origen hídrico. lo que implica también un incremento sustancial en el consumo de agua potable. se expresa que estos corresponden al valor de importancia que las personas le dan a la mejor y mayor disponibilidad de agua por un lado y por otro al bienestar que se estaría provocando por la dotación del bien y estos serán los siguientes: Mayor cobertura. se genera a partir de brindar a la población los servicios más elementales como es el servicio de agua potable. Disminución del riesgo de contaminación del agua.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) entre otro tipo de enfermedades. Aumento de beneficios. Muchos de estos beneficios no pueden contabilizarse monetariamente ó su cálculo resulta muy costoso. Reducción de los Costos Ambientales. Con el proyecto. La construcción de las redes bajo los actualizados estándares mundiales en cuanto se refiere a la calidad del agua. tomando en cuenta la estructura tarifaria de COSAALT referente al sistema fijo y que corresponde a la categoría doméstica es 30. por pérdida de beneficios potenciales en caso de que no pueda implementar este proyecto.TARIJA” 81 . de las llamadas diarreicas agudas. se disminuirá la incidencia de este tipo de enfermedades y por consiguiente se tendrá una reducción en las tasas de mortalidad y en los costos por atención médica. Por otra. generamos directamente un menor costo ambiental por reducir la potencial contaminación de ríos y vertientes que potencialmente pueden ser intervenidas por asentamientos humanos en búsqueda del líquido elemento.53 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . Al permitir a un mayor universo de personas el acceso al agua potable en forma sistemática. permitirá un aprovisionamiento constante y de calidad a todo el universo de consumidores. lo cual si se puede contabilizar para la evaluación socioeconómica. lo que significa que para recuperar su salud destinan recursos monetarios y no monetarios como el tiempo. Se identifica como un beneficio potencial al costo de oportunidad. los ingresos por cobros de tarifas de agua potable. RED DISTRIBUCION DE AGUA POTABLE REPLANTEO Y CONTROL DE LINEAS DE TUBERIA EXCAVACION C/MAQUINARIA COLOCACION DE ARENA PARA TUBERIA PROV.50 319.78 43.) PROV.353.533.391.88 16.250. Identificación y Estimación de Costos a Precios Sociales La ejecución del proyecto requiere de un presupuesto que garantice la construcción de la infraestructura del servicio de agua potable.198.MICROMEDIDOR D=1/2"+ACCES.85 1.50 8.56 22.TENDIDO DE TUBERIA 2 1/2" PVC C-9 (J.00 1. PROVISION Y COLOC. TENDIDO DE TUBERIA 2" PVC C-9 (J.41 109.698.00 6.55 1.) PROV.00 25.04 1.E.TARIJA” 82 .732.86 26.637.00 3. la infraestructura considerando las del servicio.27 128.449.020.E.MANUAL-MAT.467.739.67 61.78 559.422.371.) PROV.35 8. TENDIDO DE TUBERIA 1" PVC E-40 (J.847.R.OBRAS PRELIMINARES INSTALACION DE FAENAS LETRERO OBRAS M02 .00 4.00 8.04 6.008.502.TENDIDO DE TUBERIA 3" PVC C-9 (J.95 12.72 151.92 11.00 1.94 118.49 8.00 50.95 15.867.33 2.TANQUE ELEVADO 120 M3 Unida d Cantida d glb pza 1.10 445.00 959.00 ML m³ m³ m m m m m m m³ m³ pza pza ML pza glb glb 6.514. PRUEBA HIDRAULICA DE TUBERIA CAMARA PARA VALVULA DE HoAo EN RED DISTRIBUCION ACCESORIOS FG P/COLOCACION DE VALVULAS ACCESORIOS DE PVC P/RED DISTRIBUCION M03 . actividades asciende definidas en a el presupuesto.52 20.502.641.14 3.041.00 Precio social Costo Total 10. además de considerar un presupuesto que garantice la operación del proyecto y mantenimiento del mismo para evitar el deterioro de la infraestructura y gastos de administración del proyecto a lo largo de la vida útil.533.00 2.58 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .33 4.67 16.12 802.79 2.54 37.846.00 310.001.00 1.046.SELECCIONA-C/MAT RELLENO COMPACTADO DE TERRENO CON SALTARIN PROVISION Y COLOC.61 365. costo que es netamente para costo de operación y mantenimiento.MACROMEDIDOR D=2"+ACCES. TENDIDO DE TUBERIA 2 1/2" FG PROV.12 37.00 190.862.919.05 85.91 8.165.362.00 14.TENDIDO DE TUBERIA 3" FG RELLENO COMP. PRESUPUESTO A PRECIOS SOCIALES (Expresados en Bolivianos a Diciembre del 2014) Descripción M01 .43 6.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Bs/Mes.02 571.008. El presupuesto de la inversión que requiere el proyecto para la implementación 1.32 16.79 4.90 8.08 820.350.350.353.49 8.14 4.44 de Bs.88 21.98 27.E.27 53.397.) PROV.97 38.397.436.782. 592.696.TARIJA” 83 .28 855.98 226.595.550.00 3.LLAVE PASO 100M CABLE SUJ ACERAD CABLE DE CONTROL DE NIVEL HASTA TANQUE ELEVADO MEDIDOR ENERGIA ELECTRICA CAJA PROTECCION INTERRUP ACOMETIDA ELECTRICA PUESTA EN MARCHA Y CONEXION m² m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m² pza m m² m² glb 174.60 1.28 35.00 2.02 2.767.77 2.900.06 13.74 5.15 38.00 14.NIPLE.00 180.810.19 40.586.68 2.06 1.00 1.MITIGACION AMBIENTAL MITIGACION AMBIENTAL SUPERVISION TOTAL PRESUPUESTO: 3.81 2.02 427.834.53 22.04 pza pza glb m³ 1.00 1. Y COLOC.341.341.00 glb 1.05 665.341.550.96 20.0 m CASETA PARA HIPOCLORADOR LIMPIEZA Y RETIRO DE ESCOMBROS M04 .694.00 154.50M.65 521.00 3.50 8.30 6.909.82 231.37 9.361.834.03 1.48 21.028.698.872.781.42 87.05 123.51 737.00 4. PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS .05 5 154.05 154.36 2.CIERRE PERIMETRAL-TANQUE REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES EXCAVACION MANUAL TERRENO COMUN 0-2 MTS.781.90 2.50 8.06 123.81 2.696.03 571.12 39.45 17.00 1.00 3.12 15.00 1.60 4.00 3.60 124.50% P.81 2.27 1.696.872.88 37.0 M05 .42 12.40 11.084.22 850.75 471.0x1.00 8.00 juego m M06 .57 4.81 2.10 m² m³ m³ ML m pza pza 225.75 2.918.51 737.48 19.769.0 154.00 glb glb 1.00 155. 44 Elaboración Propia Fuente: Evaluación Social A continuación se presenta los costos de operación y mantenimiento a precios sociales del proyecto.53 pza 1.) ESCALERA DE ACERO TANQUE ELEVADO (EXTERNA) REVOQUE INTERIOR DE CEMENTO IMPERMEABILIZANTE REVOQUE ENLUCIDO EXTERIOR DE CEMENTO PROV.092.CODO.028.02 427.00 7.500.084.00 1.125.5 HP TRIFASICA+PARADA EN SECO CUPLAS. HORMIGON CICLOPEO (1:3:4.00 1.60 4.15 2.00 148.47 60.00 1.673.464.270.31 15.12 32.00 1.00 1.480.592.696.00 200.900.52 6.08 25.00 413.128.20 614.30 6.452.341.94 3.599.56 2.81 1.338.00 4.586.96 4.32 11.500.265.715.0 M PROV Y COLOC DE ALAMBRE DE PUAS PORTON DE MALLA OLIMPICA C/CUADRO FG=2" D/PUERTAS PUERTA DE MALLA OLIMPICA C/MARCO FG=1" B=1 H=2.696.00 15.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) REPLANTEO DE ESTRUCTURAS EXCAVACION C/MAQUINARIA HORMIGON POBRE DE NIVELACION LOSA RADIER DE Ho Ao VIGA DE FUNDACION DE HoAo COLUMNA DE HoAo RELLENO COMPACTADO DE TERRENO CON SALTARIN RIOSTRAS DE HoAo VIGA DE APOYO DEL TANQUE DE HoAo LOSA DE FONDO DEL TANQUE DE HoAo PARED DEL TANQUE DE HoAo LOSA DE TAPA DEL TANQUE DE HoAo TAPA METALICA DE VISITA ESCALERA METALICA INTERIOR(ANCHO 0.04 36.82 1.54 16. DE ACCESORIOS PROV/COLOCACION HIPOCLORADOR EN LINEA ELECTRONICO VENTILACION TANQUE SEGUN DISEÑO CAMARA PARA VALVULA DE HoAo 1.72 9.810.) CERCO MALLA OLIMPICA C/POSTES FG=2 C/2.60 glb glb 1.22 pza 1.714.04 7.27 18.SISTEMA DE BOMBEO TABLERO DE COMANDO 5.10 175.53 413.5 M H=2.94 3.00 2.148.74 39.696.D.00 5.128.81 2.148.40 592.81 23.449.31 261.463.00 5.80 55.600. 02 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . TIRS.445.Plomero (Empleado Municipal) CANTIDA D 15.00 90.00 230.0 14.480.000 lit) lit 3 Energia Electrica (Bomba de 5.66 VANS 29.00 0 1.348. IVANS) Al igual que la situación anterior a los precios de mercado se los multiplicó por las respectivas razones de precio cuenta y posteriormente se realiza la evaluación social.00 1.67% RBC Social IVANS Elaboración Propia Fuente: Evaluación Social 12. impresora.TARIJA” 84 .ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) COSTO DE OPERACIÓN Y MANTENIMIENTO A PRECIOS SOCIALES (Expresados en Bolivianos a Diciembre del 2014) N o 1 UNIDA D DESCRIPCION Operador-Encargado.400.72 CAES TIRS 313.00 5.680. etc.5 HP) Kwh 4 Reparacion de Roturas gbl 5 Varios (Papel. aplicados al mismo.0 5.00 0 31.715.69 12. INDICADORES SOCIOECONÓMICOS Indicador Valor (Bs) VACS 2.00 mes 2 Hipoclorito de Sodio (1 lit para 10.01 0.000. Para ello se presenta a continuación la construcción del flujo de caja y los indicadores de evaluación. CAES. 00 Total Elaboración Propia Fuente: Evaluación Social Criterios para la Toma de Decisiones (VANS.554.325.) gbl COSTO SOCIAL 12.0 0 38.475.776.94% 1. IX. Para realizar el análisis de sensibilidad desde el punto de vista privado se toma las variables que tienen mayor influencia en la evaluación del proyecto. limitantes y todos los indicadores previamente descritos.77 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . debido a que los indicadores de rentabilidad presentan valores negativos.TARIJA” 85 . lo que significa que desde el punto de vista privado no es atractivo al momento de realizar la inversión. Análisis de Sensibilidad Análisis de Sensibilidad a precios privados El análisis de sensibilidad para la alternativa seleccionada no se realizará.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) Conclusiones y Recomendaciones Considerando las características socioeconómicas potencialidades. 3. que permitirá mejorar de manera inmediata la calidad de vida de las familias. Por tratarse de un proyecto de tipo social cuyo objetivo principal no es la rentabilidad económica sino el de llegar a cubrir las necesidades básicas de la población. INDICADORES DE COSTO EFICIENCIA Indicador CAEP / Beneficiario Valor (Bs) 204. Indicadores de costo eficiencia privados A continuación se presentan los indicadores de Costo Eficiencia privados del proyecto “Construcción Sistema de Agua Potable Urbanización Las Barrancas”. el proyecto “Construcción sistema de agua potable” para la Urbanización las Barrancas. se constituye en una excelente alternativa para la población implicada en el proyecto. el proyecto cumple con los indicadores de rentabilidad socioeconómica.98 Costo de Inversión / Beneficiario 1.65 Costo de Inversión / Beneficiario 763.816.74 PROYECTO: “CONSTRUCCIÓN DEL SISTEMA DE AGUA POTABLE URBANIZACIÓN LAS BARRANCAS . por lo tanto.35 Costo de Inversión / Conexiones Elaboración Propia Fuente: Evaluación Social 3. sin embargo.TARIJA” 86 .85 VACP / Beneficiarios 1.811.00 VACP / Conexiones 7.277. es recomendable pasar a la siguiente fase del ciclo del proyecto.30 Costo de Inversión / Conexiones Elaboración Propia Fuente: Evaluación Privada 5.055.162.599.48 Análisis de sensibilidad a precios sociales El análisis de sensibilidad no se determina por ser un proyecto de apoyo social.520.37 VACS / Conexiones 1. Indicadores de costo eficiencia socioeconómicos Los indicadores de Costos Eficiencia se determinan según el tipo de proyecto y las variables a tomar en cuenta son los beneficiarios (población) y las familias de la ciudad de Tarija.53 VACS / Beneficiarios 5. porque no se necesita determinar cuanta rentabilidad se va a determinar con el proyecto. A continuación se presentan los indicadores de Costo Eficiencia socioeconómicos. INDICADORES DE COSTO EFICIENCIA Indicador Valor (Bs) CAES / Beneficiarios 140.ESTUDIO INTEGRAL TÉCNICO ECONÓMICO SOCIAL Y AMBIENTAL (TESA) CAEP / Familias 1. Si bien estos indicadores no están dentro de los parámetros establecidos por el VIPFE.023.87 CAES / Familias 704.