ELECTRICAL WORK SHOPE PRACTICE-331SEMESTER 3 ONE LAMP CONTROLLED BY ONE SWITCH AIM:To wire up a circuit in conduit system one lamp controlled by one switch TOOLS REQUIRED:Screw driver 200mm-1no,combination pair 150mm-1no,Line tester 500v-1no, Wire stripper-1 no,pocker-1no, Mallet-1no,etc…. ESTIMATE:SI NO NAME OF METERIALS SPECIFICATION QUATITY UNITS REMARKS Connect the required materials on the work board as per connection diagram. Given the supply to the circuit after checking. 3.one lamp controlled by one switch. Collect the required wiring materials. Draw the lay out and connection diagram. 4. 2. 6. Finished the work neatly and correctly. RESULT:Wired up a circuit in conduit system. TWO LAMP CONTROLLED BY TWO SWITCH AIM:To wire up a circuit in conduit system two lamp controlled by two switch TOOLS REQUIRED:- . Check the circuit for continuity. 5.1 2 3 4 5 6 7 8 9 PROCEDURE:1. Collect the required wiring materials. Connect the required materials on the work board as per connection diagram.Line tester 500v-1no.pocker-1no. REMARKS .Screw driver 200mm-1no. ESTIMATE:SI NO NAME OF METERIALS SPECIFICATION QUATITY UNITS 1 2 3 4 5 6 7 8 9 PROCEDURE:1. 3. Wire stripper-1 no.etc…. 2. Draw the lay out and connection diagram. Mallet-1no. 4. Check the circuit for continuity.combination pair 150mm-1no. Line tester 500v-1no.combination pair 150mm-1no. TWO LAMPS AND A SOCKET OUT LET AIM:To wire up a circuit in conduit system two lamps and a socket out let each controlled independently. Mallet-1no.pocker-1no. Finished the work neatly and correctly. RESULT:Wired up a circuit in conduit system. two lamps controlled by two switches. TOOLS REQUIRED:Screw driver 200mm-1no.5. ESTIMATE:- .etc…. Given the supply to the circuit after checking. 6. Wire stripper-1 no. TOOLS REQUIRED:Screw driver 200mm-1no. Given the supply to the circuit after checking. Draw the lay out and connection diagram. Mallet-1no.pocker-1no. Wire stripper-1 no.SI NO NAME OF METERIALS SPECIFICATION QUATITY UNITS 1 2 3 4 5 6 7 8 9 PROCEDURE:1. Connect the required materials on the work board as per connection diagram. 2. REMARKS . SERIES PARALLEL CIRCUIT To wire up a circuit in conduit system of series parallel connection.combination pair 150mm-1no. Collect the required wiring materials. two lamps and a socket out let each controlled independently. Finished the work neatly and correctly. Check the circuit for continuity.etc….Line tester 500v-1no. 4. 6. RESULT:Wired up a circuit in conduit system. 3. 5. REMARKS .ESTIMATE:SI NO NAME OF METERIALS SPECIFICATION QUATITY UNITS 1 2 3 4 5 6 7 8 9 PROCEDURE:1. 3. 5. Connect the required materials on the work board as per connection diagram. Check the circuit for continuity. Given the supply to the circuit after checking. 4. Collect the required wiring materials. Draw the lay out and connection diagram. 2. Mallet-1no. Finished the work neatly and correctly.combination pair 150mm-1no. . RESULT:Wired up a circuit in conduit system. two lamp controlled by one switch. STAIR CASE WIRING AIM:To wire up a circuit in conduit system one lamp controlled by two switches (stair case wiring) in deferent places.Line tester 500v-1no.etc…. Wire stripper-1 no. TOOLS REQUIRED:Screw driver 200mm-1no.6.pocker-1no. 2. Given the supply to the circuit after checking. 4. 3. Finished the work neatly and correctly. Check the circuit for continuity. 5. Collect the required wiring materials. RESULT:To wired up a circuit in conduit system One lamp controlled by two switches (stair case wiring) in deferent places. 6. HOSPITAL WIRING AIM:To wire up a circuit in conduit system two lamps controlled by two switches (one way and two way hospital wiring) TOOLS REQUIRED:- . Connect the required materials on the work board as per connection diagram.ESTIMATE:SI NO NAME OF METERIALS SPECIFICATION QUATITY UNITS REMARKS 1 2 3 4 5 6 7 8 9 PROCEDURE:1. Draw the lay out and connection diagram. Screw driver 200mm-1no. Wire stripper-1 no. ESTIMATE:SI NO NAME OF METERIALS 1 2 3 4 5 6 7 8 9 PROCEDURE:- SPECIFICATION QUATITY UNITS REMARKS . Mallet-1no.Line tester 500v-1no.pocker-1no.etc….combination pair 150mm-1no. 3. Given the supply to the circuit after checking. 6. 2. Finished the work neatly and correctly. . 5. 4.Line tester 500v-1no. Connect the required materials on the work board as per connection diagram. Check the circuit for continuity.pocker-1no. RESULT:To wired up a circuit in conduit system two lamps controlled by two switches (one way and two way hospital wiring) GODOWN WIRING AIM:To wire up a circuit in conduit system as per layout and conditions (go down wiring) TOOLS REQUIRED:Screw driver 200mm-1no.1. Wire stripper-1 no. Mallet-1no.etc…. Draw the lay out and connection diagram.combination pair 150mm-1no. Collect the required wiring materials. Mallet-1no.ESTIMATE:SI NO NAME OF METERIALS SPECIFICATION QUATITY UNITS 1 2 3 4 5 6 7 8 9 PROCEDURE:1. Check the circuit for continuity.pocker-1no. Connect the required materials on the work board as per connection diagram. Finished the work neatly and correctly. 2.etc…. 6. RESULT:To wire up a circuit in conduit system as per layout and conditions (go down wiring) HOUSE WIRING SINGLE PHASE AIM:To study about single phase house wiring and wire up the circuit TOOLS REQUIRED:Screw driver 200mm-1no. 3. REMARKS . Wire stripper-1 no. Draw the lay out and connection diagram. Collect the required wiring materials.combination pair 150mm-1no. 4.Line tester 500v-1no. Given the supply to the circuit after checking. 5. 6. 3. Given the supply to the circuit after checking. Collect the required wiring materials. REMARKS . 4. Finished the work neatly and correctly. Check the circuit for continuity. 2.ESTIMATE:SI NO NAME OF METERIALS SPECIFICATION QUATITY UNITS 1 2 3 4 5 6 7 8 9 PROCEDURE:1. Draw the lay out and connection diagram. 5. Connect the required materials on the work board as per connection diagram. RESULT:To study about single phase house wiring and wire up the circuit .