Drawings



Comments



Description

Page 1 of 57Effective from Feb, 2010 Master List No. TIM 0003 Revision 7 RESEARCH DESIGNS AND STANDARDS ORGANISATION TRACTION INSTALLATION DIRECTORATE 1.0 TITLE : MASTER LIST OF DRAWINGS OF EQUIPMENTS AND MATERIALS FOR TRACTION INSTALLATION . PREPARED BY APPROVED BY SE/DOC. DTI-P&S Page 2 of 57 Sl. N NO. o. Effective from Feb, 2010 DRAWING R E V Master List No. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E INDEX Sl No DESCRIPTION PAGE NO. CHAPTER - I - OVERHEAD EQUIPMENT 1 2 3 4 GENERAL ARRANGEMENT FOR CONVENTIONAL OHE ATD series COMPONENTS , FITTINGS, EQUIPMENTS AND SMALL PART STEEL WORKS GENERAL ARRANGEMENT AND FITTINGS FOR COMPOSITE OHE (ALUMINIUM ALLOY CATENARY AND COPPER CONTACT WIRE) 03 09 10 21 CHAPTER - II - POWER SUPPLY INSTALLATION 1 2 GENERAL ARRANGEMENT OF SUB STATION LAYOUT ,SWITCHING STATION, BT, REMOTE CONTROL AND EARTHING ARRANGEMENT. GENERAL ARRANGEMENT OF SUB STATION LAYOUT ,SWITCHING STATION, BT, REMOTE CONTROL AND EARTHING ARRANGEMENT FOR 2 X 25 kV ‘AT’ SYSTEM. SHUNT CAPACITORS AND PROTECTION FOR 25 kV ac TRACTION SYSTEM PROTECTION FOR 2 X 25 kV ac ‘AT’ SYSTEM COMPONENTS AND FITTINGS HIGHER CAPACITY CONNECTORS FOR 220 kV AND 25 kV (50 mm O/D ALUMINIUM BUS BAR) SYSTEM 23 28 3 4 5 6 29 30 31 33 CHAPTER - III - CIVIL 1 2 3 4 5 6 7 8 9 OHE MAST (STEEL) OHE PORTALS, TTC, DROPARMS AND SPS STRUCTURAL LAYOUT, STRUCTURES AND FOUNDATION FOR TRACTION SUB STATION STRUCTURES, FENCING AND SPS FOR SWS AND BT OHE SUPERMAST AND SPS EMPLOYMENT SCHEDULE OF OHE MAST OHE FOUNDATIONS MISCELLANEOUS SPUN PRESTRESS CEMENT CONCRETE (PSC) OHE MAST 35 36 39 41 43 45 53 54 54 Page 3 of 57 Effective from Feb, 2010 Sl. DRAWING NO. R No. E V Master List No. TIM 0003 Revision 7 DESCRIPTION DATE OF ISSUE S I Z E Chapter - I - OVERHEAD EQUIPMENT 1. GENERAL ARRANGEMENT FOR CONVENTIONAL OHE 1 2 3 4 5 6 ETI/OHE/G/00111 Sh.1 RE/33/G/00111 Sh.2 ETI/OHE/G/00112 ETI/OHE/G/00131 ETI/OHE/G/00144 Sh.3 ETI/OHE/G/00158 Sh-1 C D C Extra allowance for setting of structures on curves (broad gauge) Extra allowance for setting of structures on curves (metre gauge) Standard setting of structures in the vicinity of signals (broad gauge) Typical design of side bearing foundation Standard drilling schedule of OHE mast 9.5 m long (RSJ and BFB) Employment schedule of bracket tubes regulated conventional OHE (Cd Cu catenary and Cu contact wire 1000 kgf. tension each for wind pressure 75kgf /.m2 Employment schedule of bracket tubes regulated conventional OHE (Cd Cu catenary and Cu contact wire 1000 kgf tension each) for wind pressure 112.5kgf /sq.m. Employment schedule of bracket tubes regulated conventional OHE (Cd Cu catenary and cu contact wire 1000 kgf tension each) for wind pressure 150 kgf / sq.m. Employment schedule of bracket tubes unregulated conventional OHE (Cd Cu catenary and Cu contact wire 1000 kgf tension each for wind pressure 75kgf /sq.m. Employment schedule of bracket tubes unregulated conventional OHE (Cd Cu catenary and Cu contact wire 1000 kgf tension each) for wind pressure 112.5kgf /sq.m. Employment schedule of bracket tubes unregulated conventional OHE (Cd Cu catenary and Cu contact wire 1000 kgf tension each) for wind pressure 150 kgf /sq.m. General distribution of droppers. Dropper schedule for unregulated OHE with equal encumbrance (1.40/1.40). Dropper schedule for unregulated OHE with unequal encumbrance (1.40/0.90). Dropper schedule for unregulated OHE with unequal encumbrance (1.40/0.75). Dropper schedule for uninsulated overlap span. Dropper schedule for insulated overlap span. Dropper schedule for compensated OHE with equal encumbrance (1.40/1.40) for speed upto 160km/h. 20.10.05 17.05.62 20.10.05 21.08.71 24.12.97 28.06.84 A 2 3 1 2 2 2 7 ETI/OHE/G/00158 Sh-2 - 28.06.84 2 8 ETI/OHE/G/00158 Sh- 3 - 28.06.84 2 9 ETI/OHE/G/00159 Sh-1 - 28.06.84 2 10 ETI/OHE/G/00159 Sh-2 - 28.06.84 2 11 ETI/OHE/G/00159 Sh- 3 - 28.06.84 2 12 13 14 15 16 17 18 ETI/OHE/G/00161 ETI/OHE/G/00166 ETI/OHE/G/00167 ETI/OHE/G/00168 ETI/OHE/G/00169 ETI/OHE/G/00170 ETI/OHE/G/00173 A A A A A B 28.04.72 02.08.74 02.08.74 02.08.74 01.12.94 02.08.74 02.08.74 3 2 2 2 2 2 1 Page 4 of 57 Sl. N NO. o. Effective from Feb, 2010 DRAWING R E V Master List No. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 1 2 2 2 2 3 2 2 2 3 2 2 2 2 2 2 1 2 1 1 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 ETI/OHE/G/00173-1 ETI/OHE/G/00174 ETI/OHE/G/00175 ETI/OHE/G/00176 ETI/OHE/G/00177 RE/33/G/00181 RE/33/G/00182 RE/33/G/00183 Sh. 1 RE/33/G/00183 Sh. 2 RE/33/G/00184 Sh. 1 RE/33/G/00184 Sh. 2 RE/33/G/00185 Sh. 1 RE/33/G/00185 Sh. 2 ETI/OHE/G/00186 Sh. 1 RE/33/G/00186 Sh. 2 ETI/OHE/G/00187 RE/33/G/00193 ETI/OHE/G/00195 RE/33/G/00197 ETI/OHE/G/00202 B A D A A C B A A A A A - Dropper schedule for regulated OHE in worn out condition of 107 sqmm contact wire (9.75mm thickness) Dropper schedule for compensated OHE with unequal encumbrance (1.40/0.90) for speed upto 160km/h Dropper schedule for compensated OHE with unequal encumbrance (1.40/0.75) for speed upto 160km/h Dropper schedule for compensated OHE with unequal encumbrance (1.75/1.40) for speed upto 160km/h Dropper schedule for conventional regulated OHE with zero presage (1400/1400) Outline of pantograph (BG & MG) Arrangement of pantograph multiple headed train BG General clearance diagram on BG tracks (tangent and flat curves ) General clearance diagram on MG tracks (tangent and flat curves ) General clearance diagram on BG tracks (sharp curves ) General clearance diagram on MG tracks (sharp curves ) Restricted clearance diagram on tangent tracks BG Restricted clearance diagram on MG tracks (tangent and flat curves) Restricted clearance diagram on curved track on BG Restricted clearance diagram on MG tracks (sharp curves) Chart showing the blow off, push up and oscillations of the standard a.c. OHE Adjustment chart of regulating equipment winch type & pulley block type Adjustment chart of regulating equipment three pulley type 3:1 ratio Cantilever adjustment chart at mean temperature 35 0C Span and stagger chart (conventional OHE Cd copper catenary and Cu contact wire) for wind pressure 75,112.5 & 150 kgf/sq. m Sag and tension chart for loaded catenary General formation of single track in embankments cuttings BG General formation of single track in embankments cuttings MG General formation of double track in embankments cuttings BG General formation of double track in embankments cuttings MG General formation of multiple tracks BG General formation of multiple tracks MG Leading dimensions of turnouts BG Leading dimensions of turnouts MG and and and and 09.10.95 03.04.80 02.08.74 02.08.74 05.09.94 05.03.62 04.08.66 09.08.67 06.06.62 10.04.62 06.06.62 16.04.64 06.06.62 14.01.83 06.06.82 25.08.76 27.01.67 28.06.94 31.01.61 27.03.85 39 40 41 42 43 44 45 46 47 ETI/OHE/G/00222 Sh. 1 RE/33/G/01101 Sh. 1 RE/33/G/01101 Sh. 2 RE/33/G/01102 Sh. 1 RE/33/G/01102 Sh. 2 RE/33/G/01103 Sh. 1 RE/33/G/01103 Sh. 2 RE/33/G/01104 Sh. 1 RE/33/G/01104 Sh. 2 A A A - 11.09.72 07.09.62 06.04.62 07.04.62 06.04.62 07.04.60 06.04.62 20.04.62 17.05.62 1 3 3 2 2 2 2 3 2 Page 5 of 57 Sl. DRAWING NO. No. Effective from 31.12.2008 R E V Master List No. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 3 3 1 1 2 2 2 1 1 2 1 1 0 0 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 RE/33/G/01105 Sh. 1 RE/33/G/01105 Sh. 2 RE/33/G/01112 Sh. 2 RE/33/G/01401 ETI/OHE/G/01402 ETI/OHE/G/01403 Sh-1 ETI/OHE/G/01403 Sh-2 ETI/OHE/G/01403 Sh-3 ETI/OHE/G/01502 ETI/OHE/G/01503 Sh-1 ETI/OHE/G/01503 Sh-2 ETI/OHE/G/01505 ETI/OHE/G/01601 ETI/OHE/G/01701 ETI/OHE/G/01702 ETI/OHE/G/02101 ETI/OHE/G/02102 ETI/OHE/G/02102 Sh-3 ETI/OHE/G/02103 ETI/OHE/G/02104 Sh-1 RE/33/G/02104 Sh-2 ETI/OHE/G/02106 Sh-1 ETI/OHE/G/02106 Sh-3 RE/33/G/02107 ETI/OHE/G/02108 ETI/OHE/G/02111 ETI/OHE/G/02113 ETI/OHE/G/02121 Sh-1 ETI/OHE/G/02121 Sh-4 ETI/OHE/G/02131 Sh-1 ETI/OHE/G/02131 Sh-3 ETI/OHE/G/02141 A E B D C B B A A A A A A C D A A F A A C Leading dimensions of crossing BG Leading dimensions of diamond crossing MG Normal profile of maximum moving dimensions MG Standard anchor arrangement Anchor arrangement with dwarf mast Schedule of anchor block for BG. Tracks Double guy rod arrangement with anchor block BG track Schedule of anchor blocks for BG tracks (black cotton soil) Trapezoidal counter weight arrangement on OHE structures Cement concrete counter weight arrangements on OHE structures for winch type regulating equipment Cement concrete counter weight arrangement on N, O & R type portal upright Standard guide tube arrangement on a mast and structures Arrangement of 3kV and 25kV pedestal insulator supports on OHE masts and portals Standard arrangements for mounting of number plate on OHE structures Standard arrangement for mounting of number plate (Retro-reflective type) on OHE structures Schematic arrangement of regulated OHE Typical arrangement of OHE on cantilever mast for double track section Typical arrangement for fixing of bracket assembly on 9.5 m mast and structure to suit raising of track in future General arrangement of OHE with stitch wire on catenary Mast on platforms BG Mast on platforms MG Details of bracket arrangement on tangent and curved tracks Details of bracket arrangement for OHE high speed Single bracket assembly on structures and dropped arms. Box type cantilever arrangement Arrangement of anticreep Standard cantilever arrangement for boom anchor anticreep location Schematic arrangement of uninsulated overlap (Type I) (3 and 4 span overlaps) Schematic arrangement of uninsulated overlap (3 & 4 span overlaps) Schematic arrangement of insulated overlap Schematic arrangement of insulated overlap General arrangement of regulated OHE at (overlap and crossed type) 20.04.62 17.05.62 23.05.62 06.08.82 25.09.72 13.08.99 13.08.99 29.05.79 04.02.72 30.04.91 30.04.91 19.11.87 03.02.72 23.03.85 23.02.98 04.07.94 22.06.81 05.01.77 06.05.72 20.01.73 25.06.62 25.08.72 04.07.94 25.07.84 09.01.97 04.07.94 27.01.69 20.05.74 04.07.94 25.09.87 04.07.94 25.09.87 2 2 2 2 2 0 2 0 2 2 1 2 1 1 1 2 turn outs 06.94 15.81 22.84 01.06. Potential equalizer connection at insulated overlap and neutral section.06.07.5m long RSJ and BFB for tramway type OHE (regulated ) Drilling schedule of OHE mast 9.01.07.04. Effective from Feb.03 16.98 22.06.Page 6 of 57 Sl. Connection at diamond crossing.10.07.12.08.07.84 15.74 18. o.82 03. Connection at turnouts.81 25.72 12. Antitheft jumper.01.08. In span jumper connection between catenary and contact wire.02. 2010 DRAWING R E V Master List No.98 14.72 06.01.82 16.09.94 3 3 1 2 2 3 2 .81 22.81 11. Continuity jumper connection at un-insulated overlap.94 04.82 16.96 18.94 21.02. (for regulated tramway type OHE) General arrangement of turnout for tramway type OHE (regulated) Adjustment chart for tramway type OHE (regulated) Standard termination of tramway type OHE (regulated with pulley type regulating equipment) (3:1 ratio) General arrangement of connections at switching stations and BT locations for tramway type OHE.88 22.01.11.10.04.06.10.0m long RSJ and BFB for tramway type OHE (regulated ) Schematic arrangement of tramway type OHE (regulated) Arrangement of bracket assembly for tramway type OHE (regulated) Arrangement of anticreep for tramway type OHE (regulated) Arrangement of anticreep for tramway type OHE (regulated) (alternative arrangement) Arrangement of section insulator for tramway type OHE (regulated) Small parts steel for supporting section insulator assembly.01.83 28.07.94 103 104 105 106 107 108 109 ETI/OHE/G/04213 ETI/OHE/G/05101 ETI/OHE/G/05102 ETI/OHE/G/05103 ETI/OHE/G/05104 ETI/OHE/G/05106 ETI/OHE/G/05107 C B A A 22.03.98 04.01 25.06.85 15.10.94 21. 13.85 26.72 10. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 1 1 2 2 2 1 2 2 2 2 1 3 2 2 2 3 3 3 2 2 3 3 3 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 ETI/OHE/G/02151 ETI/OHE/G/02161 Sh-1 ETI/OHE/G/02161 Sh-2 ETI/OHE/G/02162 ETI/OHE/G/03101 ETI/OHE/G/03121 ETI/OHE/G/03151 ETI/OHE/G/03152 Sh-1 ETI/OHE/G/03152 Sh-2 ETI/OHE/G/03201 ETI/OHE/G/03301 ETI/OHE/G/04201 ETI/OHE/G/04202 Sh-1 ETI/OHE/G/04202 Sh-2 ETI/OHE/G/04203 ETI/OHE/G/04204 ETI/OHE/G/04205 ETI/OHE/G/04206 ETI/OHE/G/04207 Sh-1 ETI/OHE/G/04207 Sh-2 ETI/OHE/G/04208 ETI/OHE/G/04209 ETI/OHE/G/04212 C E A C C C B B B B B B General arrangement of regulated OHE at cross over (Overlap and crossed type) Arrangement of neutral section Arrangement of short neutral section Arrangement of neutral section assembly (PTFE type ) at switching station Schematic arrangement of unregulated OHE Standard termination of OHE (regulated and unregulated) General arrangement of unregulated OHE at turnout (crossed and overlap type) General arrangement of unregulated OHE at cross over and diamond crossings (crossed and overlap type) General arrangement of unregulated OHE at diamond crossings General arrangement of head span General arrangement of pull off Span and stagger chart for tramway type OHE (regulated) Drilling schedule of OHE mast 8.85 04. N NO. 04. Suspension arrangement of 25kv feeder at Switching station/Feeding post (for 2x25 kV).2008 R E V Master List No.Page 7 of 57 Sl.91 28. Connection between OHE and aluminium RC at booster station.72 30. Suspension of RC (spider) from boom of structures.93 30.94 2 2 2 1 0 2 2 2 2 0 0 1 0 2 1 2 3 1 3 1 2 2 2 . Arrangement of sectioning of AT feeder (for 2x25kV) General arrangement of connections at an elementary sectioning point on double track section (for 2x25kV) Mounting details of double pole Isolator on mast(for 2x25kV) Suspension of AT feeder (spider) from boom of portals (for 2x25kV AT system) Mounting details of double pole Isolator on portals (for 2x25kV) Span and stagger chart.07. Effective from 31.85 04.92 14.02. Termination arrangement for AT feeder. Characteristics of conductor/bus bar for 25 kV ac traction.85 07. General arrangement of earth wire on OHE mast.02.12.93 13.77 03.09.92 03.02. Connection of RC to track.92 23.12.05.83 14.11.89 23.06.79 04. Mounting of 25 kV Isolators on OHE structures (general arrangement). DRAWING NO.10. Suspension arrangement of AT feeder on portals (For 2x25 kV). Suspension of RC (spider) from boom of structures with clevis type disc insulator.03.09. 30. Connection from Isolator to OHE.06.03 13.94 31.01.91 28. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 2 3 1 1 2 110 111 112 113 114 115 ETI/OHE/G/05121 Sh-1 ETI/OHE/G/05122 Sh-1 ETI/OHE/G/05123 Sh-1 ETI/OHE/G/05143 RE/33/G/05145-1 RE/33/G/05152 C C C B A C 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 RE/33/G/05181 ETI/OHE/G/05201 ETI/OHE/G/05201-1 ETI/OHE/G/05251 ETI/OHE/G/05306 ETI/OHE/G/05307 ETI/OHE/G/05311 ETI/OHE/G/05312 ETI/OHE/G/05413 ETI/OHE/G/05513 Sh-1 ETI/OHE/G/05513 Sh-2 ETI/OHE/G/05516 ETI/OHE/G/05600 ETI/OHE/G/06000 ETI/OHE/G/06001 ETI/OHE/G/06002 ETI/OHE/G/06003 ETI/OHE/G/06004 ETI/OHE/G/06005 Sh-1 ETI/OHE/G/06005 Sh-2 ETI/OHE/G/06006 ETI/OHE/G/06008 ETI/OHE/SK/124 C A A F B D A B A A A A B A B B General arrangement of connection to OHE by copper cross feeder (150) General arrangement of connection at switching station on double track section by copper cross feeder (150) General arrangement of connection at switching station on multiple track section by copper cross feeder (150) Suspension of 25 kV feeders (spider) on OHE masts.94 14.10.01.02.94 30.92 02.86 24. return conductor and return feeder (copper and aluminium ) Arrangement of suspension of double spider 25 kV feeder and return feeder between sub-station and feeding station Assembly of section insulator General arrangement of earth wire on OHE mast.92 01.10.11. Suspension arrangement of AT feeder on traction mast (for 2x25 kV).89 17.09.10.93 30.93 04.93 14.09.11.11.05.09.01.09. Details of small parts steel work for supporting 25 kV Isolators on new TTC boom. No.92 28.72 07.92 02. Arrangement of transverse bonds. Suspension arrangement of aluminium return conductor (spider) on traction structures. Termination of feeder. 08.94 26. Sag and tension chart for catenary (65mm2) and contact wire (107mm2) for 1200kgf/1200kgf tension. Schematic arrangement of uninsulated overlap (Three spans and four spans).09.02.1 ETI/OHE/SK/473 Sh.09. N NO. Dropper schedule for uninsulated overlap span (for higher section of OHE).12.94 01.88 26. Insulated Tee junction Earthing clamp assembly Dropper schedule for regulated OHE in worn out condition of 107 mm2 contact wire (10 mm thickness) Dropper schedule for over lap’s spans.94 15.90 24.01.85 26-09-96 26-09-96 25.12.02. Arrangement for endurance and proof load test of regulating equipment (winch type ) Bracket arrangement on tangent track inside tunnel.94 01.02.94 02. Schematic arrangement of insulated overlap Dropper schedule for regulated OHE (1200 kgf/1200 kgf tension) Dropper schedule for uninsulated overlap spans (1200kgf / 1200kgf tension) Dropper schedule for insulated overlap spans (1200kgf / 1200kgf tension) Counter weight assembly.3 ETI/OHE/SK/481 ETI/OHE/SK/482 ETI/OHE/SK/521-1 ETI/OHE/SK/522 ETI/OHE/SK/523 ETI/OHE/SK/524 RE/33/531 ETI/OHE/SK/544 ETI/OHE/SK/551 ETI/OHE/SK/552 ETI/OHE/SK/581 ETI/OHE/SK/582 ETI/OHE/SK/583 ETI/OHE/SK/584 ETI/OHE/SK/585 ETI/OHE/SK/586 ETI/OHE/SK/587 ETI/OHE/SK/588 ETI/OHE/SK/597 ETI/OHE/SK/603 ETI/OHE/SK/604 ETI/OHE/ SK/605 ETI/OHE/ SK/606 ETI/OHE/ SK/607 ETI/OHE/ SK/608 A A A A A A A - Dropper schedule for insulated overlap span (for higher section of OHE).94 . Counter weight assembly (1200/1200) Bracket arrangement in tunnels with soft soil (For DBK Rly projects) Typical Sectioning diagram at station with Isolators.Page 8 of 57 Sl.94 02. Arrangement of neutral section for conversion with short neutral section.94 11.85 05.85 05.65 26.94 15.94 01. (For 2x25 kV).02.12. Typical pneumatic circuit for raising/lowering of pantograph from cab of OHE recording cum test car.11.02.02.2 ETI/OHE/SK/473 Sh.94 02.96 28. Detail of bracket arrangement inside tunnel.89 24.94 06-08-84 05.95 26.02.95 05. 2010 DRAWING R E V Master List No.88 05.08. Dropper schedule for anchor spans.94 01.09.12.94 01.90 02. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 3 3 2 1 1 1 2 1 1 1 2 3 3 3 1 2 2 2 2 1 2 2 3 2 4 2 2 2 2 2 2 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 ETI/OHE/SK/148 ETI/OHE/SK/149 ETI/OHE/SK/467 ETI/OHE/SK/473 Sh.09.09. o. Arrangement of short neutral section at existing feeding post.12. Counter weight eye rod. Sag and tension chart ( higher section of OHE) Dropper schedule for regulated OHE (for higher section of OHE) Schematic arrangement of uninsulated over lap (Three spans and four spans ) for higher section of OHE Schematic arrangement of insulated over lap (Three spans and four spans ) for higher section of OHE 22.12.96 02. Bracket arrangement on curved track inside tunnel.01. Schematic arrangement of insulated overlap (Three spans and four spans).94 02. Schematic arrangement of unined overlap.04.06.12.02. Effective from Feb.02. 02.05 27. 9.2008 R E V Master List No.10.01 11.I . Adjustment chart of Regulating equipment three pulley types (3:1 Ratio) old for composite OHE.09. DRAWING NO. 8.05. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 2 170 171 ETI/OHE/ SK/609 ETI/OHE/ SK/610 - Schematic arrangement of uninsulated over lap (Three spans and four spans) Schematic arrangement of insulated over lap (Three spans and four spans) 01. 7.08. Effective from 31.Page 9 of 57 Sl. Adjustment chart of Regulating equipment three pulley type (3:1 Ratio) modified for composite OHE. ATD Series 1.06 14.12.OVERHEAD EQUIPMENT 2. Bolt M-18with castle nut.12.03 14. Fixing arrangement of mast Anchor fitting for Anti falling device in three pulley (Mod) ATD 29.06 30. No.06 15. 2. 6. 4.10. 5.07 00-09-99 19. TI/DRG/OHE/ATD/ RDSO/00001/99/2 TI/DRG/OHE/ATD/ RDSO/00002/99/3 TI/DRG/OHE/ATD/ RDSO/00003/99/0 TI/DRG/OHE/ATD/ RDSO/00004/00/0 TI/DRG/OHE/ATD/ RDSO/00005/02/1 TI/DRG/OHE/ATD/ RDSO/00006/04/0 TI/DRG/OHE/ATD/ RDSO/00007/04/0 TI/DRG/OHE/ATD/ RDSO/00008/05/0 TI/DRG/OHE/ATD/ RDSO/00009/05/0 Regulating equipment (three pulley type) 3:1 ratio (Modified) Part Details of Regulating equipment (three pulley type) 3:1 ratio (Modified) Adjustment chart of Regulating equipment (three pulley type) 3:1 ratio (Modified) Trapezoidal counter weight assembly 3:1 ratio.94 Chapter .94 01. 3.06 A 1 0 2 1 3 4 4 4 2 - .12.06.06. Clevis & Eye (Forged). 06.01.61 24.60 22.95 01.03.along clamp Contact wire straightener assembly.10.61 06.06.01 17.88 17.OVERHEAD EQUIPMENT 3.06.05 17.88 01. High tensile rustles pin bolt 10 mm dia.87 19.60 24.08.06. Terminal connector (19mm) multiple holes (bolted type) Terminal connector (15mm) multiple holes (bolted type) Contact wire parallel clamp large Parallel Clamp (157-65/ 107/150 ) for WKRE Contact wire parallel clamp part large Contact wire parallel clamp part small Parallel Clamp (90/50) Contact wire parallel clamp part small Parallel Clamp (150/105-150) for WKRE Parallel Clamp (150/160) for WKRE Parallel Clamp part (150/105-150) Bridle wire Clamp (6mm) with two bolts Contact wire splice (107) Contact wire splice (toothed type) Contact wire splice part Contact wire splice part Catenary splice (65) Catenary splice sleeve Catenary joint socket Catenary joint socket left Catenary joint cone Feeder joint socket 19.71 08.08.01 19.59 14.06.61 24.65 03.87 29.11.01.74 30.01. Effective from Feb.09.71 29.03.06.08. EQUIPMENTS AND SMALL PART STEEL WORKS (SPS) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 ETI/OHE/P/150 RE/33/P/160 RE/33/P/250 RE/33/P/260 RE/33/P/500 RE/33/P/501 RE/33/P/504 RE/33/P/509 RE/33/P/510 RE/33/P/511 RE/33/P/520 RE/33/P/521 RE/33/P/522 RE/33/P/523 RE/33/P/530 RE/33/P/550 RE/33/P/560 ETI/OHE/P/580 ETI/OHE/P/581-599 ETI/OHE/P/1009 ETI/OHE/P/1010 ETI/OHE/P/1030-2 ETI/OHE/P/1030-3 ETI/OHE/P/1031-2 ETI/OHE/P/1040-2 ETI/OHE/P/1040-3 ETI/OHE/P/1041-2 ETI/OHE/P/1050-2 ETI/OHE/P/1050-3 ETI/OHE/P/1051-2 ETI/OHE/P/1070-1 ETI/OHE/P/1080 ETI/OHE/P/1080-1 ETI/OHE/P/1081-1 ETI/OHE/P/1081-2 ETI/OHE/P/1090 ETI/OHE/P/1091 ETI/OHE/P/1092 ETI/OHE/P/1093 ETI/OHE/P/1094 ETI/OHE/P/1102 A B C B A A A A A D A C E B C D A C B A B C A A High tensile rustles ‘U’ bolt 10 mm dia.06.05 10.61 22.10. o.06.06.01.02. COMPONENTS.01 19.01. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter . Details of contact wire straightener.62 25.61 24.60 11.71 29.84 03.06.06.95 01.I .01.05.65 11.91 24. 2010 DRAWING R E V Master List No.09.61 06.61 14.71 29. FITTINGS.74 01.03.70 11.06.03. Steel ‘U’ bolt and nuts dia 14 mm Snap head pin dia 20 mm Rail jumper assembly Rail jumper clamp body grip screw and ferrule nut Rail jumper ferrule Rail jumper extension Earthing rods Earthing rods Earthing rod hook assembly Earthing rod head Earthing rod tongue Earthing rod hook pin and other small parts Insulated Tee junction Automatic come-along clamp (for contact wire) Automatic come.01 23.91 19.03.02.91 23.06.03.07.Page 10 of 57 Sl.07.05.06.01.91 19.01 09.72 A 3 3 3 3 2 2 3 2 3 1 3 3 3 3 1 1 1 2 0 3 2 3 2 3 3 3 2 3 2 3 2 2 2 2 2 3 3 3 3 3 3 . N NO.70 10. Dropper.10. ‘U Clamp (50/50) ‘U Clamp (50) Thimble (10mm) Steel wire Ending Clamp (90) Steel wire joint socket.74 03.69 27.06.88 07.79 .11.85 01.11.00 01.65 01. Contact wire swivel clip Contact wire swivel clip part Contact wire swivel clip pin Standard contact wire crossing assembly.09.11.06. Suspension clamp Suspension clamp body Suspension clamp lock plate Double suspension clamp Double suspension clamp body Double suspension lock plate Packing saddle Contact wire dropper clip (107) Contact wire dropper clip part Locking wire Catenary dropper assembly.Page 11 of 57 Sl.88 03.11. Bridle wire dropper clip.12. Steel wire joint cone.12.88 08.65 11.00 01.71 01.09.78 08.74 09.06.87 18.88 03.88 03.94 18.93 20.06.12.08.96 01. Raised register arm clamp.05.04.01.84 04.87 19.73 03.06.71 25. Crossing clamp piece.88 18. DRAWING NO.69 01.2008 R E V Master List No.09.94 06. Crossing clamp.06.96 09.10.01.09. Double contact wire swivel clip Double contact wire swivel clip part Strain clamp link assembly Strain clamp link.88 12.12.1174 01. Effective from 31.01. Knuckle tube clamp.09.06.01.06. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 2 3 1 3 3 3 3 3 2 2 3 2 2 3 3 3 3 3 3 3 3 3 3 2 3 3 2 3 3 3 3 1 3 3 3 2 3 3 3 3 3 3 3 2 2 3 3 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 ETI/OHE/P/1104 ETI/OHE/P/1110-2 ETI/OHE/P/1120 ETI/OHE/P/1120-1 ETI/OHE/P/1121 ETI/OHE/P/1130 ETI/OHE/P/1131 ETI/OHE/P/1140 ETI/OHE/P/1143 RE/33/P/1160 RE/33/P/1161 RE/33/P/1163 RE/33/P/1170 RE/33/P/1171 RE/33/P/1172 RE/33/P/1174 RE/33/P/1180 RE/33/P/1181 RE/33/P/1182 ETI/OHE/P/1190 ETI/OHE/P/1191 ETI/OHE/P/1192 ETI/OHE/P/1193 ETI/OHE/P/1194 ETI/OHE/P/1210-2 ETI/OHE/P/1216 RE/33/P/1220 RE/33/P/1221 RE/33/P/1222 ETI/OHE/P/1230 ETI/OHE/P/1233 RE/33/P/1250 RE/33/P/1251 ETI/OHE/P/1260-1 ETI/OHE/P/1263 RE/33/P/1270-1 RE/33/P/1280 ETI/OHE/P/1310 ETI/OHE/P/1320 ETI/OHE/P/1330 ETI/OHE/P/1350 ETI/OHE/P/1360 ETI/OHE/P/1361 ETI/OHE/P/1362 ETI/OHE/P/1370-1 ETI/OHE/P/1370-2 ETI/OHE/P/1390-1 ETI/OHE/P/1391-1 D B A B B J E D K F C B F G C B C A C D E D C D A A F C B B B A B F D B Feeder joint cone Contact wire ending clamp (107) Catenary ending clamp (65) Catenary ending clamp (65) wedge type Catenary ending clamp body Feeder ending clamp (150) Feeder ending clamp body Large span wire ending clamp (130) Large span wire joint cone.74 06. Catenary dropper link.03.88 20.06.02.84 08.88 01. Suspension clevis assembly (18 mm) Double contact wire splice Pull off Clamp assembly.08. Knuckle assembly.06.08.11. 02.11.88 03.72 03.06.85 01.06. No.88 03.06. Contact wire crossing bar.06.02.69 16.08.88 08.88 01. Raised register arm Clamp (150 FB).84 13.94 26.74 06. Catenary dropper clip.88 03.69 01.05.88 01.07.11.06 88 06. 89 25. Compression joint (spider).85 03.09.12.88 22. N NO.11. Bimetallic parallel clamp (15/20). Large catenary suspension bracket top.85 05. Large bracket tube Dia 40/49 mm Large bracket sleeve Tube cap 40mm. Strain clamp 20 mm.03.09.85 10.82 01.01.85 03.92 07. o.07.06.79 07.05.02.89 10.79 02.11.06.88 07. Compression joint.06.74 01. Special dropper assembly. Standard catenary suspension bracket top Standard catenary direct clamp Standard catenary direct clamp top Standard catenary direct clamp bottom Direct catenary clamp grip.84 21.06.01.09.09. Large catenary direct clamp bottom Standard register arm hook Register arm hook top Register arm hook bottom Large register arm hook Large register arm hook top Large register arm hook bottom 38mm register arm dropper assembly 49mm register arm dropper assembly Dropper clip (38mm) for standard bracket tube Dropper clip (49mm) for large bracket tube Steady rod Steady rod piece 10.84 03. Effective from Feb. Large catenary suspension bracket. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 2 3 2 2 2 2 2 2 2 3 2 3 2 3 3 3 3 3 3 3 1 2 3 2 3 3 3 3 3 3 1 3 2 2 3 3 3 3 3 3 3 3 3 3 3 3 2 2 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 ETI/OHE/P/1400 ETI/OHE/P/1410 ETI/OHE/P/1530-1 ETI/OHE/P/1540 ETI/OHE/P/1550 ETI/OHE/P/1560 ETI/OHE/P/1580 Sh.84 10.03.12.11. Standard bracket tube Dia.06.89 03.88 19.05.89 25.11.Page 12 of 57 Sl.92 02.79 02.85 22.74 01.88 05.88 03.85 03. Parallel clamp (105/240) for dc OHE.06.89 10.11. Standard catenary suspension bracket bottom.94 22.06.07.88 04. Large catenary suspension bracket bottom.05.11.84 22.84 25. Bimetallic parallel clamp (10/20).01 10.11.88 22. Catenary direct clamp (large) Large catenary direct clamp top. Direct catenary clamp stud Bridle wire sleeve.88 03. Large suspension clamp 20mm. Standard catenary suspension bracket.06.88 01. 30/38 Tube cap.11. Standard catenary suspension bracket.88 07.79 03.07. 2010 DRAWING R E V Master List No.02.96 .01. Large catenary suspension bracket.02.84 22. Tube cap 30mm.96 11.1 ETI/OHE/P/1580 Sh.88 02.07. Contact wire ending clamp (150) (for WKRE/dc OHE). Repair sleeves (compression type).89 10.05.03.01.88 06.08.84 04. Large suspension clamp 20mm (with armour rod).01.88 03.11.88 11.01. Parallel clamp (20/20).88 07.05.06.2 ETI/OHE/P/1600 ETI/OHE/P/1610-1 ETI/OHE/P/1611 ETI/OHE/P/1640 ETI/OHE/P/1790 RE/33/P/2041 ETI/OHE/P/2060 ETI/OHE/P/2064-1 RE/33/P/2081 RE/33/P/2086 ETI/OHE/P/2104-1 ETI/OHE/P/2110 ETI/OHE/P/2110-1 ETI/OHE/P/2111 ETI/OHE/P/2112 ETI/OHE/P/2120 ETI/OHE/P/2121 ETI/OHE/P/2122 ETI/OHE/P/2123 ETI/OHE/P/2124 ETI/OHE/P/2125 ETI/OHE/P/2130 ETI/OHE/P/2130-1 ETI/OHE/P/2131 ETI/OHE/P/2132 ETI/OHE/P/2140 ETI/OHE/P/2141 ETI/OHE/P/2142 ETI/OHE/P/2150-1 ETI/OHE/P/2151-1 ETI/OHE/P/2152-1 ETI/OHE/P/2160-1 ETI/OHE/P/2161-1 ETI/OHE/P/2162-1 ETI/OHE/P/2270-4 ETI/OHE/P/2270-5 ETI/OHE/P/2274-1 ETI/OHE/P/2277 ETI/OHE/P/2340 ETI/OHE/P/2341 C B C D E D F C B C D A E C A B D B A B A A C B B B C B B C B B E C C E C C E E D D C B Short dropper assembly.06.07.88 02. 89 25.10. Dropper clip (34mm ) for register arm tube.10. No.90 11.06.94 14.00 10.07. BFB steady arm eye piece. BFB steady arm assembly.Page 13 of 57 Sl.09. Dropper clip (25) for raised register arm.88 09.02.08.94 07. Raised register arm dropper assembly.88 19.79 19. 03.03.07.92 19.09.03. Tubular stay adjuster (large) Tubular stay sleeve.01.96 19.85 19.2008 R E V Master List No.06.08.88 27.66 18.84 26. Register arm tube 25mm Register arm eye piece 25mm Register arm eye piece 25mm(Forged) Tube cap 25mm.85 18.03.04.07. Normal bent steady arm hook.07.85 07. Raised register arm tube 25 mm Raised register arm adjuster 25 mm 38mm register arm dropper assembly 49mm register arm dropper assembly 25mm register arm dropper assembly.94 04.86 14.84 11.99 29.07.07.07.09.07.72 18. Effective from 31.96 06.90 04.66 25. Tubular stay arm Stay tube (25 mm) Tubular stay adjuster. Steady arm hook (BFB) Steady arm hook BFB (Forged) BFB steady arm swivel. Tubular stay sleeve (Forged).96 04. Stud bolt (10mm) 25mm register arm dropper assembly.02.72 04.88 07.02.05.70 09.88 07.09. BFB steady arm assembly for tramway OHE (regulated).94 07.08.81 14.88 19.04.11.09.03. Register arm assembly for mast on platforms.85 04.88 19. Register arm dropper loop (short) Register arm dropper loop. BFB steady arm swivel Standard antiwind clamp.09. DRAWING NO.07.07.71 19.85 25.03.90 19.96 3 3 2 3 2 3 3 3 3 3 3 3 3 3 2 3 1 3 3 2 2 3 3 3 . Raised register arm dropper Raised register arm dropper assembly 25mm steady arm clamp Normal bent steady arm. Normal bent steady arm eye piece.05.10. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 3 3 3 2 2 2 3 1 3 2 2 3 3 2 2 3 3 3 3 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 ETI/OHE/P/2345 ETI/OHE/P/2345-1 ETI/OHE/P/2352 ETI/OHE/P/2360 ETI/OHE/P/2380 ETI/OHE/P/2390 ETI/OHE/P/2391 TI/DRG/OHE/FTGFE/ RDSO/00003/00/0 ETI/OHE/P/2392 RE/33/P/2400 RE/33/P/2401 ETI/OHE/P/2402 ETI/OHE/P/2402-1 ETI/OHE/P/2403-1 TI/DRG/OHE/FTGFE/ RDSO/00004/03/0 ETI/OHE/P/2404 ETI/OHE/P/2410 ETI/OHE/P/2420-1 RE/33/P/2421 RE/33/P/2422-1 TI/DRG/OHE/FTGFE/ RDSO/00002/00/0 ETI/OHE/P/2423-1 RE/33/P/2431 RE/33/P/2432 ETI/OHE/P/2440 ETI/OHE/P/2450 ETI/OHE/P/2460 ETI/OHE/P/2461-1 ETI/OHE/P/2462-1 ETI/OHE/P/2463 ETI/OHE/P/2464 ETI/OHE/P/2465 ETI/OHE/P/2470 ETI/OHE/P/2471-1 ETI/OHE/P/2472-1 ETI/OHE/P/2480 ETI/OHE/P/2490-2 ETI/OHE/P/2520 ETI/OHE/P/2522 ETI/OHE/P/2523 ETI/OHE/P/2540 ETI/OHE/P/2540-1 ETI/OHE/P/2541 ETI/OHE/P/2542 ETI/OHE/P/2550-1/2 A L C B G C E C A B C C A C B A D E E F A A B E E B E B B B B E C L Steady rod eye piece Double Vee suspension top eye piece Bent steady arm swivel 25mm drop bracket assembly Hook bracket BFB steady arm assembly.00 04.03 08.88 11.12.07.92 04.11.06.07.04.02.77 04.03. Register arm dropper Register arm dropper loop.05 17.66 11. Double ‘Vee’ adjuster clamp assembly Double clevis assembly.05.09.03.07.79 02.09.09. Multiple cantilevers cross arm clamp (300).84 18.12.96 11.03.03.96 11.09. Anchor fitting assembly on rolled section.84 09.96 11.06.03. Mast bracket fitting assembly Mast bracket fitting assembly (150) Mast bracket fitting assembly (200) Mast bracket clevis Mast bracket clevis (forged) Mast bracket clevis pin.3. TTC mast ‘P’ type portal upright Anchor fitting assembly on ‘K’ series mast.04. Mast anchor fitting (200) Mast guy rod fitting (200) Anchor backing angle and spacer Anchor fitting assembly on ‘K’ series mast.03.03.64 19.96 18. 2010 DRAWING R E V Master List No.95 222 ETI/OHE/P/3241-2 223 ETI/OHE/P/3250 224 ETI/OHE/P/3250-A .79 11.05.96 01.96 11.96 11.07.03.03.96 11.88 02.96 11.96 11.96 11.03. Multiple cantilever extension Register arm extension frame.03. Mast bracket swivel (150) Mast bracket swivel (200) Standard backing angle.03.96 11.84 04.66 19.84 18.03.74 04.05.88 04.03.05 11.03. Adopter for single bracket on structures and dropped arm.91 11. N NO.96 11.07. TTC mast ‘P’ type portal upright (for cement concrete counter weight) Anchor assembly on ‘N’ & ‘O’ type portal uprights.03.03. Multiple cantilever cross arm assembly Multiple cantilever cross arm. Section insulator support clamp part.03.03.79 17.05.02.96 11.07. Mast guy rod fitting welded. Mast anchor fitting (welded) Mast anchor fitting (welded) for cement concrete counter weight.05 12.03.96 11. Multiple cantilevers cross arm clamp (200).96 11.Page 14 of 57 Sl.03.88 19.96 24. Anchor assembly on ‘N’ & ‘O’ type portal uprights with (ISA 150x115x12) 11. Effective from Feb. Multiple cantilevers cross arm clamp (280).96 11.96 11. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 3 3 3 2 3 3 2 2 2 3 2 2 2 2 3 2 2 3 3 3 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 1 1 1 1 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 ETI/OHE/P/2550-3 RE/33/P/2700 RE/33/P/2701 ETI/OHE/P/2710 RE/33/P/2720 RE/33/P/2721 ETI/OHE/P/2730 ETI/OHE/P/2731 RE/33/P/2750 ETI/OHE/P/3010 ETI/OHE/P/3021 TI/DRG/OHE/FTGFE/ RDSO/00005/04/0 TI/DRG/OHE/FTGFE/ RDSO/00006/05/0 ETI/OHE/P/3050 RE/33/P/3070 RE/33/P/3070-1 RE/33/P/3070-2 RE/33/P/3071 RE/33/P/3071-1 ETI/OHE/P/3072 RE/33/P/3073 RE/33/P/3074 ETI/OHE/P/3076 RE/33/P/3100 ETI/OHE/P/3110 RE/33/P/3120 ETI/OHE/P/3121 ETI/OHE/P/3122 ETI/OHE/P/3123 ETI/OHE/P/3124 ETI/OHE/P/3131 ETI/OHE/P/3230 ETI/OHE/P/3231 ETI/OHE/P/3231-2 ETI/OHE/P/3232 ETI/OHE/P/3233 ETI/OHE/P/3234/5 ETI/OHE/P/3236/7 ETI/OHE/P/3240 E E C B C A A A C C B J H D F B A D E C G C H A A A A A C C C C B B B D B D - Antiwind clamp for tramway type OHE(regulated) Vee suspension assembly Tramway Vee clamp swivel Unequal Vee suspension assembly Double Vee suspension assembly Double Vee suspension top Section insulator support clamp.84 18.88 02.12.03. Mast fitting for hook insulator.96 11. o. Stay arm/bracket chair. Mast fitting for hook insulator(Forged) Modified BFB Steady arm assembly with 25 mm Drop bracket (ID-2306).03.09.08.66 18.96 19.04 23. 05.05.11. Effective from 31.03.09.79 16. DRAWING NO.2008 R E V Master List No. Parallel clamp (Dia 20 mm/18.03 01.88 18.88 17.86 24.74 28.05.05.09.92 10.03.04. Anchor ‘V’ bolt. Feeder splice (150) Feeder splice sleeve.96 4. Terminal clamp (19 mm) compression type.05.11.04.96 17.03.06 10. TTC masts & P type portal uprights (with ISA 150x115x12).03.03 25. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 1 1 1 1 1 1 1 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 3 2 3 3 3 2 3 225 226 227 228 229 ETI/OHE/P/3260 ETI/OHE/P/3270 ETI/OHE/P/3280 ETI/OHE/P/3290 ETI/OHE/P/3300 G A A A A A A H E D C E C D C E C B D C B G B B A B 230 ETI/OHE/P/3310 231 ETI/OHE/P/3320 232 ETI/OHE/P/3330 233 TI/DRG/OHE/FTGNF/ RDSO/00001/02/1 234 TI/DRG/OHE/FTGNF/ RDSO/00002/02/1 235 TI/DRG/OHE/FTGNF/ RDSO/00003/03/0 236 TI/DRG/OHE/FTGNF/ RDSO/00004/03/0 237 TI/DRG/OHE/FTGNF/ RDSO/00005/03/0 238 TI/DRG/OHE/FTGNF/ RDSO/00006/03/0 239 TI/DRG/OHE/FTGNF/ RDSO/00007/06/0 240 ETI/OHE/P/4001 241 ETI/OHE/P/4002 242 RE/33/P/4010-1 243 RE/33/P/4011-1 244 RE/33/P/4012-1 245 RE/33/P/4013-1 246 RE/33/P/4030 247 RE/33/P/4031 248 ETI/OHE/P/4036 249 RE/33/P/4080 250 RE/33/P/4090 251 RE/33/P/4100 252 ETI/OHE/P/4110 253 ETI/OHE/P/5000 254 ETI/OHE/P/5001/5001-1 255 ETI/OHE/P/5001-3 256 ETI/OHE/P/5002 257 ETI/OHE/P/5004/5/6-1 258 ETI/OHE/P/5007-1 259 ETI/OHE/P/5008 260 ETI/OHE/P/5011 261 ETI/OHE/P/5012 Boom anchor assembly on ‘N’ & ‘O type portals Anchor assembly on BFB portal upright Anchor assembly on G Type portal upright Anchor assembly on R Type portal upright Clamps and plates for mounting of number plate on OHE structures. Anchor loop.94 10. 18mm Bus terminal clamp (Compression type).03 27. Head span mast fitting assembly (200 mm) Head span mast fitting assembly (250 mm) Head span mast fitting assembly (300 mm) Head span mast fitting assembly (450 mm) Guy rod assembly Anchor bolt Anchor bolt Guy rod stirrup.90 17.05.08.88 28.05.09.88 28.88 28.03.01. Anchor fitting assembly on K series.09.03.88 19.08.93 10.85 11.92 28.09.74 28.03. 5 tonne buckle 5 tonne eye bolt right.96 28.03. Anchor fitting assembly on TM series masts (with ISA 150x115x12) Clamp and plates for Mounting of number plates (retroreflective type) on OHE structures.98 01.09.84 30.05 25.96 17. No.09. Guy rod dia 25mm.Page 15 of 57 Sl.74 13.09.08. Terminal clamp (15 mm) compression type. Feeder joint socket left.96 17. Span wire clip (65) Span wire clip (130) Cross span suspension clamp Cross span suspension clamp clevis Cross span suspension clamp part Cross span suspension clamp crank Steady wire clamp Steady wire clamp part ‘U’ bolt saddle. 11.03.05.03.96 19.75mm).96 17.09.03 25.89 .02.98 04.73 13.12.79 01.05 04.09. 04.90 04. Double eye distance rod (dia 20mm) Compensating plate assembly.05.08. Equalizing plate ( for WKRE) Short equalizing plate.04.90 10. 9 tonne clevis bolt – Right Anchor double strap assembly.89 20. Drum Part detail of regulating equipment (winch type).98 25.07.00 24. Trapezoidal counter weight assembly. Counter weight assembly (light).90 22. Counter weight piece.07.07.89 11.05. 9 tonne eye bolt left 9 tonne eye bolt right.96 17.00 24.90 26.96 22. 9 tonne adjuster 9 tonne adjuster (eye and clevis type) 9 tonne adjuster (double clevis type) 9 tonne turn buckle.92 11. 2010 DRAWING R E V Master List No.07.Page 16 of 57 Sl.05.08.04.92 24.00 17.04. Guy rod double strap Regulating equipment (winch type) 5:1 ratio.08. 9 tonne clevis bolt – Left.04.96 05.04. Counter weight assembly for regulating equipment (3:1) Counter weight assembly (for tramway type OHE) ( 1250 kgf) Cast iron base weight.12.96 01.00 24.92 24.08. Equalizing plate.08. Equalizing plate assembly.07. Effective from Feb.12.96 24.04.87 22.84 302 ETI/OHE/P/5314/16-1/171/23/24/33-36 303 ETI/OHE/P/5313/32 .89 09.96 24.05.94 26.04. 18mm single clevis assembly 18mm single clevis assembly modified Standard guide tube assembly. o.08.08.96 17. Compensating plate assembly Equalizing plate assembly Guy rod double strap assembly. N NO.04.96 01.96 04.92 19.00 24. Counter weight piece eye rod Regulating rope and fitting.) Axles 11. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 2 2 2 2 2 3 3 3 3 3 3 2 3 3 3 3 3 2 1 2 3 3 3 2 2 3 3 3 3 3 3 3 3 3 3 3 3 1 0 1 2 3 262 263 264 265 266 267 268 269 270 271 272 273 ETI/OHE/P/5013 ETI/OHE/P/5020 ETI/OHE/P/5020-1 ETI/OHE/P/5020-2 ETI/OHE/P/5021 ETI/OHE/P/5022 ETI/OHE/P/5023 ETI/OHE/P/5024 ETI/OHE/P/5025 ETI/OHE/P/5030 ETI/OHE/P/5040 TI/DRG/OHE/FTGFE/ RDSO/00001/00/0 274 ETI/OHE/P/5060-2 275 ETI/OHE/P/5064/65/66 276 ETI/OHE/P/5064-1/64-2 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 ETI/OHE/P/5090 ETI/OHE/P/5090-1 ETI/OHE/P/5090-3 ETI/OHE/P/5090-4 ETI/OHE/P/5090-5 ETI/OHE/P/5090-6 ETI/OHE/P/5091 ETI/OHE/P/5092/93 ETI/OHE/P/5094/95 ETI/OHE/P/5128 ETI/OHE/P/5183 ETI/OHE/P/5190-1 ETI/OHE/P/5190-2 ETI/OHE/P/5191 ETI/OHE/P/5191-1/2 ETI/OHE/P/5192 ETI/OHE/P/5192-1/2 ETI/OHE/P/5193 ETI/OHE/P/5194-1 ETI/OHE/P/5195-2 ETI/OHE/P/5220 ETI/OHE/P/5221/2 ETI/OHE/P/5300 ETI/OHE/P/5311 ETI/OHE/P/5312/15/21/31 B B A B B C B C B A C D F F B B B B F A C C C B D B C B A F D H B D B A 5 tonne eye bolt left. Part detail of regulating equipment (winch type.00 17.09.89 11.04.04.89 09.00 24. Cement concrete counter weight assembly.96 01.11. Details of guide tube attachment for trapezoidal counter weight. Counter weight assembly. Compensating plate.08.96 22.08. Compensating plate.89 11.94 22.08.94 22.07.85 11.06.07.08.04.00 04.89 04.04.12.96 22.07. Guide tube bracket angle (welded) for attachment on BFB mast and portal (for trapezoidal counter weight). 05. Post insulator jumper clamp.79 09.96 17.79 17. Effective from 31. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 3 3 3 2 0 1 2 2 3 3 3 2 2 3 1 2 2 3 3 3 2 3 2 2 2 2 2 2 3 3 3 3 1 2 3 2 3 2 2 3 3 3 2 2 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 ETI/OHE/P/5318 ETI/OHE/P/5319-1 ETI/OHE/P/5322 ETI/OHE/P/5341 ETI/OHE/P/5350-1 ETI/OHE/P/5500-1Sh.79 27.05.05.12.05. Runner right.96 17.05.07. Runner left. Disc insulator (255mm) (clevis type) Ball eye. No.06. Runner bracket. Stay arm insulator (for polluted zone).86 24.79 17. Standard 9 tonne insulator for clean areas. Limiting device for winch type regulating equipment (modified) Regulating equipment three pulley type (3:1 ratio) Details of regulating equipment (3:1 ratio) Standard stay arm insulator for clean areas. Post insulator assembly (with clamps) Standard post insulator for clean areas.94 24.Page 17 of 57 Sl. Bracket insulator (for polluted zone). Fasteners for section insulator assembly.94 24.05.96 28.07.05.86 17.12.2008 R E V Master List No. 05. 9 tonne insulator cap.96 24. Section insulator assembly.94 24. Runner assembly.94 27.1 ETI/OHE/P/5500-1Sh.07. Socket eye 3 kV post insulator assembly.05. Contact wire end link assembly.79 11.05. Bracket insulator tube cap. DRAWING NO.05.12.05.07.79 03.05.96 27.05.12.86 17.94 24.94 24.79 17. 3Kv pedestal insulator cap clamp.05.06.04 28.2 ETI/OHE/P/6000 ETI/OHE/P/6000-2 ETI/OHE/P/6001 ETI/OHE/P/6002 ETI/OHE/P/6003 ETI/OHE/P/6020 ETI/OHE/P/6020-1 ETI/OHE/P/6021 ETI/OHE/P/6030 ETI/OHE/P/6030-1 ETI/OHE/P/6031 ETI/OHE/P/6032 ETI/OHE/P/6060-1 ETI/OHE/P/6061-1 ETI/OHE/P/6061-3 ETI/OHE/P/6068 ETI/OHE/P/6069 ETI/OHE/P/6070 ETI/OHE/P/6070-1 ETI/OHE/P/6075/6076 ETI/OHE/P/6090 ETI/OHE/P/6090-1 ETI/OHE/P/6094 ETI/OHE/P/6094-1 A B A A C K C C C A A C B C A A A B A H C D C B A B A B A B A B A A A A A A A 335 ETI/OHE/P/6095 336 ETI/OHE/P/6095-1 337 338 339 340 341 342 343 344 345 346 347 348 ETI/OHE/P/6100 ETI/OHE/P/6110 ETI/OHE/P/6120 ETI/OHE/P/6121 ETI/OHE/P/6122-6125 ETI/OHE/P/6130 ETI/OHE/P/6131 ETI/OHE/P/6132/33 ETI/OHE/P/6140 ETI/OHE/P/6141 ETI/OHE/P/6142 ETI/OHE/P/6143 Drum anchor fitting Arm anchor fitting Clevis and eye Stainless steel rope end fitting.79 02.05.11. Disc insulator assembly (socket type) Disc insulator (255mm) (Ball and socket type).86 17.84 29.92 02.94 24. 11 kV post insulator.11. Section insulator cross beam assembly. Fasteners for section insulator assembly. Stay arm insulator tube cap.12.94 24. Standard sectioning insulator for clean areas.05. Contact wire end link body.84 05.05.05.05.86 27.05.79 27.07.84 29.86 27.11. Post insulator jumper clamp (30mm) for 220 kV traction substations.07.83 17.04 17.05.94 .96 22. Bracket insulator standard cap.05.94 24.04 28. Stay arm insulator hook.05.94 24.11.05. Standard bracket insulator for clean areas. Cross beam. Stay arm insulator hook cap.98 22.12.96 17. Post insulator bus bar clamp.05.96 22.96 17. 9 tonne insulator (for polluted zones).05.05.12.84 26. Post insulator bus bar clamp (50mm) for 220 kV traction substations. Ending clamp part right (107) Parallel clamp double contact wire.03.05. Longitudinal rail bond. Bus terminal cone.02. o.87 18.94 24.05.89 02.01.84 10.88 27. Ending clamp part left (107). 18mm bus splice.79 22.05 23.96 17.05. 18 mm bus tee joint Bus tee body 18 mm bus terminating tee Bus terminating tee body Double wire section insulator Structure bonds. Earth electrode.04.02.84 20.77 23. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 ETI/OHE/P/6150 ETI/OHE/P/6151 ETI/OHE/P/6160 ETI/OHE/P/6161 ETI/OHE/P/6162 ETI/OHE/P/6170 ETI/OHE/P/6180-1 ETI/OHE/P/6180-2 ETI/OHE/P/6181-1 ETI/OHE/P/6260 ETI/OHE/P/6310-1 ETI/OHE/P/6311-1 ETI/OHE/P/6313 ETI/OHE/P/6312/6314 ETI/OHE/P/6320 ETI/OHE/P/6321 RE/33/P/6330 RE/33/P/6331 RE/33/P/6350 RE/33/P/6351 RE/33/P/6600 ETI/OHE/P/7000 ETI/OHE/P/7011 ETI/OHE/P/7020 ETI/OHE/P/7021 ETI/OHE/P/7030 RE/33/P/7040 RE/33/P/7050 RE/33/P/7501 RE/33/P/7502 ETI/OHE/P/7503 ETI/OHE/P/7504 RE/33/P/7511 ETI/OHE/P/7531 ETI/OHE/P/7541 RE/33/P/7551 RE/33/P/7561 ETI/OHE/P/7572 ETI/OHE/P/7573 ETI/OHE/P/7574 ETI/OHE/P/7575 ETI/OHE/P/7581 ETI/OHE/P/7582 ETI/OHE/P/8060 ETI/OHE/P/8061 A A A A A C A A D A B B A A B C D B B B E B A F E D F C E B C A C B B A B A A A C C Runner end contact wire ending clamp.96 .04.12. N NO.08. 24.05.89 17. Medium super mast channel. Bus splices body.87 24.94 24.03.04. Earth wire mast clamp Earth wire strain clamp Typical structure number plate (100 mm size) Typical structure number plate (75 mm size) Typical structure number plate (retro reflective type) 125 mm sizes. Caution for running staff (lowering panto) Caution board for running staff (raising panto) Medium super mast assembly.89 19. Insulator end contact wire ending clamp part. Section insulator dropper assembly (without double strap).01.74 26.02.05.79 25.01.05.94 24.87 23.05.84 27.02.84 27.02.94 24.86 04.01.05.89 19.87 23.01. Effective from Feb.06.91 04.94 24.05.94 24. (18mm) bus terminal (multiple bolt) Bus terminal piece (multiple holes).74 27. 2010 DRAWING R E V Master List No. Copper rivet dia 20x30.04.84 27.84 23.05.94 24.89 27.84 17. Typical structure number plate (125mm size).84 27. Standard operating rod insulator for clean areas.Page 18 of 57 Sl.01.76 17. Bus terminal cone socket and check nut.10.71 06.74 04.06 2 2 3 3 3 3 3 3 2 3 3 3 3 3 2 3 3 3 1 2 1 3 2 3 1 2 3 2 2 2 3 2 2 2 2 2 1 0 2 1 1 0 0 3 01.05. Dead section caution board (danger).07.05.02.09.04. Runner end contact wire ending clamp part.05.87 19.84 10. Dead section caution board (caution unwired turnouts) Dead section caution board (power block working limit).02.01. Typical isolator number plate Caution plate 25000 volts ac. Earthing station. Section insulator double strap assembly.94 24.12.10.94 27.03. Warning board (caution live wire) General caution notice at entrance to Railway station (Hindi and English) General caution notice for staff (Hindi and English) Dead section caution board (electric engine stop).05.96 25. Section insulator dropper assembly (with double strap). Small parts steel works for mounting of 3kkV 11kV/ 25kV post insulator.84 23. TTC and on P and G type portal. Clamping plate and channel for connection of RC to rail.72 16.84 25.07.06.96 3 13. Guy rod 20 mm Gill sans medium letter and figure 3 inch Warning for neutral section Signals at neutral section for electric engines to switch off power Signals at neutral section for electric engines to switch on power Signals at neutral section. K175. Guide tube bracket angle for attachment on fabricated mast K150.12. K200.07.96 22.07.96 22. Guide tube bracket angle for attachment on 6” x 6” BFB mast and BFB portal (for trapezoidal counter wt.07.59 27.06.96 22. Arrangement for fixing of danger board for limit of carriage watering under OHE Warning for neutral section Men –working board for equipment Caution board for gang men Caution board for special locations General caution notice for staff (English and Orriya) Gillsons letters and figures Profile of grooved contact wire (107 mm2). K225.72 3 0 1 0 0 2 0 1 2 2 2 2 0 3 3 3 3 423 ETI/OHE/SK/99 424 ETI/OHE/SK/101 . Pedestal insulator base support Post insulator base support on portal booms Post insulator base support on TTC booms. Effective from 31.89 29.06.07. No.02 16. Guide tube bracket angle for attachment on G type portal (for trapezoidal counter wt. K225.).07.07.69 22.96 22.).07.84 17.2008 R E V Master List No. K200.96 22.96 26.04.96 22.07.60 06.).96 22.Page 19 of 57 Sl.02. TTC and P Type portal (for trapezoidal counter wt.07. K175.62 25. DRAWING NO.11. K200. Socket Eye.72 09.07.06. Insulator mounting channel for connection of RC to track.06. K225.10. P type and G type portal Guide tube support angle for attachment on fabricated mast K150. TTC.96 22.96 3 3 3 22.05. Suspension clamp for wolf conductor (without armour rod).03.02.02.72 16.96 13.12.96 22. Bird guard.64 25.07.04.69 02.08.09.07.02. Supporting plate and wooden block for connection of RC to rail Mounting of 25 kV isolator on OHE structures (steel work details) Guide tube bracket angle for attachment on fabricated mast K150. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 3 3 3 2 3 3 3 0 3 394 395 396 397 398 RE/33/P/8081 RE/33/P/8082 ETI/OHE/P/8083/3-1 ETI/OHE/P/8083-2 ETI/OHE/P/8084/85/86 B C B A A A A A A A 399 ETI/OHE/P/8087 400 ETI/OHE/P/8091 401 ETI/OHE/P/8094/96 402 ETI/OHE/P/9031/45 403 ETI/OHE/P/9047 404 ETI/OHE/P/9048 405 ETI/OHE/P/9049 406 ETI/OHE/P/9050/51 A A A 407 ETI/OHE/P/9052/3/ 4/5 408 409 410 411 ETI/OHE/P/9070/1 RE/33/302 RE/33/347 RE/33/348 A B B B B B A B B C A - 412 RE/33/349 413 TI/DRG/OHE/NS/RDSO/ 00001/00/01 414 RE/33/350 415 416 417 418 419 420 421 422 RE/33/355 RE/33/371 RE/33/411 RE/33/436 RE/33/493 RE/33/527 ETI/OHE/SK/22 ETI/OHE/SK/97 Pedestal insulator support clamp.59 25. 22.96 22.84 25. K175. Parallel clamp (small) compression type.72 09.11.93 18.91 05.93 05.G.07 19. Parallel clamp (large) compression type.09.08. o.08.07. Circuit plate.07 .07.72 09.11. Tracks.00 19.93 30.06. Effective from Feb.G. 2010 DRAWING R E V Master List No.08.72 05. Danger notice plate.08.08. 09.07. Jumper clamp (large) compression type.G.72 09.Page 20 of 57 Sl. Guy rod dia 25mm.11.11. Schedule Anchor Block for B. Jumper clamp (small) compression type. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 2 3 2 2 2 2 2 2 2 2 2 1 1 1 3 425 426 427 428 429 430 431 432 433 ETI/OHE/SK/102 ETI/OHE/SK/103 ETI/OHE/SK/104 ETI/OHE/SK/105 ETI/OHE/SK/106 ETI/OHE/SK/107 ETI/OHE/SK/534 ETI/OHE/SK/535 ETI/OHE/SK/570 C B A B - 434 ETI/OHE/SK/575 435 ETI/OHE/SK/576 436 TI/DRG/OHE/GUYROD/ RDSO/00001/07/0 437 TI/DRG/OHE/GUYROD/ RDSO/00002/07/0 438 TI/DRG/OHE/GUYROD/ RDSO/00003/07/0 439 TI/DRG/OHE/GUYROD/ RDSO/00004/07/0 Number plate. Anti climbing device.07 19. Typical arrangement of OHE w.08. N NO.72 09.07 19.ith insulated copper catenary under over line structures. Double Guy Rod arrangement with Anchor block for B. Earthing detail. track. Phase plate.72 09. track block cotton soil. Schedule of Anchor Block for B. 06.08.06. Adjustment chart for winch type regulating equipment for composite OHE.03. No.2008 R E V Master List No. alloy catenary.05.86 02.94 22.06.86 02.06.86 2 2 2 2 2 3 2 . Raised register arm clamp(MCI) Parallel grooved clamp (14/9) Aluminium alloy catenary dropper clip (for all aluminium OHE) Catenary splice (cone type) Al.06.88 15.12. GENERAL ARRANGEMENT AND FITTINGS FOR COMPOSITE OHE (ALUMINIUM ALLOY CATENARY AND COPPER CONTACT WIRE) 1 2 ETI/OHE/G/02121 SH3 ETI/OHE/G/02121 SH5 Schematic arrangement of uninsulated overlap for composite OHE Schematic arrangement of uninsulated overlap for composite OHE (Aluminium alloy catenary and copper contact wire) Schematic arrangement of insulated overlap for composite OHE Schematic arrangement of insulated overlap for composite OHE (Aluminium alloy catenary and copper contact wire) General arrangement of regulated composite OHE at turnouts (overlap and crossed type) Standard termination of regulated composite OHE to suit different tension of conductor Standard termination of regulated composite OHE with equal tension (116 mm2 AAA catenary and 107 mm2 HDGC contact wire) In span jumper connection between A1 alloy catenary and copper contact wire Continuity jumper connection at uninsulated overlap for composite OHE Connections at turnouts for composite OHE Potential ignaling connection at insulated overlap and neutral section for composite OHE Connections at diamond crossing for composite OHE General arrangement of connection to composite OHE by copper cross feeder. Effective from 31.04. 19.89 28.05. DRAWING NO.84 16.07. Assembly of section insulator for composite OHE.I – OVERHEAD EQUIPMENT 4.87 26.94 27.02.10.07.84 01.06.86 22.04.94 2 1 5 6 7 ETI/OHE/G/02141 SH2 ETI/OHE/G/03121 SH2 ETI/OHE/G/03121 SH3 B A 19.79 04.03.79 29. Double suspension clamp body for aluminium alloy catenary.87 04.88 17.05. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E Chapter .94 A 2 2 3 4 ETI/OHE/G/02131 SH2 ETI/OHE/G/02131 SH4 A - 25.86 02.02.04.07.94 3 2 2 2 3 3 2 15 ETI/OHE/G/05123 SH3 - 22.86 02.97 2 1 2 8 9 10 11 12 13 14 ETI/OHE/G/05101 SH2 ETI/OHE/G/05102 SH2 ETI/OHE/G/05103 SH2 ETI/OHE/G/05104 SH2 ETI/OHE/G/05106 SH2 ETI/OHE/G/05121 SH3 ETI/OHE/G/5122 SH3 B B B B C - 02.Page 21 of 57 Sl. General arrangement of connection at switching station on double track section for composite OHE by copper cross feeder.09. General arrangement of connection at switching station on multiple track section (for composite OHE) by copper cross feeder.94 2 16 17 18 19 20 21 22 ETI/OHE/G/05181 SH2 ETI/OHE/G/00194 ETI/OHE/P/1171-1 ETI/OHE/P/1770 ETI/OHE/SK/123 ETI/OHE/SK/130 ETI/OHE/SK/134 B A C D D D 24. 05.02.03.05.84 10.85 10. Dropper schedule for uninsulated overlap spans of composite OHE.4/0.84 07.04. alloy catenary Double suspension lock plate (MCI) Parallel groove clamp (18/14) Crimp type repair sleeve for AAA stranded catenary wire.87 12.75) for composite OHE Parallel groove clamp (19/14) 26. N NO.87 23-03-94 .89 15-06-89 05. alloy catenary. 2010 DRAWING R E V Master List No.84 07. Dropper schedule for compensated with unequal Encumbrance (1.04.84 26.4/0. Effective from Feb.09.92 07.05.05.84 04.05.85 01.Page 22 of 57 Sl. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 2 3 2 3 3 3 2 2 1 1 3 3 3 3 3 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 ETI/OHE/SK/176 ETI/OHE/SK/205 ETI/OHE/SK/231 ETI/OHE/SK/285 ETI/OHE/SK/333 ETI/OHE/SK/375 ETI/OHE/SK/436 ETI/OHE/SK/449 ETI/OHE/SK/450 ETI/OHE/SK/451 ETI/OHE/SK/468 ETI/OHE/SK/469 ETI/OHE/SK/479 ETI/OHE/SK/480 ETI/OHE/SK/591 D B C C D A B A A` - Suspension clamp (MCI) for Al.85 12.03. o. (for 75 & 112.02.9) for composite OHE Dropper schedule for compensated OHE with unequal encumbrance (1. Dropper schedule for insulated overlap spans of composite OHE Aluminium catenary suspension clamp assembly (MCI) Double suspension clamp assembly (MCI) for Al.84 10. Catenary dropper Clip assembly ignaling washer Span and stagger chart for composite OHE.5 kgf wind pressure) Envelope type end fitting assembly for All Aluminium alloy stranded catenary wire (size 19/2.04.79 mm) Dropper schedule for regulated composite OHE equal encumbrances (1400/1400) for 1000/1000 kgf tension. General arrangement (lay out plan) for the swiveling OHE. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E 5. No. Effective from 31.2008 R E V Master List No. Special jumper clamp. GENERAL ARRANGEMENT FOR LOADING MECHANISM A 38 39 40 41 42 43 44 45 46 47 TI/DRG/OHE/COLLAP/ RDSO/0001/99/0 TI/DRG/OHE/COLLAP/ RDSO/0002/99/0 TI/DRG/OHE/COLLAP/ RDSO/0003/99/0 TI/DRG/OHE/SWL/ RDSO/0004/08/0 TI/DRG/OHE/COLLAP/ RDSO/0005/99/0 TI/DRG/OHE/COLLAP/ RDSO/0006/99/0 TI/DRG/OHE/SWL/ RDSO/0007/08/0 TI/DRG/OHE/COLLAP/ RDSO/0008/99/0 TI/DRG/OHE/COLLAP/ RDSO/0009/99/0 TI/DRG/OHE/SWL/ RDSO/00010/08/0 - Special bracket for collapsible OHE. General arrangement of fixing of conduit pipe on special bracket assembly & connection of wire rope.12.Page 23 of 57 Sl. Motorised arrangement for collapsing the OHE. Special stay arm insulator for collapsible OHE. General arrangement for collapsing the OHE. General arrangement of fixing the special bracket assembly & suspension of contact wire. 1999 1999 1999 2008 1999 1999 2008 1999 1999 2008 2 1 0 3 1 1 1 3 3 1 . DRAWING NO. General arrangement of suspension of contact wire (S) from existing bracket assembly of tram-way OHE. General arrangement of Isolator connection to collapsible OHE. N NO.12. Simplified location plan and general arrangement for sectioning and paralleling station by eliminating DP isolator. REMOTE CONTROL AND EARTHING ARRANGEMENT C F A Typical location and schematic connection Diagram for a three interrupter switching station.84 21. GENERAL ARRANGEMENT OF SUBSTATION. Typical General Arrangement of a three interrupter switching station Simplified typical general arrangement of a three interrupter switching station by eliminating double pole isolator.84 07.98 24. LAYOUT.80 08. Typical general arrangement at a booster transformer station (without cross feeder).03 98 A 0 0 0 1 2 3 ETI/PSI/003 ETI/PSI/004 ETI/PSI/004-1 4 5 ETI/PSI/OO5 ETI/PSI/005-1 F A 31.01 08.Page 24 of 57 Sl. 88 24.11. SWITCHING STATION. 94 16.02 16.03. 2010 DRAWING R E V Master List No. Type-III Typical general arrangement at a booster transformer station (with cross feeder).02 16.81 19. o.07. Effective from Feb.05. Typical location plan and general arrangement of a single interrupter feeding station.08.08. Layout and general arrangement of sectioning and paralleling station at Baranagar (Sealdah Divn E.Rly) General arrangement and terminal connection of 25kv PT type-1 at switching station Typical location plan and general arrangement for a feeding station. 84 31. Typical location plan and general arrangement for a feeding station Outrigger arrangement Typical location plan and general arrangement of a single interrupter switching station.05. Simplified typical general arrangement of single interrupters switching station. Typical layout of remote control cubical at a switching station.02 75 21. BT. Typical general arrangement at a booster transformer station (with SP isolator and 4. Type-IV 18.II – POWER SUPPLY INSTALLATION 1.08. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter .70 30.98 0 1 1 1 2 1 0 2 0 0 1 1 1 1 1 1 .05.12.09.03.81 08. Typical location plan and general arrangement for sectioning and paralleling station.cross feeder).02 80 27.01.98 0 0 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ETI/PSI/006 ETI/PSI/008 ETI/PSI/009 ETI/PSI/009-1 ETI/PSI/0010 ETI/PSI/0011 ETI/PSI/0012 ETI/PSI/0016 ETI/PSI/0018 ETI/PSI/0019 ETI/PSI/011 ETI/PSI/011-I ETI/PSI/012 ETI/PSI/013 ETI/PSI/013-I ETI/PSI/014 E A A E A C A B A C 03.01.75 10.03. Typical general arrangement of a four interrupter switching station.cross feeder).73 08. Typical general arrangement at a booster transformer station (without cross feeder) Type-II Typical general arrangement at a booster transformer station (with 4. Type – I Typical general arrangement at a booster transformer station (without cross feeder).03. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 1 1 22 23 ETI/PSI/015 ETI.94 16.11.86 27. Typical general arrangement at a booster transformer station (for tramway type OHE) Typical layout of 132/27 kV traction substation (Type-I).07. Typical layout of 132/25 kV traction substation (Type-II).88 12. Typical arrangement of connection for 25 kV potential transformer with 36 mm O/D aluminium Bus bar.Page 25 of 57 Sl. Typical return current connection to buried rail at 132/25 kV traction substation General arrangement for 132 kV Railway switching station at Aligarh.08. Type-V Typical general arrangement at a booster transformer station (without cross feeder and 42 kV lightning arrester) – Type –VI 280 kVA Booster transformer station Type – VII General arrangement of 280 KVA Booster transformer station (Type III) with four cross feeder.02.04. Typical layout of 132/27 kV traction substation (TypeIV) with outgoing feeders and metering facilities. DRAWING NO.07.01.12./PSI/016 A 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 ETI/PSI/017 ETI/PSI/018 ETI/PSI/019 TI/DRG/PSI/TSSLO/ RDSO/00001/01/0 TI/DRG/PSI/TSSLO/ RDSO/00002/01/0 TI/DRG/PSI/TSSLO/ RDSO/00003/02/0 TI/DRG/PSI/TSSLO/ RDSO/00004/02/0 TI/DRG/PSI/TSSLO/ RDSO/00005/02/0 TI/DRG/PSI/TSSLO/ RDSO/00006/02/0 TI/DRG/PSI/TSSLO/ RDSO/00007/02/0 TI/DRG/PSI/TSSLO/ RDSO/00008/02/0 TI/DRG/PSI/TSSLO/ RDSO/00009/02/0 TI/DRG/PSI/TSSLO/ RDSO/00010/02/0 ETI/PSI/022-I TI/DRG/PSI/CPROOM/ RDSO/00001/01/0 ETI/PSI/0212-1 ETI/PSI/0213 ETI/PSI/0215 ETI/PSI/0216 ETI/PSI/0217 A A G B A B B B Typical general arrangement at a booster transformer station (with 4 cross feeder). Typical layout of 132/27 kV traction substation (TypeVIII). Typical layout of 132/27 kV traction substation (Type – VII).79 1 1 1 0 0 0 0 0 0 0 0 0 0 0 2 1 2 1 1 3 44 ETI/PSI/0225 C July 00 1 . No.02 30.10.02 09. Arrangement for typical outdoor illumination of 132/25 kV traction substation.83 12. Typical layout of 132/27 kV traction substation (Type-V).02 13.02 27.05.02 16.11. Effective from 31.03. 21.2008 R E V Master List No.06.03.06.83 22.12.02 22.05.94 20. Typical general arrangement of earth screen wire termination at traction substation.98 20.03.02 17.07. Typical layout of 132/27 kV traction substation (TypeVI).09.12.02 28.74 21. Typical layout of 132/27 kV traction substation (Type-III).01 16. Typical layout of 132/27 kV traction substation (Type – II). Schematic layouts for different types of 132/25 kV traction substation.12. Typical layout of 132/25 kV traction substation with 132 kV switching station (Type – X).08. Typical layout of control room at traction substation.75 19.01 26.02 23.87 18. Typical layout of 132/27 kV traction substation with single transformer (Type IX). 89. Typical layout of 132/25kv traction substation showing 25kv feeder for yard / electric loco shed supply.86 29.89 28.04.87.94 10.06.03.03.09.86 13. Typical fencing and anticlimbing arrangement at switching station.86 05.03.03.12. o.85 15. Structural assembly for a three interrupter switching station. 25 kV/240 V LT supply transformer at traction substation.09.05. Effective from Feb.94 18.75 2 3 2 2 0 0 0 0 0 0 1 3 2 3 3 2 0 1 2 1 2 1 1 1 1 0 1 2 .81 22.01. Operating pole for 25Kv dropout fuse switch.01. Arrangement of Mounting 25Kv/240V. Structural assembly for a feeding station.86 10. Typical layout of 132/25kv Traction substation(with three transformer) Type-1 Typical layout of 132/25kv Traction substation (with three transformers) Type-111. Mounting Arrangement of 100 KVA. Structural assembly for a sectioning and paralleling station. Typical termination arrangement for strung bus (ZEBRA. 15. N NO.84 21.07. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 ETI/PSI/0226 ETI/PSI/0226-I ETI/PSI/0227 ETI/PSI/0227-I ETI/PSI/0233 ETI/PSI/0235 ETI/PSI/0237 ETI/PSI/0239 ETI/PSI/0240 ETI/PSI/0240-1 ETI/PSI/0242 ETI/PSI/0243 ETI/PSI/0244 ETI/PSI/032 ETI/PSI/035 TI/DRG/PSI/AT/ RDSO/00001/02/1 ETI/PSI/037 ETI/PSI/038 ETI/PSI/039 ETI/PSI/0310 ETI/PSI/0312 ETI/PSI/101 ETI/PSI/102 ETI/PSI/103 ETI/PSI/104 ETI/PSI/105 ETI/PSI/106 ETI/PSI/111 B A A A A A D B C C B B B B B E A A Typical terminal arrangement for strung bus ‘SPIDER’ (AAC) conductor at traction substation. General arrangement and terminal connection for 25 kV PT (Type-II) at traction substation.87 18. 4 Pole 5 way rotary switches for colour light signaling and emergency load.06.85 15.91 18.86 08.84 21.03. 21. 50 kV LT Supply transformer.87 28.90 30.84 11. Structural assembly for feeding station (for five cross feeders) Structural assembly for a four interrupter switching station Structural assembly for standard booster transformer station (without cross feeder – Type-I) 18.06. 2010 DRAWING R E V Master List No. Structural details for LT supply transformer T-150 25Kv dropout fuses switch details.94 10.03.05 30.01.81 10. Typical layout of 132/25kv Traction substation (with three transformers) Type –v Typical layout of 220/25 kV traction substation Type-I Typical layout of 22o/27kV traction substation type-1 Typical return current connection to buried rail at 220/25Kv traction substation.09.02.08.Page 26 of 57 Sl.84 09.05.02.87 18.02. General arrangement and terminal connection for 25 kV PT type-II (protection type) at 220 kV traction substation. LV Box assembly for LT supplies transformer stations.85 18.06.ACSR) conductor at 220 kV traction substation Typical general arrangement of earth screen wire termination at 220Kv traction substation 25kv drop out fuse assembly. Typical terminal arrangement for strung bus at traction substation with ZEBRA conductor.11.03. Typical earthing layout of 25 kV a.06.12. S-100 mast. Typical earthing layout at a sectioning and paralleling station. Typical cable run layout of a feeding station.10.84. CTs and Las.12.02.79 13.75 26-10-98 01.80 0 1 1 1 1 1 0 26.09.Page 27 of 57 Sl.c. Name.91 28. DRAWING NO. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 1 2 73 74 76 ETI/PSI/112 ETI/PSI/113 ETI/PSI/115 B A - 77 78 79 80 81 82 83 ETI/PSI/121 ETI/PSI/201 ETI/PSI/201-I ETI/PSI/202 ETI/PSI/202-I ETI/PSI/203 ETI/PSI/204 F B B B C 84 85 86 87 88 89 89 90 91 92 93 94 95 96 97 98 99 ETI/PSI/211-1 ETI/PSI/212 ETI/PSI/222 ETI/PSI/222-I ETI/PSI/224 ETI/PSI/228 ETI/PSI/229 ETI/PSI/301 ETI/PSI/302 ETI/PSI/303 ETI/PSI/323 ETI/PSI/501 ETI/PSI/512 ETI/PSI/513 ETI/PSI/514 ETI/PSI/516 ETI/PSI/521 A B A E A C C B E C - Structural assembly for a standard booster transformer station (without cross feeder type-II) Structural assembly for a standard booster transformer station (with four cross feeder type-III) Structural assembly for a standard booster transformer station (without cross feeder and 42 kV lightning arrester type – VI) Typical fencing layout at traction substation (details of fencing panel door ant climbing device etc. Ats. Typical cable run layout of a sub sectioning and paralleling station. Details of transformer bushing/porcelain housing for BTs. Typical earthing layout of 25 kV a. Typical earthing layout of a feeding station. sub sectioning and paralleling station.75 13.82 15.86 02.10.03.12.84 18. cable trench and foundation layout of 132/25kV traction substation.10. Typical earthing layout of a booster transformer station.1V and V).11. PT type-1. HV Bushing 36kV.12. Typical arrangement of an earth electrode Typical earthing.71 26-10-98 25. 630A. Typical earthing arrangement for equipments and structures at traction substation. Earthing details for interrupter. 630 A with adjustable arcing horn LV Bushing 3. PTs. No.07. Typical earthing cable trench & foundation layout of 132/25kV traction substation with shunt capacitor bay . S-101 mast.79 29. sub sectioning and paralleling station. Effective from 31.2008 R E V Master List No. Typical general arrangement of 132kV double pole double break isolator with earthing blade assembly 02.) Typical earthing layout of sub sectioning and paralleling station.84 30. 05.6 kV. LT supply transformer 25kV lightning arrester. Typical cable run layout of a sub sectioning and paralleling station.86 12.98 21.12.02.79 03. Typical details of cable run at a two transformer traction substation.07. Typical drawing for a terminal board.71 26-10-98 20.85 30.04.c.06.12.71 08.03.84 18. rating and terminal marking plate.01.79 1 0 2 2 0 0 0 1 0 1 1 0 3 3 2 1 1 .80 21. Typical earthing layout at a booster transformer station (with four cross feeder for type -111.03.02. fencing upright and main mast.84 30.02.75 11.05.89 19. Typical arrangement of an earth electrode at traction substation. 2010 DRAWING R E V Master List No. General arrangement of 25Kv outdoor type CT.08. 1W for use in discrepancy switch on the mimic diagram board in remote control center.Page 28 of 57 Sl. Typical control desk.02.81 17.90 10. o.85 21.04. Traction power supply arrangement for yard/electric loco shed General scheme of supply for 25 kV ac traction system in Mumbai area after conversion from dc to ac. Effective from Feb. Layout of 25 kV/415V emergency power supply equipment.06 07. Typical assembly of 25kV single and double pole Motorized Isolator.06 0 3 0 1 2 3 4 1 3 .12.87 16.05.84 17.03.82 17.86 02.94 18.81 03. Scheme of interlocking arrangement for 25 kV circuit breaker at three transformer substation. Typical layout of zonal repair shop for PSI equipment. N NO.08.01 31. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 3 0 2 2 2 2 3 3 100 101 102 103 104 105 106 107 ETI/PSI/5211 ETI/PSI/5212 ETI/PSI/5213 ETI/PSI/5214 ETI/PSI/5215 ETI/PSI/611 ETI/PSI/623 ETI/PSI/624 A B A B A B A 108 109 110 111 112 113 114 116 117 ETI/PSI/628 ETI/PSI/642 ETI/PSI/651 ETI/PSI/704-I ETI/PSI/709 ETI/PSI/708 ETI/PSI/SK/344 TI/GRG/PSI/MOTISO/ 00002/06/0 TI/DRG/PSI/ INTERLOCK/RDSO/ 00001/06/0 A A A - Cast ell type mechanical integral / interlock for 132kV isolator Scheme of locking /interlocking arrangement of 132kV isolator at traction substation. Typical earthing arrangement of an auxiliary transformer.94 18. Existing and proposed arrangement for provision of rail links between RC and rail. Miniature lamp 25V. Scheme of interlocking arrangement for 25 kV circuit breakers at traction substations.06. Schematic diagram of 132/25 kV traction substation showing scheme of interlocking of circuit breaker and isolators.87 04.02.10. Castel and bolted type lock with common key for 25 kV ac single pole CB/interrupters.04.80 24.10.03.07.08. Scheme of interlocking arrangement of 25 kV circuit breaker at traction substation for MRVC.86 11. 09.01.06.85 12. 90.Page 29 of 57 Sl.II – POWER SUPPLY INSTALLATION 2) GENERAL ARRANGE MENT OF SUBSTATION LAYOUT .91 18.2008 R E V Master List No. No. Typical layout of 132/2x25 traction sub-station with three single phase transformers for single line section (V connection type).10. 0 1 1 1 1 1 .02.09.10. DRAWING NO.12. A 1 2 ETI/PSI/AT/0201 ETI/PSI/AT/0202 B Typical layout of 220/2x 25 kV traction substations with scot-connected transformers (for double line section).91 17.09. REMOTE CONTROL AND EARTHING ARRANGEMENT FOR 2 X 25KV `AT’ SYSTEM. Typical layout for a Auto transformer post (on double track section) 18.89 18.10.09.09.91 27.92 18. SWITCHING STATION . Typical layout for sectioning and paralleling post (SP) in 2x25 kV ‘AT’ system (on double traction section) Typical layout for sub-sectioning post in 2x25 kV ‘AT’ system (on single track section) Typical layout for sectioning post in 2x25 kV ‘AT’ system ( on single track section).91 23. Effective from 31. BT. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E Chapter . Typical layout of 132/2x25 kV traction sub-station with single phase transformer (for single line section) Typical layout for sub-sectioning and paralleling post (SSP) in 2x25 kV ‘AT’ system (on double track section).89 0 0 3 4 5 6 7 8 ETI/PSI/AT/0203 ETI/PSI/AT/00101 ETI/PSI/AT/00102 ETI/PSI/AT/00103 ETI/PSI/AT/00104 ETI/PSI/AT/00105 A C A B - 27. Miniature lamp 30 V.04. 22.05.04. Effective from Feb.73. 2010 DRAWING R E V Master List No.89. Typical schematic protection arrangement of shunt capacitor bank at traction substation. 25. SHUNT CAPACITORS AND PROTECTION FOR 25 Kv ac TRACTION SYSTEM ETI/PSI/024-I 1 2 3 4 5 ETI/PSI/0223 ETI/PSI/0228-I ETI/PSI/0231-I ETI/PSI/0232 E A Typical schematic diagram of protection for double transformer traction sub-station.08. Out line general arrangement for control & distribution panel for colour light ignaling with automatic change over facility (3 sources) for 25 kV ac traction system.12. 3 14 15 16 17 18 19 ETI/PSI/647 ETI/PSI/648 ETI/PSI/652 ETI/PSI/SK/343 ETI/PSI/702-1 TI/DRG/PSI/RCC/ 00001/07/0 A D - 20.07 3 8 9 10 11 ETI/PSI/325 ETI/PSI/326 ETI/PSI/642 ETI/PSI/644 A C 15. 06. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter . (SP and SSP).12.84 10.90 17.03.97 2 1 1 4 2 . Schematic power supply diagram for colour light signaling and other loads from 10KVA.04. 3 7 ETI/PSI/035-4 - 21. Typical details of cable run at a two transformer traction substation with shunt capacitor. o. 25 kV/240 V LT supply transformer.85.II – POWER SUPPLY INSTALLATION 3.05.06.03. 23. 1 phases traction system. Schematic interconnection diagram for remote control of power gear and supervision of equipments at controlled station.12. A 1 1 1 3 1 6 ETI/PSI/034 A 04.83.89.07.09.87 16. 40 Ma for use in discrepancy switch of telefonbau make on the mimic diagram board in remote control center.08. Schematic diagram of remote controlled flasher arrangement at TSS and OHE masts opposite feeding post. 1W for use in discrepancy switch on the mimic diagram board in remote control centre. Typical details of cable run at a two transformer traction substation with shunt capacitor. Typical layout for 25 kV shunt capacitor unit to be installed at 132/25kV traction substation type-I Typical schematic diagram of protection for single transformer traction substation High speed auto-reclosing scheme for feeder circuit breaker at 25 kV traction substation. 1 1 3 1 12 ETI/PSI/645 C 21.94 18.Page 30 of 57 Sl.05.81.85 21.97 22. Typical layout of remote control center.84. Typical layout of remote control center for computer based SCADA system. Schematic interconnection diagram for remote control of power gear and supervision of equipment at traction substation.94.94. Fixing arrangement of mast Anchor fitting for Antifouling device in three pulleys (MOD) ATD. Control and relay panel for ac traction substation.(220 kV) Miniature lamp 25 kV. N NO.94.07. 30. General Scheme of supply for 25 kV.02. 2 13 ETI/PSI/646 A 16. 50 Hz. 18. DRAWING NO. PROTECTION FOR 2 X 25 kV ‘ AT’ SYSTEM B B B B Protection scheme for scot connected transformer (2x 25 kV system).93. Effective from 31.Page 31 of 57 Sl.II – POWER SUPPLY INSTALLATION 4. No. Protection scheme for 2x 25 kV OHE AT TSS.09. Differential protection for scot connected transformer (2 x 25 kV system). 1. Protection scheme for single-phase transformer (2x 25 kV system). 2. 3.09.93. 29.2008 R E V Master List No. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E Chapter .09. 29.12.93 A 4 4 4 4 ETI/PSI/AT/0204 SH-1/4 ETI/PSI/AT/0204 SH-2/4 ETI/PSI/AT/0204 SH-3/4 ETI/PSI/AT/0204 SH-4/4 . 29.93. 29.09. 4. 26. ETI/PSI/P/6580 ETI/PSI/P/6580-1 ETI/PSI/P/6581 ETI/PSI/P/6590 B B B 07. 36 mm Aluminium flexible bus splice. 10. 36 mm Aluminium bus splice cum tee connector body.08. Clamping piece. COMPONENTS AND FITTINGS 1. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter .11. 12.II – POWER SUPPLY INSTALLATION 5. 3 3 5.86 10. 30.87 07.86 04.87 07. ETI/PSI/P/6480 ETI/PSI/P/6480-1 C A 36 mm Aluminium bus terminal.87. 10. 29. 36 mm Aluminium bus splice body. 50 mm Aluminium bus tee connector. Flexible joint.88 04. 9. Clamping piece (small). 36/20 mm terminal connector body. 36/20 mm taps connector body.Page 32 of 57 Sl. 36 mm Aluminium bus junction connector body.09.86.86 14.08.11.87 10.86. ETI/PSI/P/6501 ETI/PSI/P/6510 ETI/PSI/P/6510-1 ETI/PSI/P/6511 ETI/PSI/P/6520 ETI/PSI/P/6521. 23. 07. 32.79 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 3 2 2 3 2 3 13.06. Expansion type terminal connector suitable for 50 mm aluminum tubular bus bar to suit 25 kV isolator terminal pad. 50/20 mm taps connector. 36/15 mm taps connector.86. 07. A 3 3 3. Expansion type terminal connector suitable for 36 mm aluminum tubular bus bar to suit 25 kV isolator terminal pad. Clamping piece for 36 mm flexible bus splice. 18. 25 kV interrupter and 25 kV side of 13. 7. 07. 27.86 22.11.6500-1. o. 8. 50 mm Aluminium flexible bus splice.06. 50 mm Aluminium bus splice.09. 7. 16.01. 36 mm Aluminium bus splice. 50 mm Aluminium bus terminal.09. N NO. ETI/PSI/P/6500. 21.11.86 13. 35. 36 mm Aluminium bus splice cum tee connector.87. 15. 31.86. 6.09.86.86 10. ETI/PSI/P/6481 ETI/PSI/P/6482 ETI/PSI/P/6482-1 ETI/PSI/P/6490 ETI/PSI/P/6490-1.87 26.86.09.05.86 3 3 3 3 . 24.86 07.5/20 MVA traction transformer.87 13. ETI/PSI/P.08.86.86. 2. 13.04. 18. 19.08.06. 28. 4. Terminal connector for 25 kV PT with 36 mm Aluminium bus bar. ETI/PSI/P/6480-2 ETI/PSI/P/6480-3 A 04.86 04. 20 mm Aluminium bus bar tee connector 10. 34.02.08. 20.06.86 13.09.86.09.11. 36/15 mm taps connector body. 17. 10.08.86 07. 2010 DRAWING R E V Master List No. 36 mm Aluminium tee terminal body. 07. 33. ETI/PSI/P/6491. 36 mm Aluminium bus bar connector body.86 14. Effective from Feb.09.88.86 10. Flexible connector for 25 kV circuit breaker. 14. ETI/PSI/P/6523 ETI/PSI/P/6530 ETI/PSI/P/6531 ETI/PSI/P/6540 ETI/PSI/P/6541 ETI/PSI/P/6550 ETI/PSI/P/6550-1 ETI/PSI/P/6551 ETI/PSI/P/6552 ETI/PSI/P/6553 ETI/PSI/P/6560 ETI/PSI/P/6561 ETI/PSI/P/6570 C C C C B C B D C B B B C D A B B C C C B B F 10.08.06. 36 mm Aluminium bus tee connector body.08.08. 50 mm Aluminium tee terminal. 36 mm Aluminium bus double sliding body. 22. 13. 36 mm Aluminium tee terminal.86.86 10. 36 mm Aluminium bus Tee connector.09. 36/20 mm terminal connector.12. 36/20 mm taps connector.11. 36 mm Aluminium bus terminal. 25. 10. 11. 08. Bimetallic terminal connector for 30 mm copper terminal stud and 20 mm spider AAC (RIGID TYPE). 10. Tapped terminal clamp (for 25Kv/100 KVA booster transformer).09.09. Connector body for 30 mm copper terminal stud. ETI/PSI/P/6591 ETI/PSI/P/6592 ETI/PSI/P/6800 ETI/PSI/P/6830 ETI/PSI/P/6830-1 ETI/PSI/P/6830-2 ETI/PSI/P/6831 ETI/PSI/P/6841 ETI/PSI/P/6842 ETI/PSI/P/6850 ETI/PSI/P/6850-2 ETI/PSI/P/6851 ETI/PSI/P/6860 ETI/PSI/P/6096 ETI/PSI/P/6096-1 ETI/PSI/P/7520 ETI/PSI/P/7521 ETI/PSI/P/7522 ETI/PSI/P/7523 ETI/PSI/P/7524 ETI/PSI/P/7525 ETI/PSI/P/7526 ETI/PSI/P/7526-I ETI/PSI/P/7527 ETI/PSI/P/7528 ETI/PSI/P/7529 TI/DRG/PSI/3LTSS/ RDSO/00001/07/1 TI/DRG/PSI/4LTSS/ RDSO/00001/07/1 B D F F D A D D D D B C C B B B B A A A A A 20 mm Aluminium bus bar tee connector body.86.09. 39. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 3 3 3 3 3 3 3 3 2 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 36. 38. 37. Clamping piece for 20 mm spider connector.86 22. 500 A. Flexible bimetallic terminal connector assembly for 25 kV/100 KVA booster transformer.Page 33 of 57 Sl. 10. Rigid and flexible bimetallic terminal connector for 25 kV current transformers. Terminal connector for aluminum conductors (Bolted type).05.08. Sliding clamp for 50 mm O/D Aluminium bus bar. 47.05. 58. 42.86. Terminal connector suitable for 20 mm GOAT “ACSR” with terminal of 22 kV vacuum circuit breaker.86 10.09. SSP & SP with 30 MVA Transformer for four (4) lines. Effective from 31. 43. 56. 50. 57.86 08. 40.90 07. DRAWING NO.2008 R E V Master List No. SSP & SP with 30 MVA Transformer for three (3) line.08.86. 54.86 10. 12. FP. Booster transformers. 55. 60. Typical number plate for interrupter and double pole isolator Typical number plate for potential transformer type-I Typical number plate for booster transformer Typical number plate for circuit breaker Caution plate 132000 Volts Typical number plate for auxiliary transformer Typical number plate for power transformer at traction sub station Typical number plate for auto transformer Typical number plate for potential transformer at traction sub station Typical number plate for current transformer at traction sub station Typical number plate for isolator at traction sub station Typical schematic diagram for TSS.09.09.08.08. 23-11-71 23-11-71 23-11-71 04-03-74 29-05-74 20-01-78 15-05-80 08-11-89 06-05-81 06-05-81 06-05-81 05. 44. No. 59.86.08 05. 07.86 07.08. Terminal connector suitable 20 mm spider `AAC’ with terminal pad of 132 kV of isolator and 132 kV MOCB. 53. 41.09. 48.86. 51. 52. 62. 30.12. 45. 07.86 10.08 . 63. FP. 61.09. Sliding clamp for 36 mm O/D Aluminium bus bar. 49. Connector body for 20 mm “AAC” spider conductor.86 12.87.92 06.08. Flexible bimetallic terminal connector assembly for 25 kV/280 KVA. Clamping piece for 30 mm dia terminal stud. Typical schematic diagram for TSS. 46. 10.89 03.02. Details of rigid type terminal connector suitable for 50 dia aluminum tubular bus bar to suit 60 dia copper stud of 25 kV current transformers. Tee connector to suit” ZEBRA” (28. Rigid type bimetallic connector suitable for 50 dia aluminum tubular bus bar to terminal pad of 25 kV isolator/CT. Rigid through connector to suit 50 dia aluminum tubular bus bar and “SPIDER” AAC conductor for 25 kV PT type II.I.58 dia) ACSR conductor and aluminum/copper pad of isolator/CT/BT (for 220 kV system). Effective from Feb.10.89 2 9 ETI/PSI/P/11090 C 03. N NO. o.II – POWER SUPPLY INSTALLATION 6.04. Detail of rigid terminal connector suitable for 20 dia aluminum conductor to terminal pad of 25 kV PT type-I and type-II.09.89 2 8 ETI/PSI/P/11080 B 03.02. ETI/PSI/P/11010 C Bimetallic terminal connector to suit ‘ZEBRA’ ACSR conductor and 30 dia copper stud of CT/CB/traction power transformer. Details of rigid type bimetallic terminal connector suitable for 50 dia aluminum tubular bus bar to suit 30 dia copper stud of 25 kV current transformers.90 2 2 2 7 ETI/PSI/P/11070 B 03.89 2 10 ETI/PSI/P/11100 E 04.89 2 13 14 ETI/PSI/P/11130 ETI/PSI/P/11140 B B 03.89 10.02.90 2 12 ETI/PSI/P/11120 C 03.58 dia) ACSR conductor on both ways for (220 kV system). Tee connector to suit 50 O/D aluminum tube and “SPIDER” AAC conductor (for 25 kV systems).02.89 17.02.90 2 11 ETI/PSI/P/11110 C 04. Details of expansion bimetallic terminal connectors suitable for 50 dia Aluminum tubular bus bar to 60 dia copper copper stud of 25 kV CT. to suit “ZEBRA” (28. Bimetallic terminal connector to suit “ZEBRA” (28. HIGHER CAPACITY CONNECTORS FOR 220 Kv AND 25 Kv (50 mm O/D ALUMINIUM BUS BAR) SYSTEM.58 Dia) ACSR conductor (for 220 kV system). TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter .89 2 2 .02. 12. 2010 DRAWING R E V Master List No.89 2 4 5 6 ETI/PSI/P/11040 ETI/PSI/P/11050 ETI/PSI/P/11060 C C E 03.02. Details of expansion type terminal connector to suit 50 dia Aluminum tubular bus bar to terminal pad of 25 kV CT/isolator/CB and interrupter. Rigid connector on S.02.10.Page 34 of 57 Sl. Inter connector suitable for 50 O/D aluminum tube and “SPIDER” AAC conductor (for 25 kV PT type-I).02.90 2 3 ETI/PSI/P/11030 C 03.91 2 2 ETI/PSI/P/11020 E 04. Details of expansion type bimetallic terminal connector suitable for 50 dia aluminum tubular bus bar to suit 30 dia copper studs of 25 kV CT/BT/Traction power transformer. A 1. to 50 O/D aluminum tube (for 25 kV systems).89 04.10.90 12.10. Terminal stud for traction power transformer.89 03.12. Expansion type terminal connector for 25 kV.91 04.89 17. Effective from 31.90 04.I.I.02. Tee connector to suit 36 mm O/D aluminum bus bar to 50 mm O/D aluminum bus bar. Rigid bus splices connector to 50 O/D aluminum tube on both ways (for 25 kV systems).10.89 03.02. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 2 2 2 2 2 2 2 2 16 17 18 19 20 21 22 23 24 ETI/PSI/P/11160 ETI/PSI/P/11170 ETI/PSI/P/11180 ETI/PSI/P/11190 ETI/PSI/P/11200 ETI/PSI/P/11210 ETI/PSI/P/11220 ETI/PSI/P/11230 ETI/PSI/P/11240 B C B C C D D C C Tee connector to suit 50 O/D aluminum tube to 36 O/D aluminum tube (for 25 kV systems).02. Tee connector to suit 50 O/D aluminum bus bar and 15 O/D cadmium catenary (for 25 kV systems). Expansion bus coupler on S.09. Rigid type connector on S.2008 R E V Master List No.02. Sliding clamp for 50 mm O/D aluminum bus bar (For 25 kV systems).Page 35 of 57 Sl. No. to suit 50 O/D aluminum bus bar (for 25 Kv systems).90 . Terminal for traction power transformer.89 03. DRAWING NO. 30 mm dia.02. Expansion type terminal connector for 25 kV. 60 mm dia. 03. 9. 3.91 08.93 02. nuts and lock nuts for 25kV ac traction.09. 6. 9. 7. 2010 DRAWING R E V Master List No. 8.03. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter .850 m. 10.04.10.91 23. 2.87 29.09. Emergency OHE mast on sleeper General arrangement Emergency OHE mast on sleeper Detail of top middle and bottom parts Emergency OHE mast on sleeper (details of base connection) Dimension of bolts. OHE MAST 1.5 m long standard traction masts (fabricated with batten plate) ‘TM’ series. long standard traction mast (Fabricated with batten plates) ``B” Series . o.III – CIVIL 1.02. N NO.08. 4.5 m standard traction mast (fabricated ‘K’ series) 9.89 07. 5.5 m long standard traction masts (fabricated with batten plate) ‘TM’ series (weight schedule) 10. ETI/C/0018-2 ETI/C/0071 ETI/C/0072 SH1 ETI/C/0072 SH2 ETI/C/0072 SH3 ETI/C/0073 ETI/C/0074 ETI/C/0075 ETI/C/0078 SH1 ETI/C/0078 SH2 Ti/DRG/CIV/B-MAST / RDSO/00001/08/0 D E A B A A - (STEEL) 14. 16 Dia J Bolts for 25 KVA ac traction Washers and split pin for 25 kV ac traction 9.93 29.11.5 m standard traction mast (fabricated with batten plates) ‘B’ series. 11.08. Effective from Feb.91 A 1 1 2 1 1 05.03.08 2 3 2 2 1 1 9.91 14.04.82 06.Page 36 of 57 Sl.93 08. 0m) Standard ‘N’ type portal (rod laced) .91 Goods platform Black weight of ‘G’ type portal 18.5.12. NUS3 –9.Details of splicing and 04.General arrangement 16.10.03.Details of knee 04.91 bracing Two track cantilever structure General arrangement 01.ETI/C/0011/69 SH2 20.08.ETI/C/0009/69 SH5 18. Standard arrangement of supporting cantilever on the boom 02. NUS4 –8.5.ETI/C/0011/69 SH5 23.91 Standard `R’ type portal (rod laced).91 piece of top boom (length 1. Details of knee 04.ETI/C/0017 SH1 . DROP ARMS AND SPS 1.ETI/C/0011/69 SH6 24.91 Standard ‘N’ type portal (rod laced).ETI/C/0011/69 SH3 21.05.91 platform ‘N’ type portal short upright. ETI/C/0004 SH2 3.94 of portals and TTC (SPS details for conventional OHE ) Standard arrangement of supporting cantilever on the boom 02.Page 37 of 57 Sl. Standard `R’ type portal (rod laced).ETI/C/0009/69 SH3 16.ETI/C/0008 SH4 11. ETI/C/0008 SH3A 10.91 platform ‘N’ type portal short upright.89 Two track cantilever structure Details of upright 04.0. ETI/C/0008 SH1 7.Details of central 04.03.12.ETI/C/0009/69 SH2 15.91 bracing.2008 R E V Master List No.08. General arrangement 16.5&9.03.91 cover angle.03.03.12. Details of central 04.91 Two track cantilever structure Details of 5.ETI/C/0009/69 SH4 17. TTC.91 piece of top boom (length 7.03.ETI/C/0011/69 SH1 19. ETI /C/0006/68 6.ETI/C/0013/69 SH3 27.0.0&13. ETI/C/0008 SH3 9.08. 6.3.1 m) ‘ Standard `R’ type portal (rod laced).94 of portals and TTC (general arrangement) Standard arrangement of supporting cantilever on the boom 02.ETI/C/0013/69 SH1 25.88 A 1 1 1 1 2 1 1 1 1 0 2 2 2 1 2 1 1 2 1 1 0 2 2 0 1 1 1 5.03. Details of end piece 04. No.ETI/C/0008 SH6 13.12.ETI/C/0008 SH5 12.91 Two track cantilever structure Details of 8.Details of end piece of 04.945 m long for RL 04.5. Details of end piece of 04.5 m boom 04.91 top boom (length 5380 mm) Standard ‘N’ type portal (rod laced) .03.490 m long for LL 04. ETI/C/0004 SH3 ETI/C/0004 SH4 A C A A A A B C B B C A B C B C C C C D C B C E D A ‘N’ type portal short upright. DRAWING NO.03. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E Chapter .III .03.ETI/C/0013/69 SH2 26. ETI /C/0004 SH 1 2.6 & 12. Effective from 31.4.CIVIL 2) OHE PORTALS.03.03.03.88 Standard ‘N’ type portal (rod laced) .91 platform ‘N’ type portal short upright.03.91 of top boom (length 5880 mm) Standard ‘N’ type portal (rod laced). 4.91 top boom (length 11.Details of upright 04.ETI/C/0011/69 SH4 22.91 and cover angles Standard ‘N’ type portal (rod laced) .91 Standard ‘R’ type portal (rod laced).94 of portals and TTC (for tramway type OHE) General arrangement standard ‘O’ type portal (rod laced) 15.9.03. ETI/C/0008 SH2 8.5.0.0 m) Standard `R’ type portal (rod laced).91 Two track cantilever structure Details of knee plate 04.7.12. Details of splicing 04.12.03. NUS2 –9.03.Details of upright 04.0 m boom 04.03.74 Standard ‘N’ type portal (rod laced).ETI/C/0009/69 SH1 14.185 m long for HL 04.88 Standard `R’ type portal (rod laced).880 m long for 04.03. NUS1 -9. 98 14. & double BFB type) C Standard arrangement of supporting cantilevers on the boom of the portals and TTC (To avoid bird nesting). general arrangement and details of upright and end piece .91 04.88 04.91 15.Two track cantilever structure (TTC-17) General arrangement A Two track cantilever structure (TTC-17) .ETI/C/0019/70 SH1 34.05 0 .91 16. . C Special ` BFB ’ portal for 5 tracks.G.5. Details of boom A Two track cantilever structure (TTC-17).74 23.ETI/C/0019/70 SH2 35.12.07.08.P..5 and 9.OUS1 `O’ type portal short upright of length 10. B Three legged `BFB’ portal. ETI/C/0079 SH-2 54.0 m) A Special `BFB’ portal for 5 tracks.ETI/C/0077 SH-1 48. 31.03.80 02.ETI/C/0079 SH-1 53.ETI/C/0026 SH-4 39.03. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE 04.58 m or low level passenger platform only).Standard portals (N. Details of end piece of top boom (length 8.03.94 55.08. B Special `BFB’ portal for 5 tracks.0 m) standard ‘O’ type portal (rod Laced) C Details of splicing and cover angles standard ‘O’ type Portal (rod laced) A Details of knee bracing standard ‘O’ type portal (rod laced) A Three legged ‘N’ type portal (rod laced).03.98 04.04.Black weight of `O’ type portal C Standard `G’ type portal upright and end piece . .ETI/C/0053 44.91 04.07.97 m (For goods platform).ETI/C/0064 46.ETI/C/0027 SH-2 41.R.94 2 2 2 0 2 1 1 1 2 1 0 2 2 0 0 1 2 1 1 2 0 0 0 04.94 13.03. OUS4 `O’ type portal short upright of length 8.ETI/C/0077 SH-4 51. General arrangement for special portal for clear span of 40 m to 60 m for 3 Nos.ETI/C/0017 SH4 B Details of upright standard ‘O’ type portal (rod laced) B Details of end piece of top boom (length 10548 & 11048 mm) standard ‘O’ type portal (rod laced) B Detail of central piece of top boom (length 1.ETI/C/0026 SH-3 38.03.91 14.OUS3 `O’ type portal short upright of length 9. Effective from Feb.0.275 m (For high level passenger platform).Details of upright A Two track cantilever structure (TTC-17). A Special `BFB’ portal for 5 tracks. 2010 DRAWING R E V Master List No.ETI/C/0077 SH-2 49. N NO.ETI/C/0017 SH2 29. general arrangement A Details of central upright. 7.91 02.ETI/C/0052 43.88 14.ETI/C/0048 42. o.O.ETI/C/0056 45.035 m (For Rail level passenger platform only). SPS details. 3.ETI/C/0077 SH-5 52.ETI/C/0027 SH-1 40.ETI/C/0076 47..ETI/C/0026 SH-1 36.06. .ETI/C/0017 SH3 30. ETI/C/0079 SH-3 04.07.03.91 04. . General arrangement. Details of knee plate A Two track cantilever structure (TTC-17). DD line for Chitpur Terminal of Eastern Railway. 6.Black weight of `N’ type portal . TI/DRG/CIV/PORTAL /RDSO/00001/05/0 Sh-1 04.74 22.ETI/C/0017 SH5 32. Three legged `N’ type portal (rod laced).03.08.91 S I Z E 0 A 0 0 28.OUS2 `O’ type portal short upright of length 9. Details of upright.5.03.91 04.94 07.08.03.08.ETI/C/0026 SH-2 37.98 04.07.91 04.ETI/C/0077 SH-3 50.0.03.Page 38 of 57 Sl. B Standard `P’ type portal. Details of knee bracing.91 04.03.06.91 04.06. Details of central upright.4.91 20. ETI/C/0079 SH-4 56.91 04. General arrangement B Three legged `BFB’ portal.90 04.ETI/C/0017 SH6 33.08.03.5 & 9. 0m.13).06. TI/DRG/CIV/PORTAL /RDSO/00001/05/0 Sh-4 60. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 57.06 . TI/DRG/CIV/ HGAUGE/RDSO/ 00001/05/0 - - - - Details of special end piece (SE) for special portal for Clear span of 40m to 60m for 3 Nos. DD line for Chitpur Terminal of Eastern Railway. TI/DRG/CIV/ HGAUGE/RDSO/ 00001/05/0 61.05 07.03. DD line for Chitpur Terminal of Eastern Railway (Nominal length 6. Details of cover angle for special portal for Clear span of 40m to 60m for 3 Nos.2008 R E V Master List No.05 07. DRAWING NO.06. DD line for Chitpur Terminal of Eastern Railway (Nominal length 12. TI/DRG/CIV/PORTAL /RDSO/00001/05/0 Sh-2 58.7.10.3m) Details of structure and foundation.0m & 13.3m up to 12.06 - 08. Standard plan Height Gauge for level crossing (for clear Span above 7.2m) Details of structure and foundation. Effective from 31.9.63m and 13.05 08. TI/DRG/CIV/PORTAL /RDSO/00001/05/0 Sh-3 59.0m. 07.03.12.5m.06. No.Page 39 of 57 Sl.5m. Standard plan Height Gauge for level crossing (for clear Span up to 7.12. Details of special Boom (SB) for special portal for Clear span of 40m to 60m for 3 Nos.0m). 01 15. 6. Part layout of foundation and cable trench for shunt capacitor bay.06. Lifting frame for 13. Foundation and stub details for towers T1 & T1 extension. Typical cable trench and foundation layout of 132/25 kV traction substation (Trench cover improved). Details of tower T1. 10. 13. 22.91 19.84 03.07.05. Typical cable trench layout of 220/25 kV traction substation.5 MVA transformer core in traction substation.91 04.91 03. Effective from Feb.09. o.91 05.84 01.11.05. 12.91 05. 15. 15.05.84 11.03. 3. General arrangement Lifting frame for 13. 2.91 05.03.03.03.91 06.5 MVA transformer core in traction substation. Details of beam B/2 & column C/1 for 132/25 kV station. Details of baffle wall at traction substation in zones of wind pressure 112. Small part steel works.03.87 26.09. Lifting frame for 13.03.91 05. Details of tower T2. 5.86 29. 18. Small part steel works& Lifting hook details.Page 40 of 57 Sl. 16.03. Part layout of foundation and cable trench for 25 kV feeder bay for yard/electric loco shed. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter . 24.03. 17.97 01. 8.05.CIVIL 3. N NO.5 and 75 kgf/m2. STRUCTURAL LAYOUT. Details of RCC Baffle wall at traction substations in zones of wind pressure 150 kgf/m2.5 MVA transformer core in traction substation. 21.91 06.88 06. STRUCTURES AND FOUNDATIONS FOR TRACTION SUB STATION. Line diagram of structural layout of 220/25 kV traction substation.01 15.04. 19.03. Foundation and stub details of towers T1 extension and T2 extension for 132/25 kV type VI substation only. Foundation and stub details for towers T2 & T2 extension. 14.88 A 0 0 1 0 0 1 1 2 1 1 0 2 1 2 2 1 1 1 2 2 1 1 1 1 .03.91 05. 23.03.11.III .5 MVA transformer core in traction substation.05.01 15.05. 9. Lifting frame for 13. 7. 11. Details of pavement and drains. Extension of tower T2. Extension of tower T1.86 18.91 06. Structural layout 132/25 kV traction substation (Type VII to X). 2010 DRAWING R E V Master List No.01 06. Details of beam B/1. Structural layout of 220/27 kV traction substation (Type-I). 20. 4. ETI/C/0200 SH-1 ETI/C/0200 SH-2 ETI/C/0201 ETI/C/0202 ETI/C/0203 ETI/C/0204 ETI/C/0205 ETI/C/0206 ETI/C/0207 ETI/C/0208 ETI/C/0210 ETI/C/0211 ETI/C/0213 ETI/C/0214 ETI/C/0216 ETI/C/0217 SH-1 ETI/C/0217 SH-2 ETI/C/0217 SH-3 ETI/C/0217 SH-4 ETI/C/0219 ETI/C/0220 ETI/C/0222 ETI/C/0222-I ETI/C/0223 H D D H G E E D D E F B D B B C C B A A Structural layout 132/25 kV traction substation (Type I to VI). Transformer oil drainage arrangement at substation. 1. 03. 39. 35.91 05. DRAWING NO. 43.91 06. Details of beam B/4 for 132/25 kV traction substation. 38. Details of structure for 132 kV triple pole Isolator Details Of structure for 25 kV current transformer Details of structure for 42 kV 10 kA lightning arrester and 25 kV support insulator. No.91 05.91 06. Foundation for towers T1 and T1 Extension for 132/25 kV traction substation (For ZEBRA conductor).08.03. 44. 36.91 1 1 1 2 .91 06.09.97 05. Control room for traction substation. Details of mounting structure for 25 kV single phases MOCB type TRE 36. Strengthening of mounting structure for 132 kV CT. ETI/SK/C/179 ETI/SK/C/180 ETI/SK/C/183 ETI/SK/C/188 A C A A 05.91 06. 41. 47. ETI/C/0223-I ETI/C/0224 ETI/C/0225 SH-1/2 ETI/C/0225 SH-2/2 ETI/C/0226 ETI/C/0227 ETI/C/0228 ETI/C/0300 ETI/C/0310 ETI/C/0320 ETI/C/0330 ETI/C/0340 ETI/C/0350 ETI/C/0360 ETI/C/0370 SH-1.08. Foundation and details of structure for mounting of 100 kVA.88 01. 32.03. 45.LA and PT. Control room for traction substation RCC Details. 33.91 06.91 06. 25 kV/230 V LT supply transformer at traction substation Details of structure for 66 kV DP Isolator. Details of structure for 132 kV double and triple poles MOCB. Details of structure for 132 kV current transformers.Page 41 of 57 Sl. Details of structure for 132 kV potential transformers. Details of structure for 132 kV double poles Isolator.03.88 04.91 05.88 01. Effective from 31.03. 50.03.2008 R E V Master List No. 46.03. 26.03.91 05.91 05. Details of structure strengthening for 132 kV CT . 31. 42. LA and PT.91 26.03.5 kV/132 V double pole RVT.88 04.03.91 05.03. 37. Foundation for towers T1 Extension and T2 Extension for 132/25 kV (type VI substation for ZEBRA conductor).08. Black weight of structure for 42 kV 10 kA lightning arrester and 25 kV support insulator. 28.12.03.89 05.03. Details of structure and foundation for 25 kV DP Isolator at traction substation.91 04.08. 34.03.91 06. 26.03.91 17. 49.91 1 1 1 1 2 2 2 1 1 1 1 1 1 2 1 2 1 1 0 2 2 1 2 48. 40.03.03.08. Details of structure for 25 kV potential transformers.03. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 25.88 06. 29. ETI/C/0370 SH-2 ETI/C/0380 ETI/C/0390 ETI/C/0400 ETI/C/0410 ETI/C/0420 ETI/C/0430 ETI/C/0440 A E G E F F E F J F E G B B A A Layout of typical cable trench 220/27 kV traction substation (type-I).88 01. Details of structure for 132 kV support insulator. Foundation for towers T2 and T2 Extension for 132/25 kV traction substation (For ZEBRA conductor). Details of structure for 25 kV single poles Isolator. 27. 51.91 05. Details of structure for 3000 kVA shunt capacitors. Structural details for mounting of 7.03.05. Details of structure for 120 kV lightning arrester.12. 30.12. 98 14.91 10.91 04. Structural assembly for 280 kVA booster transformer station (without cross feeder and 42 kV lightning arrester).91 14. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter . Drilling schedule for S-6 mast (12.98 14.98 04.07.98 05. Details of precast cable trench for SWS station.III .91 04. Drilling schedule for S2 mast.03. Effective from Feb.03.03.88 26 ETI/C/0189 SH-2 B 05. Details of SPS for switching station Details of bracing for switching and BT mast.91 17.03.Page 42 of 57 Sl.08.03.91 14. Employment schedule for Switching and booster station main mast General arrangement and details of Fencing panel and gate for Switching station. Details of remote control cubical (foundation.03.08.08. Drilling schedule for 8’’x 6’’x 35 lbs RSJ masts 8. 14.08. 2010 DRAWING R E V Master List No. SSP & FP.88 04.08. Details of SPS for BT station.08. S-100 fabricated mast for Mounting LT supply transformer and dropout fuse switch at Switching station S-101 details of mast for Supporting Isolator inside Switching station.4 m long).06.91 04.03. FENCING AND SPS FOR SWITCHING STATION AND BOOSTER TRANSFORMER A 2 2 1 0 2 1 2 1 1 0 2 1 2 0 2 2 2 1 2 1 1 1 1 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ETI/C/0030 ETI/C/0031 ETI/C/0033 ETI/C/0034 SH-1 ETI/C/0034 SH-2 ETI/C/0034 SH-3 ETI/C/0036 ETI/C/0037 ETI/C/0038 ETI/C/0040 ETI/C/0042 ETI/C/0043 ETI/C/0044 ETI/C/0067 ETI/C/0180 ETI/C/0181 ETI/C/0182 ETI/C/0183 ETI/C/0184 ETI/C/0185 ETI/C/0186 SH-1 ETI/C/0186 SH-2 ETI/C/0187 ETI/C/0188-B ETI/C/0189 SH-1 F D D K B A E C E E E B A B C C C C C B E E A D A Drilling schedule for S1 mast.98 14.CIVIL 4. building plan and steel door).91 04.03.94 05. Drilling schedule for S-5 mast (11.08.2 m).91 04.98 14.98 18.4 m long).03.98 14.4 m long).03. General arrangement and SPS details for mounting DP Isolator on K-250/ B-250 mast at switching station. N NO. STRUCTURES.98 05.77 04.03.91 2 . Details of beam B-100-A for 280 kVA BT support (Span 3.0 m long for BT station type S4.03.4 m long). Drilling schedule for S-7 mast (12. Drilling schedule for S-3 mast (11.03.91 14.08. Drilling schedule for S-9 mast (9. o. Details of Fencing upright and ant climbing device for switching station Mounting arrangement for FLASHER on OHE mast. RCC slab. Details of SPS of outrigger for Switching station and BT stations. Drilling schedule for S-8 mast (12. Details of anchor beam for SP.91 04. Details of SPS for switching station.4 m long).4 m long).03.08.08.91 04. Typical structural assembly for simplified switching station (Single interrupter) Typical structural assembly for simplified switching station (Single interrupter) SPS Details.91 06.01. on OHE mast (typical).94 07. No. Typical structural assembly for simplified switching station (3 interrupters).94 03. Details of beam B-100-B for 280 kVA BT support (span 4.07.2008 R E V Master List No. Typical structural assembly for simplified switching station (3 interrupters) Typical structural assembly for simplified switching station (3 interrupters).94 23.03.03. 05.95 03.91 30. DRAWING NO. SPS Details.95 .94 07. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 2 1 1 1 1 2 1 1 0 27 28 29 30 31 32 33 34 35 36 ETI/C/0189 SH-3 ETI/C/0190 ETI/C/0191 ETI/C/0192 SH-1 ETI/C/0192 SH-2 ETI/C/0192 SH-3 ETI/C/0193 SH-1 ETI/C/0193 SH-2 ETI/C/0194 SH-1 ETI/C/0194 SH-2 B A A A - - Details of top beam B-102/1-A for 280 kVA BT to support insulator and lightning arrester (span 3.03.92 01. Typical structural assembly for simplified sectioning and paralleling station.SPS Details.11.(SPS Details).04.T.Page 43 of 57 Sl.93 01.04.2 m). Typical structural assembly for simplified sectioning and paralleling station.01.03.12. SPS Details for mounting of A. Effective from 31.3 m). 14.03.03.03.03.91 05. Base clamping angle for portals. 12. 32. Details of guide tube bracket angle for cement concrete counter weight.03.07.91 05.III .88 05.91 04. Details of guide tube support angle for cement concrete counter weight. 15. Short super mast channel. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter .91 05.03. Portal bracket attachment.91 05.08. Suspension support angle.08. N NO.91 18.88 05.91 05.03. 20.91 04.91 22. Front clamping angle.5 m super mast cross arm.91 A 1 3 3 3 3 3 3 3 3 1 3 3 0 3 3 2 2 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 3 .03. Portal super mast. 24.03.03. Suspension support angle (modified arrangement). 28.03. 1. Suspension support angle.91 04.I). 13.91 05. 16.CIVIL 5. 2.91 05. 0. 9. ETI/C/P/8010 ETI/C/P/8011 ETI/C/P/8012 ETI/C/P/8013 ETI/C/P/8014 ETI/C/P/8014-1 ETI/C/P/8014-2 ETI/C/P/8015 ETI/C/P/8016 ETI/C/P/8020 ETI/C/P/8021 ETI/C/P/8022 ETI/C/P/8030 ETI/C/P/8031 ETI/C/P/8032 ETI/C/P/8050 ETI/C/P/8051 ETI/C/P/8052/3 ETI/C/P/8054 ETI/C/P/8071 ETI/C/P/8072/4/6 ETI/C/P/8073/5/7 ETI/C/P/8078 ETI/C/P/8100 ETI/C/P/8101 ETI/C/P/8102 ETI/C/P/8103 ETI/C/P/8104 ETI/C/P/8111 ETI/C/P/8112 ETI/C/P/8113 ETI/C/P/8114 ETI/C/P/8115 G A A B A B B B A C A A B A B C A A A C B C A A A A A A A A A A A Short super mast assembly. Super mast assembly on portals. 23. 10.Page 44 of 57 Sl. 5.91 05.03. 1.91 04. Suspension support angles on portals for return conductor.91 04. 18. R. 25. 21. 24. OHE SUPER MAST AND SPS 1. SPS for RC suspension (TTC and portals).8 m super mast cross arm.91 04. Batten plate type III (for 2x 25 kV AT System OHE).03. Details of special guide bracket angle for cement concrete counter weight. 19.03. Bracket attachment assembly on portal upright (N. Batten plate (type. 4.91 05.03. 3.91 22.3m portal super mast cross arm feeder (for 2 x 25 kV AT System OHE). Effective from Feb. 2. Long super mast assembly. 11.03.03.91 04. Batten plate (type-II).08.03.3 m Feeder super mast cross arm (for 2 x 25 kV AT system OHE).09.03.88 05.03. 31. Clamping angle for portals. Long super mast channel. 2.03.03. Details of guide tube support angle for cement concrete counter weight. 2010 DRAWING R E V Master List No.91 04. 30. 26. Feeder super mast channel (for 2 x 25 kV AT System OHE. Details of special guide tube support angle for cement concrete counter weight.03.03. Portal super mast (for 2 x 25 kV AT system OHE).89 05. O.3.03. 29.98 05. 6.91 06. 33. 8. Cross arm (TTC and portals).91 22.91 05. 17.03.03. SPS for RC suspension (TTC and portals).8 m super mast cross arm. o.91 05. 7. G and BFB Type).91 04. 22.91 05. 27. P.91 04. 38. 36. DRAWING NO. Short super mast assembly for TM series mast (SPS details). 04.12.12. SPS details for double pole Isolator on mast (for 2 x 25 kV).2008 R E V Master List No.07.91 20.Page 45 of 57 Sl. 40. 35.03.10.94 .07.03.91 13. 37. General arrangement of short super mast assembly for TM series mast.92 06.91 04.03. 39. Feeder support clamp (for 2 X25 kV AT System OHE).94 06.91 04. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 3 3 3 1 1 1 2 34. No. Effective from 31. ETI/C/P/8116 ETI/C/P/8117 ETI/C/P/8118 ETI/C/P/8119 SH-1 ETI/C/P/8119 SH-2 ETI/C/P/8120 SH-1 ETI/C/P/8120 SH-2 A A A - Cleat angle (for 2 X 25 kV AT System OHE Suspension support angle (for 2 x25 kV AT system OHE). SPS details for double pole Isolator on `N’ & `O’ type portals (for 2 x 25 kV). WP 112. WP 112. OHE+RC+EW.05 2 3. WP 112.05 2 6. WP 112. cont. ETI/OHE/G/00153 SH4 E 20.09. WP 112. OHE+EW. Employment schedule for cantilever mast regulated OHE caty 65/cu and cont 107/cu. WP 112.Page 46 of 57 Sl.11. Employment schedule for cantilever masts regulated OHE in Gr.05 2 9. cont.11.OHE + RC.11.05 A 2 2.80 2 14.40 A for TARE section only (wind 150 kgf/m2) caty. WP 112. Employment schedule for cantilever mast regulated OHE Al caty-65and 107-cu cont wire. Employment schedule for cantilever mast regulated OHE Al caty-65and 107-cu cont wire. N NO.5kgf/m2 -OHE + EW + RC.05 2 5.5 kgf/m2 -. cont.40 A for TARE section only (wind 150 kgf/m2) caty.5 kgf/m2 at 35 degree C and with 28 kgf/m2 at 4 degree C without (EW & RC).05 2 7. ETI/OHE/G/00125 SH3 A 20.85 2 10. ETI/OHE/G/00125 SH2 A 20.03.65/cu.09.80 2 13. o. 2010 DRAWING R E V Master List No.107/cu. Employment schedule for cantilever mast regulated OHE caty 65/cu and cont 107/cu.65/cu. Employment schedule for cantilever mast unregulated OHE caty 65/cu & cont 107/cu WP 112.09.09.OHE only. Employment schedule for cantilever mast regulated OHE caty 65/cu and cont 107/cu.III .5 kgf/m2 -.65/cu.5 kgf/m2 --OHE + EW + RC. ETI/C/0700 SH-1 - 06.80 2 12. OHE only. ETI/C/0700 SH-2 - 06.80 2 .05 2 4.OHE + EW.09. WP 112.40 A for TARE section only (wind 150 kgf/m2) caty. Employment schedule for OHE masts unregulated OHE without RC and also without EW (WP = 150 kgf/m2 at 10 degree C. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter . ETI/OHE/G/00153 SH1 F 20. Employment schedule for cantilever masts regulated OHE in Gr. OHE+RC.5kgf/m2 -OHE + RC. ETI/OHE/G/00156 D 31. ETI/OHE/G/00125 SH4 A 20. Employment schedule for cantilever mast regulated OHE Al caty-65and 107-cu cont wire. ETI/OHE/G/00153 SH2 F 20. ETI/C/0700 SH-4 - 06.09.09. ETI/OHE/G/00125 SH1 A Employment schedule for cantilever mast regulated OHE Al caty-65and 107-cu cont wire.5 kgf/m2 -.77 2 11. Employment schedule for cantilever masts regulated OHE in Gr.65/cu.09. ETI/OHE/G/00154 D 09.CIVIL 6) EMPLOYMENT SCHEDULE OF OHE MASTS 1. 20.40 A for TARE section only (wind 150 kgf/m2) caty.05 2 8.5kgf/m2 -OHE only. ETI/C/0700 SH-3 - 06. Effective from Feb. cont.11.107/cu.08.107/cu.107/cu.5kgf/m2 -OHE + EW. Employment schedule for cantilever masts regulated OHE in Gr. Employment schedule for cantilever mast regulated OHE caty 65/cu and cont 107/cu. ETI/OHE/G/00153 SH3 F 20. Employment schedule for Tramway type regulated OHE (WP 112.09. Notes. Employment schedule for cantilever mast regulated OHE caty. cont. cont. cont.05 2 20. No. OHE +EW.Page 47 of 57 Sl. DRAWING NO.107/cu (WP 75 kgf/m2) OHE + EW + RC.05 2 20. caty.09.05 20. caty. 107/cu. ETI/C/0700 SH-5 - 16.5 kgf/m2) without EW and without RC.05 2 20.09.107/cu (WP 75 kgf/m2) OHE + EW.05 2 20.107/cu (WP 75 kgf/m2).115/Al. Employment schedule for cantilever mast regulated OHE caty. cont. OHE +EW+ RC.09. 40A) only. cont. ETI/C/0703 SH-1 ETI/C/0703 SH-2 ETI/C/0703 SH-3 ETI/C/0703 SH-4 A A A A 30. 65/cu. cont. Employment schedule for cantilever mast regulated OHE caty.12.05 20. 31.05 20.09. Employment schedule for Tramway type regulated OHE (WP 75kgf/m2) without EW and without RC.65/cu. cont. 28.115/Al. cont. wind 150 kgf/m2 (Gr.09. OHE only. wind 150 kgf/m2 (Gr. cont.05 2 2 2 . UNREGULATED OHE only. Employment schedule for cantilever mast regulated OHE caty. cont.09. wind 150 kgf/m2 (Gr. 40A) only. OHE +RC. ETI/C/0701 SH-3 B 20.115/Al. 29. cont.09. OHE + EW+ RC. (General) Employment schedule for cantilever mast regulated OHE for TARE section. 65/cu.40 A for TARE section only (wind 150 kgf/m2) caty. Employment schedule for cantilever mast regulated OHE caty.107/cu. Employment schedule for cantilever mast regulated OHE for TARE section. 107/cu.05 20.2008 R E V Master List No.107/cu (WP 75 kgf/m2). Employment schedule for cantilever mast regulated OHE caty.115/Al. 65/cu.107/cu (WP 75 kgf/m2) OHE only.09. Employment schedule for Tramway type regulated OHE (WP 150 kgf/m2) without EW and without RC. 107/cu.09. 06. cont. Employment schedule for cantilever masts regulated OHE in Gr.05 20.05 2 20. ETI/C/0701 SH-4 B 21. 22.107/cu (WP 75 kgf/m2).115/Al. OHE only. 40A) only.09.11.05 20. 27. 23.115/Al. 40A) only.107/cu (WP 75 kgf/m2).65/cu.40 A for TARE section only (wind 150 kgf/m2) caty.09.09.107/cu (WP 75 kgf/m2) OHE + RC. 65/cu. 65/cu. ETI/C/0700 SH-6 B 17. ETI/C/0702 SH-1 ETI/C/0702 SH-2 ETI/C/0702 SH-3 ETI/C/0702 SH-4 B B B B 25.05 2 2 2 2 20. 32. ETI/C/0701 SH-2 B 19.107/cu. Employment schedule for cantilever mast regulated OHE caty. Employment schedule for cantilever mast regulated OHE caty. 107/cu. cont. wind 150 kgf/m2 (Gr. Effective from 31. ETI/C/0701 SH-1 B 18.05 20.107/cu (WP 75 kgf/m2). caty. Employment schedule for cantilever mast regulated OHE for TARE section. Employment schedule for cantilever mast regulated OHE caty.05 2 2 2 2 20.05 20.09.09. cont. OHE +EW.09. caty.09.115/Al. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 15. ETI/C/0704 ETI/C/0705 ETI/C/0706 B B B Employment schedule for cantilever masts regulated OHE in Gr. cont. Employment schedule for cantilever mast regulated OHE for TARE section. 24.115/Al.05 2 20.79 20. ETI/C/0702 SH-5 B 26. EW+ RC. Unregulated OHE. 09. ETI/C/0716 A 43. WP 112.5 kgf/m2.85 2 08. WP 75 Kgf/m2 Employment schedule for OHE mast (9. Overlap anchor location.5m) overlap inter location with 3.10.5m) wind pressure 112. ETI/C/0711 A 38.0m implantation.05 08.9 kg mast Caty 65/cu and Cont 107/cu. ETI/C/0707 A 34. Caty 65/cu and Cont 107/cu WP 112.5m) wind pressure 112. Employment schedule for 9. ETI/C/0717 SH-2 A 45. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 2 33. ETI/C/0718 B Employment schedule for 8” X 8” X 35 lbs BFB (9.05 2 21. Employment schedule for 9. Employment schedule for OHE mast (9. Employment schedule for OHE mast (9.5m) overlap inter location with 3.5 kgf/m2. Caty 65/cu and Cont 107/cu.08. Caty 65/cu and Cont 107/cu. ETI/C/0713 ETI/C/0714 ETI/C/0715 B B A 42. Employment schedule for OHE mast overlap central location with 3.08.5m) wind pressure 112.05 2 21. ETI/C/0719 B 19.5 kgf/m2.08. WP 75 kgf/m2.0m implantation .0m implantation.Page 48 of 57 Sl.05 2 48.9 kg mast Caty 65/cu and Cont 107/cu.Caty 65/cu and Cont 107/cu WP 75 kgf/m2.85 2 2 08. 41. 40.5m) overlap anchor location with 3. Employment schedule for OHE mast (9.WP 112.5 kgf/m2 with 3.0m implantation composite OHE (1000+ 1000) kgf tension.05 20.05 20. Employment schedule for OHE mast (9.5m) wind pressure 112. ETI/C/0717 SH-1 A 44.09.05 2 .0m implantation composite OHE (1000 + 1000) kgf tension overlap central location.09. Effective from Feb.08.85 2 08. OHE + EW.85 2 2 2 08.85 2 21.09.5m long 200X200X49.5 kgf/m2 for composite OHE (1000+1000) kgf tension.5 kgf/m2 for composite OHE (1000+1000) kgf tension.Caty 65/cu and Cont 107/cu.09.10.(Cu OHE) Employment schedule for 8” X 8” X 35 lbs BFB (9.5m) overlap anchor location with 3. OHE + EW+RC. WP 112. o.5 kgf/m2) caty 65/cu and cont 107/cu.5m long 200X200X49. Employment schedule for OHE mast (9. OHE + RC.08.0m implantation.05 08. ETI/C/0708 ETI/C/0709 B A 36. 2010 DRAWING R E V Master List No.09.5 kgf/m2 for composite OHE (1000+1000) kgf tension. ETI/C/0710 A 37. N NO. Caty 65/cu and Cont 107/cu. ETI/C/0712 A 39.5kgf/m2 with 3. 40A only.0m implantation. ETI/C/0717 SH-4 A 47.5m long) (WP 150 kgf/m2) for TARE section Gr. Employment schedule for OHE mast (9. Employment schedule for OHE mast (9. Employment schedule for OHE mast (9. OHE only.05 2 21.0m implantation .09. Employment schedule for OHE mast (9. 20.85 2 20.5 m long) (WP 112.5m) wind pressure 112.09.5m) overlap central location with 3. Employment schedule for OHE mast (9.08.05 2 19.5m) wind pressure 112.5 kgf/m2. WP 75 kgf/m2. 35. ETI/C/0717 SH-3 A 46.5 kgf/m2 for composite OHE (1000+1000) kgf tension. --OHE only.09. --OHE + RC Employment schedule for OHE mast (9.07. with Higher Implantation. ETI/C/0726 SH-1 ETI/C/0726 SH-2 ETI/C/0726 SH-3 ETI/C/0726 SH-4 ETI/C/0727 - 63. 19. ETI/C/0724 - 58.86 2 19. with Higher Implantation.88 2 23. 62. Overlap anchor location.5m) Wind-112. 61.5m) wind pressure 75 kgf/m2 for composite OHE with extra setting distance.5m) for wind pressure 150 kgf/m2 copper OHE. ETI/C/0722 - 55. ETI/C/0725 A 57. ETI/C/0730 SH-1 - Employment schedule for OHE mast (9. OHE + RC Employment schedule for regulated OHE mast (9. DRAWING NO.86 2 14. ETI/C/0728 - 64.07. Overlap central location. --OHE only Employment schedule for OHE mast (9.88 19.07. 59.5m) for wind pressure 150kgf/m2 copper OHE.5m) for wind pressure 150kgf/m2 copper OHE. ETI/C/0721 SH-3 - 53.88 2 19.86 2 01.88 19.OHE + EW + RC.10. Employment schedule for OHE mast (9.86 2 26.09. Overlap inter location Employment schedule for OHE mast (9. Employment schedule for prestressed spun concrete mast (PC 42) 9.08. Overlap central location.88 2 2 2 2 2 19.12.Page 49 of 57 Sl.09.5m)wind pressure 112.88 19.08. Employment schedule for OHE mast (9.05 26. Conventional OHE.5m)wind pressure 75 kgf/m2 for composite OHE with extra setting distance.5kgf/m2 with 3.86 2 26.12. -. ETI/C/0729 - 65.07. 112. ETI/C/0720 B 50.5m) for wind pressure 150kgf/m2 copper OHE.89 2 01.88 2 . with Higher Implantation. OHE+EW+RC Employment schedule for regulated OHE mast (9. Overlap inters location.5m) wind pressure 75kgf/m2 for composite OHE (1000+1000) kgf tension.5m) for wind pressure 150kgf/m2 copper OHE. ETI/C/0721 SH-2 - 52. Employment schedule for regulated OHE mast (9.12. No.2008 R E V Master List No.5 and 75 kgf/m2.86 2 01. ETI/C/0721 SH-1 - 51.0m implantation composite OHE (1000 + 1000) kgf Tension . ETI/C/0723 - 56. Overlaps inter location. Employment schedule for regulated OHE mast (9. Employment schedule for regulated OHE mast (9. OHE + EW Employment schedule for regulated OHE mast (9.5 m long.5m) for wind pressure 150kgf/m2 copper OHE.86 2 26. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 49.5m) for wind pressure 150kgf/m2 copper OHE.08.07. Overlap anchor location. normal location WP 150.07.5m) wind pressure 75kgf/m2 for composite OHE (1000+1000) kgf tension. Employment schedule for OHE mast (9. Employment schedule for OHE mast (9.5m) wind pressure 75kgf/m2 for composite OHE (1000+1000) kgf tension.08. 60. OHE only. --OHE + EW Employment schedule for OHE mast (9.88 19. Employment schedule for regulated OHE mast (9. ETI/C/0721 SH-4 - 54. Effective from 31.5 kgf/m2 copper OHE.5m) wind pressure 75kgf/m2 for composite OHE (1000+1000) kgf tension. 1200 kg tensions for high speed 160 km/h.07.5m) wind pressure 75 kgf/m2 for composite OHE with extra setting distance. ETI/C/731 - 71.5 kgf/m2. ETI/C/0735 - 79.09.09.93 2 23. 1200 kg tensions for high speed 160 km/h. overlap inter location. ETI/C/0733-1 - 74. ETI/C/0730-1 - 70.09.5 m) wind 75kgf/m2AAA OHE.65 mm2.88 2 23.88 2 23.89 08. copper OHE.5m) Wind -112.5 kgf/m2 copper OHE. Employment schedule for OHE mast (9. 1200 kg tensions for high speed 160 km/h --OHE + RC. OHE only.09. with 1000 kg tensions OHE+RC Employment Schedule for OHE Mast (9.09.09.12. copper OHE.12. overlap central location. Overlap central location with higher implantation.5m) Wind-112.P. -.5 m) wind 75 kgf/m2 AAA OHE. Employment schedule for OHE mast (9. with 1000 kg tension.09.5 kgf/m2 copper OHE. Employment schedule for OHE mast (9.88 2 23.P.112.107mm2 (for high speed 160Kmph) overlap anchor location with 3:1 regulating equipment. Employment schedule for OHE mast (9. ETI/C/0737 - Employment schedule for OHE mast (9.with 1000 kg tensions OHE+EW+RC Employment Schedule for OHE Mast (9. Employment schedule for OHE mast (9.5m) W. Employment Schedule for OHE Mast (9.5 m) W. ETI/C/0730 SH-4 - 69.5m) Wind-112. N NO. Overlap inters location with higher implantation. 77.5 kgf/m2 Copper OHE (1200 + 1200) caty. with 1000 kg tensions.12. Overlap anchor location with higher implantation. overlap anchor location. Employment Schedule for OHE Mast (9. with 1200 kg tensions.5m) Wind-112. with Higher Implantation for high speed 160 km/h. Employment schedule for OHE mast (9.89 08. ETI/C/732 - 72.107mm2 (For high speed 160 kmph) overlap anchor location with 3:1 regulating equipment (with higher setting). with 1200 kg tensions. ETI/C/0734 SH-1 ETI/C/0734 SH-2 ETI/C/0734 SH-3 ETI/C/0734 SH-4 - 78. with 1000 kg tensions OHE+EW. with Higher Implantation for high speed 160 km/h.12. 112.89 2 2 2 2 08.89 2 . cont.5 kgf/m2.5 m) wind 75 kgf/m2 AAAOHE. --OHE + EW + RC.89 08.89 2 08.5 kgf/m2. with 1000 kg tensions. 1200 kg tensions for high speed 160 km/h.5 Kgf/m2copper OHE (1200 + 1200) caty. with 1000 kg tension. ETI/C/0730 SH-2 - 67. copper OHE.Page 50 of 57 Sl. Effective from Feb.12. ETI/C/0736 - 80.5m) Wind-112.5 m) wind 75 kgf/m2 AAA OHE.5 m) wind 75 kgf/m2 AAA OHE. ETI/C/733 - 73.12.88 2 23. with 1200 kg tensions. Employment Schedule for OHE Mast (9. with Higher Implantation for high speed 160 km/h. Employment Schedule for OHE Mast (9.89 2 08. o.88 23.93 2 08. 76.12. 65 mm2 cont. 75.5 kgf/m2 copper OHE. Employment schedule for OHE mast (9. 2010 DRAWING R E V Master List No.5 m) wind 75 kgf/m2 AAAOHE.88 2 23.5m) Wind -112.OHE + EW. 23. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 2 66. ETI/C/0730 SH-3 - 68.5 m) wind 75 kgf/m2 AAA OHE. Employment Schedule for OHE Mast (9.12. 5 m) for 2 X 25 kV composite OHE with (1000+1000) tension.89 2 07.02. wind pressure 112. (OHE+AT feeder) + EW and with extra setting.5 m) wind 112.5 m) wind 112. ETI/C/0742 SH-2 - 90.12.5 m) wind 112.5 m) for 2 X 25 kV composite OHE with (1000+1000) tension.5 m) for 2 X 25 kV with copper OHE with (1000+1000) tension.5 Kgf/m 2.5 kgf/m 2 AAA OHE. ETI/C/0742 SH-4 - 92.5 m) wind 112. Employment schedule for OHE Mast (9.10. (OHE+AT feeder). ETI/C/0742 SH-1 - 89.5 kgf/m 2 AAA OHE.09. (OHE+AT feeder) and without EW. with 1000 kg tensions OHE only.Page 51 of 57 Sl. (OHE+AT feeder) and without EW.90 2 07.09.89 2 23. 82. Overlap anchor location with higher implantation Employment schedule for OHE mast (9.89 08. with 1000 kg tensions.5 kgf/m 2 AAA OHE.5 m) for 2 X 25 kV with copper OHE with (1000+1000) tension.5 Kgf/m 2.5 Kgf/m 2.5 kgf/m 2 AAA OHE. without EW and with extra setting.09.09. wind pressure 112.10. Employment Schedule for OHE Mast (9. OHE + RC Employment Schedule for OHE Mast (9. OHE +EW +RC Employment Schedule for OHE Mast (9. Employment schedule for OHE mast (9. 83.89 08.5 kgf/m 2. (OHE+AT feeder).without EW and with extra setting.09. (OHE+AT feeder) + EW.10.5 kgf/m 2 AAA OHE.5 Kgf/m 2. wind pressure 112. wind pressure 112.5 kgf/m 2 AAA OHE. ETI/C/0741 - 88. with 1000 kg tensions. Employment schedule for OHE mast (9.89 2 08. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 2 2 2 81.10.89 2 23.09. ETI/C/0743 SH-3 - Employment Schedule for OHE Mast (9. wind pressure 112.89 2 08.2008 R E V Master List No.89 08. Effective from 31.5 kgf/m 2 AAA OHE.90 2 07. with 1000 kg tensions. ETI/C/0739 - 86.5 m) for 2 X 25 kV with copper OHE with (1000+1000) tension. Employment schedule for OHE Mast (9.5 m) wind 112. ETI/C/0738 SH-1 ETI/C/0738 SH-2 ETI/C/0738 SH-3 ETI/C/0738 SH-4 - 85. Overlap inter location with higher implantation Employment Schedule for OHE Mast (9.90 2 .5 m) wind 112.5 m) for 2 X 25 kV composite OHE with (1000+1000) tension. ETI/C/0743 SH-1 - 93.89 2 23.89 2 23. DRAWING NO. 84. Overlap central location with higher implantation Employment Schedule for OHE Mast (9.5 m) wind 112.89 08.02. wind pressure 112.09.5 Kgf/m 2. with 1000 kg tensions OHE + EW Employment Schedule for OHE Mast (9. wind pressure 112. ETI/C/0740 - 87. with 1000 kg tensions.5 m) for 2 X 25 kV with copper OHE with (1000+1000) tension.02. ETI/C/0742 SH-3 - 91. 08. ETI/C/0743 SH-2 - 94. (OHE+AT feeder +EW). Employment schedule for OHE mast (9. No. with 1000 kg tensions.5 Kgf/m 2. Employment schedule for OHE Mast (9. 07.150 mm2 F. ETI/C/0755 SH-2 - 105.04.03. ETI/C/0748 - 101.) (1200 + 1200 with 3:1 regulating equipment). Employment schedule for OHE mast (9. ETI/C/0747 SH-2 - 98. Employment schedule for OHE mast (9. OHE only.95 2 24.02. OHE only. ETI/C/0750 - 103.93 2 22. cont.with (1200 + 1200) (overlap central location with higher setting). ETI/C/0747 SH-1 - 97.03. wind pressure 112. Effective from Feb.B.) (1200 + 1200 with 3:1 regulating equipment).150 kgf/m2 cat.95 2 24.5 m) WP 112.5 m).P 112.5 m) wind – 150 kgf/m2 cat.5 m).65cu.04.5 m) wind – 150 kgf/m2cat. 65 mm2.Page 52 of 57 Sl.04. 2010 DRAWING R E V Master List No.) (1200 + 1200 with 3:1 regulating equipment).93 2 22.65cu. Employment Schedule for OHE mast (9.5 Kgf/m 2.03. OHE + EW.04. (OHE+AT feeder +EW) and with extra setting. W. OHE + EW + RC. OHE + EW + RC.93 2 22.93 2 22. W.5 m) WP 112. ETI/C/0755 SH-3 - 106. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E A 2 95.B.5 m). cont.B.150 mm2 F.65cu.04. cont.5 kgf/m2 copper OHE (cat.150 mm2 F.150 mm2 F. 65 mm2. ETI/C/0747 SH-4 - 100.5 kgf/m2 copper OHE (caty. cont-150 cu (FB) with (800+1200) kgf tension. OHE only. ETI/C/0747 SH-3 - 99. 65 mm2. Employment schedule for OHE mast (9.95 2 24. with 1200 + 1200) with 3:1 ATD (overlap anchor location with higher setting).03.P 112. o.150 mm2 F. Employment schedule for OHE mast (9.65cu.65cu. cont-150 cu (FB) with (800+1200) kgf tension. cont. Employment schedule for OHE mast (9.95 2 24. W. W. cont-150 cu (FB) with (800+1200) kgf tension. OHE + RC. N NO.5 m) for 2 X 25 kV composite OHE with (1000+1000) tension. ETI/C/0743 SH-4 - 96.P 112. cont.5 m) wind .5 kgf/m2 copper OHE (caty.93 2 24.5 kgf/m2 copper OHE (cat.5 kgf/m2 copper OHE (caty.90 22.5 m) wind .) (1200 + 1200 with 3:1 regulating equipment). Employment Schedule for OHE mast (9. 65 mm2. cont.5 kgf/m2 copper OHE (cat. ETI/C/0755 SH-1 - 104.93 2 22. OHE + RC.150 mm2 F.04.B).5 m) WP 112. ETI/C/0756 SH-1 Employment schedule for OHE Mast (9. Employment Schedule for OHE mast (9. Employment schedule for OHE mast (9. ETI/C/0749 - 102. Employment Schedule for OHE mast (9.5 kgf/m2 copper OHE (cat.B.03.150 mm2 F. Employment Schedule for OHE mast (9.5 m) wind – 150 kgf/m2cat.93 2 22. 65 mm2.75 kgf/m2 cat. cont. ETI/C/0755 SH-4 - 107.P 112. with 1200 + 1200) (overlap inter location with higher setting).04. OHE + EW. 65 mm2. cont-150 cu FB with (800+1200) kgf tension. 65 mm2. cont-150 cu (FB) with (800+1200) kgf tension.B.5 m).95 2 .B. Employment schedule for OHE mast (9. 5 m) wind .5 m) wind . ETI/C/0756 SH-3 - 110. OHE + EW.65 cu.03. No. Employment Schedule for OHE mast (9. ETI/C/0756 SH-4 - 111.5kgf/m 2 cat.5 m) wind 112.03.5 m) wind 112.65cu. Employment Schedule for OHE mast (9. cont-150 cu FB with (800+1200) kgf tension.03. cont-150 cu FB with (800+1200) kgf tension. OHE + RC.65 cu. Employment Schedule for OHE mast (9. Employment Schedule for OHE mast (9.95 24. OHE + EW.5kgf/m 2 cat. Employment Schedule for OHE mast (9. cont-150 cu FB with (800+1200) kgf. OHE only.95 2 .12. OHE + EW + RC.2008 R E V Master List No. Effective from 31.5 m) wind 112. ETI/C/0757 SH-4 - Employment Schedule for OHE mast (9.95 2 24. Tension.5 m) wind .95 2 24.03.03. DRAWING NO. ETI/C/0757 SH-3 - 114.95 2 24. ETI/C/0757 SH-2 - 113.5kgf/m 2 cat.65 cu.95 2 24. cont-150 cu FB with (800+1200) kgf tension.65 cu.5kgf/m 2 cat.75 kgf/m 2 cat.03.75 kgf/m2 cat.Page 53 of 57 Sl.95 2 24. Employment Schedule for OHE mast (9. cont-150 cu FB with (800+1200) kgf tension. ETI/C/0756 SH-2 - 109.65cu. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E A 2 108. cont-150 cu FB with (800+1200) kgf tension. OHE + EW + RC.75 kgf/m2 cat.5 m) wind 112.03. OHE + RC. cont-150 cu FB with (800+1200) kgf tension. ETI/C/0757 SH-1 - 112. 24.65 cu. 70 01.08. ETI/C/0005/68 ETI/C/0007/68 ETI/C/0012/69 ETI/C/0014/70 ETI/C/0023/70 ETI/C/0032 ETI/C/0057 ETI/C/0058 SH-1 ETI/C/0058 SH-2A ETI/C/0058 SH-3A E E A B C E D B Chart for portal foundation. Pile foundation for OHE structure in loose banks.0m depth. Structure muff for sand cored foundation. Exposed) Volume and equivalent chart of foundations for DRY BLACK COTTON SOIL only (8000Kg/m2) NBC Type 2.5 m depth. 22. 16.02 03. 21. ). ETI/C/0058 SH-6 TI/DRG/CIV/FND/ RDSO/00001/04/0 SH. Volume chart and equivalent chart of foundation for NEW PURE GRAVITY Type (500 mm exposed). Volume chart and equivalent chart of NEW PURE GRAVITY FOUNDATIONS (500 mm. Volume chart and equivalent chart of foundation.C.08 26. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Chapter . Short bored pile foundation for traction mast (permissible BM and volume). B B B B A 21. Arrangement of treating black cotton soil at the location of OHE foundation on stable bank.Page 54 of 57 Sl.05. Volume chart and equivalent chart of foundation for DRY BLACK COTTON SOIL (NBC Type) for 16500 & 11000 Kgf/m2 3. Effective from Feb.for 16500 and 11000 kgf/m2.04 3 2 3 3 17.-1 TI/DRG/CIV/FND/ RDSO/00001/04/0 SH. 21.02 21. ETI/C/0058 SH-4 ETI/C/0058 SH-5 B B 06. 15.0 m depth. Details of foundation for fencing upright. o.03. 2.-4 TI/DRG/CIV/FND/ RDSO/00001/04/0 SH.10. 12.02 30. 18. 14. N NO.10.10.04 26. G.02 06.5m depth. 10.02. - 26.02 3 3 3 2 3 3 .85 21.10. Volume chart and equivalent chart of foundation (Side bearing.02.02 21.04. 8.99 06.02. Volume chart and equivalent chart of foundation (for a direct load of 4000 kg).68 21. 7.10. 2010 DRAWING R E V Master List No.04 26. 4. 3.02. Typical side bearing foundation on banks.08 3 3 19. Details of foundation in hard rock for PORTALS. Volume chart and equivalent chart of foundation (N.02 06.01.02 26. 5.10.04. Volume chart and equivalent chart of foundation for NEW PURE GRAVITY TYPE.78 21.CIVIL 7) OHE FOUNDATION A 1.03.10.02 2 1 2 2 3 2 2 2 2 2 11. Volume chart and equivalent chart of foundation for DRY BLACK COTTON soil only for 8000 kgf/m2 (NBC Type) 2. Muff for OHE structures.02 2 2 13. Dwarf mast foundation for loose soil (SBC=5500 kg/m2).02 14.-5 ETI/C/0059 ETI/C/0060 ETI/C/0061 ETI/C/0062 ETI/C/0063 ETI/C/0080 B - 06.04.03.III .11.B. Volume chart and equivalent chart of foundation for DRY BLACK COTTON soil (NBC Type). 20. 3.76 21. 6. 24. Chart for portal foundation in dry black cotton soil (SBC=16500 kgf/m2). Details of OHE foundation in soft rock (SBC = 45000 kgf/m2). 9.-3 TI/DRG/CIV/FND/ RDSO/00001/04/0 SH.02 24. Type). Details of OHE foundation in hard rock (SBC=90000 kgf/m2).02 06. 23.-2 TI/DRG/CIV/FND/ RDSO/00001/04/0 SH.02.02.03. Side gravity & W. 07.04. 3.78 S I Z E 0 2 2 25.94 28.77 24. 6. ETI/C/0002 ETI/C/0010 ETI/C/0045 SH-1 ETI/C/0045 SH-2 ETI/C/0068 ETI/C/0069 A C D E F C Details of base plate for mast on drains in station yards Bolted base connection for portals located in drains.CIVIL 8.06. Danger plate in level crossing gauge for electrified section 16. 2. ETI/SK/C/214 SH-1 .Page 55 of 57 Sl.02 21. Typical design of pure gravity foundation. 5.12. 09.III . 26.CIVIL 9. ETI/C/0209 ETI/SK/C/131 ETI/SK/C/142 Details of foundation for 132/25 kV traction substation structures. Typical design of side gravity foundation.86 20.70 04. DRAWING NO.02. 4.2008 R E V C - Master List No.12.91 18.ETI/SK/C/214 SH-2 ETI/SK/C/242 ETI/OHE/SK/537 SH-1 ETI/OHE/SK/537 SH-2 E A A D B MS Bracket fitting for PSC General arrangement and SPS details SPS details for earth wire clamp on PSC mast RC arrangement in PSC mast Earthing and bonding of PSC mast. 132 kV emergency tower (with RSJ ) outline diagram 132 kV emergency tower (with RSJ ) structural drawings Protective screen at foot over and road over bridge. No.12.03. SPUN PRESTRESSED CEMENT CONCRETE (PSC) OHE MAST 1.10.III .00 A 2 1 2 0 1 2 Chapter . 3.94 1 2 2 1 3 .94 22-09-95 28.99 06. 27. Chapter . TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE 21. 5.90 22.03. Effective from 31.02.10.12. Typical earthing arrangement in spun PSC mast with 18 mm dia rod.08. MISCELLANEOUS 1. 4.75 28. 2. Udhna Surat (Gujrat) Railway Electrification Office. Hajipur (Bihar) Northeast Frontier Railway. South West Railway. o. Beiapur. Chennai. 2010 DRAWING R E V Master List No. Northern Railway.600 003. Effective from Feb. Stn. Hubli (Kanataka).O. DRM's Office. HQ Office. Jaipur North Eastern Railway.D. Church gate. Stn. Mumbai CST – 400 001. 8th floor. Chennai-600008 Railway Electrification Office. Opposite KKC. New Delhi . Bld. P. Ist floor. Block-A Subedarganj.C. Railway Electrification Office. Calcutta-700 001. HQ Office. DISTRIBUTION S. Station road Charbagh Lucknow-226001 . Sector-11. Danapur Railway Electrification Office. DRM’s Office. Any updation / correction in between shall be advised to the customer separately in the form of a correction slip. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E Note:This Master list is valid for two year from the date of issue.Page 56 of 57 Sl. Allahabad 211001. Park Town. Ranchi-834001 Railway Electrification. Southern Railway. Garden Reach. Secunderabad – 500371 Western Railway. Calcutta-700 043. Opposite CSD Canteen Ambala Cantt-133001 Railway Electrification Office. Navi Mumbai-400 614 North Central Railway. Fairlie Place.Mumbai CST . Bhubaneswar -751 023 East Central Railway. Maligaon. N NO. Bldg. Bilaspur (Chattisgarh) North West Railway.110 001. Guwahati-731 011 Konkan Railway. 45. Allahabad-211 033 South East Central Railway. Box No. Central Railway.B. South Central Railway. Ignore. Bhubaneswar Railway Electrification Office. Eastern Railway. Rail Nil yam.No Abbreviation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 CEE/SER CEE/ER CEE/NR CEE/SR CEE/SCR CEE/WR CEE/CR CEE/SWR CEE/WCR CEE/ECOR CEE/ECR CEE/NEFR CEE/Konkan CEE/NCR CEE/SEC CEE/NWR CEE/NER CEE/CORE PM/Ranchi CPM/Danapur CPM/Ambala CPM/Bhubaneswar CPM/ Vishakhapatnam CPM/Chennai CPM/Surat PM/Lucknow Complete Address South Eastern Railway. West Central Railway . Baroda House. Vishakhapatnam Railway Electrification Office.400 020. Raigad Bhavan. There after it’s validity ceases to exist. Indira Market Jabalpur (MP) East Coast Railway. Gorakhpur -273 001 Central Organisation. Railway Electrification. /Rly.Bd. Mumbai-4000 01 3rd Floor.110 001.Page 57 of 57 Sl. VT Traction Sub-station Building. DRAWING NO. Rail Nil yam. 3rd. SECY/RE/RLY.E. New Delhi . No. Railway Board. New Delhi-110001 Southern Railway. Secunderabad-500371 2nd Floor .Road. Parcel Office Building .2008 R E V Master List No. Opposite Times Of India Bldg. D. Indian Railways Institute of Electrical Engineering. New Delhi . New Administrative office. Bd. Park Town. Chennai-600003 S. Calcutta-700001 N.) CPM ( Conv. For Record and reference For Record and reference For Record and reference For Record and reference For Record and reference 1 Copy for reference folder Cost of the drawings A0 = Rs1000/A1 = Rs 800/A2 = Rs 500/A3 = Rs 300/A4 = Rs 200/Plus postal charges 15% Extra.Railway. New Annexe. Building.233. Effective from 31. TIM 0003 Revision 6 DESCRIPTION DATE OF ISSUE S I Z E 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 CEE(Cons) CR CEE(Cons) WR CEE(Cons) ER CEE(Cons) NR CEE(Cons) SR CEE(Cons) SER CEE(Cons) SCR CEE ( Conv. Rail Bhavan.N.Railway. Mumbai CST-400001 Western Railway. Mumbai. Railway.110 001. Baroda House. Post Box No. Fairlie Place. Calcutta-700043 S. Churchgate. Garden Reach. Nasik Road-422101 Railway Board.4000 01 Director. EDTI(Co-ord) EDTI(OHE) DTI-PSI DTI-OHE DTI-P&S SE/DOC/TI Central Railway.12.C. SE/DOC/TI Master copy for record . Mumbai-400020 Eastern Railway. Rail Bhavan.) Director/IRIEEN SECY/Elec. Effective from Feb. o. 2010 DRAWING R E V Master List No.Page 58 of 57 Sl. TIM 0003 Revision 7 DATE DESCRIPTION OF ISSUE S I Z E . N NO.
Copyright © 2024 DOKUMEN.SITE Inc.