Detailed Construction Calculator for Residence.pdf

March 19, 2018 | Author: Shiv Kumar Verma | Category: Basement, Sand, Concrete, Brick, Framing (Construction)


Comments



Description

9/10/2014Detailed Construction Calculator for Residence Detailed Construction Cost Calculator This calculator is specially designed to give you cost estimation based on your customized requirements. You can choose quality (Average, Medium or High) for each category separately and get exact, accurate estimates for your all construction needs, moreover our experts can provide you accurate and detailed cost based on your House Map, Design or based on shortlisted Brands, to know more details, please fill up enquiry form Click Here or Contact Us. Basement Required ? Yes No Dehradun Cost summary of various categories (Foundation, Super Structure, Plaster, Flooring etc) Saving as shown below. S. No. Description (Without Basement) 1. 2. 3. 4. 5. 6. 7. 8. 9. Foundation work Super Structure work Plaster work Flooring Work Doors,Windows,Modular Kitchen & Other Wood Work Stairs Flooring / Kitchen Slabs,Balcony Railing, Water Tank, Pump etc Painting Work Electrical Work CP Fitting & Sanitary Ware Total (without Basement) Market Cost 97,292 12,94,859 91,534 74,759 4,11,211 3,89,362 92,552 46,928 30,888 25,63,729 Allcost.in Cost 90,244 11,93,859 76,521 63,946 3,51,914 3,44,386 86,733 42,240 27,408 22,77,251 Grand Total (without basement) : 25,63,729 See Basement Cost Breakup 1.Foundation work High Quality Description Item Details Unit of Measurement Total Area Total Qty Rate per Unit Total Amount (1- a) Foundation- Plain Cement Concrete Plain Cement Concrete of Mix 1 : 2 : 4 more... Material Cost Manpower Cost Cement-43 Grade Bag 2280 41.04 310.00 12722.00 Coarse Sand Cubic Meter 2280 11.40 1400.00 15960.00 Aggregate 10 & 20 mm Cubic Meter 2280 77.52 750.00 58140.00 Men Nos 2280 20.52 350.00 7182.00 1. Total Cost of Foundation work 90,244 2. Super Structure work Average Quality Description Item Details Unit of Measurement Total Area Total Qty Rate per Unit Total Amount 2. Super Structure work (2- a) Ground Floor Slab - Column & Slab Work http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI= 1/6 00 Slab Work: M25.laying and fixing in position the Steel Reinforcement in all reinforced concrete work at all floors.00 Coarse Sand Cubic Meter 2280 6. Cement/ Sand Mortar 1:6.00 10.96 700.15 mm thick Plaster on Walls and Ceiling.00 Cement-43 Grade Bags 2280 184. spacers..00 Men Nos 2280 20.12 1200. design and as directed by the Engineer In Charge.00 Cement-43 Grade Bags 2280 193.00 6156.00 24510.00 245100.00 Coarse Sand Cubic Meter 2280 6. bending .00 Coarse Sand Cubic Meter 2280 11.00 Cement-43 Grade Bags 2280 50.00 Men Nos 2280 0.00 20520. depths. Material Cost Manpower Cost 2. Straightening.256 3. Straightening.25 241714.00 8208.00 Shuttering Material Square Feet 2280 1026.. Fine & Coarse sand in equal proportion http://www.80 300.16 300.allcost.20 300.86 1200.00 63744.00 58140. Cutting & laying Steel Reinforcement more. 16 mm Dia Kg 2280 570.00 10260. Material Cost Manpower Cost Providing and Constructing Half Brick (4") walls more. 12.02.12 700.in/calculator/advanced/MjI4MA==/MA==/MjI= 2/6 ..00 14232.25 84474. Cutting & laying Steel Reinforcement. Plaster Average Quality Description Item Details Unit of Measurement Total Area Total Qty Rate per Unit Total Amount 12 . 16 mm Dia Kg 2280 5700.68 300.84 1200.60 3. Total Cost of Super Structure 9.84 1200.10.00 (2.. The rate to include supply and use of 18 gauge black annealed binding wire double fold to tie the bars in position and providing Chairs.00 43. Straightening.52 300. levels and heights as per drawing.b) Brick Work ( MASONARY WORKS) Providing and Constructing Half Brick (4") walls more.00 Aggregate 10 & 20 mm Cubic Meter 2280 9.00 Men Nos 2280 20.00 300. Material Cost Manpower Cost TMT 8. 12.00 15048.52 300.00 Cement-43 Grade Bags 2280 34.00 0.20 300.00 Aggregate 10 & 20 mm Cubic Meter 2280 72.9/10/2014 Detailed Construction Calculator for Residence Column Work: 9" x 4"..00 Shuttering Material Square Feet 2280 2052. Cutting .00 43. separators.00 10.00 6384.10.00 55404.00 Bricks Nos 2280 74373.00 Men Nos 2280 34.00 Coarse Sand Cubic Meter 2280 53.00 51072.00 6156. Material Cost Manpower Cost TMT 8.00 10260.00 Bricks Nos 2280 25992. M25.00 8208..00 10260.00 3. Material Running Feet 2280 969.00 labour Square Feet 2280 45. Total Cost of Plaster work 70.00 Material Square Feet 2280 45.00 labour Square Feet 2280 22. http://www.00 Men Nos 2280 9. Flooring Work Average Quality Description Item Details Unit of Measurement Total Area Total Qty Rate per Unit Total Amount Flooring Type Select an Option: Cement Concrete Flooring Providing and laying Cement Concrete flooring more. Total Cost of selected Flooring type 13.d) Modular Kitchen Providing and fixing of Modular Kitcen of selected design with MDF particle Board more..00 42135. Manpower Cost Material Square Feet 2280 22.00 Fine Sand Cubic Meter 2280 34.9/10/2014 Detailed Construction Calculator for Residence Material Cost Manpower Cost Cement-43 Grade Bags 2280 140.00 15..051 5..00 Coarse Sand..00 14535.00 19289.20 564.20 300.60 850.00 Coarse sand Cubic Meter 2280 12.Doors..b) Doors Select an Option: Wooden Flush door / Panel Door / Glazed door/ Flush Doors with out teak veeners Providing of Wooden Flush door / Panel Door / Glazed door/ Flush Doors with out teak veeners more.80 1800.00 Fine Sand Cubic Meter 2280 12.c) Window Select an Option: Wooden/ Panel/ Teak Window Providing and fixing single or double Wooden/ Panel/ Teak Window more.56 1200.80 300.00 6840.00 2736..688 4.04 1200.25 10711.00 6791.00 11081.00 (5.80 300.00 38760.24 587.00 Material Square Feet 2280 2.03.00 80.00 Installation Charges labour Running Feet 2280 969.12 300.Windows..00 77520.28 20000.00 5472.00 (5.00 23940.00 10260.04 564..00 41040.00 Brick Blast Cubic Meter 2280 18.00 45600.Modular Kitchen & Other Wood Work Average Quality Description Item Details Unit of Measurement Total Area Total Qty Rate per Unit Total Amount (5..a) Door Frame Select an Option: Teak/ Hard Wood Door Frames Providing of Teak/ Hard Wooden Door Frames more.00 4.in/calculator/advanced/MjI4MA==/MA==/MjI= 3/6 . Manpower Cost Cement-43 Grade Bags 2280 79..allcost.45 300. Manpower Cost (5.DW Cubic Meter 2280 4.00 3.60 243.00 Men Nos 2280 34.00 14448. .00 Material Cost Manpower Cost (6.28 1200.in/calculator/advanced/MjI4MA==/MA==/MjI= 4/6 .00 70.00 31738.00 Men Nos 2280 1322.00 13000.12 240.allcost.00 Tile Square Feet 2280 1140.00 Material+Labour 2280 NaN 2.9/10/2014 Detailed Construction Calculator for Residence Manpower Cost labour Square Feet 2280 2.00 Providing & Laying machine cut 17 .00 1938.00 Men Nos 2280 22. (6. Modular Kitchen including Frame & Supporting 11400.85 1200.00 (6..00 6840.00 3.i)Motors for Submersible and Boring Material+Labour 2280 0.h)Under Ground Water Tank 1000 Ltrs Material+Labour 2280 0.00 Brick Blast Cubic Meter 2280 25.00 19289.00 63840.70 5700.00 28.50 2500.08 587.00 70000.00 10.00 13680.00 Kota Stone Square Feet 2280 2280.80 300.00 5.00 Polishing Material Square Feet 2280 6840.g)Over Head Water Tank 1500 Ltrs Material 2280 0.00 Fine Sand Cubic Meter 2280 34.40 24.. BATHROOM AND OTHER AREAS Material Cost Manpower Cost (6.80 2800.00 (6.20 564.00 5.f)Kitchen Granite Stone Counters http://www..28.18 mm thick Pre-polished Granite stone slab more. Total Cost of Doors.00 Coarse Sand. (6.00 9131. Window.00 2.c)TILES IN DADO..00 5.b)FlOORING MATERIAL WATER PROOFING TREATMENT Providing and treating "Vacuum De-watering Treatment" more.00 34200.19 564.00 2.00 15960.50 3000.28 850.00 30.00 5582. Material+Labour 2280 0. Stairs Flooring / Kitchen Slabs & Misc Important Work Average Quality Description Item Details Unit of Measurement Total Area Total Qty Rate per Unit Total Amount (6.. DW Cubic Meter 2280 2.a)Providing of 20 mm thick Kota stone in Treads & Risers in Flooring more.00 2736.00 (6.00 Total Area 2280 1140.d)Cement Pavers and Blocks for outer Areas Providing and laying Cement-Concrete Precast Pavement blocks more.... DW Cubic Meter 2280 1.25 14728. Cement-43 Grade Bags 2280 66.00 Coarse Sand.26 240.00 14.00 2220. (6.036 6.00 Fine Sand Cubic Meter 2280 16.00 Cement-43 Grade Bags 2280 23.00 Material+Labour 2280 0.28 5000.e)Cement Tiles for Ramp Area Providing and laying Pre cast heavy duty Chequered Cement tiles more..00 White Cement Bags 2280 2.00 15869. 00 8.180 8 .00 15000.00 2000..00 2. including Modular base plates Set 2280 1000..00 Electrical Switch Gear Set 2280 1000.80 3800.00 2. Rate per Unit Select an Option: Snowcem (7-b)External Paint Providing and applying Snowcem with necessary repair only no Putty application more. Total Qty Select an Option: Oil Bound Distemper (7-a) Internal Paint Providing and applying Oil Bound Distemper with necessary repair with Putty and application of 2 or more coats more.00 Misc Set 2280 1000.CP Fitting & Sanitary Ware Average Quality Description http://www.00 Labour Charges for Installation & Fixing Nos 2280 13.120 7.00 1.00 7.00 3000. Electrical Work Average Quality Description Item Details Unit of Measurement Total Area Total Qty Rate per Unit Total Amount Electric Fitting Including Wiring and Switchgear Flexible Wires (FRLS Grade) Running Meter 2280 1000.00 15. Kitchen Slabs.50 13500.00 6.. Balcony Railing.00 3.00 5.00 (6.j)Motors incase No Submersible is there Material+Labour 2280 0..k)Iron Grill for Railing and Windows Providing and fixing of Modular MS Iron grill of selected design and specification more.Total Cost of Painting work 3300.00 6.00 13500.00 1. Painting Work Average Quality Description Item Details Unit of Measurement Material+labour Square Feet 2280 Material+labour Square Feet Total Amount 6498.00 Select an Option: Enamel Paint (7-C)Paint on Wooden Doors/ Window/ MS Frames Providing and applying Enamle Paint with necessary repair or Putty application or both as required more.00 45.608 9.00 2280 3192.00 2000.allcost. Water Tank.Total Cost of Electrical Work 34..00 labour Kg 2280 300. Total Cost of Stairs Flooring.39.. Manpower Cost Material Kg 2280 300. Total Area Material+labour Square Feet 2280 150..00 38988.. Pump & Misc Work 3.00 22.00 Modular Switches & Sockets.in/calculator/advanced/MjI4MA==/MA==/MjI= Item Details Unit of Total Total Rate per Total 5/6 .75 1750.00 15960.9/10/2014 Detailed Construction Calculator for Residence (6.00 10.47. 00 22000.00 2280 0.00 22.in Advanced Calculator Benefits Of Allcost Membership By becoming member and talking our services you will be able to save up to 15% of the project cost.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI= 6/6 . you can freely speak to our consultants on following services Architectural and Interiors Structural design and MEP service design Quantity calculation. 22.00 31.detailed planning and measurements based on drawings and designs Accurate budget and cost calculations based on customized requirements Consultancy on correct products shortlisting.77.9/10/2014 Detailed Construction Calculator for Residence Measurement Area Qty Unit Amount 2280 0.Total Cost of Plumbing & Sanitary Ware work 3150.144 Grand Total (without basement) Rs.251 This Construction Cost Estimate was calculated with AllCost.50 9. Plumbing & Sanitary Ware (Water Supply Pipes and Various) Fittings 3 Toilets + 2 Kitchen + Sanitary Pipes (Sewerage) Manpower Cost Material Misc labour 9. procurement and buying Educate your self through building material section of site Scale mapping of Architects /MEP-Civil Contractors/Interior Designers Free guidance on how to beware of contractors befooling techniques 24*7 Customer care support Close http://www.00 24.
Copyright © 2024 DOKUMEN.SITE Inc.