Michel
[email protected] +33 609 730 194 (cell phone) 17, rue JONQUOY 75014 PARIS 42 years old SAP Production Planning Senior Consultant Full-life cycle PP implementations: business analysis, design, implementation. Fluent English Expert PP, PP-PI More than 15 year experience in Manufacturing & Logistics Consulting Good know ledge of SAP APO, MM, WM, HUM, QM & PM PROFESSIONAL EXPERIENCE SAP PP CONSULTANT (since 1998, more than 10 years) Since 10/2008 Freelance 11/2009 – 07/2010 Wines and spirits LVMH - MHIS - Project: Support and evolution (APO 5.0 & ECC 6). - Function: APO Functional Consultant - Mission, ¾ Location ¾ & Realisation: 05/2009 – 09/2009 Participated in the redesign of the APO application. Treatment of change requests for correction or evolution. UNIFINE – COSUN GROUP Food and bake ingredients Support and training (R/3 4.7). PP-PI Functional Consultant + MM, WM & HUM Support Consultant ¾ ¾ 03/2009 Daily support on delivery, MRP, production, storage and shipping flows. Database creation of work instructions and training of end users. Sheet metal work SAP – Groupe RUGET SAP mission of Continuous Business Improvement (CBI)for client "Groupe RUGET". PP Functional Consultant + LO-VC + Technical Master Data Audit of the implemented PP solution on the production planning, configuration and technical data domains. Montluel. ¾ Recommendations to improve the flow : SOP, demand management and load levelling. 04/2008 - 01/2009 AMCOR FLEXIBLES ATLAS (ECC 6.0, APO 5.0) Flexible packaging Core Consultant PP + LO-VC Support Consultant MM, WM, HUM, QM, PM, EDI Participation in the deployment of the solution. Finnish, Swiss and British sites. Adaptation of variant configurator solution (PP + LO-VC) in order to integrate bags and pouches production flows. Finalizing the design, detail design, mock-up and integration tests. Support before and after go-live for the first deployed site (reel production). Halen plant in Belgium started in 1st May 2008. ¾ Specification of EDI interfaces between PP and FLEXNET, integration tests and post go-live support of the first site, tracking of EDI messages in error and correction. ¾ Post-go live support on integration points with PP. Example: flows on printing cylinders (inspection control in QM, equipment in PM and tools in PP routings). CV Condemine 1/4 Definition and deployment of a short term planning solution. ¾ Study of future amount of data exchanged in the interface. Go-live in July 04 ¾ Integration of the variant configurator for Porsche Cayenne & VW Touareg bumpers. ¾ General design phase with business flow analysis. support pre and post go-live: o Production declarations.12/2005 PLASTIC OMNIUM SCOOP (R/3 4. configurations profiles. detailed design phase with master data setup o PP master data impacted by VC : BOM & routings.1) Production of cigarettes and cigars. Langres (mid 2004 to April 2006) ¾ Using the MRP simulation environment (PP-PLT) in order to add a planning material in the BOM. APO 4. MM. ¾ Prototyping of « engineering-to-order » flow based on LO-VC and APO PP-DS. MM. validation of the demand and forecast repartition on finished products (PP-DEM). APO 5. filters adding and packaging. ¾ Writing of technical specifications and user acceptance tests.10/2007 ALCAN PACKAGING GENESYS (ECC 6. ¾ Study of the two existing variant configuration solutions : UK template mainly based on variant tables and configured materials and French template based on configurable materials. production version). o Shop floor papers for cigarette making. distribution PP Functional Consultant Participation in the deployment of the last three sites (Moroccan sites). variant tables… ¾ Training of key-users and final users. Valenciennes. Paris. BOM. balance of used and produced materials. Casablanca Tetouan & El Moudzine sites ¾ Finalization of the detailed design. HUM Support Consultant Support for the operations on production and stocks for the already deployed sites.6c) Automotive equipment LO-VC + PP Functional Consultant Variant configurator integration (PP + LO-VC) Slovak site. SD). ¾ Adjustment or correction of specific reports: o Efficiency. These planning materials encompass requirements of bumpers of the same models regardless of their colour.0) Packaging PP & LO-VC Functional Consultant Participation to the detailed design phase of the core model. o Distribution of inventory differences on production orders (Distribution of Usage Variance DUV) 01/2006 . Levallois.6c to 5. 07/2007 .7) Jet-engine nacelle and thrust reverser PP Functional Consultant Design and writings of specification for interfaces between the Aircelle’s SAP system and the subcontractor’s specific information system incorporating logistics flows (PP. ¾ Mock-up : variant configuration flow in order to integrate forecasts at the SOP level (PP-SOP).0. routings. simulations of load analysis (PP-PLT). WM. Painting operation and injection operation planned from the repetitive planning table transaction CV Condemine 2/4 . o Master data dedicated to variant configurator :classes 200 & 300. Guichen.03/2006 VALLOUREC Release upgrade from R/3 4. Le Havre. 04/2006 .0 Casing and drilling for oil LO-VC & PP Functional Consultant Set up of a prototype based on variant configurator : study of feasibility for a functional extension and impact of the release upgrade. ¾ Writing of the detailed design documents for the master data (material master. training. 01/2004 . ¾ Integration of commercial forecasts with quotas. dependencies.03/2008 AIRCELLE Outsourcing of logistic flows (R/3 4.6c.11/2007 . Gennevilliers. ¾ Protototyping flows from logistics warehouse to supply area of work centers.06/2007 ALTADIS SAGA (R/3 4. pre & post go-live support. (from July 2002) 12/2000 . ¾ Audit of the implemented solution (FI. Neuf-Brisach. ¾ Report to the SAP competency centre leader. ¾ Management of subcontractor contracts for PM and QM integration. End of 2002 to December 2005 ¾ Adaptation of the PP core-model site by site while maintaining the consistency of the solution and respecting the integration points with other modules. MM. stabilisation of the information system in order to change in maintenance phase.04/2001 SIEMENS Odyssée (SAP) Electronics and electrical engineering Training project manager Organisation of trainings for 1500 users. Telford (UK) go-live July 02. St Denis ¾ Planning of trainings according to user profiles.07/2000 ALSTOM Project of combining two SAP solutions : Finances (APIS) and Maintenance (PARTHLINK). Annecy. MM. ¾ Design and implementation of a knowledge acquisition control plan ¾ Coordination of trainers (FI-CO. PM. ¾ Works with ABAP team to cost.01/2004 DBGP-TEXTRON Stabilization of a recently started SAP solution Mechanical industry : pumps for viscous fluids Team leading of SAP Consultants After the starting in 2002 of an SAP solution.Coordination Etude de faisabilité. ¾ Core model adaptation: o Shifts. o Design and settings of three main flows : supplying of aluminium for laminating operation. ¾ Coordinating consultants. CATS) 06/2000 . PS. ¾ Planning (tasks. PP.01/2000 PECHINEY Aluminium processing SAP PP (R/3) PP Functional Consultant Integration of production flows inside a finance. o Integration of customer forecast on the painted level (semi-finished products). 10/1999 . selling plans of action model by model and monitoring their achievements. HUM Maintenance and support of the sites progressively deployed in Europe.6c) Automotive equipment PP Functional Consultant Core-model definition (business flow analysis. 04/2001 . PP). 2001). production declaration of reels and shipping.01/2003 . Consultant SAP PP & Logistics . design and develop ABAP customized transactions Participation in the pilot site deployment. loads. scheduling) ¾ Managing of two consultants. Levallois (April 2001 – Nov. general design and detailed design phase) mainly based on repetitive manufacturing and production planning for make-to-stock flows. o Specification and building of reports (QM. based on two different versions of SAP.. CV Condemine 3/4 . CO. SD).01/2003 PLASTIC OMNIUM SCOOP (R3 4. purchase and sales solution already started. SD. Consultant support PP + MM. DIPLOMAS 1991 « Arts et Métiers » Engineer (ENSAM). Consultant Automation of reports submitted to authorities. DGA.+ IA + Networks and information systems. 05/1996 – 06/1996.. Consultant in information systems (AMOE / AMOA) (5 years) 05/1993 . 01/1995 . PowerPoint) Language and requests: SQL. routings) o Graphic planning settings (with individual capacity and hierarchy of work centres) o Training and pre & post go-live support. SNP et PP/DS (2002) SAP logistics modules MM. (Ecole Nationale Supérieure d’Arts et Métiers) 1992 DEA (post-graduate degree) Neuroscience applied to robotics. 2005 – Oct. 2008 ALTI Sept.02/1998 ASSYSTEM Engineering and innovation consultancy Consulting and design of specific programs. Excel. QM (1999 – 2008) SAP Basis BC400: Introduction to ABAP (2006) Planning tools and office tools (MS Project. finance and logistics including production. SAP APO DP. PM. Drafting management specifications based on RG00040 methodology.09/1999 GUITEL Migration to SAP (R/3 3. Corporate trainings: Project Management (2 weeks in 1994) SAP: PP (Sept. Word. o Participation in general design phase. Paris. SFR. WM.0h) Small wheels and beading rings (for supermarket carts) PP Functional Consultant Full SAP scope integration : HR. work centres. COGEMA La Hague (Cherbourg). CAREER PATH Since October 2008: Freelance Feb. & Oct. 2005 SIEMENS Business Services Sept 1998 – May 2000 IBM Global Services May 1993 – Aug. Options: EEA.2000 – Feb.04-1995 Homogenisation of the document management.11/1998 . 1998) . Factory of MELOX in France. 03/1995 .02/1995 Updating the operational IT master plan within a context of strong growth. 05/1993 – 12/1994 ¾ Setting up a repository for documentary management shared by all workshops. (BOM.1998 ALPHATEM Services become ASSYSTEM in June 1996 EDUCATION . SAP PP certified by the CESI institute. MS Access LANGUAGES French: mother tongue English: fluent Spanish: beginner CV Condemine 4/4 . 08/1996 – 08/1998 Development of applications integrating neural networks. Creation and development of the information system in order to keep up with production increases. o PP master data settings.