Cotizacion Electrica

March 19, 2018 | Author: asgnar | Category: Amortization (Business), Cash Flow, Depreciation, Money, Energy And Resource


Comments



Description

Item CodigoD14 1 D12 2 D13 3 B11 4 D21 5 D14 6 D15 7 D13 8 D3 9 D4 10 B8 11 B10 12 E6 13 E4 14 E7 15 E2 16 E12 17 E10 18 E11 19 E8 20 E1 21 E3 22 E9 23 E5 24 C4 25 C2 26 C3 27 C1 28 C30 29 B9 30 D23 31 D22 32 D24 33 A5 34 A4 35 A3 36 A6 37 D1 38 D2 39 C17 40 C14 41 C15 42 C16 43 C19 44 C18 45 D25 46 D15 47 D16 48 B4 49 B1 50 B5 51 C22 52 C21 53 C20 54 C23 55 C28 56 D9 57 D10 58 B7 59 B6 60 B3 61 D5 62 D6 63 D11 64 D12 65 D7 66 D8 67 B17 68 D8 69 D7 70 D24 71 B14 72 B12 73 B13 74 B15 75 B23 76 B16 77 B24 78 D17 79 D18 80 A2 81 D11 82 C7 83 C10 84 C9 85 C13 86 C5 87 C6 88 C31 89 C12 90 C8 91 C11 92 D23 93 B21 94 B22 95 D27 96 C26 97 D20 98 D22 99 C32 100 C25 101 D28 102 . C24 103 D20 104 B26 105 B2 106 B25 107 A1 108 D18 109 D26 110 B18 111 B19 112 D16 113 D17 114 D19 115 D21 116 B20 117 D2 118 D1 119 D3 120 C27 121 C29 122 D10 123 D9 124 D4 125 D6 126 D5 127 D19 128 . C33 129 RB1 130 RB2 131 RB3 132 RB4 133 RB5 134 RB6 135 RB7 136 RB8 137 RB9 138 RB10 139 RC1 140 RC2 141 RC3 142 RC4 143 RD1 144 145 146 147 148 149 150 151 152 153 154 . 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 . 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 . 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 . 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 . 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 . 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 . Negro CB Multiflex 0. Negro CB / CU H500MCM clase B 37 CB / CU 2/AWG Clase B 19 H Conduit 2" 6 mts Conduit 4" 6 mts Escalerilla Electrogalvanizada 250 x 100 x 2 mm .Descripción Hormigon Fierro Moldaje CB/XT 8 kV 133%IL 350 MCM CB Multiflex 0.6/1 kV 1 x 250 MCM.6/1 kV 1 x 350 MCM. . . . . . . . . . . . 245 11.331 0 0 0 0 0 0 0 0 0 0 0 0 0 Flete Handling 1 1 .650 kg 4.000 230.725 8.348 c/u 6.245 m 5.348 14.600 12.650 4.725 c/u 4.200 m2 12.600 m 11.990 5.200 3.888 4.990 m 8.331 6.725 4.888 c/u 14.000 kg 3.Unidad Valor $ m3 Valor Costo 230.725 kg 4. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . C 0 2250 Amortiguador tipo Stockbridge para conductor AAA FLINT Ø25.16MM 0 840 Cadena de Suspensión sencilla para conductor AAA FLINT Ø25.16MM.16MM. galvanizado 0 GL Empalme a compresión para cable de guardia Ac. 0 0 0 0 0 0 0 0 0 0 0 18 245kV. S 0 228 Cadena de Amarre sencilla para conductor AAA FLINT Ø25. 0 22000 Hardened Glass Fog type Suspension Insulators with zinc sleeve.0 0 840 Cadena de Suspensión sencilla para conductor AAA FLINT Ø25. galvanizado 3/8” 0 6 Esferas de señalización diurna Ø600mm cable de guardia Ac. galvani 0 22000 Porcelain Fog type Suspension Insulators with zinc sleeve.16MM 0 228 Cadena de Amarre sencilla para conductor AAA FLINT Ø25. Porcelain Solid .16MM 0 GL Empalme a compresión para conductor AAA FLINT Ø25.16MM 0 6 Cadena de Amarre para cable de guardia Ac.Core Cylindrical Post Insulator C8-1050-II / U . Galvanizado 3/8” 0 20 Amortiguador tipo Stockbridge para cable de guardia Ac. galva 0 1 Cadena de suspensión para cable de guardia Ac. Galvanizado 3/8” 0 2 Cadena de Amarre en marco de línea para cable de guardia Ac. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . galvanizado 3/8” DDP USD 195.42 c. galvanizado 3/8” FOB € 11.00 (DDP) . Euros 9.34 AAA FLINT Ø25. Con Tensor FOB € 71.11 a Ac.70 e guardia Ac.63 ble de guardia Ac.16MM.11 cable de guardia Ac.00 th zinc sleeve.16MM FOB € 11. Con varillas de protección.16MM.82 A FLINT Ø25. FOB € 47.ctor AAA FLINT Ø25.00 ctor AAA FLINT Ø25. Sin varillas de protección.50 (FOB)1 ators with zinc sleeve. FOB € 20.16MM. Sin Tensor FOB € 46.16MM.67 (FOB) st Insulator C8-1050-II / Up-right USD 1’300. Galvanizado 3/8” FOB € 21. Galvanizado 3/8” FOB € 28. galvanizado 3/8” FOB € 15.40 dia Ac.69 AAA FLINT Ø25. USD 19.18 or AAA FLINT Ø25. galvanizado 3/8” FOB € 13.16MM FOB € 16. 000 230 2.000 1.000 2.000 45.744 22.000 1.000 1.250 2.250 1.Codigo 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Descripción ANDAMIOS CAMION PLUMA CAMION TOLVA COMPRESOR C/ ROMPEPAVIMENTOS GRUA HERRAMIENTAS MENORES RETROEXCAVADORA RODILLO SOLDADORA VETONERA HERRAMIENTAS ELECTRICAS HERRAMIENTAS MECANICAS CAMIONETA TALADRO 1" HERRAMIENTAS MENORES MAQUINA DE SOLDAR ESMERIL ANGULAR DE 7" HERRAMIENTAS MECANICAS MULTITESTER HERRAMIENTAS EXCAVACIÓN CAMION PLUMA Unidad DIA DIA DIA DIA DIA DIA DIA DIA DIA DIA MES MES DIA DIA HORA HORA HORA HORA HORA HORA HORA Costo Unit 3.140 1.500 50.000 7.300 2.289 3.400 2.500 4.000 50.250 1.500 .500 2. 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 . 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 . 500 HH 7.944 HH 8.Codigo 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Descripción Gerente de Proyecto Ingeniero Residente Ing Gestión de Calidad Ing.397 HH 6. Gestion Ambiental Ingeniero Especialista Ingeniero Proyectista Jefe Terreno Supervisor Terreno Prevencionista Riesgos Capataz Maestro Mayor Maestro 1a Ayudante Chofer .200 HH 6.000 HH 9.525 HH 9.525 HH 9.800 HH 7.840 HH 19.900 HH 5.000 HH 8.970 HH 3.556 HH 5.819 HH 4.940 HH 5.525 HH 7.781 HH 7.050 HH 3.025 HH 2.700 HH 2.612 HH 5.417 .525 HH 9.556 HH 4.478 HH 4.015 HH 5.722 HH 9.Administrativo Pañolero Tecnico A Tecnico B Inspector Capataz C Maestro Mayor C Maestro Primera C Maestro Segunda C Ayudante C Soldador C Ayudante 1 Ayudante 2 Electromecanico 1 Electromecanico 2 Supervisor Especialista Capataz Unidad Costo Unit HH 19.819 HH 2.827 HH 5.100 HH 9.200 HH 3.000 HH 3. .10 0.9 3.7 1.5 3.39% 50.OTROS GASTOS DESCRIPCION UNID.8 2.3 2.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.4 3.3 4. SUBTOTAL 2.4 1..6 2. SUBTOTAL 4.4 2.5 1.00 TOTAL COSTO 4.ANALISIS DE PRECIOS UNITARIOS APU MAESTRO Cliente CODELCO Oferta INACAP 01 Contrato PROY.MANO DE OBRA CATEGORIA UNID. SUBTOTAL 3.2 3.8 3. TITULACION SA OLIVERA O Fecha 31/12/07 Obra Implementacion Sist. CANTIDAD COSTO UNIT.6 3. CANTIDAD COSTO UNIT.6 1.7 2. CANTIDAD COSTO UNIT.1 4.9 2.10 0..4 4.8 1.2 1.1 1.2 2. CANTIDAD 1.9 1.7 3. Corrector FP Revision Moneda Valor Moneda ITEM 1 DESCRIPCION Proyecto de Ingeniería 0 USD 520 UNIDAD gl CANTIDAD 1 PRECIO UNITARIO 0 COSTO UNIT.MATERIALES Y EQUIPOS DESCRIPCION UNID.1 2..00 TOTAL COSTO 2. SUBTOTAL 1.2 4.00 TOTAL COSTO 3.3 3.1 3.10 0.5 2.00 0 0 39.00% PRECIO TOTAL PARTIDA (USD) 0 0 0 Handling 1 Handling 2 Handling 3 Handling 4 20% 20% 20% 20% .5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) 0.3 1. ÍNDICE N° PARTIDA UNIDAD CANTIDAD Proyecto de Ingeniería gl 1 Celdas 6 kV c/u 1 3 Sistema Corrector Factor de Potencia gl 1 4 4 Cables y Barras gl 1 5 5 Sala Eléctrica Completa c/u 1 6 6 Montaje Celdas gl 1 7 7 Montaje Sistema Corrector Factor de Potencia gl 1 8 8 Montaje de Cables y Barras gl 1 9 9 Montaje Sala Eléctrica gl 1 10 10 Interconexionado de equipos gl 1 11 11 Pruebas y Puesta en Servicio gl 1 12 12 Capacitación gl 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 1 1 2 2 3 DESCRIPCIÓN 1 . ÍNDICE N° PARTIDA 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 56 57 57 58 58 59 59 60 60 DESCRIPCIÓN UNIDAD CANTIDAD . 3 2.6 1.2 3.502.00 93.46 SUBTOTAL 49.4 4.507..46 20.1 1 CATEGORIA UNID.8 1.00 TOTAL COSTO 3.5 3.46 1.1 2.46 1.754..4 2. CANTIDAD COSTO UNIT. Proyecto de Ingeniería un CANTIDAD COSTO UNIT.1 4.00 49. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.6 3.4 3.9 2.507.46 2.10 0.00 93.763.1 3.9 1.80% 26.7 2. SUBTOTAL 4.2 1..7 3.507.10 0.OTROS GASTOS DESCRIPCION UNID.46 .3 3. 1 49.3 4.2 2.5 2.763. CANTIDAD COSTO UNIT.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY. CANTIDAD COSTO UNIT.507.4 1.9 3.2 4.8 2.40% 19. SUBTOTAL 2.6 2.5 1.3 1.8 3.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID. SUBTOTAL 3. Corrector FP Revision Moneda Valor Moneda ITEM 1 DESCRIPCION Proyecto de Ingeniería 0 USD 520 UNIDAD gl PRECIO UNITARIO CANTIDAD 1.7 1.10 TOTAL COSTO 49.MANO DE OBRA 1..00 24.00 TOTAL COSTO 4.MATERIALES Y EQUIPOS DESCRIPCION UNID.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0. 678.6 kV c/u CANTIDAD 1.31 3..31 4.2 2.071.8 3.3 3. SUBTOTAL 4.2 4.6 2..31 20.9 1. CANTIDAD COSTO UNIT.3 1.MANO DE OBRA CATEGORIA UNID.7 3. Celda Metalclad 6.131.MATERIALES Y EQUIPOS 3.80% 26. CANTIDAD COSTO UNIT.00 TOTAL COSTO 2.262.4 1.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0.10 0.262..262.3 2. CANTIDAD COSTO UNIT.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.8 1.7 1.6 3.3 4.31 1.6 1. 70.5 1. SUBTOTAL 2.262.31 .5 3. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.00 133.00 TOTAL COSTO 3.10 TOTAL COSTO 70.4 2.2 1.00 35.2 3.10 0.071.7 2.00 133.1 1 DESCRIPCION UNID.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.31 SUBTOTAL 70.40% 27.1 2.1 4.9 3.5 2.00 70. SUBTOTAL 1..8 2.4 4.OTROS GASTOS DESCRIPCION UNID.00 COSTO UNIT.9 2.1 1.4 3. Corrector FP Revision Moneda Valor Moneda ITEM 2 DESCRIPCION Celdas 6 kV 0 USD 520 UNIDAD c/u PRECIO UNITARIO CANTIDAD 1. 2 1.3 4.32 2.00 78.72 3.4 2. SUBTOTAL 2.00 10.25 53.021.3 1 Condensador auxiliar (C1) un 4.2 1 Seguros un 1.07 1.OTROS GASTOS DESCRIPCION UNID.00 TOTAL COSTO 2.683.7 1 TDCC un 1.07 .589.MATERIALES Y EQUIPOS DESCRIPCION UNID.085.1 1 Resistencias amortiguadoras un 4.64 4.7 1.508.93 1.00 626..9 2.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID. SUBTOTAL 4.00 299.7 2.717.307.6 1.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY. CANTIDAD COSTO UNIT..00 2.717.014.07 20.589.32 3.5 1 Reactores (L1) un 4. CANTIDAD COSTO UNIT. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.00 PRECIO UNITARIO 299.10 TOTAL COSTO 147.287.6 2..97 626.223.00 6.00 1.236.56 157.02 3.151.00 3.1 1 Fletes un 1.00 TOTAL COSTO 3.4 1.56 3.10 0.9 3.10 0.2 2.6 1 TDA y F en baja tensión un 1.MANO DE OBRA CATEGORIA UNID.996.00 8.4 1 TT / CC ( 10/5 A) un 1.97 3.64 8.991.014.5 1.56 2. SUBTOTAL 3.51 4.8 1. Corrector FP Revision Moneda Valor Moneda ITEM 3 DESCRIPCION Sistema Corrector Factor de Potencia 0 USD 520 UNIDAD gl CANTIDAD 1.80% 26.3 1.93 4.90 3.3 2.00 13.1 1. CANTIDAD COSTO UNIT.26 20. CANTIDAD COSTO UNIT.8 2. SUBTOTAL 1.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 10.508.223.40% 62.00 2.458..2 1 Condensador principal (C2) un 4.4 4.9 1.833.00 5.93 41.8 3.98 27.5 2.1 2.463.865. Corrector FP Revision Moneda Valor Moneda ITEM 4 DESCRIPCION Cables y Barras 0 USD 520 UNIDAD gl CANTIDAD 1.2 2.4 2.757.10 14.08 9.1 2.00 28.9 1.00 TOTAL COSTO 3.1 1.7 1.98 169.47 20.519.47 1.3 1. SUBTOTAL 4.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.981.3 2.436.757.8 2.10 0.92 3.52 456.80% 26.1 1 Barras de cobre de 50*10mm mt 12.00 38.8 1.00 PRECIO UNITARIO 28.2 1.77 3.6 1. SUBTOTAL 2.5 1 Cable de 3 x 12 AWG mt 300.00 304..00 114.62 TOTAL COSTO 4.4 1 Placas de Aislación gl 1.88 4.6 2.3 1 Mufas de 12 kV jgo 8.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 1.7 2.5 1.8 3..98 4.MANO DE OBRA CATEGORIA UNID.4 4.00 1.184.47 .40% 5.592.00 TOTAL COSTO 2.3 4.1 1 Fletes un 1.370.77 3.OTROS GASTOS DESCRIPCION UNID. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.2 1 Seguros un 1.23 1.5 2.2 1 Cable de 12 kV mt 250. SUBTOTAL 3.62 2.00 7.4 1. CANTIDAD COSTO UNIT.MATERIALES Y EQUIPOS DESCRIPCION UNID.85 15. CANTIDAD COSTO UNIT. CANTIDAD COSTO UNIT.7 3..88 849.10 0.77 380.9 3. SUBTOTAL 1. CANTIDAD COSTO UNIT.00 169.9 2.23 3.92 3.164.00 849.019..00 380.6 3. 00 2. SUBTOTAL 2.025.00 85. CANTIDAD COSTO UNIT.9 2.5 1.49 143. CANTIDAD COSTO UNIT. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.7 2.00 TOTAL COSTO 85.98 166.8 1.08 4..4 1.41 5.46 137.00 271.7 1.00 TOTAL COSTO 2.08 1.51 3..6 1 Equipo Fluorescente de 2 X 40W un 12.423.00 66.1 1 Fletes un 1.1 2.6 2.762.71 3.823.759.370.10 1 Soportes de acero inox.94 3. un 38.52 4.823.429..46 3.9 3.8 2.00 1.3 2.00 PRECIO UNITARIO 271.125.00 20.8 1 Luminaria Aviso un 1.23 3.MATERIALES Y EQUIPOS DESCRIPCION UNID.2 1 Seguros un 1.41 4. CANTIDAD COSTO UNIT.33 16.OTROS GASTOS DESCRIPCION UNID.23 1.000.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.025.4 4.125.55 4.38 3. SUBTOTAL 4.00 1.MANO DE OBRA CATEGORIA UNID.47 1.00 200.00 114. Corrector FP Revision Moneda Valor Moneda ITEM 5 DESCRIPCION Sala Eléctrica Completa 0 USD 520 UNIDAD c/u CANTIDAD 1.1 1 Sala Electrica GL 1.77 3.537.98 3.47 .80% 26.150. SUBTOTAL 3.5 1 Tapa de EPC de 300 mm FRPV mt 112.7 1 Reflector Haluro metalico de 250 W un 6.10 0.3 1 Parrilla de FRPV industrial m2 60.00 TOTAL COSTO 3.00 166.00 187.40% 56.4 1 EPC de 300 X 150 mm FRPV mt 112.9 1.10 0.5 2.3 4.3 1.6 1.944..00 5.423. CANTIDAD COSTO UNIT.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 6.2 1 Estructura kg 3.508.524.00 39.4 2.28 1.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.569. SUBTOTAL 1.201.2 1.373.47 20.98 4.2 2.00 279.00 71.1 1. 3 28 Electromecanico 1 HH 90 10.17 2.10 TOTAL COSTO 2.00 8.25 .368.7 2. CANTIDAD COSTO UNIT.52 1.234.72 1. 1.00 4.3 2.353.2 4.8 2. 2.6 31 Especialista HH 18 20.003.9 3.163.9 2.10 TOTAL COSTO 5.51 946.25 20.5 30 Supervisor HH 90 13.48 1.1 4.92 1.MATERIALES Y EQUIPOS DESCRIPCION UNID.2 1 Instrumentos de medición gl 1 1.6 3.8 1.51 946.014.51 585. Corrector FP Revision Moneda Valor Moneda ITEM 6 DESCRIPCION Montaje Celdas 0 USD 520 UNIDAD gl CANTIDAD 1.1 3.9 1. CANTIDAD COSTO UNIT.2 3.3 3.00 15.40% 3.30 1.5 2...10 0.2 27 Ayudante 2 HH 90 6.5 3.1 26 Ayudante 1 HH 90 6.00 PRECIO UNITARIO 15.88 2. SUBTOTAL 4. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.7 32 Capataz HH 45 21.00 TOTAL COSTO 4.73 977.4 3.6 2..5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0. SUBTOTAL 1.4 2..638.7 3.163.20 2.014.154. SUBTOTAL 3.48 1.353.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.3 4.80% 26.25 1.17 SUBTOTAL 1.25 1.13 362.1 1 Herramientas menores gl CANTIDAD 1 COSTO UNIT.OTROS GASTOS DESCRIPCION UNID.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.4 4.006.04 3.88 1.51 585.4 29 Electromecanico 2 HH 90 10.8 3.MANO DE OBRA CATEGORIA UNID.25 1. CANTIDAD COSTO UNIT. CANTIDAD COSTO UNIT.1 3.382.1 26 Ayudante 1 HH 225 6.365.2 3.10 TOTAL COSTO 14.1 1 Herramientas menores gl CANTIDAD 1 COSTO UNIT.9 2.4 4.908.71 1.10 TOTAL COSTO 5.537.6 2.463.444..095. SUBTOTAL 1.7 32 Capataz HH 112.9 3.62 1.40% 7.3 2.4 2.885.51 1.4 3.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0.10 0.13 905.19 2.. 2.920. Corrector FP Revision Moneda Valor Moneda ITEM 7 DESCRIPCION Montaje Sistema Corrector Factor de Potencia 0 USD 520 UNIDAD gl CANTIDAD 1.8 2.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.31 1.908.00 10.3 3.7 2.71 1.537.MANO DE OBRA CATEGORIA UNID.463.62 20.5 2.19 2.72 3.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.5 21.6 31 Especialista HH 45 20.382.62 1.62 .62 1.2 4..80% 26.3 4.92 2.73 2.1 4.92 SUBTOTAL 3.008.8 3. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist. SUBTOTAL 3.3 28 Electromecanico 1 HH 225 10. 3.4 29 Electromecanico 2 HH 225 10.75 1.MATERIALES Y EQUIPOS DESCRIPCION UNID.51 2.. CANTIDAD COSTO UNIT.51 2.11 3.6 3.OTROS GASTOS DESCRIPCION UNID.80 1.086.365.015.7 3.2 1 Instrumentos de medición gl 1 2.5 3.00 PRECIO UNITARIO 37.00 TOTAL COSTO 4. SUBTOTAL 4.8 1. CANTIDAD COSTO UNIT.51 2.5 30 Supervisor HH 225 13.00 20.00 37.2 27 Ayudante 2 HH 225 6.9 1.51 1. 4 4.52 1.1 1 Herramientas menores gl CANTIDAD 1 COSTO UNIT.014.20 2.00 PRECIO UNITARIO 15.9 2.MANO DE OBRA CATEGORIA UNID.40% 3.73 977.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.5 2.2 4.92 1.51 946.5 3.17 2.4 3.88 2.4 29 Electromecanico 2 HH 90 10. SUBTOTAL 1. CANTIDAD COSTO UNIT. SUBTOTAL 3.1 26 Ayudante 1 HH 90 6. 2.88 1.48 1.7 3.638.00 15.8 1.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.5 30 Supervisor HH 90 13..3 2..7 2.48 1.1 3.2 1 Instrumentos de medición gl 1 1.30 1.MATERIALES Y EQUIPOS DESCRIPCION UNID.7 32 Capataz HH 45 21.00 8.9 3.014.9 1.25 1.353.163.1 4.6 3.25 . SUBTOTAL 4.4 2.163.25 20.3 3.51 946.10 0.368.80% 26.72 1.10 TOTAL COSTO 5.51 585.8 3.51 585.04 3.6 31 Especialista HH 18 20.OTROS GASTOS DESCRIPCION UNID.25 1. Corrector FP Revision Moneda Valor Moneda ITEM 8 DESCRIPCION Montaje de Cables y Barras 0 USD 520 UNIDAD gl CANTIDAD 1.3 4.353. CANTIDAD COSTO UNIT.154. CANTIDAD COSTO UNIT.17 SUBTOTAL 1..234.00 4.25 1.13 362.003.10 TOTAL COSTO 2.3 28 Electromecanico 1 HH 90 10.6 2.8 2.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0.2 27 Ayudante 2 HH 90 6.006. 1.00 TOTAL COSTO 4.2 3.. 5 21.10 TOTAL COSTO 3.009.37 1.005.10 TOTAL COSTO 8..522.2 3.30 2. 2. CANTIDAD COSTO UNIT.40% 4.6 2.9 3.37 1.5 2.731.10 0.745.3 2..457.4 29 Electromecanico 2 HH 135 10.51 1.75 2.6 31 Especialista HH 27 20.45 1.88 1.OTROS GASTOS DESCRIPCION UNID.5 3.6 3.419.4 3.8 3.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0.4 2.MANO DE OBRA CATEGORIA UNID.3 28 Electromecanico 1 HH 135 10.2 27 Ayudante 2 HH 135 6.2 1 Instrumentos de medición gl 1 1.9 1. 2.745.7 32 Capataz HH 67.9 2. SUBTOTAL 4.3 3.7 2.37 . Corrector FP Revision Moneda Valor Moneda ITEM 9 DESCRIPCION Montaje Sala Eléctrica 0 USD 520 UNIDAD gl CANTIDAD 1.1 1 Herramientas menores gl CANTIDAD 1 COSTO UNIT.5 30 Supervisor HH 135 13.00 PRECIO UNITARIO 22.00 6.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.51 1.029.51 1.8 1.2 4..80% 26.13 543.7 3.MATERIALES Y EQUIPOS DESCRIPCION UNID.4 4.37 20.73 1.029.522.851.1 26 Ayudante 1 HH 135 6.23 878.07 3.552.23 1. SUBTOTAL 1.3 4.31 2.419. CANTIDAD COSTO UNIT.00 12.31 1.1 4.37 1.. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist. SUBTOTAL 3.00 TOTAL COSTO 4.78 1.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.00 22.72 1. CANTIDAD COSTO UNIT.8 2.466.1 3.75 SUBTOTAL 2.51 878. 1 3.3 2.12 1.. SUBTOTAL 4.4 2.6 31 Especialista HH 9 20. 2.44 507.4 29 Electromecanico 2 HH 45 10.003. CANTIDAD COSTO UNIT.12 1.58 2.5 21.8 3.7 3.5 3.582.13 181.OTROS GASTOS DESCRIPCION UNID.6 2.582.2 4.2 27 Ayudante 2 HH 45 6.51 473.5 30 Supervisor HH 45 13.819.MANO DE OBRA CATEGORIA UNID.74 1.. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.2 1 Instrumentos de medición gl 1 507.51 473.5 2.80% 26.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.10 2.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.10 0.73 488.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0.00 2.74 1.10 TOTAL COSTO 1. Corrector FP Revision Moneda Valor Moneda ITEM 10 DESCRIPCION Interconexionado de equipos 0 USD 520 UNIDAD gl CANTIDAD 1.00 TOTAL COSTO 4.00 7.12 1. 676.15 1.MATERIALES Y EQUIPOS DESCRIPCION UNID.40% 1.8 1..3 28 Electromecanico 1 HH 45 10.12 20. CANTIDAD COSTO UNIT. CANTIDAD COSTO UNIT.6 3.577.4 4.44 2.7 32 Capataz HH 22.4 3. SUBTOTAL 1.9 1.2 3.72 617.02 3.8 2.58 SUBTOTAL 676.12 .7 2.51 292.002.3 4.9 3.1 4..00 4.51 292.1 26 Ayudante 1 HH 45 6.3 3.1 1 Herramientas menores gl CANTIDAD 1 COSTO UNIT.10 TOTAL COSTO 2.00 PRECIO UNITARIO 7. SUBTOTAL 3.26 1.96 1.184.9 2. 07 1.8 3.3 4.760.MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID. SUBTOTAL 1.15 20.8 2.83 SUBTOTAL 1.10 5.7 3.10 0.3 3.190.961. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist..3 2.73 1.2 3. CANTIDAD COSTO UNIT.5 2.9 3. SUBTOTAL 4.961.34 1.4 4.6 2.1 3.7 2.15 .9 2.10 TOTAL COSTO 2.37 2.MATERIALES Y EQUIPOS DESCRIPCION UNID. 2.245.80% 26.00 7.6 3.OTROS GASTOS DESCRIPCION UNID.15 1.5 3.00 PRECIO UNITARIO 13.5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0.13 1.3 28 Electromecanico 1 HH 40.371.1 4.83 2.5 10.5 30 Supervisor HH 81 13.180.904.00 1.20 3.4 3.37 934.51 1.7 32 Capataz HH 81 21.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.2 4.95 TOTAL COSTO 2..245.630.6 31 Especialista HH 81 20.51 263.00 3. Corrector FP Revision Moneda Valor Moneda ITEM 11 DESCRIPCION Pruebas y Puesta en Servicio 0 USD 520 UNIDAD gl CANTIDAD 1.111.1 1 Herramientas menores gl CANTIDAD 1 COSTO UNIT.81 1.25 1. CANTIDAD COSTO UNIT.1 26 Ayudante 1 HH 40.686.40% 2.5 6.00 1.72 1.4 29 Electromecanico 2 HH 0 10.00 TOTAL COSTO 4. 1.MANO DE OBRA CATEGORIA UNID.9 1.51 425. CANTIDAD COSTO UNIT. SUBTOTAL 3.2 1 Instrumentos de medición gl 1 934.00 13.51 0..8 1.2 27 Ayudante 2 HH 0 6.4 2..47 0. .2 3.MATERIALES Y EQUIPOS DESCRIPCION UNID.ANALISIS DE PRECIOS UNITARIOS Cliente CODELCO Oferta INACAP 01 Contrato PROY.20 1.51 0.2 27 Ayudante 2 HH 0 6.51 0. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.8 1. CANTIDAD COSTO UNIT.9 3.5 2.10 0.20 20.MANO DE OBRA CATEGORIA UNID.1 2.00 1.00 PRECIO UNITARIO 2.130.2 4.7 32 Capataz HH 27 21.75 1. CANTIDAD COSTO UNIT.45 1.20 2.2 2.130.40% 445.00 1..51 0. SUBTOTAL 3.51 0.6 3.3 3.6 31 Especialista HH 27 20.72 0.8 2.4 2.00 1.OTROS GASTOS DESCRIPCION UNID.3 28 Electromecanico 1 HH 0 10..MAQUINAS Y HERRAMIENTAS DESCRIPCION UNID.4 4. Corrector FP Revision Moneda Valor Moneda ITEM 12 DESCRIPCION Capacitación 0 USD 520 UNIDAD gl CANTIDAD 1.140.79% 26.8 3.7 3.73 586. SUBTOTAL 1. CANTIDAD COSTO UNIT.10 TOTAL COSTO 1.00 1..00 TOTAL COSTO 3.10 0.00 1.9 1.1 26 Ayudante 1 HH 0 6.00 2.6 2.1 4. SUBTOTAL 4.5 3.13 543.4 3.9 2.140.1 3.3 2.00 TOTAL COSTO 4.5 30 Supervisor HH 0 13.00 1.20 .5 TOTAL COSTO COSTO PARTIDA (USD) GASTOS GENERALES (USD) UTILIDAD (USD) PRECIO TOTAL PARTIDA (USD) 0. CANTIDAD COSTO UNIT.7 2. SUBTOTAL 2.3 4.00 565.4 29 Electromecanico 2 HH 0 10. 683.15 2.154.00 0.46 70.07 1.00 0. TITULACION SA OLIVERA O Obra Implementacion Sist.981.686.37 4.37 7.019.373.537.524.763.00 369.302.223.73 .62 8.819.920.00 0.00 0.04 3.20 941.00 35. Corrector FP ITEM 1 2 3 4 5 6 7 8 9 10 11 12 PARTIDAS Proyecto de Ingeniería Celdas 6 kV Sistema Corrector Factor de Potencia Cables y Barras Sala Eléctrica Completa Montaje Celdas Montaje Sistema Corrector Factor de Potencia Montaje de Cables y Barras Montaje Sala Eléctrica Interconexionado de equipos Pruebas y Puesta en Servicio Capacitación Oferta Fecha Revision Moneda UNIDAD CANTIDAD gl c/u gl gl c/u gl gl gl gl gl gl gl 1 1 1 1 1 1 1 1 1 1 1 1 MANO DE OBRA 49.002.507.371.163.20 14.07 28.49 0.00 3.00 6.095.904.005.00 0.00 2.00 248.31 157.00 70.184.25 37.31 299.150.757.10 5. 19.00 0.00 0.638.00 INACAP 01 31/Dec/2007 0 USD UTILIDAD 24.009.85 6.180.484.04 5.00 565.00 0.00 2.006.00 4.262.62 137.92 EQU.262.00 0.003.62 15.003.47 8.47 271.477.00 445.00 3.00 10.164.307.00 4.784.00 0.20 0.130.885.00 1.00 0.00 0.592.56 1.00 56.25 12.00 17.00 195.638.47 143.11 2.51 5.163.46 133.131.00 2.731.996.00 0.368.154.762.008.507.00 5.25 22.00 78.15 1.20 92.678.00 7.457.07 15.184.00 PRECIO TOTAL PARTIDA 93.130.00 17.00 0.190.908.00 0.745. 0.51 14.95 1. Y HERR.236.507.572.00 7.25 20.00 0.991.31 147.91 PRECIO COSTO PARTIDA 49.368.577.02 2.00 0.006.00 62.071.476.20 497.00 71.12 13.20 8.140.00 27.41 OTROS GASTOS 0.552.00 4.823.00 10.00 3.015.961.502.00 0.00 0.00 5.011.754.30 2.582.73 GASTOS GRALES.12 7.47 15.46 0.FORMATO DE RESUMEN DE PRESUPUESTO Nombre de la Licitación: Cliente CODELCO Contrato PROY.00 0.49 MATERIALES 0.003.98 0. 92 17.00 20.572.484 17.73 100.82% 1.572 369.80% 26. Corrector FP Montaje y Puesta en Marcha Revision 0 Moneda Valor Moneda Descripción Valor USD 520 Porcentaje Mano de Obra Maquinas y Herramientas Materiales y Equipos Otros Gastos Total Costo Directo 92.784.478 497.301 .507.477 17.49 369.784 248.476.76923 92.40% Total Oferta 941.00% 52.80% 44230.73 9.25% 1.Calculo Costos Y Margenes Cliente CODELCO Oferta INACAP 01 Contrato PROY.506 0 941.302.91 497.011.477.484.012 0 195.86% Gastos Generales Utilidad 195.41 17. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.87% 39.00 248. . 923 0 % Utilización Cantidad Duración Faena (meses) 8.00 17. TITULACION SA OLIVERA O Fecha 31-12-07 Obra Implementacion Sist.808 1.00 6.00 6.000 100.00% 1 1 6.00 6.385 7.00 1.00 13.154 192 96 5 865 0 462 81 38 87 81 0 865 962 1.00% 2 4 4 4 2 6.00% 1 2 1 1 40 1 1.00% 100.194 2.577 10.500 0 0 2.538 1.00 6.00% 100.00 6.00% 100.00% 100.00% 100.165 15.00 6.731 1.923 Total Gastos Generales Total 195.308 1 0 17.788 5.00 13.00% 10.00 6.846 12.00% 1 1 1 1 1.442 0 2.00% 100.00% 100.00 1.00 1.846 16. Corrector FP Revision 0 Moneda Valor Moneda USD 520 Descripción Administracion Central BMV Administracion Central BMV Administración SG Construcción Ingeniero Control Calidad Experto Prevencion de Riesgos Administracion Faena Ingeniero Residente Administrativo Jefe Terreno Inspector Tecnico de Calidad Programador y control de costos Encargado de bodega Prevencionista A-B Equipos y Herramientas Camionetas Ingeniero Residente Combustible camioneta Otros Gastos Movilización y desmovilización Equipos computacionales Comunicaciones Papeles e insumos Alimentación personal indirecto Capacitación personal Viajes a Terreno Pasajes Alojamientos Viaticos Arriendo camioneta Combustible camioneta Seguro Medio Ambiental Seguro Terceros Seguro Vehiculos Boleta de garantia Costo Mensual 28.00 6.00 6.00% 100.00% 100.308 1.846 8.154 577 1.00% 100.00% 10.938 923 2.00 6.00 6.00% 1 800 6.00 28.654 100.00% 12.00% 100.308 15.200 865 100.000 3.00% 100.00% 100.784 .00 6.538 1.885 2.000 0 0 4.00% 100.308 1.Gastos Generales Cliente CODELCO Oferta INACAP 01 Contrato PROY.923 100.00 865 962 1.088 3.00 6.00% 100.00% 100.00 6.000 100.308 2.00 5.00 6.077 969 100.596 1.00 6.00 1.00 6.846 6.00% 100.00% 1 1 1 1 6.00 17.00% 100.000 5.00 1.00% 1 1 1 1 1 6.538 1. . . 6 kV Mem Calculo y Dimensionamiento Sala Electrica Especificación tecnica Alimentadores MT Especificación tecnica celdas MT Especificación tecnica Sala Electrrica Especificación tecnica Sistema corrector FP Listado circuitos fuerza y control Especificaciones tecnicas de Montaje de equipos Manual pre operaciones y puesta en marcha Disciplina Control e instrumentación Disciplina Control Planos Diagramas elementales de c. y c.a. Diagramas de interconexionado de equipos Disciplina Civil Planos Plano disposicion de escalerillas . de protecciones y medidas Diagramas elementales de control en c.PROYECTO INGENIERÍA DOCUMENTO : Cuadro de precios de Ingeniería DESCRIPCIÓN DESARROLLO INGENIERÍA Disciplina eléctrica Planos Plano de Planta General con ruteo del proyecto Diagrama unilineal de fuerza y protecciones Plano de canalizaciones de fuerza y control plantas Plano de canalizaciones de fuerza y control elevaciones cortes y secciones Plano de detalles de Montaje de equipos y canalizaciones Documentos Mem Calculo y Dimensionamiento Alim MT 6.c.a.6 kV Mem Calculo y Dimensionamiento Celdas MT 6. Plano disposicion de ductos MT Plano camaras MT Documentos Memoria de calculo canalizacion subterranea Memoria de calculo mecanica de suelo Especificacion tecnica camaras MT TOTAL INGENIERÍA . 02320322 597.03379109 289.227 0.02478013 637.18021916 1.019 0.04505479 289.227 1.914 4 2.06758218 289.954 1 1.922 0.149 1.486 1 1.231 8.0112637 289.971 6 558 3.971 .693 3.341 1 558 558 0.920.227 0.971 1 558 558 0.971 0 1 1.231 0.149 0.922 0.937 1 1.10137328 869.937 1 3.02478013 637.977 1 892 892 0.159.885 0 0 1 558 558 0.0112637 289.971 3 558 1.673 0.227 1.07459972 1.971 1 558 558 0.00901096 231.114 1.18021916 1.971 1 446 446 0.114 0.971 4 558 2.149 1.159.02320322 597.149 0.NGENIERÍA Cantidad Proponente Precio unitario $/documento Valor ofertado $ 1 558 558 0.693 0.01126367 289.0112637 289.346 0.673 5.298 0 0 0 3 1.01802192 463.149 0.231 8.341 1 1.0112637 289.02320322 597.149 1.341 1 1.02250236 579.885 4 2. 1 558 558 0.02320322 597.341 1 1.341 0 49.341 1 1.01126367 289.971 1 558 558 0.02320322 597.507 .149 1.149 1.02320322 597.01126367 289.149 1.149 0.971 0 1 1.149 0.149 0. . 1 .26230309. Sueldo Bruto Sueldo liquido Colacion Valor dia Bruto Valor hora Bruto Cargo Montaje sala eléctrica Montaje celdas MT Montaje alimentador Montaje condensadores filtro Montaje resistencias filtro Montaje inductancias filtro Montaje condensadores FP Interconexionado de equipos Comisionamiento equipos Pruebas de puesta en marcha Puesta en Servicio Capacitación 3 sems 2 sems 2 sems 1 sem 1 sem 1 sem 2 sems 1 sem 1 sem 3 días 1 día 3 días 135 90 90 45 45 45 90 45 45 27 9 27 81 Ayudante 1 100% 100% 100% 100% 100% 100% 100% 100% 50% 50% 50% 0% . 819 HH Ayudante 2 380.750 100% 126.000 410.000 205.438 0% 38.875 100% 126.000 3.875 100% 0 50% 0 50% 0 50% 0 0% 750.375 2.500 0% 0 0% 750.500 41.556 HH 615.000 205.000 4.500 350.750 100% 126.000 4.875 100% 126.875 100% 63.000 600.375 2.750 100% 126.750 100% 253.500 0% 20.000 3.000 3.000 100% 410.875 100% 253.000 600.875 100% 253.819 HH Electromecanico 1 380.000 410.500 0% 61.625 100% 253.500 41.750 100% 253.000 100% 205.000 100% 410.063 0% 12.000 100% 102.500 350.500 25.000 100% 205.500 25.000 100% 205.437.625 100% 253.000 100% 410.875 100% 126.000 0 0 0 0 .875 100% 126.750 100% 126.556 HH Electromecanico 2 615.000 205.000 3.000 410.000 205.688 0% 0 0% 437.000 100% 205. 000 157.500 5.000 78.500.500 1.750 423.019.875 211.500 392.750 9.500 14.000 3.009.000 3.200.500 235.500 20% 267.000 1.750 254.029.625.750 1.750 2.848.000 20% 267.500 78.000 1.750 825.944 HH Especialista 802.875 423.000 3.500 20% 535.500 100% 160.500 2.500 78.500 20% 267.500 100% 0 100% 1.938 495.250 2.500 1.500 84.500 157.188 235.500 1.250 84.019.750 254.875 423.417 Capataz 50% 50% 50% 50% 50% 50% 50% 50% 100% 100% 100% 100% 635.500 8.500 20% 267.009.000 20% 267.009.019.625 423.000 800.000 78.500 20% 535.Supervisor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 1.938 .750 1.500 235.563 165.500 53.875 211.750 211.250 3.000 20% 535.009.750 211.300.500 78.722 HH 235.500 157.500 100% 53.000.500 78. 089) .827) (81.262) (116.00 30% % Inversión 1 Periodo 0 Inversión Inversión 1 Inversión 2 ( con Financiamiento) Total Inversión Ingresos Anticipo (15%) Estado de Avance 1 (20%) Estado de Avance 2 (20%) Estado de Avance 3 (20%) Estado de Avance 4 (15%) Estado de Avance 5 (10%) Comisiones (Representadas) Sub Total Ingresos Total Ingresos Amortización Pago Intereses Sub Total Amortización Total Amortización Egresos Ingeniería Ingeniería Sub Total Ing Suministros Celdas 6 kV Sistema Corrector Factor de Potencia Cables y Barras Sala Eléctrica Completa Sub Total Suministros Montaje Montaje Celdas Montaje Sistema Corrector F de P Montaje de Cables y Barras Montaje Sala Eléctrica Interconexionado Sub Total Montaje Pruebas Pruebas y Puesta en Servicio Capacitación Sub Total Pruebas Gastos Generales Gastos Generales Sub Total Gastos Generales Multas Multa por atraso en hitos Multa por atraso en plazo total Sub Total Multas Depreciaciones Depreciaciones Sub Total Depreciaciones Total Egresos Saldo Saldo Periodo Antes Impuesto Renta (34.1. .Benef / Costo) Amortización Saldo Inicial Pago capital prestamo Pago Intereses Saldo Final USD USD . Indice de Rentabilidad.Impuesto Renta 19% Saldo Después Impuesto Renta Depreciaciones Capital de Trabajo Pago capital prestamo Sub Total Capial de Trabajo Flujo de Caja Neto (116. (Relac.089) Horizonte de evaluación Periodo Moneda Tasa de descuento Tasa de Impuesto a la Renta Tasa de interes prestamo Banco VAN (12%) TIR Anualidad Equivalente Periodo de recuperacion de la inv. 131) (52.161) (107.664) 0 (35.261 188.457) (50.457) (14.457) (14.881) (123.629 (10.922) 61.676) (35.161) (143.457) (14.664) (7.027 (10.632) 53.083 .234) 45.664) (7.261 188.891) (2.195 141.Periodo 1 Periodo 2 Periodo 3 Periodo 4 Periodo 5 141.268) 0 (52.005) 0 0 0 0 (24.102) 14.457) (14.560 (2.868) 13.507) 0 0 0 0 0 0 0 0 0 0 0 0 0 (35.881) (35.195 141.195 188.339 (2.137) 0 0 0 (35.804) (50.507) (49.753) 13.261 188.261 188.457) (14.003) (6.985 (325) (13.131) (52.804) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (2.261 141.195 141.112) 34.195 188.881) (131.804) (50.221) 14.635) 88.592) (35.102 (441) (13.891) (52.868 (209) (13.891) (134.008) (4.161) (10.985) 13.261 188.261 141.221 (559) (14.261 188.891) (126.019) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (14.891) (2.195 (677) (14.891) (2.881) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (4.753 (49.003) (10.161) (10.881) (96.592) (35.804) (50.261 188. 734 2.041) .544) (441) (38.891 10.787 (13.544) 33.544) (209) (11.939) (52.654 49.472 10.082 (13.544) (559) (52.544) (677) (67.161 (13.544) (13.544) 61.544) (13.544) (13.544) (13.041) (13.608 10.684 2.544) (325) (25.355 3.891 8.089 (13.5 1.476 27.16.333) 6 Meses USD 12% 19% 5% 33.189 43.891 11.954) (13.161 6.954) (38.439 2.544) 24.544) (13.381 25% 36.262) (13.3 (81.544) 39.939) (13.032 (13.225 (67.544) 32.555 36.826 71.086) (25.086) (13. 003) (1.003) (6.Periodo 6 94.638 0 0 0 0 0 0 0 (4.804) (50.561 (94) (13.482) 18.079 Análisis de VAN v/s Tasa .431 98.130 4.133) (50.804) 0 0 0 (10.003) (10.161) (80.003) (28.022) (4.005) (4.161) (10.130) (5.561 98.638) 13.008) (4. 011 18.065) (5.435 14.356 7.333) (13.929 21.330 36.161 Análisis de VAN v/s Tasa 50.000 30.303 1.051) (6.020 40.923 5.644 10.013) (3.305 19% 20% 21% 22% 23% 24% 25% 26% 27% 28% VAN ($) 44.490 12.000 (13.000) .786 33.200 15.261 Tasa de Desc.877 10.959 23.000 20.000 0 8% (10.000 10.109 (1.544) (13.544) 11.3.381 30. (%) 9% 10% 11% 12% 13% 14% 15% 16% 17% 18% (11.974) VAN (USD) 40.544) (94) 2.108 26.573 3. Análisis de VAN v/s Tasa Descuento . (%) 23% 28% .Análisis de VAN v/s Tasa Descuento 13% 18% Tasa de Desc. 89 185.92 252.298.60 9.156.694.48 9.89 Distribución Porcentual de Costos Otros Gastos 3% Mano de Obra 19% Materiales y Equipos 74% .137.598.448.087.Descripción Mano de Obra Maquinas y Herramientas Materiales y Equipos Otros Gastos Total Costo Directo Valor 48.084.988.998. ual de Costos Maquinas y Herramientas 4% . Descripción Total Costo Directo Gastos Generales Utilidad Valor 252.807.00 Distribución Porcentual de Propuesta Utilidad 26% Gastos Generales 21% .298.448.00 126.225.599.149.89 101. centual de Propuesta Total Costo Directo 53% . 9 1.Rf E(RM) B 1% 10% E(Ri) 0 0.2 1.8 2.5 1.7 3 Ko 1% 4% 6% 9% 12% 15% 17% 20% 23% 25% 28% TIR 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 25% 25% 25% 25% 25% 25% 25% 25% 25% 25% 25% .3 0.4 2.1 2.6 0. 5 Riesgo 2 2.5 3 3.5 .Tasa de Descuento Esperada 30% 25% E(Ri) 20% 15% 10% 5% 0% 0 0.5 1 1.
Copyright © 2024 DOKUMEN.SITE Inc.