Construction Cost Handbook Malaysia 2016

March 27, 2018 | Author: erickyfm | Category: Apartment, Quality Management, Iso 9000, Index (Economics), Concrete


Comments



Description

JUBM and Langdon SeahConstruction Cost Handbook MALAYSIA 2016 Langdon & Seah Sdn Bhd Juru Ukur Bahan Malaysia JUBM Sdn Bhd Arcadis Projeks Sdn Bhd KDN PP10466/05/2013(032500) The following handbook of information relating to the Malaysian construction industry has been compiled by: Langdon & Seah Sdn Bhd in collaboration with Juru Ukur Bahan Malaysia, JUBM Sdn Bhd & Arcadis Projeks Sdn Bhd Level 5, Menara TSR 12 Jalan PJU 7/3, Mutiara Damansara 47810 Petaling Jaya Selangor Telephone Fax Email Website : (6 03) 2106 8000/ 2106 9000 : (6 03) 2106 9090 : [email protected] : http://www.arcadis.com http://www.LangdonSeah.com © Langdon & Seah Sdn Bhd All rights reserved. No part of this publication may be reproduced or copied in any form without prior written permission from Langdon & Seah Sdn Bhd. The information contained herein should be regarded as indicative and for general guidance only. Whilst every effort has been made to ensure accuracy, no responsibility can be accepted for errors and omissions, however caused. Unless otherwise stated, costs reflected in this handbook are Malaysian costs at 4th Quarter 2015. Langdon & Seah Sdn Bhd (520443-H) Juru Ukur Bahan Malaysia JUBM Sdn Bhd (27638-X) Arcadis Projeks Sdn Bhd (233819-K) KDN : PP10466/05/2013 (032500) For private circulation to staff and business associates only. Printed: January 2016 by Spiral Ecoprint Sdn Bhd (KDN: PQ1780/4606) No.44, Jalan PBS 14/11, Taman Perindustrian Bukit Serdang, 43300 Seri Kembangan, Selangor Darul Ehsan 1 TABLE OF CONTENTS Page No. 2 4 12 Table of Contents About Us Calendars 1. CONSTRUCTION COST DATA Construction Cost Specification Kuala Lumpur Construction Cost Trend Construction Costs for Kuala Lumpur Construction Costs for Johor Bahru Construction Costs for Penang Construction Costs for Kota Kinabalu Construction Costs for Kuching Construction Costs for Selected Asian Cities Major Rates for Malaysia Major Rates for Selected Asian Cities ACMV Costs for Various Designs & Developments in Kuala Lumpur M&E Costs for Selected Asian Cities Unit Costs for Ancillary Facilities for Kuala Lumpur Fit-Out Costs for Kuala Lumpur 14 16 18 20 22 24 26 28 34 36 42 44 50 52 2. GENERAL CONSTRUCTION DATA JUBM - Langdon & Seah Building Works Composite Tender Price Index (BWCTPI) JKR Tender Price Index Value of Construction Work Done Performance of Construction Sector Estimating Rules of Thumb Technical Specifications Average Unit Prices Unit Price Index Construction Sector Indicators Commodities Price Trend (Jan to Dec 2015) Malaysia Construction Sector - Employment & GDP Progress Payments 54 55 56 57 58 60 62 64 65 66 68 69 3. PROPERTY Residential Hotel Office Shopping Complex Shop Industrial 2 72 74 76 78 80 81 TABLE OF CONTENTS OTHER INFORMATION Utility Costs for Selected Asian Cities Weight & Measures Conversion Guide Public Holidays Arcadis Asia Leadership Team Arcadis Asia Sectors Arcadis Asia Services Directory of Offices Telephone Directory (Malaysia) TABLE OF CONTENTS 94 96 98 100 106 108 111 114 124 3 . FINANCIAL Financial Definitions & Formulae Mortgage Repayment Table Malaysia Balance of Trade Consumer Price Index Prime Rates & Base Lending Rates Interest Rates : Banking Institutions Currency Chart Exchange Rates 84 85 86 87 88 89 90 91 5. 4.Page No. we are able to apply the Group’s deep market sector insights and its cost and project management services. consultancy. We support UN-Habitat with knowledge and expertise to improve the quality of life in rapidly growing cities around the world. We work in partnership with our clients to deliver exceptional and sustainable outcomes throughout the lifecycle of their natural and built assets. and engineering skills. Through this. JUBM Sdn Bhd and Juru Ukur Bahan Malaysia.000 people active in over 70 countries that generate more than 3 billion in revenues. we form the Langdon Seah – JUBM group which offers a multi-disciplinary construction cost consultancy service and provides integrated solutions for all types of buildings and infrastructure projects throughout Malaysia working from five offices in Kuala Lumpur. Penang. Johor Bahru. we are involved in many major projects implemented since independence and is recognized as a market leading construction specialist with an extensive cost database. Together. Langdon & Seah is an affiliate of Arcadis. Established in 1947. the leading global Design & Consultancy firm for natural and built assets. (Log on to www. Within Asia we can call upon the skills and resource of almost 5.com for more details) 4 ABOUT US . Together with collaborative partners. collective design. we are 28.arcadis.ABOUT US Langdon & Seah Sdn Bhd is one of the largest and longest established Quantity Surveying practices in the country.000 professionals based through the region. Kota Kinabalu and Kuching. We ensure a high level of professional services by instilling and encouraging a culture of continuous learning and professional development for all staff.aspx (Cont’d) ABOUT US 5 . and our involvement with the public. We believe in our people and they reciprocate by delivering successful solutions for our clients. The AGBP is available for viewing at http://www. Integrity At Langdon Seah . As such. We have a dedicated staff resource of 340 (as at December 2015) forming the backbone of our client – focused service delivery. providing sponsorship and allowing time off for Continuous Professional Development (CPD) training for professional progress. we thus implement as part of our company policy the ARCADIS General Business Principles (AGBP) in the development and implementation of our commitment to integrity. The AGBP guides our business decisions and actions throughout all management levels and applies equally to company actions and to individual behaviour of all our employees in conducting our business. we developed a structured and comprehensive framework of training in both technical as well as soft skills. business partners and employees. Integrity refers to the high ethical standards we apply in the execution of our daily business processes and activities. the government bodies and all her agencies as well as the laws of the country.Our People The Langdon Seah .JUBM group’s pride however will always be in its greatest asset: its people.com/General_Business_Principles. our relationship with clients.JUBM group. regardless of their roles and positions in the company. integrity is an important core value of our practice.arcadis. In line with our affiliation with ARCADIS NV. : AR0595 / AR0598 / AR0599 The Langdon Seah . we continue to enhance our Environmental.JUBM group consistently pushes its levels of professional services to higher level by implementing a Quality Management System based on the ISO 9001 International Standards.JUBM group. No. health and safety as well as conforming to the relevant laws in the country. the first Quantity Surveying consultancy to successfully attain certification. as well as health and safety of its staff and community insofar as possible in all areas where the company is involved in. We strive to continually apply and implement the best available techniques and methodologies under the EHS Policy to achieve clearly quantifiable and practical objectives of the company. Health & Safety Policy on all aspects of our business which impacts on the environment. increased competitive advantage and high levels of confidence in our capabilities by our clients.JUBM group is committed in reducing the impact on the environment. As such. The company received accreditation from the Standard & Industrial Research Institute of Malaysia (SIRIM) in May 1995. improved productivity and efficiency. achieved on February 2009. We have since upgraded the Quality Management System to the new MS ISO 9001:2008 Standards and will continue to improve so as to achieve our vision of being the first point of reference for our clients. Our Quality Management System ensures high standards of service performance. another industry first for Langdon Seah . Environmental Management System The Langdon Seah . Forming the core of our EHS Policy is the ISO 14001 Environmental Management System. 6 ABOUT US .ABOUT US (Cont’d) Quality Management System MALAYSIA DIT ED C ERTIFICATIO N BO DY C RE AC International Standards MS ISO/IEC GUIDE 62:1999 QS 02121999 CB 01 Certified to ISO 9001 : 2008 Cert. JUBM group with a rich and extensive construction cost database. hospitality to corporate headquarters.JUBM group provides its services to nearly all market segments in the construction industry from religious buildings to residential homes. The diverse range of project experience provides Langdon Seah . Kuala Lumpur Imperia Puteri Harbour.Our Projects As the leading cost construction consultancy in the country. mixed use developments to master planning.Kajang Line Source: www. Langdon Seah . JohorUSJ DaMen. This enables the company to handle the simplest to the most complex projects entrusted by clients who recognize our value and dynamism. Damansara City 2. Langdon & Seah has been involved with a long list of major construction projects since its setting up more than 60 years ago.com.mymrt.my (Cont’d) ABOUT US 7 . Kuala Lumpur Pavilion KVMRT Sungai Buloh . PJ8. Sunway Putra Mall & Hotel 2015 6. Louis Vuitton. Iringan Hijau. Office Block & Serviced Apartment. Kuala Lumpur 2010 11. Kuala Lumpur 2002 2. Auditorium & Experimental Theatre. Setia Sky Residences 2016 5 16. Kuala Lumpur 2012 8. Palazzio Sunway Condominiums. Kuala Lumpur 2011 15. Seri Hening Residence. CIMB New Headquarters Kuala Lumpur 2011 3. Menara Maybank. Sports & Leisure 17. The Pearl Stonor. Menara Telekom. Legoland Malaysia. Kuala Lumpur 2008 13. Penang Indoor Stadium & Aquatic Centre 1997 22. 2 Hampshire Condominiums. Belum Rainforest Resort (Phase 1). Alamanda. Kuala Lumpur 2006 3 20 Residential 10. Putrajaya 2004 7. Kuala Lumpur 2006 Hospitality. Selangor 2007 9. Pulau Banding 2009 19. Sri Bukit Persekutuan. Johor 2012 12 18. Four Seasons Hotel 2017 21. Kuala Lumpur 2007 14. Sunway Pyramid (Phase 2). Equestrian Park. Putrajaya 2005 20. Kuala Lumpur 2 1989 Retail 5.ABOUT US (Cont’d) 1 A Selection of Our Projects Commercial 1. Kuala Lumpur 2010 12. Selangor 2009 4. Putrajaya 2006 8 ABOUT US . KLP Fashion Avenue. 7 6 9 4 18 14 13 11 16 10 17 19 22 15 21 8 (Cont’d) ABOUT US 9 . Selangor 2010 38 Public 39. Masjid Besar Sandakan. Selangor 2007 27. Lim Kok Wing University. KVMRT Sungai Buloh .com. Kajang Specialist Centre. Star Publications Office & Newspaper Printing Factory. Selangor 2004 Transport & Infrastructure 28.limkokwing. Integrated Water Supply.Kajang Line 2017 31 31. Federal Government Administrative Centre. Johor 2007 40.my/ 37 36. Malaysia 2003 41. Johor State Assembly Building.ABOUT US (Cont’d) 35 A Selection of Our Projects (Cont’d) Private Healthcare 27 23. Putrajaya 2010 44. Selangor 1998 Source: http://www. Ministry of Education Teacher’s Quarters. Selangor 2011 34. Selangor 2009 35. Bangunan UMNO (Pekan). Citizenship and Immigration Canada (CIC) Annexe of Canadian High Commission. Selangor 1994 Religious Buildings 37. Kuala Lumpur 2014 30. Pahang 2007 42. Universiti Teknologi Petronas. IBS Housing. Lutheran Bible Training Institute. Perodua . Sabah 1988 38. Sunway Medical Centre.kpjhealth. Selangor 2005 24. Electrified Double Track-Padang Besar to Ipoh (Station Building) 2014 29.Second National Car Plant. Semangar Water Treatment Plant 32. Sunway Monash University. 6 Stations for Kelana Jaya LRT Line Extension. PML Production Facility. Giant Distribution Centre (Sepang). Kuala Lumpur 2004 43. Perak 2003 26. Putrajaya 2011 10 44 ABOUT US .net Private Educational 26 25. Selangor 2000 Source: http://www. Kuala Lumpur 2008 Industrial 23 33. 36 32 40 29 24 28 39 41 42 25 34 33 30 43 ABOUT US 11 . CALENDARS CALENDARS S M T W T F S 1 2 31 3 4 5 6 7 8 9 10 11 12 13 14 15 16 JAN T 2 9 W T F S 3 4 5 6 10 11 12 13 FEB 2016 S M 6 T 1 8 W T F S 2 3 4 5 9 10 11 12 MAR 7 14 15 16 17 18 19 20 21 22 23 24 25 26 27 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 27 28 29 30 31 S 2 9 S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 S M 10 11 12 13 14 15 16 17 18 19 20 21 22 23 15 16 17 18 19 20 21 22 23 24 25 26 27 28 12 13 14 15 16 17 18 19 20 21 22 23 24 25 24 25 26 27 28 29 30 29 30 31 26 27 28 29 30 17 18 19 20 21 22 23 24 25 26 27 28 29 30 S M T W T 3 5 6 7 4 APR S M 31 3 4 T W T F 1 8 F 1 S 2 MAY S M T W 1 8 2 9 3 4 5 6 10 11 12 13 7 T F S 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 14 15 16 17 18 19 20 21 22 23 24 25 26 27 24 25 26 27 28 29 30 28 29 30 31 S M S M JUL T W T F S AUG 6 7 W 1 8 T 2 9 F S 3 4 10 11 JUN S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 SEP 18 19 20 21 22 23 24 25 26 27 28 29 30 T 1 6 7 8 13 14 15 T F S 3 4 5 10 11 12 17 18 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 16 17 18 19 20 21 22 23 24 25 26 27 28 29 20 21 22 23 24 25 26 27 28 29 30 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S M S M S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 JAN W 2 9 16 5 T 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 OCT NOV 5 6 T W 1 8 T 2 9 F S 3 4 10 11 FEB 7 S M T W T F S DEC 5 2017 T W 1 8 T F S 2 3 4 9 10 11 MAR 6 7 22 23 24 25 26 27 28 29 30 31 12 13 14 15 16 17 18 19 20 21 22 23 24 25 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 26 27 28 29 30 31 S M 30 2 3 S M 1 7 8 S M T W 4 6 7 T W T F 4 5 6 7 APR S 1 8 T W T F S 2 3 4 5 6 9 10 11 12 13 MAY 5 T 1 8 F S 2 3 9 10 JUN 9 10 11 12 13 14 15 16 17 18 19 20 21 22 14 15 16 17 18 19 20 21 22 23 24 25 26 27 11 12 13 14 15 16 17 18 19 20 21 22 23 24 23 24 25 26 27 28 29 28 29 30 31 25 26 27 28 29 30 S M 30 31 S M T W 6 1 8 2 3 4 5 9 10 11 12 T W T F S 1 7 T F S 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 13 14 15 16 17 18 19 20 21 22 23 24 25 26 23 24 25 26 27 28 29 27 28 29 30 31 S M S M JUL T W T F S AUG T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 SEP 17 18 19 20 21 22 23 24 25 26 27 28 29 30 W 1 5 6 7 8 12 13 14 15 T F S 2 3 4 9 10 11 16 17 18 1 2 31 3 4 5 6 7 8 9 10 11 12 13 14 15 16 22 23 24 25 26 27 28 29 30 31 19 20 21 22 23 24 25 26 27 28 29 30 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2 OCT T S M 3 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 1 12 S M 1 7 8 NOV S M T W T F S DEC CALENDARS . CONSTRUCTION COST DATA Construction Cost Specification Kuala Lumpur Construction Cost Trend Construction Costs for Kuala Lumpur Construction Costs for Johor Bahru Construction Costs for Penang Construction Costs for Kota Kinabalu Construction Costs for Kuching Construction Costs for Selected Asian Cities Major Rates for Malaysia Major Rates for Selected Asian Cities ACMV Costs for Various Designs & Developments in Kuala Lumpur M&E Costs for Selected Asian Cities Unit Costs for Ancillary Facilities for Kuala Lumpur Fit-Out Costs for Kuala Lumpur 1 . 3-star. including air-conditioning. but excluding decorative light fittings and loose furniture. average standard Apartment. but excluding air-conditioning. etc. kitchen cabinets and home appliances. tenant area with raised floor/ carpet. kitchen cabinets and home appliances. garden and parking. average standard Retail malls. mid market Business hotels . heating and lighting. Out-of-town shopping centre. Including public area fit-out and M&E. painted wall and false ceiling. kitchen cabinets and home appliances. (Malaysia only) 6-12 units per floor. high end High rise offices. including air-conditioning.4/5 -star Luxury hotels . loose furniture. RC structure with steel roof and M&E to main distribution.) 4) Operating Supplies and Equipment (OS&E) excluded. high rise. RC structure. average standard Detached houses. average standard BUILDING TYPE 1 CONSTRUCTION COST DATA 1. including small office with simple fit-out and M&E. low rise. high end Terraced houses. curtain wall. but excluding decorative light fittings. (Malaysia only) Excluding air-conditioning. high end Apartment. (Malaysia only) Average standard offices exclude tenant fitout.DOMESTIC OFFICE / COMMERCIAL 14 INDUSTRIAL HOTELS OUTLINE SPECIFICATION 1) Interior decoration 2) Furniture (fixed and movable) 3) Special light fittings (chandeliers. 46m2 . but excluding decorative light fittings and loose furniture. including public area fit-out.5-star Industrial units. but excluding decorative light fittings. Houses with fit-out. shell only (Conventional single storey framed units) Owner operated factories. high rise.83m2 per unit Apartment units with good quality fit-out. but excluding shop fit-out. Houses with good quality fit-out. light weight industry RC structure. prestige quality Medium/high rise offices. kitchen cabinets and home appliances. but excluding air-conditioning and heating. Budget hotels . garden and parking. loose furniture. CONSTRUCTION COST DATA CONSTRUCTION COST SPECIFICATION CONSTRUCTION COST DATA . including air-conditioning. Apartment units with fit-out. including air-conditioning. dollars.public sector Schools (primary and secondary) RC structure RC structure. but excluding educational equipment.CONSTRUCTION COST DATA 15 Including fit-out. Fittings and Equipment (FF&E). balconies. no facade enclosure. stairwells. (Malaysia only) Student hostels to university standard. changing and showers. finance and legal expenses. 4. 2. above ground (<4 levels) Notes: 1. Students’ residences Sports clubs. water tanks and the like. plant rooms. All buildings are assumed to have no basements (except otherwise stated) and are built on flat ground. restaurant/cafe. Excluding medical and operating equipment. loose furniture and air-conditioning. professional fees. The standard for each category of building varies from region to region and do not necessary follow that of each other. Fluctuation in exchange rates may lead to changes in construction costs expressed in U. ancillary sports facilities. Dry sports (no swimming pool) and are for ‘leisure centre’ type schemes including main sports hall. multi purpose sports/leisure centres (dry sports) General hospitals . external works. The costs for the respective categories given above are averages based on fixed price competitive tenders. Including fit-out and air-conditioning. etc. The cost excludes site formation works. Underground/basement car parks (<3 levels) Multi storey car parks. with normal soil and site condition. All costs are in US$/m2 CFA unless otherwise stated. bar. The costs per square metre are based on Construction Floor Areas (CFA) measured to the outside face of the external walls/ external perimeter including lift shafts. It must be understood that the actual cost of a building will depend upon the design and many other factors and may vary from the figures shown. 3. natural ventilation. 5. (Malaysia only) Schools with standard government provisions. Furniture. OTHERS . land cost. Costs include a/c.S. high rise Shopping Centres All cost are at an average level unless otherwise stated 16 CONSTRUCTION COST DATA .500 3.000 4. CONSTRUCTION COST DATA KUALA LUMPUR CONSTRUCTION COST TREND 2005 . low rise (<6 levels) Detached houses and bungalows Luxury apts.000 500 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Bungalows (mass housing) Terraced houses Average standard apts.000 500 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Average standard offices.000 2.000 2.000 3.500 1.2015 Domestic RM/m2 4. high rise (<15 levels) Low cost housing Office / Commercial RM/m2 5.500 1. high rise Low cost flats.500 2.000 3.500 2.000 1. high rise Low cost flats.500 4.500 3. high rise Prestige offices.000 1.1 CONSTRUCTION COST DATA 1. 800 1.000 3.000 6.200 600 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories.000 4.000 7.000 1.000 9. 3-star budget hotels. ditto 5-star luxury hotels.&E.000 2.400 1.RM/m2 2. ditto All cost are at an average level unless otherwise stated CONSTRUCTION COST DATA 17 . low rise RM/m2 10.000 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Resort Hotel inclusive of F.000 5.000 8.F. ditto 5-star luxury hotels. low rise (<6 levels) Low cost flats.500 3.320 1.005 290 455 920 135 200 260 SERVICES RM/m2 4.750 2.420 840 905 810 175 295 810 100 150 205 - - - 1.515 2.535 2.580 3.400 2.250 3.320 3.890 3.040 2.025 2.930 950 1.610 2.390 6.255 2. high rise Prestige offices.510 4. high rise Shopping centres OFFICE / COMMERCIAL Detached houses (mass housing) Detached houses (high end) Terraced houses Average standard apartments.290 745 1.370 1.420 3.380 420 550 615 - - - 3.180 1.420 2.180 1.&E.280 790 1. high rise Low cost housing Low cost flats.070 3.710 3.890 4.100 920 1.180 8. ditto HOTELS Average standard offices.600 1. inclusive of F.F.065 2.815 1.910 1. high rise (<15 levels) DOMESTIC 3.820 1.475 2.850 9.030 1.18 Resort hotels.530 4.820 580 800 970 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR KUALA LUMPUR CONSTRUCTION COST DATA . 3-star budget hotels.900 445 600 710 BUILDING 1.110 5.190 520 700 820 - - - TOTAL 5.005 1.110 1.375 7.635 1. high rise Luxury apartments.550 2.990 3.050 1.190 1. 115 650 705 900 1.865 - 900 1.330 1.010 1. OTHERS Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories.650 1.980 .405 930 1.295 1.020 1.170 1.155 1. low rise INDUSTRIAL - - - 2.235 375 210 195 250 555 360 495 530 590 - - - 620 290 215 300 660 515 605 690 745 1.790 1.760 The above costs are at 4th Quarter 2015 levels.620 1.430 820 805 970 1.110 1.050 1.&E.490 860 900 1.270 2.670 2.F.420 1.150 2. Basement car parks (<3 levels) Elevated car parks (<4 levels) Primary and Secondary schools Student hostels Sports clubs inclusive of F.990 1.430 1.CONSTRUCTION COST DATA 19 - - 970 1. inclusive of preliminaries (10%) but exclusive of contingencies. ditto 5-star luxury hotels. high rise Luxury apartments.180 2.025 1. low rise (<6 levels) Low cost flats.100 1.360 1.530 1.790 2.910 605 825 985 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR JOHOR BAHRU CONSTRUCTION COST DATA .235 8.&E.440 6. high rise Prestige offices. ditto HOTELS Average standard offices.285 2.230 1.190 SERVICES RM/m2 4.505 2.900 2.700 1.610 1. high rise Shopping centres OFFICE / COMMERCIAL Detached houses (mass housing) Detached houses (high end) Terraced houses Average standard apartments.855 9.930 775 1.425 430 570 620 - - - 3.920 2.430 3.305 3.445 855 600 675 200 250 575 105 155 205 - - - 800 845 345 450 875 135 205 260 1. inclusive of F.375 1.650 1.575 1.935 1.495 4.730 3.935 3.660 2.050 1. high rise Low cost housing Low cost flats.060 1.035 470 620 725 BUILDING 1.105 5.160 2.290 795 1. high rise (<15 levels) DOMESTIC 3.125 3.430 2.735 3.490 2.365 7.835 4.350 2.20 Resort hotels.305 3.620 3.500 2.F.595 4.180 3.000 535 725 825 - - - TOTAL 5.215 1.420 2. 3-star budget hotels.250 1. 350 2.025 1.050 2.765 1.&E.805 The above costs are at 4th Quarter 2015 levels.460 1.190 1.460 1.015 .705 2.360 1.140 855 840 1.650 2.900 - 915 1.445 1. OTHERS Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories.170 1.CONSTRUCTION COST DATA 21 - - 985 1.425 935 1.815 1. low rise INDUSTRIAL - - - 1. Basement car parks (<3 levels) Elevated car parks (<4 levels) Primary and Secondary schools Student hostels Sports clubs inclusive of F.F.055 1.105 1.240 280 200 195 250 560 375 500 545 615 - - - 305 250 215 300 660 535 600 715 775 1.230 870 930 1.315 950 670 735 945 1.105 1. inclusive of preliminaries (10%) but exclusive of contingencies.195 2. 885 850 1. high rise Luxury apartments. ditto HOTELS Average standard offices.650 7.750 1.700 5.870 1.335 2.425 1.750 1.255 3.920 970 1. high rise (<15 levels) DOMESTIC 2.320 2.450 1.100 580 785 930 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR PENANG CONSTRUCTION COST DATA .405 1.710 850 1.720 3. 3-star budget hotels.475 8.120 2.585 945 SERVICES RM/m2 3.900 700 920 1. high rise Shopping centres OFFICE / COMMERCIAL Detached houses (mass housing) Detached houses (high end) Terraced houses Average standard apartments. high rise Prestige offices.270 1.650 1. low rise (<6 levels) Low cost flats.125 950 1.250 470 600 700 BUILDING 1.950 1.600 450 550 620 - - - 3.675 1.025 6.750 4. high rise Low cost housing Low cost flats.350 745 900 810 150 275 740 85 142 195 - - - 950 950 300 400 850 110 185 230 1.100 1.375 1.965 1.125 4.975 3.F.340 535 692 815 - - - TOTAL 4.660 5.850 2. inclusive of F.615 2.600 1.22 Resort hotels.195 2.&E. ditto 5-star luxury hotels.535 1.485 2.650 2.700 2.325 2.620 2.300 2. OTHERS Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories.060 2.145 1.550 - 760 905 1. inclusive of preliminaries (10%) but exclusive of contingencies.100 320 188 195 210 530 485 500 520 585 - - - 550 320 250 275 700 560 600 700 745 1. low rise INDUSTRIAL - - - 1.&E.840 1.130 1.845 .240 2.145 718 855 1.360 825 880 965 1.910 1.490 1.280 1.600 1.240 900 1.CONSTRUCTION COST DATA 23 - - 770 1.500 1.F.255 1. Basement car parks (<3 levels) Elevated car parks (<4 levels) Primary and Secondary schools Student hostels Sports clubs inclusive of F.465 1.490 The above costs are at 4th Quarter 2015 levels.765 930 1.080 1.000 825 530 660 850 1. 680 4.900 6. high rise Shopping centres OFFICE / COMMERCIAL Detached houses (mass housing) Detached houses (high end) Terraced houses Average standard apartments.140 1. high rise Low cost housing Low cost flats.890 3210 1.010 1.335 5.025 160 180 215 SERVICES RM/m2 4.040 1.270 2.&E.385 1.540 1. inclusive of F.255 525 680 795 - - - TOTAL 4.770 3.010 2.885 600 750 865 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR KOTA KINABALU CONSTRUCTION COST DATA .200 3.530 2.785 5.540 2.170 2.740 1.380 970 1. high rise (<15 levels) DOMESTIC 3.385 2.060 2.340 1.510 2.230 840 1.24 Resort hotels.130 1. 3-star budget hotels.710 3.380 1.400 840 410 970 275 345 905 115 160 205 - - - 1.920 3.600 970 515 1.935 1. ditto HOTELS Average standard offices. high rise Prestige offices. high rise Luxury apartments.350 7.480 2.285 8.090 1.025 1.400 4.195 330 410 1.095 3. ditto 5-star luxury hotels.135 1.880 9.350 410 520 590 - - - 3.580 2.355 3.240 750 1.510 2.350 3. low rise (<6 levels) Low cost flats.F.860 440 570 650 BUILDING 1.510 2. 930 1.520 1.280 960 650 700 920 1.755 .CONSTRUCTION COST DATA 25 - - 950 1.415 1.210 240 180 225 250 690 345 410 410 480 - - - 275 215 355 275 840 410 490 505 545 1.200 830 925 1.960 1.190 1.600 1.035 1. OTHERS Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories.&E.295 1.455 1. low rise INDUSTRIAL - - - 1.300 1.620 The above costs are at 4th Quarter 2015 levels.800 1.140 820 810 990 1. inclusive of preliminaries (10%) but exclusive of contingencies.170 2.F. Basement car parks (<3 levels) Elevated car parks (<4 levels) Primary and Secondary schools Student hostels Sports clubs inclusive of F.440 950 1.830 - 890 1.690 1.265 2.165 1.140 1. 050 5.300 4.165 1. 3-star budget hotels.000 1.600 825 470 815 165 300 860 120 165 170 - - - 1.050 1.650 598 830 880 - - - 3.650 650 850 940 BUILDING 1.625 1.950 4. high rise (<15 levels) DOMESTIC 2.650 800 1.565 1.020 1.750 1.F.700 2.650 2.550 1.860 1. high rise Shopping centres OFFICE / COMMERCIAL Detached houses (mass housing) Detached houses (high end) Terraced houses Average standard apartments.800 1. ditto HOTELS Average standard offices.800 1.620 2.860 1.510 718 995 1. inclusive of F.000 1.000 150 200 250 SERVICES RM/m2 4.050 - - - TOTAL 5.850 3.850 3.000 1.350 3. high rise Luxury apartments. ditto 5-star luxury hotels.100 1.480 950 1.190 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR KUCHING CONSTRUCTION COST DATA .700 1.070 4.380 2.770 2.350 7.870 3.150 1.180 1.900 1.120 9. low rise (<6 levels) Low cost flats.250 2.700 1.900 1. high rise Prestige offices.220 1. high rise Low cost housing Low cost flats.550 3.26 Resort hotels.250 1.&E.480 2.600 1.000 600 950 200 400 1.550 2.500 2.690 7.430 1.620 2.750 1. low rise INDUSTRIAL - - - 1.300 1.270 1.495 1.210 1.450 1.410 1.140 1.850 - 1.240 1.600 1.060 1.670 1.300 380 230 220 250 735 300 450 365 425 - - - 400 250 350 320 880 430 530 400 500 1.565 The above costs are at 4th Quarter 2015 levels.585 1.190 1.880 1.&E.760 1.450 2.100 1.670 2.360 960 1.350 2.F.100 1. OTHERS Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories.020 1.000 980 1.800 .115 870 1.200 1.150 1.830 1.CONSTRUCTION COST DATA 27 - - 890 1. inclusive of preliminaries (10%) but exclusive of contingencies Basement car parks (<3 levels) Elevated car parks (<4 levels) Primary and Secondary schools Student hostels Sports clubs inclusive of F.425 1. high end OFFICE / COMMERCIAL Apartments.030 1.1.1.360 2.1.1. high end Terraced houses.1.350 .370 1.646 627 .1.1.290 1.145+ 1.180 .722 .053 .471 2.442 .685 772 .750 .045 542 . average standard High rise offices.3.260 820 .112 1.750 .855 .180 .675 .215 .1.1. prestige quality Out-of-town shopping centre.930 .170 605 1.800 604 899 421 730 635 - 460 880 305 880 590 .698 926 .573 .528 1.885 965 .280 MANILA@ 2.103 1.116 1.983 576 .2.1. average standard Retail malls.730 .1.790 .2.2.075 .145 2.790 .1. high rise.092 813 1. average standard Detached houses.1.28 Budget hotels .3.075 1.093 .1.080 .829 .870 1.307 .840 2.375 1.2.145 2.067 .1.348 .175 825 1. high end DOMESTIC .960 1. mid market Business hotels .1.965 2.1.2.1.665 835 .492 .730 772 .544 1.453 789 .1.360 .599 636 879 342 922 JAKARTA# US$/m2 .685 1.537 .130 515 . high rise.1.1.3 star.596 .744 - BANGKOK* 575 . average standard Apartments.075 1.3.2.1.365 735 .1.343 813 .4/5 star Luxury hotels .930 .1.998 .663 1.075 .165 1.116 .167 .350 1.004 526 800 BRUNEI .2.870 860 1.292 1.149 .930+ 1.2.260 .1.1.930 SINGAPORE^ 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA .225 .5 star HOTELS Medium/high rise offices.505 .690 .1.310 .575 .920 .540 2.615 305 735 210 715 KUALA LUMPUR .805 599 .1.040 .1.2. 040 RM 4.00 1.765 690 .290 665 .765 1.465 305 .61 N/A 505 . above ground (<4 levels) Schools (primary & secondary) Students’ residences Sports clubs. @ Rates include 12% VAT.146 N/A 416 .425 560 .1.350 .145 N/A 740 .000 .640 .606 690 .1.1.385 Underground/basement car parks (<3 levels) Multi storey car parks.610 .562 B$ 1.843 . Owner operated factories.945 $ N/A 1.650 450 .930 945 . ^ Rates are nett of GST.37 1. # Rates are nett of VAT. 835 .1.475 510 . inclusive of preliminaries but exclusive of contingencies.40 2. multi purpose sports/leisure centres (dry sports) General hospitals .016 1.310 N/A N/A 998 . low rise.2.790 .913 713 .2. (Conventional single storey framed units).270 N/A N/A N/A N/A 449 .678 IDR 13.180 .750 N/A 442 .660 168 .496 310 .1. $ Open on all sides with parapet.2.943 511 .33 475 255 235 295 610 Exchange Rate Used : US$1 = 345 200 210 265 560 - 415 .1.750 2.814 375 .560 460 .343 287 .CONSTRUCTION COST DATA (Cont’d) 29 BAHT 35.720 610 .945 .1.1.public sector OTHERS Industrial units.460 The above costs are at 4th Quarter 2015 levels.310 PHP 47. * Rates exclude VAT. light weight industry INDUSTRIAL S$ 1. + Includes raised floor and ceiling to tenanted areas but excludes office carpets (normally under tenant’s fit-out).541 287 . shell only. 340 .635 3.5.305 .690 3.183 1.110 N/A 605 765 405 465 HO CHI MINH# US$/m2 4.875 MACAU$ 1 (Cont’d) CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR SELECTED ASIA CITIES CONSTRUCTION COST DATA .475 2.4.3.127 .3.650 3.690 4.210 .240 .590 N/A 1.295 .364 1.420 480 .3.535 2.960 3.4. high rise.340 5.710 .710 3.655 3.170 .4.1.4.710 .3.130 .180 .350 HONG KONG^ 3. prestige quality Out-of-town shopping centre.347 .510 . mid market Business hotels .510 375 .1.646 .629 1.970 4.475 .197 .1.3.363 525 . average standard Detached houses.5.355 .080 .2.3.140 .320 .340 1.1.30 Budget hotels .2.235 3.960 655 .690 .979 2.5.743 - SEOUL# 385 .235 .535 2.4.069 2. high rise.4.035 .315 3.5.430 .3.1.620 . high end Terraced houses.860 710 .3.093 1. average standard High rise offices.1. average standard Retail malls.3 star.330 4. average standard Apartments.1.310 .6.805 1.720 4.4.1.562 .2.391 .5 star HOTELS Medium/high rise offices.690 1.940 4.981 N/A 2.820 .306 .1.3. high end DOMESTIC 725 .425 4.585 1.4.505 .6.825 815 . high end OFFICE / COMMERCIAL Apartments.140 .710 4.580 .030 5.570 585 930 375 485 1.410 510 775 350 460 INDIA* - 755 885 475 565 1.1.920 .4/5 star Luxury hotels .010 .210 .4. 540 .2.355 HK$ 7.380 660 .950 3.136 N/A 942 .5. low rise.155 .730 2.public sector Exchange Rate Used : US$1 = OTHERS Industrial units. ^ Offices of average standard are built to the following provisions: (i) Curtain wall/window wall facade (ii) Tenant are with screeded floor.715 .415 2.2.640 270 215 270 300 560 KRW 1.505 1.1. shell only.1.370 .490 2. multi purpose sports/leisure centres (dry sports) General hospitals .130 . * Rates are based on projects in Bangalore and are nett of VAT and Service Tax.950 1.830 2. Underground/basement car parks (<3 levels) Multi storey car parks.590 . above ground (<4 levels) Schools (primary & secondary) Students’ residences Sports clubs.410 N/A 605 385 505 505 755 - 360 .836 300 .3. Owner operated factories. inclusive of preliminaries but exclusive of contingencies.488 N/A 725 425 555 655 805 VND 22.2.382 . light weight industry INDUSTRIAL MOP 7.060 N/A The above costs are at 4th Quarter 2015 levels.2.1. Mumbai costs are generally 8% higher.470 .4. (Conventional single storey framed units).757 N/A 1.810 2.80 5.375 250 195 245 270 535 - 305 .1.080 .109 581 .1.2.CONSTRUCTION COST DATA (Cont’d) 31 INR 65. $ Rates are exclusive of any management contract fee. # Rates are nett of VAT and contingencies.970 .955 .475 N/A 320 . painted wall and ceiling Schools (primary and secondary) are of public authority standard.990 N/A N/A N/A .00 585 . no a/c and complete with basic external works.98 N/A 1.410 .870 1. high end OFFICE / COMMERCIAL Apartments.890 1. average standard High rise offices.195 1.155 720 .650 630 .930 N/A 1.1.195 .290 1.1. high rise.820 1.215 740 .2.836 1.1.795 .715 900 .2.700 .630 1. high end Terraced houses.655 .175 .645 1.085 1.1.715 .750 .245 2.930 N/A 1.695 945 .1.1.875 845 .270 .795 .1.245 1. average standard Apartments.1.1.740 520 860 385 520 CHONGQING/ SHENZHEN/ SHENYANG* CHENGDU* GUANGZHOU* BEIJING* 1.010 .110 .1.170 1.475 929 .1.140 . high rise.1.2.215 .1.1.010 .125 N/A 980 .1.1.645 .905 1. prestige quality Out-of-town shopping centre.495 490 785 385 530 755 .095 1.1.470 .1.080 1.190 .32 Budget hotels .100 .480 .155 .930 .215 1. average standard Detached houses.1.4/5 star Luxury hotels .1.495 1.385 1.1.045 .2.960 1.160 .750 900 .195 805 .695 .010 .1. average standard Retail malls.1.070 415 560 DALIAN* 1 CONSTRUCTION COST DATA (Cont’d) CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA . high end DOMESTIC 520 865 390 535 - 575 955 435 590 975 .1.800 .000 695 .585 .750 2.180 1.1.835 675 1.625 1. mid market Business hotels .575 .795 .260 815 .260 666 .1.2.025 .480 .2.830 560 1.645 450 675 SHANGHAI* US$/m2 - 590 965 445 565 980 .110 .1.1.065 .3 star.190 2.040 .5 star HOTELS Medium/high rise offices.245 .645 .415 N/A 630 .245 .2. 35 N/A 330 .695 380 .1. shell only.615 .35 795 390 435 280 815 N/A 500 355 395 250 740 - N/A 495 .525 Students’ residences 975 .35 1. * Houses are built to shell and core standard only.535 930 .1.050 Underground/basement car parks (<3 levels) Multi storey car parks.675 Schools (primary & secondary) 375 . light weight industry INDUSTRIAL RMB 6. no a/c and complete with basic external works.35 N/A RMB 6.585 525 .395 N/A N/A N/A 440 . where all tenant or occupant areas are unfurnished.600 750 .625 350 . inclusive of preliminaries but exclusive of contingencies.195 Sports clubs.535 535 .1.public sector Exchange Rate Used : US$1 = RMB 6.850 455 .1.35 N/A 365 . above ground (<4 levels) 375 .35 OTHERS Industrial units.495 .545 RMB 6.560 770 . low rise.245 .945 General hospitals . (Conventional single storey framed units). * Schools (primary and secondary) are of public authority standard.1.245 N/A 535 . Owner operated factories. multi purpose sports/leisure centres (dry sports) 1. N/A RMB 6.375 N/A N/A N/A N/A N/A The above costs are at 4th Quarter 2015 levels.525 525 .380 N/A N/A N/A N/A N/A 560 .CONSTRUCTION COST DATA 33 N/A N/A N/A RMB 6. 4.4.23.0 395.64mm profiled steel sheeting 13.0 3.0 290.0 38.0 .7 KOTA KINABALU 360.5 80.20.0 65.0 .0 55.0 220.0 . Sawn formwork to soffits of suspended slabs 10. Excavating basement ≤ 2m deep 2.0 .3.0 44.0 m2 m2 350. “Kliplok Colorbond” 0. Mild steel rod reinforcement 8.320.50.0 100. Aluminium casement windows.0 20.270.0 44.0 .0 kg 3.0 .45.0 .20.8 KUCHING 1 CONSTRUCTION COST DATA MAJOR RATES FOR MALAYSIA CONSTRUCTION COST DATA .0 14.0 3.0 .45.0 30.420.0 20.0 13.6 .0 30.60.5m deep 3.0 .0 .3 KUALA LUMPUR RM 285.0 .0 22. Hardcore bed blinded with fine materials 5.120.0 .40. Reinforced concrete grade 30 7.0 .280.65.0 .0 .0 55.0 .8 3.92.0 JOHOR BAHRU 250.0 40.70.0 12.0 96.0 35.75.1 .5 17.60.3 kg 3.0 .25.0 98.5 .0 m3 260.0 .0 18.0 .7 65.0 345.380.0 .0 .0 .0 300.0 45.0 m3 60.0 100.0 .0 38.0 20. single glazed 34 .0 m3 15. Mass concrete grade 15 6.40. 112.350.0 230.0 46.0 . High tensile rod reinforcement 9. Sawn formwork to columns and walls 11.3.5 12. Excavating for footings ≤ 1.0 330.7 3.0 55.500.0 3.0 m3 240.0 .0 390.2 3.0 220.0 .27.0 95.0 .31.0 3.21.2 PENANG m2 m2 m2 m3 15.0* 40.45.0 .0 3.0 20. Remove excavated materials off site 4.0 .0 m3 20.3.5mm thick brick walls 12.260.26.8 .0 47.1.3.0 .20.0 16.1 .0 52. 0 . Steelwork .0 9. Two coats of emulsion paint to plastered surfaces 7. Structural steelwork .6 6.0 .0 6.50 22. stanchions and the like 15.0 9.2 23.0 .5 40.0 .7. channels.45. 25mm cement and sand (1:3) paving 17. * Rates is for “Kliplok Colorbond” 0.14.5 - 8.9.0 3.8.22.2 .0 .5 - The above costs are at 4th Quarter 2015 levels.8.0 .35.0 24.5 . 6.0 .12.0 6.0 12.CONSTRUCTION COST DATA 35 6. Ceramic tiles bedded to floor screed (measured separately) 19.0 6. 12mm fibrous plasterboard ceiling lining 20.5 kg m2 m2 m2 m2 m2 % Average expected preliminaries 9.5 3.beams.0 .0 .22.54mm profiled steel sheeting.35.0 kg 14.28.75.0 48.0 6.0 8.0 7. exclusive of contingencies and preliminaries.0 .0 . 20mm cement and sand (1:4) plaster to walls 18.0 25.0 25.5 .0 5.25.0 - 7.70.0 15.0 6.4.50.40.0 .50 25.0 .0 . flats and the like 16.0 8.0 50.5 .0 - 3.5 - 10.0 8.0 15.angles.0 .0 6.6 12.0 35.0 55.0 78.80.5 - 3.0 15.0 35.0 60.0 .0 100.50 50. Sawn formwork to columns and walls 11.750 3. Mass concrete grade 15 6.45 .00 . “Kliplok Colorbond” 0.1.00 3.200 10 10 190 170 170 JAKARTA IDR’000 * 95 95 250 1.20 .40 SINGAPORE@ S$ 1 CONSTRUCTION COST DATA MAJOR RATES FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA .600 23 22 420 420 700 BANGKOK* BAHT 3. Excavating basement ≤ 2m deep 2.30 .200^ 130 . Structural steelwork .500 42 43 900 850 N/A MANILA PHP 4.30 -3.20 .60 350 . High tensile rod reinforcement 9.320 -3. Hardcore bed blinded with fine materials 5.00 15 . single glazed 14.20 9 58 160 .5m deep 3.80 . Remove excavated materials off site 4.65 0.1.200 2.8.050 1. 112.50 BRUNEI B$ 25 25 60 250 1. Steelwork .5. Sawn formwork to soffits of suspended slabs 10.64mm profiled steel sheeting 13.20 . Aluminium casement windows.1.50 3 3 43 124 130 0.20 .8. Excavating for footings ≤ 1.280 .5.50 3.210 3. 25mm cement and sand (1:3) paving 36 55 . stanchions and the like 15.80 21 43 290 20 20 15 . channels. Reinforced concrete grade 30 7.80 4.45 .70 .80 .50 15 15 20 60 240 260 3. Mild steel rod reinforcement 8.000 120 120 120 650 2.20 50 190 .beams.200 7.500 6.200 35 45 38 370 1.5mm thick brick walls 12.500# 220 250 145 784 2.00 6.30 1.100 10.angles.00 .00 38 38 45 m3 m3 m3 m3 m3 m3 kg kg m2 m2 m2 KUALA LUMPUR RM 55 55 200 1. flats and the like 16.25 .30 42 42 35 .65 15 15 17.22 m2 m2 kg kg m2 .135 1. 12mm fibrous plasterboard ceiling lining 20. @ Rates are nett of GST.70 35 .CONSTRUCTION COST DATA (Cont’d) 37 15 .4.10 150$ 75 160 220 12 . 6mm thick. Ceramic tiles bedded to floor screed (measured separately) 19. # Aluminium with anodized finish.200 5 5 .8 28 8 33 25 6 .50 .50 .45 3.18 965 275 1.17 The above cost are based on lump sum fixed price contract rate exclusive of preliminaries and contingencies unless otherwise stated. 17. ^ Rate for lean concrete blinding.00 13 . 20mm cement and sand (1:4) plaster to walls 18. Two coats of emulsion paint to plastered surfaces Average expected preliminaries .22 50 .12 m2 m2 m2 m2 % 120 12 .50 6 . $ 9mm gypsum board.4.18 800 220 1.600 30 22 74 3. * Rates are nett of VAT. 660 3.940 68.5 57.930 1.400 29.203.1.84.000 1. Mass concrete grade 15 6.4 76.35 8.200 1.4 . 112. flats and the like 16. Excavating basement ≤ 2m deep 2.5 70.0 .425 5.9 1.0 .0 .7 28. single glazed 14.950 225 205 280$ 950 1.75.beams.2 2.160 39.400 9.angles.3 235. 25mm cement and sand (1:3) paving 38 175 195 N/A 4.4 .5m deep 3.000 1. Hardcore bed blinded with fine materials 5.100 1.5 494. Sawn formwork to soffits of suspended slabs 10.400 44. stanchions and the like 15.378 .300 8 8 280 280 500 MACAU MOP 1 CONSTRUCTION COST DATA MAJOR RATES FOR SELECTED ASIAN CITIES (Cont’d) CONSTRUCTION COST DATA .025 5.000 120 140 90 1.850 63 65 600 650 940 1.546.4 . Sawn formwork to columns and walls 11.787 .386.64mm profiled steel sheeting 13.77.19.50 9.50 27 N/A 815+ 26 31 37 170 433 517 4 4 85 73 72 HO CHI MINH^ BEIJING VND (’000) RMB 38 42 140 880 2.7 184.8 350.400 1. “Kliplok Colorbond” 0. channels. Reinforced concrete grade 30 7.0 .0 198.63.1. Excavating for footings ≤ 1.5mm thick brick walls 12.218.3 .2 .17.28.6 .2. Aluminium casement windows.200 64.300 321.250 103 103 400 m3 m3 m3 m3 m3 m3 kg kg m2 m2 m2 m2 m2 kg kg m2 INDIA* INR 1. Mild steel rod reinforcement 8.280 29.1.5 16. Remove excavated materials off site 4.900 29.400 78.976 17.700 SEOUL# KRW 26.3 .0 . High tensile rod reinforcement 9. Structural steelwork .5 .50 420 420 420 HONG KONG HK$ 38 43 120 N/A 4.660 1.523 1.930 9.240 1. Steelwork .8 9.31.660 .650 6.260. 10 162 28 140 60 10 .6 239.3 82. 20mm cement and sand (1:4) plaster to walls 18.450 1.15 570 145 380 200 6 .11 26.100 210 8 .400 77. 17.0 .870 6 .300 64.7 32 7 . * Rates are supply & fix based on projects in Bangalore and are nett of VAT and service Tax.CONSTRUCTION COST DATA (Cont’d) 39 340 1.8 8 .500 9. ^ Rates are nett of VAT.90.12 283. $ Rate including dumping charges.5 .7 . + Rate for double glazed window. Mumbai costs are generally 8% higher.313.85. Two coats of emulsion paint to plastered surfaces Average expected preliminaries .264.5 . # Rates include labour costs and are nett of VAT.12 m2 m2 m2 m2 % 7. Ceramic tiles bedded to floor screed (measured separately) 19.12 650 150 500 The above costs are based on lump sum fixed price contract rate exclusive of preliminaries and contingencies unless otherwise stated. 12mm fibrous plasterboard ceiling lining 20. 40 3.50 8. Excavating for footings ≤ 1. Hardcore bed blinded with fine materials 5.00 80 80 60 SHENZHEN/ GUANGZHOU RMB 9.50 50 50 65 CHONGQING/ CHENGDU RMB 10 8 30 N/A 525 30 25 65 180 449 484 5.40 84 84 85* N/A 690 10 8 25 m3 m3 m3 m3 m3 m3 kg kg m2 m2 m2 m2 m2 kg kg m2 SHANGHAI RMB 8. “Kliplok Colorbond” 0.64mm profiled steel sheeting 13.20 4.50 28 N/A 700+ 18 25 52 150 340 360 3. channels. 25mm cement and sand (1:3) paving 40 30 30 98 165 320 420 3.80 9. flats and the like 16. single glazed 14. High tensile rod reinforcement 9. Aluminium casement windows.80 37 N/A 700+ 28 33 30 170 420 500 4. 112. Sawn formwork to soffits of suspended slabs 10. Reinforced concrete grade 30 7.1.20 90 90 70 SHENYANG RMB 9. Structural steelwork . Steelwork .5mm thick brick walls 12.20 92 92 70 DALIAN RMB 1 (Cont’d) CONSTRUCTION COST DATA MAJOR RATES FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA .angles.5m deep 3.00 5. Excavating basement ≤ 2m deep 2.80 9. Mild steel rod reinforcement 8.beams.20 4.50 3. stanchions and the like 15. Remove excavated materials off site 4. Sawn formwork to columns and walls 11.80 25 N/A 700+ 22 25 35 150 410 500 4. Mass concrete grade 15 6. 10 m2 m2 m2 m2 % 35 5 . + Rate for double glazed window. 17. 20mm cement and sand (1:4) plaster to walls 18. Ceramic tiles bedded to floor screed (measured separately) 19.10 180 25 150 30 5 .10 140 40 140 The above costs are based on lump sum fixed price contract rate exclusive of preliminaries and contingencies unless otherwise stated. * Rate for 120mm thick concrete block walls.10 120 32 120 30 5 . 12mm fibrous plasterboard ceiling lining 20. Two coats of emulsion paint to plastered surfaces Average expected preliminaries .10 120 26 165 32 5 .CONSTRUCTION COST DATA 41 26 155 150 39 5 . 1 CONSTRUCTION COST DATA ACMV COSTS FOR VARIOUS DESIGNS & DEVELOPMENTS IN KUALA LUMPUR ACMV : Air Conditioning & Mechanical Ventilation System RM/m2 of Construction Floor Area 500 400 400 350 360 300 250 260 200 210 100 0 Central Variable Air Volume Central Constant Air Volume Central Variable Refrigerant Volume RM/m2 of Construction Floor Area 500 450 400 391 300 310 450 400 350 280 278 Hotel Commercial Complex 280 190 200 200 90 100 100 60 42 Factory Residential Office Academic Institution Hospital 0 CONSTRUCTION COST DATA . RM/Tonne of Refrigeration 8000 7400 6000 6650 6000 4500 5200 4000 4000 2000 0 Central Variable Air Volume Central Constant Air Volume Central Variable Refrigerant Volume RM/Tonne of Refrigeration 10000 8500 8400 7500 7600 7500 7500 6600 6500 5000 5000 6200 4600 2500 2000 2000 1300 1200 CONSTRUCTION COST DATA Commercial Complex Hotel Factory Residential Office Academic Institution Hospital 0 43 . 500 4.1.600 2.600 5.000 $ MANILA PHP/m2 30 20 100 50 80 170 55 195 170 105 165 35 140 160 95 - - - 60 40 190 90 155 275 145 380 325 245 270 125 300 265 180 SINGAPORE^ S$/m2 1 CONSTRUCTION COST DATA M&E COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA .700 .600 2.040 .300 4.1.790 1.000 650 3.1.800 4.500 6.400 - @ BANGKOK BAHT/m2 16 11 61 12 38 233 194 292 221 252 181 23 292 207 214 - - - 39 19 84 41 60 292 233 381 317 317 226 39 336 246 246 BRUNEI B$/m2 190 110 790 190 770 780 440 790 690 780 965 300 965 855 855 .500 3.110 .000 3.290 .870 .650 790 .400 1.500 790 .950 700 1.1.800 - 4.400 1.000 6.400 4.950 1.010 3.100 4.690 .44 Offices Industrial Hotels Shopping Centres Apartments HYDRAULIC SERVICES Offices Industrial** Hotels Shopping Centres Apartments ELECTRICAL SERVICES Offices Industrial* Hotels Shopping Centres Apartments MECHANICAL SERVICES 26 37 180 26 20 230 144 255 210 88 360 62 290 300 210 - - - 59 46 250 35 50 470 160 600 280 220 475 90 465 410 295 KUALA LUMPUR RM/m2 3.000 1.300 2.800 2.110 .000 1.500 9.300 5.040 .910 750 .060 3.1.110 # JAKARTA IDR’000/m2 900 700 1.1.200 .200 4.300 .400 3.140 .950 3.400 .110 .350 4.1.600 4.800 1.600 3.400 3.000 4.000 2.550 4.500 600 - - - 2.200 3.1.030 .1.1.000 6.700 3.1.000 1.290 .700 6.200 .800 2. Rates for Electrical Services are excluding genset.180 N/A 1.050 .100 700 600 700 700 650 70 45 70 60 45 35 25 35 40 25 - 180 115 120 100 125 60 55 60 60 55 The above costs are at 4th Quarter 2015 levels.000 595 .200 900 1. Offices Industrial Hotels Shopping Centres Apartments LIFTS / ESCALATORS Offices Industrial Hotels Shopping Centres Apartments FIRE SERVICES . Rates for Hydraulic Services are excluding STP.000 800 .090 320 .200 250 . ^ Rates are nett of GST and excluding BAS.1.170 N/A 430 . @ Based upon nett enclosed area and nett of VAT. $ Transformer included in Electrical Services.870 250 110 270 270 270 - 1.2.1.870 420 . # All rates are nett of VAT. Rates for Mechanical Services refers to ACMV Rates only.3.900 N/A 1.600 .300 1.580 780 730 780 780 720 9 4 12 12 11 32 12 26 32 26 - 32 19 45 36 26 39 19 49 66 52 - 390 200 390 310 310 430 . ** Excludes special power supply.2.1.CONSTRUCTION COST DATA (Cont’d) 45 88 55 85 85 63 60 45 65 65 20 - - 400 190 370 110 105 80 65 95 85 25 - 850 750 890 820 850 1. exclusive of contingencies unless otherwise stated.200 1.1.450 500 .300 1.2. * Generally without air condition.800 .100 . 085 2.200 2.474 N/A N/A N/A 1.647 2.550 - 3.700 5.900 1.2.429 N/A N/A N/A 1.445 980 1.825 2.1.500 6.600 .600 .2.195 3.000 200 2.1.534 N/A N/A N/A 546 .150 5.800 .350 2.037 .000 2.300 N/A N/A 2.2.225 4.005 795 5.500 .900 HO CHI MINH VND(’000)/m2 95 95 370 140 170 460 320 705 481 253 760 170 910 790 140 - 140 140 480 200 230 703 450 943 676 398 .500 5.2.000 .150 .100 2.3.100 2.965 5.500 1.775 2.750 .600 2.387 .2.050 3.410 BEIJING RMB/m2 600 450 1.3.500 900 2.800 1.250 1.050 .200 600 .250 4.300 850 2.600 .750 .750 2.100 MACAU MOP/m2 1 (Cont’d) CONSTRUCTION COST DATA M&E COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA .46 Offices Industrial Hotels Shopping Centres Apartments HYDRAULIC SERVICES Offices Industrial** Hotels Shopping Centres Apartments ELECTRICAL SERVICES Offices Industrial* Hotels Shopping Centres Apartments MECHANICAL SERVICES 36 23 74 30 51 210 130 300 180 140 230 96 223 155 99 - - - 59 33 115 60 78 395 190 490 262 189 301 165 353 255 180 SEOUL@ KRW(’000)/m2 665 450 3.796 .000 - - HONG KONG HK$/m2 N/A N/A 1.2.825 - 4.2.736 .250 1.800 300 2.280 .1.335 - 1.800 1.800 600 1.600 1.2.1.725 4.750 .1.195 1.750 2.500 .750 650 1.000 N/A N/A 2.269 1.765 2.865 INDIA# INR/m2 281 .725 5.200 3.850 1.600 .900 1.800 900 .2.950 .200 . Offices Industrial Hotels Shopping Centres Apartments LIFTS / ESCALATORS Offices Industrial Hotels Shopping Centres Apartments FIRE SERVICES .1.375 . Mumbai costs are generally 8% higher.1.165 N/A N/A 1.079 N/A N/A N/A 446 .800 450 .910 1.665 .561 294 145 232 327 175 180 150 220 220 70 - 577 400 520 520 289 265 225 375 375 135 700 550 550 850 450 550 400 600 550 150 700 500 850 700 250 .010 .050 505 1.1.850 .004 650 .165 .300 The above costs are at 4th Quarter 2015 levels.1. ** Excludes special power supply.100 600 .243 .485 795 1.200 .850 1.760 694 .1. # Rates are based on projects in Bangalore and are nett of VAT and Service Tax.600 N/A N/A 900 .700 450 .565 .275 1.670 611 . exclusive of contingencies unless otherwise stated.1.1.1. * Generally without air condition.1.850 N/A N/A 600 .010 555 - 1.800 250 .750 .1.115 730 1. @ Rates are nett of VAT.CONSTRUCTION COST DATA (Cont’d) 47 42 16 100 48 29 32 25 38 26 35 - - 67 26 175 84 41 65 38 85 70 68 875 565 1.225 1.000 . 220 .050 310 - - 163 131 488 184 226 651 431 830 651 368 .980 .150 .1.954 122 .1.339 707 .040 150 .280 CHONGQING/ CHENGDU RMB/m2 30 N/A 197 118 99 - 439 N/A 683 488 293 - 585 N/A 683 585 98 - 296 167 197 118 878 585 390 634 780 878 293 683 SHENYANG RMB/m2 69 N/A 197 118 99 - 458 N/A 702 507 215 - 585 N/A 683 585 98 - 296 167 148 118 897 605 312 673 780 683 293 683 DALIAN RMB/m2 1 (Cont’d) CONSTRUCTION COST DATA M&E COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA .410 SHANGHAI RMB/m2 122 86 391 112 145 530 306 680 483 278 - - 166 112 493 150 257 765 445 916 653 445 765 .980 .103 .071 .966 .268 1.1.380 SHENZHEN/ GUANGZHOU RMB/m2 60 60 280 60 100 420 250 500 400 220 680 130 720 580 90 - 120 120 350 120 180 650 350 750 650 330 .1.289 .265 .48 Offices Industrial Hotels Shopping Centres Apartments HYDRAULIC SERVICES Offices Industrial** Hotels Shopping Centres Apartments ELECTRICAL SERVICES Offices Industrial* Hotels Shopping Centres Apartments MECHANICAL SERVICES 110 89 368 137 168 593 305 651 520 252 761 173 971 1.1. Offices Industrial Hotels Shopping Centres Apartments LIFTS / ESCALATORS Offices Industrial Hotels Shopping Centres Apartments FIRE SERVICES 500 230 250 550 224 146 127 224 300 N/A 250 150 120 - 146 N/A 146 146 59 - 350 250 200 550 224 195 146 224 .CONSTRUCTION COST DATA 49 280 135 220 325 165 220 150 280 250 50 - - 550 390 495 495 325 300 250 380 380 100 294 150 241 326 122 224 139 278 247 64 - - 481 434 465 460 268 348 267 413 370 122 330 140 280 280 130 160 130 180 200 45 - 580 340 480 430 230 230 230 300 300 90 300 N/A 300 140 120 - 146 N/A 127 49 49 - The above costs are at 4th Quarter 2015 levels. * Generally without air condition. exclusive of contingencies unless otherwise stated. ** Excludes special power supply. per set 46. putting green 50 per set 275.600 per room 15. lighting and all accessories Size: 8’ x 8’ x 7’6” GOLF COURSES (Based on “Average Cost Model” of an 18 hole golf course in Asia). aluminium framed glass door.552.200 per room 18. per hole 2. Including fairway construction and rough hydro seeding.000 SAUNAS Sauna room complete with timber finishes (Finland Spruce). water proofing system. high impact projection screen.000 GOLF SIMULATOR Complete golf simulation system complete with projector. ceramic wall tiles. stainless steel heater with built-in control panel and all accessories Size: 8’ x 8’ x 7’6” STEAM BATHS Steam bath complete with steam generator.20 * Price varies according to equipment and design. artificial grass putting turf.000 CONSTRUCTION COST DATA .1 CONSTRUCTION COST DATA UNIT COSTS FOR ANCILLARY FACILITIES FOR KUALA LUMPUR DESCRIPTION UNIT RM PLAYGROUND EQUIPMENT Outdoor playground equipment comprising various activities and safety mat Age group: 4 to 12 Child Capacity: 15 . 800 Extra for heating equipment (solar) per pool 287. completed with 5m wide deck and associated equipment per pool 822.DESCRIPTION UNIT RM SQUASH COURTS Single court with glass back wall including associated mechanical and electrical services but excluding any public facilities (enclosing structure not included) per court 59.000 Size: 25m x 10.300 Extra for heating equipment (solar) per pool 172.5m Depth: approx.8m to 3.5m Depth: approx.000 TENNIS COURTS Single court on grade with acrylic surfacing complete excluding chain link fence SWIMMING POOLS CONSTRUCTION COST DATA 51 . 1.300 per court 60. including mechanical ventilation and associated equipment per pool 1. 1.500 Extra for ozone system per pool 241.500 Size: 25m x 10.8m Outdoor swimming pool built on ground.201.500 Extra for ozone system per pool 345.0m Indoor swimming pool built with suspended structure (enclosing structure not included) fully tiled and completed with 5m wide deck.2m to 1. fully tiled. drapery.above 5 .770 . crockery.4.070 . Includes furniture. cutlery. fax machines.080 Executive Office 1.1 CONSTRUCTION COST DATA FIT-OUT COSTS FOR KUALA LUMPUR DESCRIPTION RM/m2 HOTELS Public Area (Front of House): 2. Excludes partitioning.1.730 . 2. computers.star Hotel 3.star Hotel 4.g. bed.3. RESTAURANTS 2. linen.820 General dining restaurant 5. wall and ceiling finishes. air-conditioning and suspended ceiling to suit layout.star Hotel Notes: 1. Includes furniture. operational items (e. etc.260 . refrigerator etc.above 5 .800 3 .star Hotel 1. Includes furniture.2. utensils. sanitary fittings and light fittings. Local furniture allowed for general offices.470 3 . M&E works. chandelier.). linen.650 .above Fine dining restaurant Notes: 1.530 . office equipment (e. cutlery. building shell. television. 2.g.1. Local Area Network.750 4 . etc).above Prestige Office Notes: 1. crockery. OFFICES 490 660 General Office 660 . floor.460 . minor alteration to air-conditioning and fire services installation to suit layout.g.340 .star Hotel 2. 3. opening expenses. stage equipment and computer systems.UPS. wall and ceiling finishes.170 4 .150 . floor. exhaust for kitchen but excludes exhaust flue. partitioning.3.). operational items and equipment (e. Excludes telephones. photocopies. 52 CONSTRUCTION COST DATA . minor alteration to fire services.star Hotel Guest Rooms: 1. GENERAL CONSTRUCTION DATA JUBM .Employment & GDP Progress Payments 2 .Langdon & Seah Building Works Composite Tender Price Index (BWCTPI) JKR Tender Price Index Value of Construction Work Done Performance of Construction Sector Estimating Rules of Thumb Technical Specifications Average Unit Prices Unit Price Index Construction Sector Indicators Commodities Price Trend (Jan to Dec 2015) Malaysia Construction Sector . 9 152.0 Q1 2012 140.0 Q2 2012 154.3 143.0 141.4 Q3 2015 Tender Price Index Q4 2015 54 1H 2016 (f) 2 GENERAL CONSTRUCTION DATA JUBM .6 Q3 2012 147.100.0 167.0 Q4 2014 Q2 2014 180.0 110.3 Q4 2009 130.9 175.0 146.3 Q3 2014 170.7 133.5 149.0 Q1 2015 190.0 Q1 2013 160.3 154.0 135.0 170.5 166.0 Q2 2015 200.2 150.0 120.1 146.3 141.3 Q1 2014 Q4 2013 169.1 149.5 172.8 173.0 167.8 142.9 141.5 174.3 166.6 Q2 2013 169.2 Q4 2012 Q1 2009 150.LANGDON & SEAH BUILDING WORKS COMPOSITE TENDER PRICE INDEX (BWCTPI) GENERAL CONSTRUCTION DATA .4 Q3 2013 171.4 Q2 2010 Q1 2010 Q3 2009 Q2 2009 Base Year = 2000 Q3 2011 Q2 2011 Q1 2011 Source: JUBM & Langdon & Seah Q4 2011 Q4 2010 Q3 2010 137. 13 458.03 461. Malaysia 1/2 312.32 437.24 446.09 393.59 0 50 100 150 200 250 300 350 400 450 500 2006 2005 2002 Base Year = 1980 Source: Contract and Quantity Survey Branch.35 453.82 2011 2012 2013 2014 2015 411.GENERAL CONSTRUCTION DATA 408.36 429.62 426.68 427.49 415. Public Works Department (JKR).14 410.64 415.18 Year 2005 2006 2007 2008 2009 2010 2003 Tender Price Index 2004 TENDER PRICE INDEX JKR TENDER PRICE INDEX 55 2015 2014 2013 2012 2011 2010 2009 2008 2007 .99 N/A 2/2 312.56 412.44 441.49 420.03 398.76 446. 061 5.099 20.6 31.2 32.123 7.3 4.3 4.0 100.3 39.530 4.852 24.413 6.6 32.5 30.7 (%) Non-residential Buildings 8.869 7.340 1.0 8.6 25.5 32.253 8.382 6.813 7.6 32.760 5.4 24.8 5.373 884 1.1 26.4 34.0 100.0 100.8 4.1 29.0 100.4 32.8 35.202 7.431 6.006 9.714 7.2 7.036 4.7 26.0 Total RM million 2 GENERAL CONSTRUCTION DATA VALUE OF CONSTRUCTION WORK DONE BY TYPE OF CONSTRUCTION ACTIVITY GENERAL CONSTRUCTION DATA .5 28.191 15.253 6.5 5.8 26.4 31.603 8.0 100.973 25.180 4.9 34.087 1.052 982 1.166 5.598 8.376 1.6 5.057 RM million 30.227 Q1/2012 Q2/2012 Q3/2012 Q4/2012 Q1/2013 Q2/2013 Q3/2013 Q4/2013 Q1/2014 Q2/2014 Q3/2014 Q4/2014 Q1/2015 Q2/2015 Q3/2015 29.0 100.5 27.2 4.8 30.0 100.513 6.052 8.484 6.285 7.8 34.724 9.9 (%) Special Trade RM million 28.062 1.165 1.6 35.158 6. Department of Statistics Malaysia 3.363 3.6 5.3 33.4 27.0 22.1 8.3 38.8 4.0 100.0 100.834 24.661 (%) 100.717 22.1 4.0 42.2 34.0 100.3 28.7 4.162 5.301 27.173 25.119 7.4 43.0 100.4 33.239 28.280 1.610 RM million Residential Buildings Q1/2011 Q2/2011 Q3/2011 Q4/2011 Quarter / Year 1.3 (%) Civil Engineering Source: Quarterly Construction Statistics.741 27.8 38.399 8.775 4.6 27.0 100.5 25.613 22.578 6.288 9.9 35.1 5.192 1.958 RM million 34.6 36.657 7.330 8.9 30.937 8.355 6.606 8.4 34.8 28.0 100.1 23.56 4.0 100.349 20.059 8.692 17.6 34.0 29.5 34.141 1.835 4.491 3.037 17.167 7.5 28.025 7.598 6.418 9.086 7.050 7.006 5.6 36.726 20.5 33.4 34.086 1.041 16.1 (%) 10.0 100.222 1.807 7.3 28.0 100.0 30.0 100.320 1.0 100.885 5.838 8.2 5.4 30.753 8.157 8.7 4.667 9.335 1.519 15.401 22.201 8.4 30.5 27.3 5.275 915 1.1 26. 9 .099.500 22.8 10.000 27.2 14.0 16.000 25.7.00 15.0 Percentage Change (%) (QoQ) (YoY) (%) (10.741.973.000 20.364 24.00 25.000 28.2013 2014 GENERAL CONSTRUCTION DATA 8.883 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 No.8 0.5.00) (5.652 9.00 20.000 27.00 10.629 8.834.00) 0.00 5.2 5.00 Q1 2013 Q2 Source: Quarterly Construction Statistics.1 1.074 9.000 25.835 10.7 15.173.1 0.1 10.3 11.3 21.392 9.1 6.2 0.717.774 9.411 22.301.2 10.5 7.719 9.239.1 .851.875 9.613. of Project 24.6 12.000 9.7 9.6 11. Department of Statistics Malaysia 2015 Value of Construction Done (RM’000) Q3 Q4 Q1 2014 Q2 Q3 Q4 Q1 2015 Q2 Q3 Percentage Change (%) (YoY) Percentage Change (%) (QoQ) PERFORMANCE OF THE CONSTRUCTION SECTOR 57 .753 9.000 28.1 8.692.982 10. 5 m 3. ventilation duct.1 m 4.38m3 0. Taxis and Light Vans Coaches and Buses Lorries Container Vehicles Length Width Minimum Headroom 5 m 2.43m3 0.90m3 0.350 7.5 m 2.400 1.600 1.0 m 3.1.5 m Minimum headroom means the clearance between the floor and the lower most projection from the ceiling including any lighting units. Loading/ Unloading Bays and Lay-bys Private Cars.0 m3 5.441 1.2 GENERAL CONSTRUCTION DATA ESTIMATING RULES OF THUMB Composition of Concrete (per m3) Mix Cement Sand Aggregate 1:3:6 1:2:4 1:1:2 216kg 308kg 540kg 0. 58 GENERAL CONSTRUCTION DATA .5 m 3. conduits or similar.75m3 Weight of Concrete Items Item Weight Concrete Cement Sand Aggregate Steel 2.8 m 4.843 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 Average Loads Volume 10.45m3 0.450 m3 Lorry Concrete truck (24 ton) Barge Dimensions for Standard Parking Space.5 m3 200 .86m3 0.4 m 12 m 11 m 16 m 3. Structure Design . GENERAL CONSTRUCTION DATA 59 .0 m2/m2 0.5 m2/m2 1.4 m2/m2 Residential Apartments Office.Conditioning Average 0.42 m 15 .25 m The above dimensions are for a single court with appropriate clearance.6 m3/m2 Formwork/floor area 2.05 tonne/m2 of floor area The above ratios are indicative and for reference purposes only.120 m 70 .0 m2/m2 Reinforcement/concrete vol.3 m3/m2 to 0. No spectator seating or support area has been allowed.0 m2/m2 0.80 m 25 . Hotel Industrial Average Internal Wall/Floor Ratio 1. 160 kg/m3 to 250 kg/m 3 Average External Wall/Floor Ratio 1. Indicative Dimensions for Sports Grounds Tennis Court Squash Court Basketball Court Volleyball Court Badminton Court Rink Soccer Playing Feld Futsal Length Width 40 m 20 m 13 m 6 m 38 m 23 m 30 m 20 m 20 m 10 m 61 m 26 m 110 .2 m2/m2 to 3. They do not account for buildings with special shapes.5 m2/m2 Residential Apartments Office Hotel Air . configurations or particular small foot prints.4 m2/m2 0.Concrete Ratios The following is a range of concrete ratios for building superstructure design: Concrete/floor area 0. 0 6.99 Mass Per Unit Area Kg/m2 (all Ref.97 5.02 2.2 metres Sheets (Ref.0 7.0 metres Width : 2.60 BS 4483 or SS-32 Ref No.0 5.0 5. No’s: A4.0 6.0 8.5 6.0 5. No’s) Length : 6.0 metres Width : 2.0 10.0 metres Rolls STANDARD SIZES 2 GENERAL CONSTRUCTION DATA TECHNICAL SPECIFICATIONS Table for Standard BRC Fabrics GENERAL CONSTRUCTION DATA .0 8.5 6.53 3.0 200 200 200 200 200 200 200 200 100 100 100 100 100 100 100 100 100 100 100 100 100 6.0 9.0 6.0 5.0 8.0 8. No. A 10 A9 A8 A7 A 6/5 A5 A4 B 12 B 10 B9 B8 B7 B6 B5 C 10 C9 C8 C7 C6 C5 10.0 9.93 10.0 6.0 4.0 9.95 3.0 8.0 7.0 9.0 7.93 4.90 8.99 3.61 2.72 5.0 5.0 400 400 400 400 400 400 200 200 200 200 200 200 200 RECTANGULAR MESHES 200 200 200 200 200 200 200 200 785 636 503 385 283 196 1. A6.0 8.0 5.14 6.0 4.0 5.54 0.22 1.0 10.34 3.0 12.05 6.73 3.16 4.131 785 636 503 385 283 196 393 318 252 193 166 142 98 63 71 71 49 49 49 49 252 252 252 252 193 193 193 393 318 252 193 166 142 98 63 Cross-Sectional Area Main Wire Cross Wire Size Spacing Size Spacing Main Cross mm mm mm mm mm2/m mm2/m SQUARE MESHES 6.0 7. A 393 A 252 A 193 A 142 A 98 - B 1131 B 385 B 503 B 385 B 283 B 196 C 785 C 636 C 503 C 385 C 283 - BRC Ref. A5. A6/5 only) Length : 40.61 1.0 8.0 8.0 7.55 4.0 6.0 7.0 5.0 10.41 2.0 7. 065 * High Yield Deformed Bar Standard Length : 12 metres straight.5 113.854 4.068 1.8 804.3 50. GENERAL CONSTRUCTION DATA 61 .088 1.984 3.395 0.995 1.466 2.2 380.023 1.3 63.222 0. Size (mm) High Yield Mild Steel Sectional Weight 12m Length Per Bundle (MT) Deformed Round Area (mm2) (kg/m) Per Bundle D6 D8 D9 D 10 D 12 D 16 D 20 D 22 D 25 D 28 D 32 D 35 D 38 D 40 Ø6 Ø8 Ø9 Ø 10 Ø 12 Ø 16 Ø 20 Ø 22 Ø 25 Ø 28 Ø 32 Ø 35 Ø 38 - 28. * Mild Steel Round Bar Standard Length : 12 metres straight or 12 metres once folded.1 201.1 490.834 6.6 0.006 1.2 962.903 9.044 1.313 7.Weight Tables for Mild Steel Round Bar & High Tensile Deformed Bar Unit No. quality per size per order upon request.1 1. * Special cut length can be produced from 6m to 15m on a certain min.553 8.1 314.256.616 0.1 1.9 615.023 1.864 376 210 168 138 96 54 34 28 22 18 14 12 10 9 1.003 1.6 78.002 0.888 1.006 1.579 2.134.499 0.020 1. Weight Cross Std.017 1. of Pcs.061 1. Source: Special Release 1.00 2.00 2.47 38.70 1.380.690.93 1.17 2.00 1.90 1.80 1.48 A 17.430.67 37.31 2.230.380.70 1.14 37.14 C Ordinary Portland Cement RM/50 kg Bag 2 GENERAL CONSTRUCTION DATA AVERAGE UNIT PRICES GENERAL CONSTRUCTION DATA .31 Bitumen RM/Metric Ton Fuel Oil RM/Litre A 44.00 39.17 2.00 C 2.31 2.00 2.17 2.02 19.650.89 18.67 38.95 1.240.05 1.00 1.230.02 18.00 2.00 2.240.31 2.00 2.95 2.17 2.00 2.68 46.52 18.71 19.420.00 2.02 36.31 2.00 39.80 1.00 2.00 2.66 36.250.02 48.230.200.62 B 2.52 18.52 18.17 2. Department of Statistics.00 2.44 48.89 B 17.31 2.240.00 1.03 19.60 18.17 2.00 2.03 19.90 1.95 1.17 2.05 2.00 1.700.00 2.17 2.380.14 37.95 1.380.67 37.00 1.69 19.90 1.430.03 19.95 2. C = Kuching December rates are not available at time of printing.90 A 1.200.03 19.95 1.54 19.83 36.230.17 2.95 2.420.87 47.84 17.00 1.05 1.95 1.440.00 2.00 1.33 39.14 37.00 1.00 2.03 19.17 Region N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 80/100 Penetration Medium 2015 2.980.16 46.66 36.93 1.82 19. For Civil Engineering Works.31 2.650.31 2.95 1.14 37.69 19.430.02 48.70 1.66 37.16 44.90 Diesel Retail Price Automative Gas Oil RM/Litre Region: A = Central Peninsular Malaysia.52 18.05 2.92 18.93 1.00 Sand RM/Metric Ton 18.33 39.00 2.03 19.95 1.690.380.000.56 19.00 2.980.31 2.00 39.31 2.00 1.02 48.14 37.68 19.95 1.58 18.31 2.00 1.11 44.00 2.63 19.230.05 2. B = Kota Kinabalu.700.51 B River Sand C 37.53 19.650.80 1.00 A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov C B A 2.02 48.92 17. 2.90 B C 1.05 1.00 1.67 39. Malaysia.14 36.00 2.84 17.92 17.650.95 1.84 19.00 2.17 2. 00 23.57 C .57 25.73 32.83 62.11 31.57 25.29 31.22 29.42 30.83 62.40 25.44 32.62 53.50 23.44 33.40 25. C = Kuching December rates are not available at time of printing.24 31.22 26.00 41.00 36.90 31.04 32.65 41.18 28.18 28.65 41.00 C Granite 20mm (3/4”) 52.88 60.62 53. For Civil Engineering Works.62 53.00 36.32 32.83 62.65 41.87 A 41.00 41.35 25.00 36.40 C Granite 40mm (11/2”) 29.41 42.80 24.00 36. Malaysia.87 24.18 28.93 25.40 25.48 34.95 23.73 30.28 32.00 52.71 31.41 B Crusher run 21.61 23.75 41.62 53.88 62.42 31.40 60.41 42.53 31.41 42.83 62.18 27.83 B 34.00 23.18 28. B = Kota Kinabalu.00 36.05 24.32 32.41 42.69 24.65 41.68 30.53 32.38 A 59.62 B 23.18 28.65 41.32 32.00 52.48 36.40 25.00 53.00 41.41 42.18 C 26. A Granite 10mm (3/8”) Region 2015 Aggregates RM/Metric Ton 23.75 42.57 25.GENERAL CONSTRUCTION DATA 63 30.57 25.00 36.40 25.62 53.49 31.40 59.00 36.40 25.63 23.41 31.18 33.57 25.41 42.48 34.69 24.31 29. Department of Statistics.75 41.06 31.57 25.98 28.88 60.61 24.65 41.65 41.31 30.41 42.40 25.93 32.62 54.38 27.26 32.65 B 26.04 A Region: A = Central Peninsular Malaysia.40 59.04 31.18 28. Source: Special Release 1.62 53.18 28.44 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 41.87 24.95 23.92 25. 9 104.7 105.9 104.5 69.1 110. Source: Special Release 2.2 113.5 Roofing Materials 100.5 109.9 108.5 106.6 103.0 96.6 106.0 98. Negeri Sembilan and Selangor Region.4 109.5 108.8 69.9 112.1 112.8 68.3 113.2 112.9 104.1 102.2 113.5 107.7 109.4 109.2 113.7 112.8 Sanitary Fittings 100.2 113.1 106.7 104.2 100.5 112.0 105.1 112.0 112.8 2 GENERAL CONSTRUCTION DATA UNIT PRICE INDEX GENERAL CONSTRUCTION DATA .5 108.7 107.0 105.5 111.5 107.6 108.9 112.6 Ceiling Materials 99.4 2015 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Glass 106.6 97. For Building and Structural Works.7 104.9 97.0 100. Melaka.2 105.6 107.0 113.4 109.4 108.7 99.9 108.6 112.3 113.8 100.3 112.5 100.1 112.7 108. Malaysia.4 98.3 100.7 99.3 74.4 Timber 97.5 108.7 98.2 107.5 111.8 68. Bricks & Wall Steel & Metal Sections 94.7 108.2 109.9 111.8 68.0 100.6 Plumbing Materials Note: July 2012 = 100 Unit Price Index above are applicable for Wilayah Persekutuan Kuala Lumpur.3 109.9 104.3 110.8 68.0 113. Department of Statistics.5 106.3 108.9 Plywood 68.1 112.5 70.3 70.2 99. December rates are not available at time of printing.7 112.8 104.8 68.1 102.5 113.1 112.3 110.64 102.3 Floor & Wall Tiles 107.7 100.6 100.5 101.4 94.4 109.2 96.0 100.7 100.5 112.7 94.1 112.7 104.2 101.2 108.7 97.7 98.9 107.1 Paints 105. 000 RM Million Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov 260.1 214.387 13.0 220.0 240.0 99.7 Construction Related Products Loans Approval for Construction Sector (RM million) 1.117 14.000 3. Central Bank of Malaysia.384 Note: November and December rates are not available at time of printing.0 100. * No.000 2.000 Number 80.9 108.0 200. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Other Articles of Concrete.891 2.7 106.5 193.6 101.3 118.374 18.504 2.8 194.7 Basic Iron and Steel Products 112.828 9.058 2.0 160.8 117.6 119.500 4. of housing units by private developers approved for construction by the Ministry of Housing and Local Government in Peninsular Malaysia.000 20.6 202.401 2.1 201.704 2.000 1.000 25.5 186.978 6.020 1.0 180.5 98.3 119.7 118.144 1.7 193.0 Other articles of concrete.7 112. # All rates are based on the new Industrial production Index (2010 = 100).4 106.0 243.500 3.9 111.500 2.4 99.000 10.956 1.5 119.525 13.520 21.7 119. Source: Monthly Statistical Bulletin.4 118.511 2.765 3.9 121. cement and plaster Basic iron and steel products Production of construction related products 2015 Housing Approvals* (number) Loans Approved for Construction Sector (RM million) 2014 2014 2015 0 500 1.6 214. 2015 Cement & Plaster Production# (Index) CONSTRUCTION SECTOR INDICATORS 65 .1 111.GENERAL CONSTRUCTION DATA Index 0 5.000 15.0 120.0 140.3 202.102 Housing Approvals* (number) 11.557 2. 000 12.500 4.000 5.500 5.000 9.000 4.000 11.000 15.000 6.000 Jan 66 Feb Mar Apr May GENERAL CONSTRUCTION DATA .000 14.000 13.000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jun Jul Aug Sep Oct Nov Dec Copper (Grade A) USD/Tonne 7.000 10.500 6.000 8.2 GENERAL CONSTRUCTION DATA COMMODITIES PRICE TREND (JAN TO DEC 2015) Nickel USD/Tonne 16. 82 5.300 Jan Feb Mar Apr May Year 2015 Aluminium Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1.15 1.628.221.75 13.50 Jun Jul Aug Copper (Grade A) Sep Oct Nov Dec Nickel Monthly Average (USD / Tonne) 5.816.762.501.000 1.455.539.400 1.637.500 1.807.738.64 9.75 13.90 5.700.86 14.027.64 12.53 1.299.493.00 4.93 1.335.Aluminium USD/Tonne 2.33 5.08 1.588.25 9.07 6.338.225.24 Source: London Metal Exchange GENERAL CONSTRUCTION DATA 67 .22 10.41 11.375.45 6.18 1.206.827.776.05 12.773.925.465.50 10.900 1.00 8.12 1.523.804.892.32 1.527.771.48 1.685.832.600 1.682.814.700 1.93 1.55 5.20 4.820.19 14.52 5.088.55 5.41 1.81 1.18 5.800 1. 00 2012 2013 2014 2015* 2016** Year Gross Domestic Product (GDP) for Construction Sector Contribution to Total GDP Note: * Estimate by Ministry of Finance Malaysia ** Forecast by Ministry of Finance Malaysia Source: Economic Report 2015/2016. Ministry of Finance.140 9.000 3.20 1.50 1. Malaysia 68 GENERAL CONSTRUCTION DATA .00 1.160 9.000 4.40 1.100 8.EMPLOYMENT & GDP Employment (’000) % 1.90 2012 2013 2014 2015* Employment for Construction Sector Contribution to Total Employment GDP (RM million) % 55.60 45.000 4.200 9.10 1.220 9.260 9.280 9.20 40.2 GENERAL CONSTRUCTION DATA MALAYSIA CONSTRUCTION SECTOR .60 25.240 1.120 1.40 20.80 50.40 4.00 35.000 4.80 30.180 1.000 3.20 15.000 3.000 3.000 3.000 4.30 1. 75% 80% 85% 90% 95% 100% Contract Period 82% 87% 92% 95% 98% 100% Cumulative Progress Claims The rate of expenditure is an average rate and will vary from project to project when specific project circumstances are taken into account.GENERAL CONSTRUCTION DATA 0 20 40 60 80 100 0 20 40 60 Contract Period (%) Progress Claims (%) 80 100 Cumulative Progress Claims 2% 5% 8% 13% 18% 24% 30% Contract Period 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% Contract Period 36% 43% 50% 57% 64% 70% 76% Cumulative Progress Claims No account has been made for retention. The following graph and table are an indication of the rate of expenditure for construction projects. PROGRESS PAYMENTS 69 . 2 70 GENERAL CONSTRUCTION DATA GENERAL CONSTRUCTION DATA . PROPERTY Residential Hotel Office Shopping Complex Shop Industrial 3 . 395.724 3.761 1.086 9.389 6.826 234.892.139 72.304 282.689 220.617 50.804 167.757 11.796 245.460 90.396 Existing Stock Incoming Supply (unit) (unit) 0 10 20 30 40 50 2013 Ampang Hilir / U-Thant 2012 Source: Knight Frank Note: (e) = estimate.101 31.034 725.013 62.668 47.668 162.855 65. (f) = forecast Bangsar / Damansara Heights 2010 2011 2H2014 Mont’ Kiara / Sri Hartamas 1H2014 KL City 1H2015(e) 2H2015(f) Projection of Cumulative Supply for High End Condominiums Number of Units (’000) Source: Residential Property Stock Report.101 38.72 4. p = preliminary MALAYSIA WP Kuala Lumpur WP Putrajaya WP Labuan Selangor Johor Pulau Pinang Perak Negeri Sembilan Melaka Kedah Pahang Terengganu Kelantan Perlis Sabah Sarawak Residential p Q2 2015 3 PROPERTY RESIDENTIAL PROPERTY .185 15.659 831.186 56.270 393.200 882 176.303 423.523 166. by Valuation & Property Services Department.303 29.322 23. 2nd Quarter 2015.292 24.114 44.055 446. 1.600 1.000 2Q10 470 750 610 1.800 2.40 2.30 Asking Gross Rental (RM psf/month) 650 .000 1.2Q07 410 620 500 730 240 280 2Q08 415 725 515 890 240 290 2Q09 420 700 530 950 250 290 Bdr Sri Damansara (SD7) TTDI (Athinahapan) Bandar Utama (BU1) Bangsar Baru USJ (USJ 6) Bdr Puchong Jaya Source: The Edge & CBRE Bdr Puchong Jaya USJ (USJ 6) Bangsar Baru Bandar Utama (BU1) TTDI (Athinahapan) Bdr Sri Damansara (SD7) 0 200 400 600 800 1.400 1.100 650 .3.600 500 600 2Q14 970 1.50 2.600 500 .800 670 760 2.3.350 440 500 Capital Value for selected 2-storey terraced houses (land area 1.250 1.780 600 660 2Q15 970 1.300 1.100 1.600 1.20 .4.950 520 .750 Average Asking Price (RM psf) Source: Knight Frank Notes: * Excludes The Binjai On The Park ** Includes Twins @ Damansara Heights *** Excludes Verve Suites which comprises mainly fully furnished small units KL City* Ampang Hilir / U-Thant Damansara Heights** Kenny Hills Bangsar Mont Kiara*** Locality Asking Prices and Rentals of Existing High End Condominiums (1H 2015) .200 1.900 sqft) in Klang Valley RM/Unit/'000 PROPERTY 73 2Q13 850 1.1.900 650 .100 270 320 2Q11 600 900 800 1.30 2.200 450 .00 2.200 .20 .4.50 .50 .1.300 1.100 920 1.00 2.1.5.00 .4.70 .300 340 375 2Q12 700 1.400 1. 241 4.529 Existing Stock Incoming Supply (Room) (Room) Source: Leisure Property Stock Report.001 761 1.205.556 13.0 130.974 218 561 1.0 140.683 6.0 points 1Q13 Tourism Market Index 2Q13 74 3Q13 3 PROPERTY HOTEL PROPERTY 3Q15 2Q15 1Q15 .898 22.444 8.0 110.0 90.610 4.859 3.706 783 1.896 2.0 120.219 22.0 160.0 80.322 909 166 479 0 79 1.283 3.853 12.774 15.761 11.0 150.056 906 16.0 4Q14 3Q14 2Q14 1Q14 4Q13 Source: Malaysian Institute of Economic Research 100.071 1.906 16.599 35. 2nd Quarter 2015 by Valuation & Property Services Department p = preliminary MALAYSIA WP Kuala Lumpur WP Putrajaya WP Labuan Selangor Johor Pulau Pinang Perak Negeri Sembilan Melaka Kedah Pahang Terengganu Kelantan Perlis Sabah Sarawak Hotel p Q2 2015 70.111 21.702 16. 000 Receipts (RM mil) 2008 RM Million 80. WTW Research Ibis Hotel The RuMa Hotel and Residences Banyan Tree Signatures Pavilion KL W Hotel and Serviced Apartment .000 2007 70.000 60.000 50.000 20.Hotel Raffles Hotel Four Seasons Place Kuala Lumpur Harrods Hotel Hilton Garden Inn Alila Bangsar @ The Establishment Sheraton Petlaing Jaya Autograph Collection @ Empire City Marriott @ Empire City 1 Clermont Hotel @ Damansara City Nos of Room Incoming Hotel Development in Klang Valley 2016 2016 2016 2016 2017 2017 2018 2016 2017 2017 2016 2016 2016 Expected year of completion .000 40.000 2011 2010 Tourist Arrivals & Receipts to Malaysia 2009 PROPERTY 75 2014 2013 2012 0 5 10 15 20 25 Million 30 304 253 143 150 750 250 321 255 124 253 280 286 313 Source: Property market 2015.000 30.Arrivals (Mil) 2006 2005 2004 Source: Tourism Malaysia - 10. 50 9.04% 0.00 8.50 8.50 7.80 RM7.50 Asking Gross Rental (RM psf/month) Selected Grade A Office Asking Rentals (1H2015) 0.00 10.50 5.50 7.50 4.80 Average Grade A Rent @ Golden Triangle of KL CBD Average Grade A Rent @ Prime KL Fringe 15.0% Vacancy 2015 7.8.2.0% .00 4.50 5.80 6.50 8.50 4.80 RM5.56 Average Grade A Rent @ Prime Decentralised Area Source: Knight Frank & IVPS Research 6.76 1 First Avenue Plaza 33 Surian Tower The Ascent @ Paradigm Puchong Financial Corporate Centre The Pinnacle Wisma Mustapha Kamal Beyond KL (Selangor) Quill 7 Menara CIMB Nu Tower 1 & Nu Tower 2 Menara Shell The Gardens North & South Towers Menara BRDB KL Fringe Integra Tower Menara Maxis Vista Tower G Tower Menara Darussalam Menara Binjai Menara Prestige KL City RM6.0.01% .00 6.0% Q-O-Q Change NA NA NA NA Y-O-Y Change 12 Month Outlook 3 PROPERTY OFFICE PROPERTY .50 .50 8.50 5.50 11.50 7. PROPERTY 77 Source: Knight Frank Occupancy and Rental Trends 1H2010 - 1H2015 1,738,182 518,801 293,512 19,222 629,064 89,924 24,567 8,375 20,248 5,004 5,050 19,175 6,459 9,847 11,933 47,624 29,378 Incoming Supply (m2) Source: Commercial Property Stock Report, 2nd Quarter 2015 by Valuation & Property Services Department p = preliminary 19,779,301 8,257,055 2,026,833 66,157 3,049,090 1,063,350 1,105,459 613,463 294,165 398,487 339,243 397,067 336,898 380,067 131,038 671,674 649,255 WP Kuala Lumpur WP Putrajaya WP Labuan Selangor Johor Pulau Pinang Perak Negeri Sembilan Melaka Kedah Pahang Terengganu Kelantan Perlis Sabah Sarawak MALAYSIA Existing Stock Total Space (m2) Purpose Built Office p Q2 2015 78 13,206,456 2,603,216 61,090 28,734 3,019,857 1,660,763 1,678,831 831,098 439,577 399,852 486,607 272,809 115,398 224,890 47,652 654,918 681,164 Existing Stock Total Space (m2) 1,567,139 338,146 26,456 0 46,643 368,115 47,541 32,070 56,429 79,512 69,689 7,108 53,099 112,352 15,026 122,875 192,077 Incoming Supply (m2) Pulau Pinang 12.71% Other States 32.13% Johor 12.58% Selangor 22.87% WP Kuala Lumpur 19.71% Distribution of Shopping Complex in Malaysia as at Q2 2015p Source: Commercial Property Stock Report 2nd Quarter 2015 by Valuation & Property Services Department p = preliminary MALAYSIA WP Kuala Lumpur WP Putrajaya WP Labuan Selangor Johor Pulau Pinang Perak Negeri Sembilan Melaka Kedah Pahang Terengganu Kelantan Perlis Sabah Sarawak Shopping Complex p Q2 2015 3 PROPERTY SHOPPING COMPLEX PROPERTY Existing Stock Bukit Bintang/ Jalan Raja Chulan Jalan Ampang Klang Shah Alam Subang Jaya/ Sunway Petaling Jaya Source: Commercial Property Stock Report 2nd Quarter 2015 by Valuation & Property Services Department - 100,000 200,000 300,000 400,000 500,000 600,000 m2 Bangsar Shopping Complex's Existing Stock in Kuala Lumpur & Selangor (By Location) as at Q2 2015 Central Commercial Area PROPERTY 79 Source: Knight Frank Note: (1) Previously known as CapSquare Retail Centre (2) Previously known as G Avenue 300,000 360,000 850,000 230,000 62,000 176,000 400,000 375,000 277,086 700,000 380,000 109,000 240,000 Estimate Net. Lettable Area (sf) Lulu Hypermarket @ Jakel Square, KL City (1) GLO Damansara, KL Fringe (2) Sunway Velocity Mall, KL Fringe Bangsar Trade Centre, KL Fringe Sunway Pyramid (Phase 3), Bandar Sunway The Square @ One City, USJ 25 Da:Men, Subang Jaya Evolve Concept Mall @ Pacific Place, Ara Damansara Star Avenue Lifestyle Mall, Subang Aeon Shah Alam, Shah Alam M Square Shopping Mall @ Millenia City, Puchong Centrus Mall, Cyberjaya ERETAIL@Emerald Avenue, Selayang New Projects Shopping Malls Scheduled for Completion / Opening in 2H2015 861 881 4.014 Existing p 1-1 1/2 Storey 6-6 1/2 Storey 19.84% 1.759 3.376 .42% 4.45% Pre-War 5-5 1/2 Storey 11.52% 342 .88% 2.587 1. 0. 10. 30.036 Existing Stock Incoming Supply (unit) (unit) WP Kuala Lumpur WP Putrajaya WP Labuan Selangor Johor Pulau Pinang Perak Negeri Sembilan Melaka Kedah Pahang Terengganu Kelantan Perlis Sabah Sarawak Shop p Q2 2015 3 PROPERTY SHOP PROPERTY .683 18.18% 4.601 18.573 18. 6. 27.66% 941 .915 4.874 .218 .669 .356 .345 .209 8.063 .480 6.923 .36% 740 .45% Incoming Supplyp 3-3 1/2 Storey Lock-Up 1.204 91.746 389 856 87. 17.39% 2-2 1/2 Storey Above 6 1/2 Storey 30. 0. 2nd Quarter 2015 by Valuation & Property Services Department p = preliminary 25.708 4.416 30.139 .668 2. 17. 1.40% 7.305 167 92 21. 17.65% 2. 47.913 3.674 .809 26.960 8.53% 316 .80 MALAYSIA 411.695 .749 16.354 49.412 4.13% 33.52% Distribution of Existing and Incoming Supply of Shop in Kuala Lumpur and Selangor as at Q2 2015 Source: Commercial Property Stock Report.612 .324 18.764 5.86% 122 . 0. 6. 0. 2. 2. 7.509 .21% 204 . 1. 1.852 72.262 4.21% 1.34% 4-4 1/2 Storey SOHO p = preliminary 11.969 26.720 5. 75% p = preliminary MALAYSIA WP Kuala Lumpur WP Putrajaya WP Labuan Selangor Johor Pulau Pinang Perak Negeri Sembilan Melaka Kedah Pahang Terengganu Kelantan Perlis Sabah Sarawak Industrial p Q2 2015 99.349 Existing Stock Incoming Supply (unit) (unit) Source: Industrial Property Stock Report.89% 5 .425 4.79% Incoming SupplyP 2276 .20% Distribution of Existing and Incoming Supply of Industrial in Kuala Lumpur and Selangor as at Q2 2015 INDUSTRIAL 81 . 11. 11.93% Detached 1180 .17% 1. 6. p = preliminary 4.138 48 586 36.717 2.937 .744 288 577 903 561 256 146 70 80 9 554 1. 71.PROPERTY Semi-Detached Industrial Complex Terraced Flatted Factory 4.218 8.329 3. 61.257 0 0 3 3.92% 256 . 0. 2nd Quarter 2015 by Valuation & Property Services Department.532 4.212 3.934 .422 824 478 222 5. 3.119 5.968 11.249 14. 31.452 4.13% 483 .466 .016 7. 1.23% Existingp 29.567 . 3 82 PROPERTY PROPERTY . FINANCIAL Financial Definitions & Formulae Mortgage Repayment Table Malaysia Balance of Trade Consumer Price Index Prime Rates & Base Lending Rates Interest Rates : Banking Institutions Currency Chart Exchange Rates 4 . a.g. 12% p. The IRR can be compared to the Discount Rate. e.g.1)] = = = = present value future value payment amount period (e. If interest rate = 10% p. discounted back to today’s values at the Discount Rate.a. 72 Rule The approximate number of years required to double your capital can be calculated by dividing the interest rate into 72. compounded monthly.2 years to double your capital if it is invested at 10% p.e. Net Present Value (NPV) The NPV is the present value of all future cash flows. 10 years with monthly payments.2 years It will take approximately 7. The NPV indicates in today’s dollars the profit or loss a developer makes above or below his required profit (based on a nominated Discount Rate). n = 10 x 12 = 120) = interest rate per period (e.a. i = 12% ÷ 12 month = 1% per period) FINANCIAL . opportunity cost Internal Rate of Return (IRR) The IRR may be defined as the interest rate that equates the present value of expected future cash flows to the cost of the investment. FINANCIAL FORMULAE Future value of $1 FV = PV (1+i)n Future value of $1 per period FV = PMT [((1+i)n – 1) ÷ i] Sinking fund (the amount required to be put away periodically to realise PMT = FV [i ÷ ((1+i)n – 1)] some future sum) Present value of $1 Present value of $1 per period Annuity with a PV of $1 (Mortgage bond formula) PV FV PMT n i 84 PV = FV [1÷ (1+i)n] PV = PMT [((1+i)n – 1) ÷ (i(1+i)n)] PMT = PV[(i(1+i)n) ÷ ((1+i)n . i.g. Then 72 ÷ 10 = 7.4 FINANCIAL FINANCIAL DEFINITIONS Discount Rate The rate of return a developer expects when investing in a project. 000 / 1.19 28.17 20.72 12.83 17.35 22.27 23.33 19.02 18.60 7.49 27.80 20.13 12.37 20.MORTGAGE REPAYMENT TABLE Based on: * 1.25 21.a.53 16.85 25.99 17.91 8.99 20. 5 10 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% 16% 17% 18% 19% 20% 21% 22% 23% 24% 25% 18.01 11.06 19.44 8.74 22.93 15.17 13.22 = $13.21 16.57 19.32 24.38 18.05 27.24 22.67 19.65 10.16 7.91 14.61 11.56 10.82 20.36 9.35 10.94 26.62 28.10 11.32 14.98 Example Borrow $1.76 21.05 22.61 12.75 8.58 21.000 units of currency * Interest compounded monthly * Equal monthly repayments REPAYMENT (years) Interest p.14 10.78 18.75 11.22 13.32 11.000.35 14.a.33 19.99 9.77 29.67 13.00 9.39 25.87 19.44 13.36 6.67 21.00 12.00 14.39 16.75 15 20 7.000 to be repaid monthly at 10% p.65 13.220 per month FINANCIAL 85 .13 16.78 14.67 15.43 16.69 15.000 x $13. over 10 years.75 23.56 18.79 24.28 20.000.31 19. Repayments = 1.10 16.37 12.75 17. 864 637.529 113.421 644.875 552.552 113.687 492.131 566.000 100.175 663.000 400.683 679.355 136.913 326.500 275. Ministry of Finance.000 300.000 80.018 605.420 590.799 140.892 137.920 641.861 Note: * January to June only Source: Economic Report 2015/2016.000 600.835 541.000 500.076 412.000 0 0 04 05 06 07 08 09 10 11 12 13 14 15* Trade Balance Import (RM million) Export (RM million) Exports Year 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015* (RM mil) 539.000 800.893 531.529 452.000 700.000 160.488 171.726 475.000 140.000 100.294 Imports (RM mil) 410.000 40.414 50.384 517.000 120.000 20.000 60.751 140.000 200.292 129.000 180. Malaysia 86 FINANCIAL .135 658.030 96.565 504.433 Trade Balance (RM mil) 128.4 FINANCIAL MALAYSIA BALANCE OF TRADE Trade Balance RM million Import/Export RM million 200. 0 1.6 2.1 2.00% 2.03 % 2015* 112.00% Year Year CPI % Change 2005 87.03 % 2008 97.7 2.00% 3.11 % 2014 110.58 % 2010 100.66 % 2013 107.8 5.61 % 2007 92.2 3.02 % 2006 90.CONSUMER PRICE INDEX % Change in CPI 6.00% 4.9 3.4 3.19 % 2012 104.00% 5.00% 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 0.7 3.44 % 2009 98.00% 1.3 0. Malaysia FINANCIAL 87 .71 % 2011 103.9 1.05 % Note: Year 2010 is the Base Year * Average from January to November 2015 only Source: Department of Statistics. 35 South Korea+ Thailand++ 1.65 Philippines 4.50 United States of America Vietnam# 3.95 Indonesia 7.00 3-Year Benchmark Lending Rate Indicative Effective Lending Rate Call Rate of The Bank of Korea Minimum Loan Rate % pa (Average Based on Local Bank) Minimum and in VND per year Source: Arcadis Asia Offices 88 FINANCIAL .25 * ** + ++ # 7.51 Singapore 5.4 FINANCIAL PRIME RATES & BASE LENDING RATES as at 4th Quarter 2015 Country Rate (%) Brunei China* 4.50 United Kingdom 0.10 9.75 Macau 5.00 India 9.25 Malaysia** 4.50 Hong Kong 5.75 5. 00 8.85 6.64 4.51 4.49 4.57 4.97 6.79 6.79 4.90 6.54 4.79 6.79 6.90 Note: December rates are not available at time of publication.54 4.INTEREST RATES: BANKING INSTITUTIONS Percent Per Annum 9.61 4.79 6. Central Bank of Malaysia FINANCIAL 89 .68 4.00 6.87 6.00 4.88 6.91 6.87 6.67 4.79 6.90 6.53 6.79 6.79 6.00 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Commercial Banks : Base Lending Rates Commercial Banks : Average Lending Rates Investment Banks : Average Lending Rates Commercial Banks 2015 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Base Lending Rates (%) Average Lending Rates (%) Investment Banks Average Lending Rates (%) 6.68 4.00 7.85 6.79 6. Source: Monthly Statistical Bulletin.79 6.79 6.00 5.75 6. 90 1.50 8.50 5.00 5.50 3.00 2.00 Ringgit (RM) 2005 2006 RM per 1 USD RM per 1 SGD 2007 2008 2009 RM per 1 GBP RM per 1 EURO 2010 2011 2012 2014 RM per 100 JPY 2013 2015 Year 4 FINANCIAL CURRENCY CHART FINANCIAL .00 3.00 7.50 2.00 4.00 6.50 7.50 6.50 4. 9 22.80 Philippines peso 10.3294 1.com/convert/classic FINANCIAL 91 .1578 0.890 riyal 0.4163 South Africa rand 3.9047 46.8539 3.2139 dollar 1.3763 Brunei dollar 0.99 1.3674 66.3188 1.3709 Bahrain dinar 0.14 13.0875 0.465 143.6418 Singapore dollar 0.623.451 won 267.6719 United Kingdom pound 0.152.8469 3.7142 0.7501 India rupees 15.34 rupee 33.EXCHANGE RATES as at 4 January 2016 Currency RM1 US $1 Australia Country dollar 0.2326 1.2950 New Zealand dollar 0.20 Kenya shillings 23.8023 7.6784 United States of America dollar 0.5372 101.3289 1.140 1.965 United Arab Emirates dirham 0.0 Japan yen 27.9199 European Currency Unit ecu 0.4143 China rmb 1.3721 104.450.3640 35.220.168.3401 1.0 Source: www.9500 120.900 Qatar South Korea Sri Lanka Thailand baht 8.21 Lebanon pound 350.0800 Indonesia Hong Kong rupiah 3.0000 4.4624 Pakistan rupee 24.5933 15.5120 6.oanda.7940 7.0000 Vietnam dong 5.6 Malaysia ringgit 1.505.5015 Egypt pound 1. 4 9292 FINANCIAL FINANCIAL . OTHER INFORMATION Utility Costs for Selected Asian Cities Weight & Measures Conversion Guide Public Holidays Arcadis Asia Leadership Team Arcadis Asia Sectors Arcadis Asia Services Directory of Offices Telephone Directory (Malaysia) 5 . 118 0.000kWh = US$0.00/mth.83/m3. Special users (e.000 .240(peak) 0.527 WATER (US$/m3) Commercial/ Industrial Domestic 1.12. US$0. 400 .16/m3.570 0. hospitals and others) only. government buildings.O.09/litre. (Dom): 0 . WATER: (Dom) Consumption: US$0.600 .130 0.238 .g.400kWh .18.088 . Business.980 0.12 m3 = F. fuel clause adjustment and government tax.400 .800kWh = US$0.910 . Above 4.910 .048(normal) 0.550 .110 0.35 HK$ 7.439 N/A N/A N/A N/A Leaded 1.070 0.0. saunas.550 1.700 1.780 . WATER: (Dom): 0 . hotels. golf courses.98 BEIJING HONG KONG MACAU 0.0. Other charges (depending on meter size 15mm .80 MOP 7.22.280 0.590 0.840 N/A N/A 0.420 0.162(peak) 0.33 Exchange Rate US $1 = KUALA LUMPUR COUNTRY 5 OTHER INFORMATION UTILITY COSTS FOR SELECTED ASIAN CITIES as at 4th Quarter 2015 OTHER INFORMATION .62m3 = US$0.15/litre CHONGQING UNLEADED FUEL: Unleaded 93# = US$1.473 Unleaded FUEL (US$/litre) Diesel 0.200kWh = US$0.860 0.970 0.94 0.170 RMB 6.22.14. Above 62m3 = US$1.600kWh = US$0.10.310 0. construction.850 0. 1.200 kWh = US$0.4. 97# = US$1. Meter rental = US$0.170 ELECTRICITY: Based on tariff scheme of CLP Holding Limited and is charged on bi-monthly consumption.g.35 RMB 6.1.720 0.820 0.210 N/A 1.53/m3.000 0.0.160 / 0.78/m3 for 80m3or above.79m3 and US$0.62/m3 for 29 .35 RMB 6. public infrastructures and other temporary consumption) are excluded. 43 .130(normal) 0. 97# = US$1.43m3 = US$0.21.70/m3 for 61 .050 .0.15/litre SHANGHAI 0.370 0.US$0.072(normal) 0.100 0.080 RMB 6.478 .3.860 0.120 0.970 ELECTRICITY: Electricity tariff are composition of demand charges.2.462 0. 0.800 . UNLEADED FUEL: Unleaded 97 GUANGZHOU UNLEADED FUEL: Unleaded gasoline 97 UNLEADED FUEL: Unleaded petrol Ron 95 0. 1.132 ELECTRICITY (US$/kwh) Commercial/ IndustriaI Domestic RM 4.C.0. (Comm/Ind) Charges for ordinary users (e.780 0.09/litre. associations. gaming industries. consumption charges.400 kWh = US$0.60m3.440 0.100 0. schools.0. 3.380 0.830 0.1. 2.35 UNLEADED FUEL: Unleaded 93# = US$1.55/m3 for 28m3 or below.1.0.34-58. 12 . US$0.097(peak) 0.200mm).850 1. 92 Unleaded Petrol and 95 Unleaded Petrol as at October 2012.05/kWh ~ 0. 0. (Dom): US$0. above 100kWh 15c. excld.480 .0.0.318 .719 1.111 0.306 0.00 BAHT 35.510 0.288 .062 .121 0. WATER: Dom & Non-dom water rate incld.338 1.1.210 .00 INR 65.886 0.080 N/A N/A N/A N/A 0.939 0.0.0. 1-10kWh 10c. (Comm/Ind): 150.400 .800 1.1.61 BANGALORE .0.692 0.240 .0.750 / 0.648 0.088 . ELECTRICITY: Tariff is based on low tension power supply.406 ELECTRICITY (Dom): Tariff effective from 1st Jan 2012.0.411 N/A N/A N/A 0.100 ELECTRICITY & WATER: Actual Billing: Include misc.877 0.0.280 0.030m3 0.0. charges such as Environmental Charge.139 .116 .0.239 .444 0.076 0.320 . Water .000 kWh.690 0.0.41m3.267 . Currency Exchange Rate Adjustment (CERA).487 0.860 N/A All rates are nett of GST.41/mth + US$0.160 0.0.532 1.0.210 0. etc.0. FUEL: Diesel: D.410 BRUNEI HO CHI MINH 0.470 0.427 0.0.008 . 11-60kWh 8c.165 KRW 1. 61-100kWh 12c. VAT.165/kwh .220 IDR 13.0.O .136 S$ 1.568 0. (Com): US$6.95/month (the usage of 15mm caliber) and (Com): US$78.060 .037 0.150 0. Domestic water rate is an avg for the 1st 40m3.538 0. Electricity .111 0.162 UNLEADED FUEL: Gasohol 95 ELECTRICITY: (Dom) For normal tariff with consumption not exceeding 150kWh/month.058 .110 1.810 .31/mth + US$0.860 kWh. BANGKOK NEW DELHI INR 65.5.490 0.130 0.610 0.(Dom): 190 kWh .35/month (the usage of 100mm caliber). 0.905 0.840 ELECTRICITY: Plus electricity basic rates (300kWh below in use). (Comm/Ind): 4.0. sanitary appliance fee.430 0.160 0. FUEL : Diesel and 98 Unleaded petrol as at 5 November 2015.074 .0.700 .0.052.713 0.40 MANILA SEOUL SINGAPORE 0.620 1.0.720 0.26 VND 22.0.993 0. conservation tax & water-borne fee.750 PHP 47.1/kwh WATER: Plus water basic rates.05%.355 0.0. (Dom): US$1. 0.00 JAKARTA All rates are VAT inclusive ELECTRICITY: Domestic electricity rates are applied to the 301th KW above wards.06/kWh ~0.050 .150 1.492 . 0.(Dom): 29m3 .042 .060 .120 0.110 B$ 1.762 0.290 1.098 0.111 0.OTHER INFORMATION 95 0. 000 m2 = 100 ha = 0.997 gal = 1.4723 l = 3.0394 in = 0.9842 ton AREA 1 sq cm (cm2) 1 sq metre (m2) 1 hectare (ha) 1 sq km (km2) VOLUME / CAPACITY 1 cu cm (cm3) 1 cu decimetre (dm3) 1 cu metre (m3) 1 litre (l ) 1 hectolitre (hl ) MASS (WEIGHT) 1 milligram (mg) 1 gram (g) 1 kilogram (kg) 1 tonne (t) USA MEASURES AND EQUIVALENTS USA Dry Measure Equivalents 1 pint = 0.000 g = 1.9689 UK pint = 0.3861 mile2 = 1.8327 UK gal = 29.574 ml = 0.0353 ft3 = 1.0353 oz = 2.3937 in = 1.000 cm2 = 10.0408 UK fl oz = 0.3080 yd3 = 1.0154 grain = 0.0610 in3 = 0.2046 lb = 0.000 kg = 0.000 m = 0.76 pt = 21.000 mg = 1.0936 yd = 0.1550 in2 = 1.5 OTHER INFORMATION WEIGHT AND MEASURES Metric Measures and Equivalents LENGTH 1 millimetre (mm) 1 centimetre (cm) 1 metre (m) 1 kilometre (km) = 10 mm = 100 cm = 1.8327 UK pt = 0.000 cm3 = 1.6214 mile = 100 mm2 = 10.1960 yd2 = 2.7854 l OTHER INFORMATION .4710 acres = 0.5506 l USA Liquid Measure Equivalents 1 fluid ounce 1 pint (16 fl oz) 1 gallon 96 = 1.000 dm3 = 1 dm3 = 100 l = 0. 5461 l = 437.9 m2 = 2.760 yd = 2.387 cm3 = 0.54 cm = 0.025.35 g = 0.4536 kg = 6.Imperial Measures and Equivalents LENGTH 1 inch (in) 1 foot (ft) 1 yard (yd) 1 mile 1 int.5683 l = 4.0283 m3 = 28.853 km AREA 1 sq inch (in2) 1 sq foot (ft2) 1 sq yard (yd2) 1 acre 1 sq mile (mile2) in2 = 144 = 9 ft2 = 4.59 km2 VOLUME / CAPACITY 1 cu inch (in3) 1 cu foot (ft3) 1 fluid ounce (fl oz) 1 pint (pt) 1 gallon (gal) = 20 fl oz = 8 pt = 16.413 ml = 0.3048 m = 0.32) o F = (9/5 oC) + 32 C o F OTHER INFORMATION 97 .016 t = 1.0929 m2 = 0.728 in3 MASS (WEIGHT) 1 ounce (oz) 1 pound (lb) 1 stone 1 hundredweight (cwt) 1 ton Temperature Conversion o o C = 5/9 (oF .4516 cm2 = 0.3503 kg = 50.9144 m = 1.8361 m2 = 4.840 yd2 = 640 acres = 6. nautical mile = 12 in = 3 ft = 1.6093 km = 1.4 yd = 2.046.5 grains = 16 oz = 14 lb = 112 lb = 20 cwt = 28.802 kg = 1. 5682613 1.1365225 0. nautical into kilometres Multiply by 25.3048 0.7645549 4.0254 304. 6 inches multiplied by 25.4 25.168 1.387064 0.852 VOLUME & CAPACITY 98 To Convert Multiply by cubic inches into cubic centimetres cubic inches into litres cubic feet into cubic metres cubic feet into litres UK pints into litres UK quarts into litres cubic yards into cubic metres UK gallons into litres UK gallons into cubic metres UK fluid ounces into cubic centimetres 16.413063 OTHER INFORMATION .0283168 28. LENGTH To Convert mili-inches into micrometres inches into milimetres inches into centimetres inches into metres feet into milimetres feet into centimetres feet into metres yards into metres fathoms into metres chains into metres furlongs into metres miles.016387 0.4 2. Conversely if you wish to convert Metric measure into Imperial measure simply divide by the same factor. For example 6 inches into milimetres.4 milimetres.1168 201.54 0.48 0.316847 0.9144 1. statute into kilometres miles.8288 20.4 equals 152.8 30.0045461 28.609344 1.54609 0.5 OTHER INFORMATION CONVERSION GUIDE Conversion Formulae To use the conversion formulae simply multiply the Imperial measurement by the factor beside the conversion you wish to make. 0304 0.0283495 0.001356 0.35582 745.01387 99 .16 6.01 hectare) acres into square metres acres into hectares square miles into square kilometres Multiply by 645.064799 1.092903 0.0083613 4046.AREA To Convert square inches into square milimetres square inches into square centimetres square feet into square centimetres square feet into square metres square yards into square metres square yards into (0.60479 POWER To Convert foot pounds-force per second into watts horsepower into watts foot pounds-force per second into kilowatts horsepower into kilowatts horsepower into metric horsepower OTHER INFORMATION Multiply by 1.323995 0.836127 0.4535924 6.103477 0.589988 MASS To Convert grains into miligrams grains into metric carats grains into grams pennyweights into grams ounces into grams ounces troy into grams ounces into kilograms pounds into kilograms stones into kilograms hundredweights into kilograms tons into kilograms tons into metric tonnes tahils into grams kati into kilograms Multiply by 64.555174 28.7 0.35023932 50.79891 0.0469 1.01605 37.799 0.8564 0.4516 929.349523 31.4046856 2.802345 1016.7457 1. Perlis & Terengganu # The following day will be an additional Public Holiday BRUNEI New Year’s Day Chinese New Year National Day Israk Miraj Royal Brunei Armed Forces Ann.5 OTHER INFORMATION PUBLIC HOLIDAYS 2016 MALAYSIA New Year’s Day** Chinese New Year 01 08 09 01 21 04 06 .07 31 12 16 02 29 12 25 Labour Day Wesak Day King/Agong’s Birthday Hari Raya Aidilfitri* National Day Hari Raya Qurban* Malaysia Day Awal Muharam (Maal Hijrah) Deepavali* Prophet Muhammad’s Birthday Christmas Day Jan Feb Feb May May Jun Jul Aug Sep Sep Oct# Oct Dec Dec# * Subject to change ** Except Johor. Revelation of the Holy Koran* Hari Raya Aidilfitri* Hari Raya Aidilfitri* Hari Raya Aidilfitri* HM The Sultan’s Birthday ^ Hari Raya Aidil Adha* ^ Islamic New Year* ^ Christmas Day 01 08 23 06 31 06 22 07 09 11 15 11 02 25 Jan Feb Feb May May Jun Jun Jul Jul Jul Jul Sep Oct Dec Fridays and Saturdays are government off days * Subject to change ^ Replacement for Fridays / Sundays 100 OTHER INFORMATION . First Day of Ramadhan* Ann. Kedah. Kelantan. 13 February are holidays.9 October are working days. # 4 . @ 16 .10 04 01 09 15 01 . $ ^ (Cont’d) OTHER INFORMATION 101 . 8 .2016 HONG KONG The First day Of January 01 Lunar New Year’s Day 08 . 6 & 14 February are working days. 18 September is working day.17 September are holidays.11 Jun are holidays. 12 Jun is working day. * 10 .03 Jan Feb Feb Apr May Jun Sep Oct 11 . CHINA New Year’s Day Chines New Year’s Eve Chinese New Year$ Tomb-Sweeping Day Labour Day^ Dragon-Boat Festival* Mid Autumn Festival@ National Day# 01 07 08 . the day following them is designated as a general holiday in substitution.10 Good Friday 25 The day following Good Friday 26 Easter Monday 28 Ching Ming Festival 04 The day following Labour Day* 02 Buddha’s Birthday 14 Tuen Ng Festival 09 HKSAR Establishment Day 01 The day following Chinese Mid-Autumn Festival 16 National Day 01 The day following Chung Yeung Festival* 10 The 1st weekday after Christmas Day 26 The 2nd weekday after Christmas Day* 27 Jan Feb Mar Mar Mar Apr May May Jun Jul Sep Oct Oct Dec Dec * As both the Labour Day and the Chung Yeung Festival fall on a Sunday. 2 May is a holiday. the second weekday after Christmas Day is designated as a general holiday in substitution. and as Christmas Day falls on a Sunday.7 October are holiday. 102 OTHER INFORMATION .5 OTHER INFORMATION (Cont’d) PUBLIC HOLIDAYS 2016 MACAU New Year’s Day*# Lunar New Year’s Day*# The 2nd day of Lunar New Year*# The 3rd day of Lunar New Year*# Good Friday# The day before Easter The first working day after the Day before Easter@# Ching Ming Festival*# Labour Day* The first working day after Labor Day@# The Buddha’s Birthday The first working day after Buddha’s Birthday@ Tung Ng Frestival (Dragon Boat Festival)# Bank’s Holiday# The day following Mid-Autumn Festival*# National Day* The day following National Day The first working day after National Day@# The second working day after National Day@ Chung Yeung Festival* The first working day after Chung Yeung Festival@# All Soul’s Day# Feast of the Immaculate Conception# Macau SAR Establishment Day*# Winter Solstice Christmas Eve Christmas Day The first working day after Christmas Day@# The second working day after Christmas Day@# 01 08 09 10 25 26 28 04 01 02 14 16 09 01 16 01 02 03 04 09 10 02 08 20 21 24 25 26 27 Jan Feb Feb Feb Mar Mar Mar Apr May May May May Jun Jul Sep Oct Oct Oct Oct Oct Oct Nov Dec Dec Dec Dec Dec Dec Dec # Bank’s Holiday * Obligatory Holiday @ Special Holiday granted by Chief executive for staff in Public Administration. 2016 INDIA New Year’s Day Republic Day Good Friday Ugadi Ramnavami Independence Day Ganesh Chaturthi Dusshera Karnataka Formation Day 01 26 25 08 15 15 05 12 01 Jan Jan Mar Apr Apr Aug Sep Oct Nov 01 08 09 25 01 05 06 22 06 .07 17 12 02 12 25 Jan Feb Mar Mar May May May May Jul Aug Sep Oct Dec Dec 01 07 01 05 14 06 15 14 03 09 25 Jan Feb Mar May May Jun Aug Sep Oct Oct Dec INDONESIA New Year’s Day Chinese New Year (Imlek) Hindu Day of Quiet (Nyepi) Good Friday International Labour Day Ascension Day of Jesus Christ Ascension of Prophet Mohammad Waicak Day Idul Fitri* National Independence Day Idul Adha Day Hijriyah New Year Prophet Muhammad’s Birthday Christmas Day * Subject to changes KOREA New Year’s Day Lunar New Year (Seol) Independent Movement Day Children’s Day Buddha’s Birthday Memorial Day Liberation Day Full Moon Day (Chuseok) National Foundation Day Hangul Proclamation Day Christmas Day (Cont’d) OTHER INFORMATION 103 . 09 25 01 21 06 09 12 29 25 Jan Feb Mar May^ May Jul Aug Sep Oct Dec^ Special Holidays (Non Working Holidays) Chinese New Year Black Saturday (Additional) Ninoy Aquino Day All Saint’s Day All Souls Day (Additional) Christmas Eve (Additional) Last Day of the Year (Additional) SINGAPORE New Year’s Day Chinese New Year Good Friday Labour Day Vesak Day Hari Raya Puasa National Day Hari Raya Haji Deepavali Christmas Day *Subject to changes ^ The following Monday will be a public holiday 104 OTHER INFORMATION .5 OTHER INFORMATION (Cont’d) PUBLIC HOLIDAYS 2016 PHILIPPINES Regular Holidays New Year’s Day Maundy Thursday Good Friday Araw ng Kagitingan Labour Day Independence Day End of Eid-ul-Fitre National Heroes’ Day Eid-ul Adha Bonifacio Day Christmas Day Rizal Day 01 24 25 09 01 12 08 29 13 30 25 30 Jan Mar Mar Apr May Jun Jul Aug Sep Nov Dec Dec 08 26 21 01 02 24 31 Feb Mar Aug Nov Nov Dec Dec 01 08 . 2016 THAILAND New Year’s Day Chinese New Year* Makha Bucha Day Chakri Memorial day Songkran Festival Royal Ploughing Ceremony Day+ National Labour Day Coronation Day Visakha Bucha Day Mid Year Bank Holiday# Asarnha Bucha Day Khao Phansa Day (Buddhist Lent Day)+ H.M. The Queen’s Birthday Chulalongkorn day H.M. The King’s Birthday Constitution Day New Year’s Eve 01 Jan 08 Feb 22 Feb 06 Apr 13 - 15 Apr 25 Apr 02 May1 05 May 20 May 01 Jul 19 Jul 20 Jul 12 Aug 24 Oct2 05 Dec 12 Dec3 02 Jan 20174 *Unofficial Chinese Community Only # Banks only + Government only @ Special Holiday granted by Thai Government 1 Substitute for 1 May (Sunday) 2 Substitute for 23 October (Sunday) 3 Substitute for 10 December (Saturday) 4 Substitute for 31 December (Saturday) VIETNAM (Normal Scheduled Holidays) Solar New Year Lunar New Year Hung Vuong King Celebration Liberation Day of Saigon International Labour Day National Day 01 08 - 12 16 - 18 30 01 - 03 02 Jan Feb Apr* Apr May** Sep Dec * Substitute for 16 April (Saturday) ** Substitude for 30 April & 1 May (Saturday & Sunday) OTHER INFORMATION 105 5 OTHER INFORMATION ARCADIS ASIA LEADERSHIP TEAM Kenneth Poon [email protected] Matt Bennion [email protected] Graham Kean Director [email protected] Eric de Kruif [email protected] 106 OTHER INFORMATION Loo Ming Chee Regional Head, Southeast Asia [email protected] Alan Hearn Regional Head, East Asia & India [email protected] Lai Pak Hung Head of Greater China [email protected] OTHER INFORMATION 107 AVIATION Airports are critical to a nation’s long-term economic and environmental and social impacts is essential. for example. 108 OTHER INFORMATION . ranked fairly low in top pharmaceutical markets one decade ago but can now be found among the Top 5. We maximize the potential of the airport by creating outcomes-focused strategies. globalization and sustainability are just some of the key issues facing global automotive businesses. Our experience of working in complex airport environments around the world gives us knowledge and insight into the unique challenges faced by the aviation industry. Approximately two third of total global demand growth for Chemicals is expected to be generated in Asia.5 OTHER INFORMATION ARCADIS ASIA SECTORS AUTOMOTIVE We partner with leading automotive industry clients across Asia to deliver guaranteed and sustainable outcomes. Across many parts of Asia today. driven by demand. rapid urbanization. CHEMICALS & PHARMACEUTICALS Manufacturing is ‘on the move’ to Asia. close to traditionally strong markets such as Germany and France. whilst also delivering their brand expansion sustainable way. ensuring the business is aligned with continuously changing regulatory. fast GDP growth. China. market competitiveness . FINANCIAL INSTITUTIONS We have a strong track record of helping clients across Asia to address different challenges in the market.COMMERCIAL DEVELOPERS our market in Asia. has been fueled by demand for properties under the grand hospitality and entertainment. cost. we have the ability to identify the right solutions and maximise returns on our client’s investments. etc. Add to this the growing complexities of shifting environmental legislation and you have a heavily complex and rapidly evolving industry. Our people bring together expertise and understanding from a broad base of technical capabilities sustainably as possible. where economy is. time to launch. All of these sectors are confronted with ever increasing challenges in terms positioning. in many countries. formed the majority of buildings rising from the ground. We partner with global Oil & Gas clients to navigate even the most challenging issues across rapidly shifting markets. (Cont’d) OTHER INFORMATION 109 . With a combination of international expertise and local knowledge. driven by investment in property. for example. we bring the best business outcomes to our clients. OIL AND GAS Rising production costs and unpredictable prices put Oil & Gas clients under more pressure than ever. With our wide coverage and strong establishment in the region. China. clients rely on us to improve performance and connect communities across the globe. contract administration. In Asia. Singapore and Malaysia. from luxury to fast fashion. 110 OTHER INFORMATION . cost management. we have been involved in providing engineering design. beauty and cosmetics to supermarkets. RETAIL & CONGLOMERATES Our retail delivery experts enable retailers to respond to these modern challenges and gain a competitive advantage. and our transformational thinking. business advisory and mobility oriented design across numerous metro rail and high speed rail projects in Hong Kong. risk management. With unrivaled experience across all facets of the retail world. With our expertise in rail. shrinking budgets and environmental sensitivity require innovative approaches to deliver advanced infrastructure. we will help you successfully navigate these complex challenges across the world through our comprehensive set of specialist services.5 OTHER INFORMATION (Cont’d) ARCADIS ASIA SECTORS RAIL Rapidly increasing urbanization. through major department stores to fast food chains. We bring unique insights which support you in getting better results with more certainty. ensuring a development or program is both economically and environmentally viable for many years to come. to tighter regulation and market consolidation.ARCADIS ASIA SERVICES BUSINESS ADVISORY From rapid urbanization and pressure on natural resources. the need to achieve value for money is central to every investment strategy. OTHER INFORMATION 111 . we live in an increasingly complex world. Our people understand the need to accurately advise on costs and procurement at planning stage. COST MANAGEMENT station or a large scale industrial development. In Arcadis you have a partner that understands your business challenges and operate. safe environment in which to live. Arcadis is a global leader in some of the world’s leading corporates and governments understand their impact on the natural world.5 OTHER INFORMATION ARCADIS ASIA SERVICES CONTRACT SOLUTIONS Disputes in the construction and engineering sectors not only drain your resources but can also potentially place projects or businesses in jeopardy. ENVIRONMENT We all deserve a clean. businesses and governments recognize the need to incorporate environmental concerns into their decision making. 112 OTHER INFORMATION . Now more than ever. Our years of experience in avoiding. mitigating or resolving disputes have helped our clients overcome even the most complex of challenges. Arcadis’ specialist teams around the globe are uniquely positioned to provide safe and secure water technology that is built to withstand the demands of a rapidly changing world. Thanks to our centuries of experience in the water sector. timeframes and the large number of parties involved can be daunting. Budgets. and assure the outcomes to meet our clients’ business objectives and create exceptional value. WATER From source to tap and then back to nature. OTHER INFORMATION 113 .PROJECT & PROGRAMME MANAGEMENT Organizing the creation of the world’s largest. most complex and iconic programs of work in the built and natural environment today is no easy task. health and safety. supply chains. we work alongside our clients to create the right strategy. the planet’s most precious resource should be cherished. At Arcadis. manage and mitigate risk. 5 OTHER INFORMATION DIRECTORY OF OFFICES MALAYSIA SELANGOR LANGDON & SEAH SDN BHD JURU UKUR BAHAN MALAYSIA JUBM SDN BHD ARCADIS PROJEKS SDN BHD Level 5, Menara TSR 12 Jalan PJU 7/3, Mutiara Damansara 47810 Petaling Jaya Selangor Darul Ehsan, Malaysia GPS : 3.1616, 101.6129 Tel/Fax : (60 3) 2106 8000 / (60 3) 2106 9090 Email : [email protected] Contact : Loo Ming Chee / Mohd Ali Abd Karim / Justin Teoh / Syed Mahadzir Syed Ahmad / Mohamad Faiz Awang / Nur Aziz Abu Bakar JOHOR LANGDON & SEAH SDN BHD JURU UKUR BAHAN MALAYSIA JUBM SDN BHD ARCADIS PROJEKS SDN BHD 47, Jalan Setia Tropika 1/30 Taman Setia Tropika 81200 Johor Bahru Johor Darul Takzim, Malaysia GPS : 1.5422, 103.7111 Tel/Fax : (60 7) 232 8300 / (60 7) 232 8232 Email : [email protected] Contact : Syed Mahadzir Syed Ahmad PENANG LANGDON & SEAH SDN BHD JURU UKUR BAHAN MALAYSIA JUBM SDN BHD ARCADIS PROJEKS SDN BHD Suite 3A-3, Level 3A Wisma Great Eastern No.25, Lebuh Light 10200 Penang, Malaysia GPS : 5.4201, 100.3408 Tel : (60 4) 264 2071 / 264 2072 / 264 2073 Fax : (60 4) 264 2068 Email : [email protected] Contact : Nur Aziz Abu Bakar SABAH LANGDON & SEAH SDN BHD JURU UKUR BAHAN MALAYSIA JUBM SDN BHD ARCADIS PROJEKS SDN BHD Suite 8A, 8th Floor Wisma Pendidikan, Jalan Padang P.O.Box 11598, 88817 Kota Kinabalu Sabah, Malaysia GPS : 5.9783, 116.0761 Tel/Fax : (60 88) 223 369 / (60 88) 216 537 Email : [email protected] Contact : Ang Kun Eng 114 OTHER INFORMATION 5 OTHER INFORMATION (Cont’d) DIRECTORY OF OFFICES CHANGSHA LANGDON & SEAH CONSULTANCY (SHANGHAI) CO. LTD. CHANGSHA BRANCH Room 11051, Zhong Tian Plaza 766 Wu Yi Avenue, Furong District Changsha, Hunan Province, 410005, China GPS : 28.1952, 112.9831 Tel/Fax : (00 86 731) 8971 1860 / (00 86 731) 8971 6736 Email : [email protected] Contact : Chen Yong CHENGDU LANGDON & SEAH CONSULTANCY (CHENGDU) CO. LTD. Room 807, Block A, Times Plaza No.2 Zongfu Road, Chengdu Sichuan Province, 610016, China GPS : 30.6567, 104.0806 Tel/Fax : (00 86 28) 8671 8373 / (00 86 28) 8671 8535 Email : [email protected] Contact : Lum Ka Wai, Andy CHONGQING LANGDON & SEAH CONSULTANCY (CHENGDU) CO. LTD. CHONGQING BRANCH Room 3408, International Trade Centre 38 Qing Nian Road, Central District Chongqing 400010, China GPS : 29.5563, 106.5743 Tel/Fax : (00 86 23) 8655 1333 / (00 86 23) 8655 1616 Email : [email protected] Contact : Lin Wai Yip, Gary DALIAN LANGDON & SEAH (BEIJING) CONSTRUCTION CONSULTANTS CO LTD DALIAN BRANCH Unit 07, 32F, Xiwang Tower 136 Zhongshan Road, Zhongshan District Dalian, Liaoning Province, 116001, China GPS : 38.9149, 121.6312 Tel/Fax : (00 86 411) 8800 8018 / (00 86 411) 8800 8823 Email : [email protected] Contact : Ng Hin Kan, Kenn FOSHAN LANGDON & SEAH CONSULTANCY (SHENZHEN) CO. LTD. FOSHAN BRANCH 3/F, Foshan Ling Nan Tian Di Zu Miao Road Shop Nos. Z01-Z11 Zu Miao Road, Foshan Guangdong Province, 528000, China GPS : 23.0312, 113.1128 Tel/Fax : (00 86 757) 8203 0028 / (00 86 757) 8203 0029 Email : [email protected] Contact : Lee Kwok Wing, Dickey 116 OTHER INFORMATION LTD. 570100. 519031.0295.2189 Tel/Fax : (00 86 571) 2829 7766 / (00 86 571) 2829 7622 Email : [email protected] Tel/Fax : (00 86 20) 8130 3813 / (00 86 20) 8130 3812 Email : [email protected] Tel/Fax : (00 86 756) 868 8986 / (00 86 756) 868 8969 Email : [email protected]. 120. Hangzhou Zhejiang Province.1428. GUANGZHOU BRANCH 3A10-18 Unit. Hengqin Zhuhai. Hong Kong GPS : 22. AIA Kowloon Tower Landmark East. Haikou Hainan Province. Francis (Cont’d) OTHER INFORMATION 117 . 310016. 3/F. 114. LTD. Jack HAIKOU LANGDON & SEAH CONSULTANCY (SHENZHEN) CO. HAIKOU BRANCH Unit B 27/F Times Square 2 GuomaoRoad. Kowloon.3262 Tel/Fax : (00 86 898) 6652 7818 / (00 86 898) 6652 7809 Email : info-cn@arcadis. 100 How Ming Street Kwun Tong. 113. China GPS : 23.3125. China GPS : 22. China GPS : 30. Bank of America Plaza 555 Ren Min Zhong Road.com Contact : Au Kai Ming. Guangzhou Guangdong Province. Guangdong Province. 110.com Contact : Wong Wing Cheung.1231.2223 Tel/Fax : (00 852) 2830 3500 / (00 852) 2576 0416 Email : info-hk@arcadis. 510145. 156 Nan Shan Ju Road. China GPS : 20.2518.com Contact : Yi Zheng Gang HANGZHOU LANGDON & SEAH CONSULTANCY (SHANGHAI) CO. HANGZHOU BRANCH Room 2305 WinNing International 100 Min Xin Road.LTD.GUANGZHOU LANGDON & SEAH CONSULTANCY (SHENZHEN) CO. Stanley HONG KONG ARCADIS ASIA LIMITED LANGDON & SEAH HONG KONG LIMITED LANGDON & SEAH CHINA LIMITED LANGDON & SEAH MANAGEMENT LIMITED 38/F.com Contact : Wan Chi Shing. HENGQIN BRANCH 7/F. 113.com Contact : Lu Mei Hua / Zhou Yuan HENGQIN LANGDON & SEAH CONSULTANCY (ZHUHAI HENGQIN) CO. 110013. Nanjing Jiangsu Province 210009. Shangdong Province. Shinan District Qingdao. 594 Edificio BCM. China GPS : 36. SHENYANG BRANCH Room 1801. 1806-1809.4355 Tel/Fax : (00 86 24) 3195 8880 / (00 86 24) 3128 6983 Email : info-cn@arcadis. GPS : 31.5 OTHER INFORMATION (Cont’d) DIRECTORY OF OFFICES MACAU LANGDON & SEAH MACAU LIMITED Avenida da Praia Grande. Joe SHENYANG LANGDON & SEAH (BEIJING) CONSTRUCTION CONSULTANTS CO. 18/F E Tower of Fortune Plaza. Simon 118 OTHER INFORMATION . 123.com Contact : Chan Hoi Or.1922. LTD. No.0719.com Contact : Chen Taofen QINGDAO LANGDON & SEAH CONSULTANCY (SHANGHAI) CO. Building C. LTD. QINGDAO BRANCH Room 09. The Place. No.3754 Tel/Fax : (00 86 532) 8280 1818 / (00 86 532) 8280 1881 Email : info-cn@arcadis. NANJING BRANCH 1104 South Tower Jinmao Plaza.0609. LTD. 120. Macau GPS : 22. Changning District Shanghai 200051. Katherine NANJING LANGDON & SEAH CONSULTANCY (SHANGHAI) CO.com Contact : Feng Shi En.7834 Tel/Fax : (00 86 25) 5791 1860 / (00 86 25) 6698 1860 Email : info-cn@arcadis. 201 Zhong Yang Road. China. 11th Floor.150 Zunyi Road. HNA Center 234 Yan An San Road. 59 Beizhan Road Shenhe District. 113.com Contact : Chan Yuk Sim. 266071. 12th Floor. 118. 16F.2073.com Contact : Chow Hau Ming. LTD.4079 Tel/Fax : (00 86 21) 6026 1300 / (00 86 21) 6026 1800 Email : info-cn@arcadis. 121. Andy SHANGHAI LANGDON & SEAH CONSULTANCY (SHANGHAI) CO.5413 Tel/Fax : (00 853) 2833 1710 / (00 853) 2833 1532 Email : info-mo@arcadis. Shenyang Liaoning Province. China GPS : 41. China GPS : 32.8143. LTD. 710065.3103 Tel/Fax : (00 86 27) 5920 9299 / (00 86 27) 5920 9298 Email : info-cn@arcadis. 215021 China GPS : 31. China GPS : 30.com Contact : Lo Kwok Chu. Tianjin World Financial Centre Office Tower 2 Dagubei Road. 1628 Zhongshan Road Wuhan. LTD.6082.2028 Tel/Fax : (00 86 22) 2329 8611 / (00 86 22) 2319 3186 Email : info-cn@arcadis. XI’AN BRANCH Unit 06-07. 120. Hubei Province 430010.9349 Tel/Fax : (00 86 29) 8866 9711 / (00 86 29) 8866 9760 Email : [email protected] Contact : Wang Zhu Zhu (Cont’d) OTHER INFORMATION 119 . 108. China GPS : 22. He Ping District Tianjin.com Contact : Wong Chin Ying WUHAN LANGDON & SEAH CONSULTANCY (SHANGHAI) CO. WUHAN BRANCH Room 1008. Kenneth SUZHOU LANGDON & SEAH CONSULTANCY (SHANGHAI) CO LTD SUZHOU BRANCH Room 906 Century Financial Tower 1 Suzhou Avenue West. Corporate Centre 5 Wuhan Tiandi. Shaanxi Province.com Contact : Guang Rong XI’AN LANGDON & SEAH CONSULTANCY (SHENZHEN) CO. 16/F. China GPS : 39. 114. Shenzhen Guangdong Province 518031. 10/F.5432. Suzhou Jiangsu Province.1296.com Contact : Zhang Rui TIANJIN LANGDON & SEAH CONSULTANCY CO LTD TIANJIN BRANCH 4002.6749 Tel/Fax : (00 86 512) 8777 5599 / (00 86 512) 8777 5600 Email : info-cn@arcadis. China GPS : 34.0821 Tel/Fax : (00 86 755) 2598 1841 / (00 86 755) 2598 1854 Email : info-cn@arcadis. AVIC Centre 1018 Huafu Road.SHENZHEN LANGDON & SEAH CONSULTANCY (SHENZHEN) CO LTD Room 1001.2304. 40/F. 114. 117. CapitaMall Office Building 64 South Second Ring Western Xi’an.3159. 300020. Near Khopat Bus Depot. Izzat Nagar Hyderabad 500084. India GPS : 19. 78. LTD New No. 72. M G Road Bangalore 560008.055. Udyog Vihar Phase-V.465. Pune 411004 (Near Skoda Show Room) Maharashtra. 80.085 Tel/Fax : (00 91 124) 430 8790 / (00 91 124) 430 8793 Email : [email protected]. First Floor Akruti SMC Khopat Junction. Unit No. 20.8567 Tel/Fax : (00 91 20) 2565 0417 / (00 91 22) 3933 5556 Email : [email protected] Contact : Velan Murali / Darshan Joshi / Rahul Patil MUMBAI LANGDON & SEAH CONSULTING INDIA PVT LTD Unit No. Thane (West) 400601. India GPS : 12. India GPS : 18. Maharashtra. LTD The Elements.5204.5 OTHER INFORMATION (Cont’d) DIRECTORY OF OFFICES INDIA BANGALORE LANGDON & SEAH CONSULTING INDIA PVT LTD 2nd Floor.9.9756 Tel/Fax : (00 91 22) 4125 6060 / (00 91 22) 4125 6050 Email : [email protected]. Bhandarkar Institute Road Lane No-14.475.617 Tel/Fax : (00 91 80) 4123 9141 / (00 91 80) 4123 8922 Email : [email protected] Contact : Velan Murali / Bhoomeshwar Rao PUNE LANGDON & SEAH CONSULTING INDIA PVT LTD City Survey No 804/B.265 Tel/Fax : (00 91 44) 2855 3137 / (00 91 44) 2855 0141 Email : info-in@arcadis. 2nd Floor. India GPS : 13. India GPS : 17. 77.com Contact : Velan Murali / Darshan Joshi 120 OTHER INFORMATION . West Cott Road.com Contact : Velan Murali / Sankar Ramakrishnan DELHI LANGDON & SEAH CONSULTING INDIA PVT. Esquire Center No. Trade Fair Office Hitex Exhibition Center. 73. 77. Royapettah Chennai 600004.375 Tel/Fax : (00 91 40) 2311 4942 / (00 91 40) 2311 2942 Email : [email protected] Contact : Velan Murali / Biju AK CHENNAI LANGDON & SEAH CONSULTING INDIA PVT. Gurgaon Haryana 122016 India GPS : 28.974.com Contact : Velan Murali / Arun Basu HYDERABAD LANGDON & SEAH CONSULTING INDIA PVT LTD 2nd Floor. Seochojungang-ro 24-gil Seocho-Gu. Jalan By Pass Ngurah Rai No. 121. 6th Floor E2-3. Indonesia GPS : [email protected] GPS : 22. Kings Court 1 2129 Chino Roces Avenue Makati City 1231. EP & Gp Block. Putu Arya Canti JAKARTA P.9054 Tel/Fax : (00 63 32) 2322 200 / (00 63 32) 2603 699 Email : info-ph@arcadis. Cardinal Rosales Avenue Cebu Business Park Cebu City 6000. Indonesia GPS : 6. 115. 2Quad Bldg.2106 Tel/Fax : (00 62 361) 472 5353 / (00 62 361) 472 5354 Email : info. Banjar Pengenderan. 88.4337 Tel/Fax : (00 91 124) 430 8790 / (00 91 124) 430 8793 Email : [email protected]@arcadis. Philippines GPS : 14.com Contact : Ir. Kedonganan Bali 80361. 106.0135 Tel/Fax : (00 63 2) 811 2971 / (00 63 2) 811 2071 Email : [email protected] Tel/Fax : (00 82 2) 543 3888 / (00 82 2) 543 3898 Email : info-kr@arcadis. 127.com Contact : Peter Robinson KOREA SEOUL LANGDON & SEAH KOREA CO LTD #429.com Contact : Darneil Perez CEBU LANGDON & SEAH PHILIPPINES INC 12F.com Contact : Darneil Perez OTHER INFORMATION 121 .KOLKATA LANGDON & SEAH CONSULTING INDIA PVT LTD Stesalit Towers. Ratu Plaza Office Tower Jalan Jenderal Sudirman 9 Jakarta 10270.T.5576.67.5698. 27.7893. Philippines GPS : 10. Salt Lake Kolkata . Sector V. LANGDON & SEAH INDONESIA Level 18. 123.4953.T.com Contact : Aaron Page PHILIPPINES MANILA LANGDON & SEAH PHILIPPINES INC 4th & 7th Floor.com Contact : Velan Murali / Arun Basu INDONESIA BALI P.2271.3143. Seoul Korea 137-882 GPS : 37. Alamanda Office. LANGDON & SEAH INDONESIA Level 2.8008 Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846 Email : info. 5 OTHER INFORMATION (Cont’d) DIRECTORY OF OFFICES SINGAPORE LANGDON & SEAH SINGAPORE PTE LTD L&S CONTRACT ADVISORY & DISPUTE MANAGEMENT SERVICES PTE LTD 1 Magazine Road.7025 Tel/Fax : (00 848) 3823 8297 / (00 848) 3823 8197 Email : [email protected] Contact : Mark Olive HO CHI MINH CITY LANGDON & SEAH VIETNAM CO LTD L12-03.0462.8421 Tel/Fax : (65) 6239 8600 / (65) 6538 4508 Email : [email protected] Tel/Fax : (65) 6222 3888 / (65) 6224 7089 Email : info-sg@arcadis. Lumpini Pratumwan Bangkok 10330.5454 Tel/Fax : (00 66 2) 253 1438-9 / (00 66 2) 253 4977 Email : [email protected] Tel/Fax : (00 844) 3942 7525 / (00 844) 3942 7526 Email : info-vn@arcadis. Hoa Binh Tower Building 106 Hoang Quoc Viet Street Cau Giay District Hanoi. Thailand GPS : 13.sg Contact : Seah Choo Meng / Teoh Wooi Sin / Bernard Ho THAILAND BANGKOK LANGDON & SEAH (THAILAND) LTD LECE (THAILAND) CO LTD 10th Floor. 103. Vincom Building 72 Le Thanh Ton Street.com Contact : Mark Olive 122 OTHER INFORMATION . Kian Gwan II Building 140/1 Wireless Road. 100. Vietnam GPS : 10. Level 12. 103. 105.com Contact : Ang Yen Kooi / Wong Soon Bin VIETNAM HANOI LANGDON & SEAH VIETNAM CO LTD Level 2.2885. District 1 Ho Chi Minh City.7778.com Contact : Eugene Seah / Ho Kong Mo ARCADIS PROJECT MANAGEMENT PTE LTD 1 Magazine Road. 106. #03-12 Central Mall Singapore 059567 GPS : 1.2885. #05-01 Central Mall Singapore 059567 GPS : 1.7350. Vietnam GPS : 21. com Contact : Poon Kan Young.3125. Kenneth.Box 7895 1008 AB Amsterdam The Netherlands Tel/Fax : (00 31 20) 201 1011 / (00 31 20) 201 1002 Email : info@arcadis. Kowloon. 114.com Website : www.com Contact : Neil McArthur. CEO ARCADIS HEADQUARTERS AMSTERDAM ARCADIS NV “Symphony” Gustav Mahlerplein 97-103 1082 MS Amsterdam P. CEO OTHER INFORMATION 123 .ARCADIS ASIA HEADQUARTERS HONG KONG ARCADIS ASIA LIMITED 38/F AIA Kowloon Tower. Landmark East 100 How Ming Street Kwun Tong. Hong Kong GPS : 22.arcadis.2223 Tel/Fax : (00 852) 2830 3500 / (00 852) 2576 0416 Email : [email protected]. Co-operatives & Consumerism Ministry of Housing and Local Government Ministry of Works Malaysia Kuala Lumpur City Hall (DBKL) Perbadanan Putrajaya Petaling Jaya City Council (MBPJ) Shah Alam City Council (MBSA) Subang Jaya Municipal Council (MPSJ) Kajang Municipal Council (MPK) Selayang Municipal Council (MPS) Ampang Jaya Municipal Council (MPAJ) Penang Island Municipal Council SIRIM Berhad The Malaysia Highway Authority Contractor’s Association Master Builders Association Malaysia Contractor’s Registration Board Construction Industry Development Board (CIDB) Professional Registration Boards Board of Architects Malaysia Board of Engineers Malaysia Board of Quantity Surveyors Malaysia Professional Bodies Assoc. of Consulting Engineers Malaysia (ACEM) Malaysia Institute of Architects (PAM) Malaysia Institute of Planners (MIP) The Institution of Engineers Malaysia (IEM) Royal Institution of Surveyors Malaysia (RISM) Other Important Numbers Ambulance & Police Civil Defence (Rescue) Fire Fighter General Hospital KL SYABAS Sdn Bhd Tenaga Nasional (KL) 124 03-8885 7000 03-2698 9211 03-8000 8000 03-8000 8000 03-8000 8000 03-2617 9000 03-8000 8000 03-7956 3544 03-5510 5133 03-8024 7700 03-8737 7899 03-6126 5800 03-4296 8000 04.5 OTHER INFORMATION TELEPHONE DIRECTORY (MALAYSIA) Ministries/Departments Department of Statistics Malaysia Department of Town and Country Planning Ministry of Domestic Trade.259 2020 03-5544 6000 03-8738 3000 03-7984 8636 03-4047 7000 03-2698 2878 03-2610 7095 03-2610 8140 03-2095 0031 03-2693 4182 03-7877 0636 03-7968 4001 03-7955 1773 999 999 999 03-2615 5555 1800 88 5252 03-2296 5566 OTHER INFORMATION . com .com FOLLOW US @Arcadis_Asia JOIN US Linkedln Arcadis www.arcadis. Malaysia Tel: (603) 2106 8000 / 2106 9000 Fax: (603) 2106 9090 Email: [email protected] www. 47810 Petaling Jaya Selangor. Menara TSR. 12 Jalan PJU 7/3 Mutiara Damansara.An Affiliate of ARCADIS LANGDON & SEAH SDN BHD JURU UKUR BAHAN MALAYSIA JUBM SDN BHD ARCADIS PROJEKS SDN BHD Level 5.
Copyright © 2024 DOKUMEN.SITE Inc.