Certified Scrum Master Question Dumps 2 - Tutorials for Exams

March 26, 2018 | Author: Gokul Krish | Category: Scrum (Software Development), Leadership, Leadership & Mentoring, Accountability, Business


Comments



Description

Certified Scrum Master Question Dumps 2 - Tutorials for Exams http://tutorials.algaeservice.com/2016/08/certified-scrum-master-questio... 1) What does the Product Owner do during a Sprint? A. Protects the Team and the process B. Clarifies requirements and answers questions (Correct Answer) C. Guides the Team in its work D. Intervenes when required to make sure the pace of work is sustainable Send 2) Which role is responsible for turning the Product Backlog into incremental pieces of functionality? A. Product Owner B. ScrumMaster C. Team (Correct Answer) D. Everyone within the Project 3) If a Team member is consistently late for the Daily Scrum, what is usually the first thing a Team should do? A. Report the Team member to his or her manager B. Have the Team member do the testing C. Meet with the Team member to determine a solution (Correct Answer) D. Ask the ScrumMaster to move the Team member off the Team 4) During a Daily Scrum meeting, Olivia mentions she has found some open source code she thinks will solve one of the problems she has been working on. She wants to implement it immediately. What is the best next step? A. The ScrumMaster tells Olivia to prepare an example and presentation for the Team so they can consider using the code B. After the Daily Scrum meeting is held, a separate meeting is conducted to discuss the open source solution (Correct Answer) C. All members of the Team are told to evaluate Olivia's solution and report back to the team at the next Daily Scrum meeting. D. The Product Owner notes the impediment and solves the problem after the meeting 5) Who is responsible for facilitating the Sprint Retrospective Meeting? A. Team 1 of 7 5/24/2017 11:42 AM Product Owner B. ScrumMaster C. To lead the Team in the evaluation of each individual Team member D. Team (Correct Answer) C. Stakeholders 8) What is the ScrumMaster's role in the Sprint Retrospective? A. To make sure the Team is still on target for its Sprint goals C.. Four hours maximum (Correct Answer) B. Stakeholders D. Product Owner C. Four to eight hours C. A slow running server is not considered an impediment 10) Why should the Product Owner attend the Daily Scrum? A. No one 6) Which role is MOST LIKELY to communicate an impediment during a Daily Scrum? A. At least eight hours D. To provide answers to the challenges that the Team identifies 9) Which of the following is true concerning impediments? A. ScrumMaster (Correct Answer) D. Scrum Development Team B. To determine the re-composition of the Team B. B. Product Owner (Correct Answer) D. how long is the Sprint Review Meeting? A. D. As long as required 2 of 7 5/24/2017 11:42 AM . ScrumMaster 7) Who is primarily responsible for maintaining the Product Backlog? A. It is the Product Owner's job to remove impediments. To comment on the Team's progress B.Certified Scrum Master Question Dumps 2 .com/2016/08/certified-scrum-master-questio. To tell the Team which tasks to work on next and update the Product Backlog D. To see the progress being made and determine whether the Team needs help(Correct Answer) 11) In a 30-day Sprint.algaeservice.Tutorials for Exams http://tutorials.. To facilitate the Team's search for improvements (Correct Answer) C. The Team should not use daily Scrum meetings to report impediments B. It is the ScrumMaster's top priority to remove impediments (Correct Answer) C. . Product Owner. Scrum Teams place value in following a plan. Product Owner C. Features a detailed overview that enlightens and inspires B. C. but they value responding to change even more (Correct Answer) B.Certified Scrum Master Question Dumps 2 . Provides a complete breakdown structure of the ROI formula C. Team 18) What does Scrum's definition of done help a Team produce? 3 of 7 5/24/2017 11:42 AM . This is outside of the scope of Scrum D. A. Scrum is intended to be an efficient way to carry out plans that have already been made D. Outlines traceability back to overall corporate governance in IT investment 14) Which of the following statements is TRUE about Scrum teams and planning? A. ScrumMaster. Is the Team's Scrum expert. Creates. Planning is not important in Scrum. Project Manager. and Team (Correct Answer) C. Describes why the project is pursued and the product desired end state (Correct Answer) D. Is the keeper of the product vision 16) According to Scrum guidelines. Team D. refines and communicates customer requirements to the Team D. (Correct Answer) C. who should be present when reviewing and adjusting the Sprint goal and work? A. who is responsible for hiring or assigning a new person into a Team? A. Determine the appropriate release dates (Correct Answer) B. Traditional planning is replaced by the Sprint Burndown chart 15) The ScrumMaster. Controls the priority order of items in the team's backlog B.ScrumMaster.Tutorials for Exams http://tutorials. Determine the Team composition necessary for success D.com/2016/08/certified-scrum-master-questio.algaeservice.. Product Owner and Stakeholders B.. 12) Which of the following is a responsibility of the Product Owner? A. Determine the length of the Sprints 13) What are the desirable qualities of a Product Vision? A. Determine the appropriate technical solution for the project.. ScrumMaster B. The self-managing Team (Correct Answer) 17) If a Team determines that it has over-committed itself for a Sprint. C. as the ScrumMaster is committed to the Scrum framework D. For the Team to manage the number of hours spent on tasks in the Sprint D.algaeservice. Keeping stakeholders from distracting the Team C.. B. Architecture is not important. Architecture is defined and planned up front D. For the ScrumMaster to manage the progress during the Sprint B. Functionality that has been deployed to the users and delivers real business value B. For the Team to manage themselves during the Sprint (Correct Answer) C. Functionality that has been designed and analyzed C. what authority does it have? A. Managing the project and ensuring that the work meets the commitments to the stakeholders D. The Team does whatever is necessary to achieve the goal (Correct Answer) 22) Which of the following is a MAIN purpose of a Sprint Backlog? A. The Team works under the authority of the Product Architect. For Stakeholders to review what the Team has built and to give input on what to do next (Correct Answer) C.Tutorials for Exams http://tutorials. For the Product Manager to be able to show progress to the Stakeholders 4 of 7 5/24/2017 11:42 AM . Product functionality ready to be tested D. The Team has authority to swap Sprint backlog items with Product Backlog items if it cannot finish them. but functionality is important C.com/2016/08/certified-scrum-master-questio. Directing the Team's daily activities B. who has set the definition of done C. For Stakeholders to "hold the Team's feet to the fire" . For the Product Owner to understand what the Team has committed to for a Sprint 23) What is the main purpose of a Sprint Review? A. An increment of potentially shippable product (Correct Answer) 19) How do the principles behind the Agile Manifesto suggest approaching architecture? A. Optimizing the business value of the work (Correct Answer) 21) After a Team has committed to a Sprint goal.. Architecture emerges (Correct Answer) B.Certified Scrum Master Question Dumps 2 . Architecture is defined and implemented in the first iterations 20) How are the Product Owner's responsibilities BEST described? A.to make sure something is produced during the Sprint D. For the Team to review their work and to determine what is needed to complete the next set of backlog items B. A. The Team works according to the priorities set by the ScrumMaster. Accomplishes the Sprint goal (Correct Answer) D. as the project is focused on current status B. The ScrumMaster 26) Can the Product Owner and the ScrumMaster be the same person? A. Develops a plan for the rest of the Sprints C. 24) What does the Team do during the first Sprint? A. Delivers design documents B.com/2016/08/certified-scrum-master-questio. Yes.Certified Scrum Master Question Dumps 2 . After every day (Correct Answer) C.. who is primarily responsible for making scope versus schedule trade-off decisions? A. Team lead C. After every release D. It would take too much of one person's time D. who determines how the Team does its work? A.Tutorials for Exams http://tutorials. After every Sprint B. Project Manager B. The Product Owner (Correct Answer) D. Yes. Planning is not required in an agile project. D. as long as the person can balance both responsibilities with care 27) How does the Agile Manifesto address planning? A.. Upfront planning and design is an integral stage before development can begin. 28) When should the Burndown Chart be updated? A. Sign-off on the detail of Product Backlog items is mandatory before any item can be planned into an iteration.algaeservice. No. The Project Manager B. The person would have too much power and it would create confusion (Correct Answer) B. Responding to change is more important than following a plan (Correct Answer) C. The Team C. After every week 29) Once a Team starts a Sprint. Team (Correct Answer) 30) Which statement is accurate about the role of the Product Owner during 5 of 7 5/24/2017 11:42 AM . Predetermines the complete architecture and infrastructure 25) When using Scrum. if the person has the authority and empowerment to do both things C. No. ScrumMaster D. The Product Owner ensures the Burndown rate is maintained at the estimated rate D. Changes are accepted at any time during the development effort depending on the business value of the change. The Team extends the length of the Sprint until the Product Owner returns B.. the Product Owner's acceptance. then all changes are deferred to a future release 34) What is the approach that Scrum encourages when a Team determines it will be difficult to deliver any value by the end of a Sprint? A. C. 6 of 7 5/24/2017 11:42 AM . What should the Team do? A. Then. The ScrumMaster assumes the responsibilities of the Product Owner. Which of the following statements illustrates this? A. Extend the Sprint by a few days to accommodate the extra work C. The Sprint is abnormally terminated D.com/2016/08/certified-scrum-master-questio. The Product Owner's participation is defined by the Team (Correct Answer) B. focus on what can be done and identify a way to deliver something valuable at the end of each Sprint (Correct Answer) B. changes are deferred to a future release C. the Daily Scrum? A. Immediately escalate to Senior Management. C. Respect the CEO's authority and add the story to the current Sprint without any adjustments B. The product increment may not meet expectations (Correct Answer) 33) Agile Manifesto says to value responding to change over following a plan. Add the story to the current Sprint and drop a story of equal size 32) What is MOST likely to result if the Product Owner is not available during a Sprint? A.Tutorials for Exams http://tutorials.Certified Scrum Master Question Dumps 2 . Changes are accepted up until the point that the first Sprint begins.algaeservice. Together with the Product Owner. and the ability of the team to respond in a timeframe acceptable to the Product Owner (Correct Answer) D. Suggest the Product Owner abnormally terminate the Sprint D. Inform the Product Owner so he/she can work with the CEO (Correct Answer) D. Add the story to the next Sprint. Changes are accepted only if other features are removed from the backlog such that a fixed end-date is maintained B. The Product Owner outlines the additional changes that must be absorbed by the Team in the Sprint C.. The Product Owner provides instruction to the Team on how to implement a workable solution 31) The CEO asks the Team to add a story to the current Sprint. Changes are accepted up until about halfway through the project. and adaptation (Correct Answer) B. and simplicity D. and measuring C.algaeservice. inspection.. Feedback.Certified Scrum Master Question Dumps 2 . Transparency.. committing. 35) What are the three components of an empirical process? A. taking action. courage. Planning. and checking for quality 光相天 7 of 7 5/24/2017 11:42 AM .com/2016/08/certified-scrum-master-questio. Planning.Tutorials for Exams http://tutorials.
Copyright © 2024 DOKUMEN.SITE Inc.