Calculo de Redes de Distribución

June 22, 2018 | Author: E Gony De la Cruz | Category: Liquids, Hydraulic Engineering, Water And The Environment, Water And Politics, Hydrology


Comments



Description

CALCULO HIDRALICO DE LA RED DE DISTRIBUCION - SISTEMA RAMIFICADOPROYECTO: CONSULTOR: CLIENTE: ENTIDAD: SECTOR II A) CALCULO BASICO DE DISEÑO DATOS: Población actual= Dotacion = Poblacion de diseño= K1= k2= Factor de crecimiento 748 150.00 959 1.30 2.00 1.2820855615 lt/hab/dia hab. RESULTADOS: Caudal promedio= Caudal maximo diario= Caudal maximo horario= Caudal unitario= 2.220 2.886 4.440 0.0046296 lt/seg lt/seg lt/seg lt/seg/hab B) CALCULO DE LOS GASTOS POR TRAMO TRAMO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 INICIO RESV. A A A B H B C I C D E E F F D G G D J K J L L M N N O O O P P Q Q R T R S S FINAL A TAP. N°1 TAP. N°2 B H VPII N°1 C I VPII N°2 D E VPII N°3 F VPII N°4 TAP. N°3 G TAP. N°4 VPII N°5 J K TAP. N°5 L TAP. N°6 M N VPII N°6 O TAP. N°7 VPII N°7 P TAP. N°8 Q TAP. N°9 R T VPII N°8 S VPII N°9 TAP. N°10 TOTAL N° HAB. POB. FUTURA POR TRAMO 0 8 14 8 90 6 8 167 14 0 17 5 28 12 14 8 38 12 56 22 0 42 65 14 24 26 0 22 28 0 46 15 8 13 42 28 22 17 21 959 N° HABIT. POR TRAMO 0 6 11 6 70 5 6 130 11 0 13 4 22 9 11 6 30 9 44 17 0 33 51 11 19 20 0 17 22 0 36 12 6 10 33 22 17 13 16 748 GASTOS POR TRAMO (lt/seg) 0.000 0.036 0.065 0.036 0.415 0.030 0.036 0.772 0.065 0.000 0.077 0.024 0.131 0.053 0.065 0.036 0.178 0.053 0.261 0.101 0.000 0.196 0.303 0.065 0.113 0.119 0.000 0.101 0.131 0.000 0.214 0.071 0.036 0.059 0.196 0.131 0.101 0.077 0.095 4.440 C) CALCULO HIDRAULICO DE LA RED DE DISTRIBUCION GASTO (lt/seg) TRAMO 1 2 3 INICIO RESV. A A FINAL A TAP. N°1 TAP. N°2 TRAMO 0.000 0.036 0.065 LONGITUD (m) DISEÑO 4.615 0.036 0.065 617.490 203.400 96.500 DIAMETRO NOMINAL INTERNO (pulg.) (mm) 4" 105.8 3/4" 22.9 3/4" 22.9 VELOCIDAD (m/s) 0.525 0.086 0.159 PERDIDA DE CARGA UNIT. TRAMO (‰) (m) 3.021 1.865 0.639 0.130 1.962 0.189 COTA PIEZOMETRICA (m.s.n.m.) INICIAL FINAL 574.00 572.13 572.13 572.00 572.13 571.95 COTA DEL TERRENO (m.s.n.m.) INICIAL FINAL 574.00 552.50 552.50 563.00 552.50 555.00 PRESION (m) FINAL INICIAL 0.00 19.63 19.63 19.63 9.00 16.95 131 0.00 555.04 17.80 539.186 0.000 0.036 0.04 19.59 569.8 55.331 0.00 539.480 176.310 66.135 0.4 55.086 0.00 553.68 568.250 45.70 551.50 545.4 55.00 557.52 43.440 4. N°6 M N VPII N°6 O TAP.012 0.065 0.580 1286.007 0.1 82.119 0.288 0.15 570.89 37.245 0.59 12.80 516.452 5.359 1.513 0.15 40.73 571.077 0.237 0.42 570.49 49.8 29.210 1084.00 526.302 6.307 1.211 2.4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 A B H B C I C D E E F F D G G D J K J L L M N N O O O P P Q Q R T R S S B H VPII N°1 C I VPII N°2 D E VPII N°3 F VPII N°4 TAP.222 0.00 530.159 0.371 1. N°10 TOTAL 0.101 0.005 2.196 0.50 516.077 0.053 0.314 0.34 41.006 2.5 TOTAL 2.101 0.391 8.79 566.42 40.00 546.210 59.36 33.962 7.236 8.04 570.8 55.81 568.68 570.33 571.64 32.4 55.178 0.185 0.28 570.86 570.00 528.44 571.4 22.199 0.639 1.57 25.087 1.00 553.16 15.4 82.085 5.196 0.50 546.80 532.130 0.520 27.9 29.45 46.727 2.113 0.077 0.50 524.414 0.52 49.15 40. N°3 G TAP.59 15.80 530.073 0.74 570.303 0.90 18.31 49.00 539.465 0.1 22.8 55.400 117. N°4 VPII N°5 J K TAP.89 42.260 50.80 553.360 1033.00 553.73 41.4 29.32 566.04 16.63 571.44 571.931 1.084 0.262 0.33 571.5 C-7.00 546.036 0.500 78.000 0.594 0.100 152.52 571.90 32.04 571.00 527.89 570.79 37.80 538.50 19.15 42.64 31.595 2.180 317.053 0.15 32.030 84.34 39.00 542.45 570.320 0.69 571.850 70.1 22.698 0.784 0.10 570.50 522.156 2.50 542.52 49.409 0.95 570.58 40.04 15.00 528.9 55.438 0.80 516.275 0.8 1257.15 570.89 571.870 142.9 55.058 0.459 0.74 570.310 99.27 25.240 60.80 536.04 29.74 570.1 105.362 0.101 0.033 0.00 555.69 30.9 82.059 572.27 37.564 0.00 529.57 29.065 3.600 113.8 29.68 39.44 571.850 67.120 520.48 .50 537.172 0.52 571.850 348.680 5181.106 0.059 0.98 552.750 119.095 81.723 1.50 545.402 0.47 9.140 C-10 C-10 C-7.030 0.289 0.530 115.430 53.70 553.554 0.290 356.69 571.50 560.187 0.90 18.00 529.63 29.355 3.514 0.4 22.57 571.066 0.261 0.88 570. N°5 L TAP.161 0.889 0.257 0.68 571.019 0.59 569.00 528.68 568.00 542.267 0.580 125.354 1.155 0.572 1.58 569.77 570.80 559.354 1.57 32.72 17.00 539.68 41.4 0.15 571.80 537.095 4.939 1.22 566.663 0.000 0.750 46.81 566.393 0.036 0.28 24.053 2.59 12.574 0.036 0.57 571.000 359.1 22.00 539.59 570.000 0.00 530.4 105.096 2.664 1.95 570.582 0.000 0.9 105.273 0.214 0.04 569.595 17.95 570.496 29.50 555.278 0.00 557.90 571.200 0.15 44.00 524.807 0.86 565.57 571.60 529.178 0.730 0.31 44.065 0.106 0.69 570.001 0.4 82.73 42.50 539.749 10.480 103.126 1.131 0.4 22.60 529.00 529.90 569.86 570.530 59.15 40.00 528.900 31.44 571.80 530.95 570.164 0.152 0.89 570.945 11.00 553.024 0.9 29.027 0.053 0.52 37.4 22.10 531.883 3.81 568.539 0.415 0.119 1.000 0.4 29.80 532.69 32.4 29.930 0.00 530.077 0.198 0.219 1.00 528.301 0.445 0.030 4.4 82.5 3/4" 1" 2" 3" 4" 22.086 4.024 0.90 571.80 534.15 33.673 1.73 42.68 39.72 570.32 571.9 29.50 546.94 31.10 17.31 39.64 38.30 516.77 570.00 537.00 529.4 29.00 530.004 0.020 0.570 123.324 0.50 529.519 0.44 569. N°7 VPII N°7 P TAP.4 29.50 534.13 571.131 0.036 0.842 0.850 5181.66 570.10 10.130 0.021 2.70 546.77 571.10 42.900 0.89 43.04 24.95 4" 2" 2" 4" 2" 2" 4" 2" 3/4" 1" 3/4" 3/4" 1" 1" 3/4" 4" 1" 1" 4" 1" 3" 3" 3/4" 3" 3/4" 1" 3" 3/4" 2" 3/4" 2" 1" 1" 1" 3/4" 1" 105.000 1.52 31.097 0.68 42.984 0.453 0.488 0.740 64.214 0.83 38.90 571.027 1.00 539.000 71.36 24.065 0.36 19.32 566.080 184.430 126.153 0.4 22.184 0.101 0.52 571.349 0.247 0.90 570.9 29.4 105.00 534.52 43. N°8 Q TAP.4 105.97 569.249 0.065 0.72 44.772 0.44 571.864 0.491 0.118 0. N°9 R T VPII N°8 S VPII N°9 TAP.88 33.27 25.90 534.071 0.800 67.040 96.10 530.95 C-7.367 0.232 0.9 29.9 22.770 0. . . . . grifos.RED DE DISTRIBUCION Es el conjunto de tuberias de diferentes diametros. Presiones maximas y minimas a considerar. Consideraciones basicas de diseño: Tipos de redes: Sistema abierto o ramificado Velocidad > maximo minimo < Presion > maximo minimo < . El caudal maximo horario. y demas accesorios cuyo orige Aspectos a conocer: Ubicación del reservorio. valvulas. 00 m/seg 0.00 m de agua funcion de la necesidad domestica Diametro → Valvulas → Tuberias → Calculo Hidrulico → Sistema cerrado .emas accesorios cuyo origen esta en el punto de entrada al pueblo y que se desarrolla por todas las calles de deterioro de los accesorios y tuberias 3.00 m de agua 5.60 m/seg sedimentacion perdidas por fuga y fuertes golpes de ariete 50. minimo recomendado Ø 3/4" Para aislar tramos no mayores a 300 m. En general de PVC Ecuaciones de Hazen-Williams y Fair-Whipple . En lugares que garanticen el buen funcionamiento del sistema y permitan interrupciones para realizar las ampliaciones y reparaciones de la red.rrolla por todas las calles de la poblacion.
Copyright © 2024 DOKUMEN.SITE Inc.