BEW - Method Statement for DB Dressing and Cable Glanding

April 4, 2018 | Author: Arun Udayabhanu | Category: Quality Assurance, Personal Protective Equipment, Safety, Engineering, Technology


Comments



Description

BRIGHT ELECTRICAL WORKS LLC72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING S. No. 1 Date Description 12-03-2014 Method Statement for DB Dressing and cable glanding 3/7 Prepared by Checked by Mr. Naufal Nazim Mr. Sharkawy SAFETY 6. PROCEDURE 8. RESPONSIBILITIES 7. SCOPE 3. QA/QC PROCEDURE 9. REFERENCES 4. DEFINITIONS 5.BRIGHT ELECTRICAL WORKS LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING CONTENTS 1. PURPOSE 2. ATTACHMENTS 3/7 . REFERENCES 3.BRIGHT ELECTRICAL WORKS LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING 1.2 Latest Approved Shop Drawings 3. MDB & DB Dressing and Cable Glanding 3.SCOPE OF WORKS/METHOD 2.PURPOSE To ensure that DB Dressing and Cable Glanding are executed safely and in accordance with the contract requirements and that all quality assurance / control activities required for the same are conducted in a systematic manner.1 Approved material submittals: 3. works are inspected and conformance is verified and documented.1 This procedure is applicable to the following works associated with the project titled 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY  Installation of Meter Cabinet.3 Inspection and Test plan 3/7 . 2.  He shall ensure that adequate quality measures are being undertaken. Any Process adopted and may have a particular safety risk will be assessed and addressed as required. Manufacturer’s recommendation has to be followed on health and safety if applicable.2 ENGINEER: DIAR CONSULTANT 4.9 QA/QC: QUALITY ASSURANCE / QUALITY CONTROL 4 SAFETY      Tool box talk has to be conducted all the hazards have to be identified before starting the work.5 PROJECT: BRIGHT ELECTRICAL WORKS EST LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY 4. Personnel Protective Equipments (PPE) to be worn by the Task force during execution at site.3 CONTRACTOR: BHATIA GENERAL CONTRACTING CO.1 Project Engineer  To be the focal point for interfaces and other communications with the ENGINEER and Contractors as required during execution of work. L. 3/7 .4 MEPCONTRACTOR: 4.1 EMPLOYER: JARVIS CORPORATION 4. 4. Clear the obstructions from the surrounding area to avoid Near misses and accidents.L.6 HSE: HEALTH.8 ITP: INSPECTION AND TEST PLAN 4.BRIGHT ELECTRICAL WORKS LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING 3 DEFINITIONS 4.C. 5 RESPONSIBILITIES 6.  He shall ensure that the proper tools and tackles are available for the timely completion of the job in a quality manner. SAFETY AND ENVIRONMENT 4.7 ITR: INSPECTION TEST REQUEST 4. BRIGHT ELECTRICAL WORKS LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING  He shall ensure all inspection are conducted as per the contract specifications and ITPs.2 Handling  During transportation. He shall liaise with ENGINEER for inspection of installations works. Hole saw Cutter. handling and storage. Aware of all code of practices. the cable glanding the sizes of the enclosure for the MDB. Approved Material and shop drawings and standards are available at the point of use. 3/7 . Wire Cutter. it should be protected properly with the covers.1 Equipments:  Standard Hand tools – Drilling Machine.  Monitor the quality of work & ensure that fulfillment of specified requirement and that all quality records related to work are completed.  Reviews the Method Statement before starting the work. Hammer. Crimbing tools Grinder. Chisel.  Ensure the work is completed as per quality requirements. proper tools & tackles and manpower are used at all stages of work. To ensure all inspections. Water Level.3 Site Foreman (Electrical)      Check Check Check Check Check with the approved material submittal and shop drawing the location and level. the Installation and Cable termination. 6. explains the same to the subordinates and prepares program for the daily job. 7.  He shall originate ITR for completed installation works and companies. 6 PROCEDURE 7. DB’s. Standards & Specifications and HSE plan and to appreciate the workforce to perform a time bound and quality job. Meter Cabinet etc. He should also ensure the works complies with the contract requirements / approved shop drawings.  Inspect for any damage during. He shall be responsible for the total quality control for installation work. To ensure all current issues of procedures. material must not be handled roughly. Measuring Tape etc. Contractor shall inspect the same work prior to initiate ITR for ENGINEER approval.  Maintain Comprehensive inspection and test records for any further documentation. Marker. All standards and measure related to service provider to be checked. 3/7 . Related check sheets shall be completed.BRIGHT ELECTRICAL WORKS LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING  Use of improper machinery / handling equipment for lifting must be avoided. free for any rough surfaces or corrugation and material to be covered properly during transportation. 7.3 Transportation:  The transporting vehicle must ideally have a flat bed.4 Storage  Material should be stored in covered store with locking facility. 7 QA/QC PROCEDURE All inspection / Testing as defined in related Inspection and Test Plan (ITP) shall be conducted. 7. 2. 3. 7. 4. Checking the Installation. Accepte d Date SubContract or Rejecte d Contract or Consulta nt BHATIA DIAR Remark s Checking the Glanding. 6.BRIGHT ELECTRICAL WORKS LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING 8 ATTACHMENTS 8. DB Dressing and Cable Glanding Drawing No: Report No: Location: Date: CHECK LIST FOR DB DRESSING AND CABLE GLANDING SL. Checking the approved shop drawing.CONTRACTOR APPROVALS For CONTRACTOR For CONSULTANT QA/QC DIAR SITE ENGINEER (ELECTRICAL) SIGNATURE NAME DATE 3/7 . Checking the earthing. 5. Checking the identification. Check that the material is as per approved submittal. STATUS REMARKS: For SUB. Checking the Termination of Cable. NO 1.1 CHECK LIST FOR DB DRESSING AND CABLE GLANDING. BRIGHT ELECTRICAL WORKS LLC 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING 3/7 .
Copyright © 2026 DOKUMEN.SITE Inc.