ATR (2)

March 21, 2018 | Author: rajinder kutaal | Category: Road Transport, Infrastructure, Road Infrastructure, Transport Infrastructure, Engineering


Comments



Description

FORMAT -IIIPardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt. for the month September 2010. NQM J.S. Kocher Date of inspection 22.09.2010. Sr. Name No of . Block Name work of Paragraph of reports on which action is required. Parawise action taken Sr. No. Action required & Para 1 2 3 4 5 6 1 Nalagarh Link road 1(a) Not satisfactory. Shoulder need to be shoulders has been to village maintained by removing the thick growth of maintained by removing Dharampur grass. growth of grass and shrubs Package No.- HP-11-04 2(a) 3(a) 5(a) 6 (a) No rain cuts observed. Shoulder need to be dressed to restore the camber for proper drainage of surface water. Not satisfactory. Premix carpet is completely worn out and need renewal coat after repair of few potholes. No other defects are observed. Main informatory board need to be repaired. Routine maintenance in above respect need to be carried out. Km. stones need to be repaired and panited Whether If no col No. 6 Remarks/ verification action is specify the by S.Q.M. completed date when the action will complete Y/N 7 yes 8 NA Shoulders has been dressed and lowered down yes NA Pot holes have been filledup and required renewal coat has been done. yes NA Repainting done Yes NA Km stone repaired and painted. Yes NA 9 6 shoulders has been maintained by removing growth of grass and shrubs Shoulders has been lowered down Whether If no col No. Shoulder are covered with Sheetalpur grass and shrubs which has resulted in raised road shoulders causing drainage problem.Q. Routine maintenance in painting done above respect need to be carried out. since there was no provision mtr. 6 Remarks/ verification action is specify the by S. painted. NQM J. No. 200 mtr. Kocher Date of inspection 22.State Quality Monitor FORMAT -III Pardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt. Action required & Para 1 2 3 4 5 1 Nalagarh Baddi to 1(a) Not satisfactory. Package No. Yes NA 6 (a) Km. Block Name of work Paragraph of reports on which action is required. Yes NA 9 .09.2010.HP-11-04 2(a) No rain cuts observed. stones need to be repainted. Km stone repainted and 200 Stone not fixed. Sr. Stones fixed and in DPR. completed date when the action will complete Y/N 7 yes 8 NA yes NA 5(a) Main informatory board is missing and need New board erected and to be repaired.S.. for the month September 2010. Name No of .M. Parawise action taken Sr. Name No of .HP-11-05 2(a) No rain cuts observed. 4 (a) Culverts/Causeway are fuctional. Surface of road is good.S. 6 Remarks/ verification action is specify the by S. Package No. NQM J. Whether If no col No. for the month September 2010. Unlined drains are chocked with growth of grass and need to be made functional. No. Parawise action taken Sr.09. However due to recent rains. some rain damages are noticed at several places which needs to be repaired. Shoulder need to be dressed to drainage of surface water.. 7 yes 8 NA yes NA yes NA The drains made functional by removing grass and muck. Few potholes developed and need to be repaired. yes NA 9 . completed date when the action will complete Y/N 6 shoulders has been maintained by removing growth of grass and shrubs Shoulders has been dressed and lowered down Pot holes have been filledup and shoulders trimmed to required level.M. Sr.State Quality Monitor FORMAT -III Pardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt. Action required & Para 1 2 3 4 5 1 Nalagarh Kunjal 1(a) Not satisfactory.Q. Block Name work of Paragraph of reports on which action is required. Shoulder are full of growth Dassomaja which has raised the level of shoulder and is ra road causing drainage problem.2010. Due to raised shoulders surface water is flowing over the road and is damaging the edges. Kocher Date of inspection 22. Km. 200 mtr. stones need to be repainted. Stones fixed and painted. Routine maintenance in above respect need to be carried out. Yes NA State Quality Monitor . New board erected and painting done Yes NA Km stone repainted and 200 mtr.5(a) 6 (a) Main informatory board is missing and need to be repaired. Stone are not existing. some rain damages are noticed at several places which needs to be repaired.2010.Q. Action required & Para 1 2 3 4 5 1 Nalagarh Kunjal 1(a) Not satisfactory. No. yes NA 9 . Few potholes developed and need to be repaired.M. Parawise action taken Sr. for the month September 2010. Block Name work of Paragraph of reports on which action is required. 6 Remarks/ verification action is specify the by S. NQM J. Surface of road is good. Sr. 7 yes 8 NA yes NA yes NA The drains made functional by removing grass and muck. Unlined drains are chocked with growth of grass and need to be made functional. 4 (a) Culverts/Causeway are fuctional.09. Package No. Kocher Date of inspection 22.State Quality Monitor FORMAT -III Pardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt. However due to recent rains. Shoulder need to be dressed to drainage of surface water. Due to raised shoulders surface water is flowing over the road and is damaging the edges.. completed date when the action will complete Y/N 6 shoulders has been maintained by removing growth of grass and shrubs Shoulders has been dressed and lowered down Pot holes have been filledup and shoulders trimmed to required level. Shoulder are full of growth Dassomaja which has raised the level of shoulder and is ra road causing drainage problem.HP-11-05 2(a) No rain cuts observed. Name No of . Whether If no col No.S. New board erected and painting done Yes NA Km stone repainted and 200 mtr. Km. Yes NA State Quality Monitor . Routine maintenance in above respect need to be carried out. Stones fixed and painted.5(a) 6 (a) Main informatory board is missing and need to be repaired. 200 mtr. stones need to be repainted. Stone are not existing. Routine maintenance in above 6 (a) Km. NQM J. for the month September 2010.S. Shoulders has been yes NA Shoulder need to be dressed and lowered dressed to restore the down 3(a) Not satisfactory. & Action required Para 1 2 3 4 5 6 7 8 1 Nalagarh Link road to 1(a) Not satisfactory. Pot holes have been yes NA Premix carpet is filledup and required completely worn out renewal coat has been 5(a) Main informatory Repainting done Yes NA board need to be repaired. No. Name of Name of Paragraph of reports on Parawise action taken Whether If no col No. Block work which action is required. action is 6 specify the complete date when d the action will complete Sr. shoulders has been yes NA village Shoulder need to be maintained by removing Dharampur maintained by growth of grass and removing the thick shrubs growth grass.FORMAT -III Pardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt. Y/N No. Sr.2010. Kocher Date of inspection 22. 2(a) No rain of cuts observed. stones need to be Km stone repaired and Yes NA repaired and panited painted.09. . 7 8 yes NA State Quality Monitor . for the month April 2014. NQM Date of inspection Sr. Action required Y/N 1 2 3 1 Nalagarh Link road to village Sauri km. action is 6 specify the complete date when d the action will complete Sr. citizen board painted and written again. Block work which action is required. Name of Name of Paragraph of reports on Parawise action taken Whether If no col No. No.FORMAT -III Pardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt. No. 0/0 to 2/250 Package HP-11-71 No. & Para 4 5 6 1 (13) The main board be Main and citizen board fixed at once and written and fixed at site. Shoulder need to be dressed to drainage of surface water. Sr. NQM J. Kocher Date of inspection 22. Dassomajara Shoulder are full of road growth which has raised the level of shoulder and is causing drainage problem.2010. No. for the month September 2010. Block work which action is required. action is 6 specify the complete date when d the action will complete Sr. 2(a) No rain cuts observed.FORMAT -III Pardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt.09. Action required No. & 1 2 3 4 5 1 Nalagarh Kunjal 1(a) Not satisfactory. Y/N 6 shoulders has been maintained by removing growth of grass and shrubs 7 yes 8 NA Shoulders has been dressed and lowered down yes NA .S. Name of Name of Paragraph of reports on Parawise action taken Whether If no col No. 200 mtr. some rain damages are noticed at several places which needs to be repaired. stones need to be Km stone repainted and repainted. Pot holes have been filledup and shoulders trimmed to required level. Culverts/Causeway are fuctional. Stones fixed and Stone are not existing. Unlined drains are chocked with growth of grass and need to be made functional. Routine maintenance in above respect need to be carried out. 200 mtr. However due to recent rains. yes NA New board erected and painting done Yes NA Yes NA Km. Main informatory board is missing and need to be repaired. . painted. yes NA The drains made functional by removing grass and muck.3(a) 4 (a) 5(a) 6 (a) Surface of road is good. Due to raised shoulders surface water is flowing over the road and is damaging the edges. Few potholes developed and need to be repaired. . SQM U. information Board has been fixed at site. 13(a) Main/citizen The main informatary informatery boards be Board and Citizen provided immidiately. action is 6 specify the complete date when d the action Sr. 0/0 to 2/250 4 1 5 6 The BM's be The Bench marks @4 per established @4nos per km has been established. Package HP-11-71 No. referenced of C. N.FORMAT -III Pardhan Mantri Gram Sadak Yojna ( PMGSY) Action taken statement on the pending reports of NQM of the Solan Distt. No.W.C/L C/L of C. referenced with marker pegs provided during laying of G-II & Gwith marker pegs. . Name of Name of Paragraph of reports on Parawise action taken Whether If no col No. 7 8 Yes NA yes NA III layer. will complete Y/N & Para Action required 1 2 3 1 Nalagarh Link road to village Sauri km.The photographs in support of observations are enclosed. Sharma Date of inspection 28/04/14 Sr. No. Block work which action is required.W. The photographs in support of Bench Marks established are enclosed. KM as per norms. for the month April 2014. he month September 2010. tion 22.Q.M.09. Remarks/ verification by S. 9 State Quality Monitor .2010. tion Remarks/ verification by S.r the month April 2014.M. te Quality Monitor 9 .Q. tion 22.M. Remarks/ verification by S.he month September 2010.Q.09.2010. 9 . . . 9 State Quality Monitor . ection 28/04/14 Remarks/ verification by S.Q.r the month April 2014.M.
Copyright © 2024 DOKUMEN.SITE Inc.