Anupam Singh.doc

May 13, 2018 | Author: Farzand Ali | Category: Antenna (Radio), Telecommunications, Networks, Electronics, Technology


Comments



Description

ANUPAM SINGHHouse No.- 825, SEC-2, VASUNDHARA, GHAZIABAD U.P. Mob: +919958527413,7840880066 E-Mail-: [email protected] Work Experience: 5+yrs EQUIPMENTS WORK ON:    ERICSSON 2G, 3G BTS MINILINK-E, TRAFFIC NODE, AXX, HI-CAP Alcatel BTS, Alcatel - Lucent BTS NEC-PASOLINK EMPLOYMENT HISTORY: Engineer Field Operations & Maintenance (O&M), Ericsson India Pvt. Ltd 18 th July 2014 To till date in Delhi Circle. Engineer Field Operations & Maintenance (O&M), Ericsson India Pvt. Ltd 23 rd AUG 2010 to 30th June 2014 in UP East (Azamgarh Zone). Reliance project (Bihar & Jharkhand) (From 28.06.2009 to 20.08.2010).  Ericsson India Pvt. Ltd 18th July 2014 to till date in Delhi Circle.  Ericsson India Pvt. Ltd 23rd AUG 2010 to 30th June 2014 in UP East Circle. TOOLS USED:  Winfiol  Hyper Terminal  RBS Element Manager  Win Commander 5.0  WS_FTP  Mini link craft 1.1, 2.1, 2.4, 2.10, 2.21,14A  OMT R41H, OMT43, Remote OMT Over IP48S, OMT 37_6,28_2,30_4,34_9 (Operation and Maintenance Terminal) JOP RESPONSSIBILTES: Day to day closure of BTS and Microwave Alarms faced in the Cluster.  Maintenance & supervision of Transmission system (Ericsson).  Maintenance of Ericsson BTS (RBS 2954, RBS2964, RBS2204, RBS2104, RBS2111, RBS6101, RBS6202RUS, RBS6201RUG, RBS6601).  Experience on Ericsson MUX (AXX 9200).  Maintenance of ECI equipment SDH/PDH.  Configuration of microwave links of 7 GHz, 15 GHz & 18 GHz bands including STM hops.  Regular Software Upgrades of Ericsson Transmission Equipments.  Maintaining the KPI.  Responsible for network optimization.  Coordinating with O&M Engineers for O&M activities and Control outages in network.  Responsible towards Quality of Sites as per customer requirements.  Coordinating With Idea Representatives to Rectify the Networks Problems.  Resource management. TRANSMMISSION:           Installation, Commissioning of Transmission Equipment Traffic Node. Software upgrade, Hardware upgrade of Traffic Node. Have experience on 2p, 2pB, 6p, 6pB, 6pC, 6pD, 20pB Traffic-Node. Working knowledge of, NPU 1B, NPU2, NPU3, NPU3B, NPU1C. Working on TN MMU2C, MMU2D. ETU3, ETU2B, LTU155e/o, LTU12x1 and LTU 16x2. Configuration of ETU, MMU and NPU for IP Technology. Ethernet configuration of Traffic-Node for IP Technology. Traffic Migration from one link to another link. MMU2C to MMU2D up gradation. Alarm Monitoring and rectification of Traffic Node. E1 routing from Backbone site to Terminal Sites. RBS (Node B):          Installation, Integration, Commissioning of RBS 6000 Series (6101, 6201, Combo (6201 and 6101), 6202, 6601, 6601E). Troubleshooting in running Iub, OAM, External Hardware and Cabinet Scripts. Alarm rectification of NodeB. Trouble shooting of Sites working on IP. Software upgrade of NodeB. Sector Expansion of NodeB. License Installation of NodeB. Resolve Quality Related issue of NodeB, Quality Audit of Sites. VSWR Measurement of NodeB and its rectification. To provide remote support to Field engineers.  Yash Enterprises, Patna, Bihar (From 28.06.2009 to 20.08.2010): PROJECT NAME:ALCATEL and Alcatel - LUCENT BTS INTEGRATION (In presence of Site Engineer) POWER measurement & AT TROUBLE SHOOTING & MAINTENANCE Location - BIHAR and JHARKHAND Role - Site Engineer Operator - RELIANCE TELECOMM LTD. RESPONSSIBILTES: Coordinate with MW & RF team for the planning of various data of MW links, Antenna size, Freq & Polarization for Radios, coordinates/degree of GSM antennas & up-down tilt of antenna as per requirement.  Follow up with vendor for the Installation of various transport equipments, Installation of MW antennas & their alignments. Responsible for site Rectification in case of any technical issue on sites.  PERFORMANCE MANGEMENT: Commissioning & Maintenance of BTS, M/W, Antenna alignment.  Alcatel BTS (GSM) and Ericsson commissioning installation and Site AT.  New BTS Site Integration.  Alcatel lucent (CDMA) BTS installation commissioning & RFR.  Installation of DDF modules and microwave equipments.    Monitoring of alarms and all activities of cell site. Manage teams of installers and commissioners. Software downloading, performing operational checks on various modules subsystems, integrating with other network elements, VSWR measurements etc. Troubleshooting with hardware /software problem in BTS. Carried out work for installation of both 900 MHz & 1800 MHz band. Operational, Maintenance, System level Integration, testing hardware and Software Integrity.    Educational Qualifications: I have completed B.Tech (Applied Electronics & Instrumentation Engineering) from INDERPRASTHA ENGINEERING COLLEGE, SAHIBABAD, GHAZIABAD. S.NO. 1 Examination/Degree B.Tech University/Board U.P. Technical University, Lucknow Year 2009 Percentage 61.2% 2 10+2 U.P. Board 2003 54.2% 3 10 U.P. Board 2001 54% Personal Details: Father’s Name Mother’s Name Date of Birth Nationality Sex Languages Known : : : : : : Mr. Shiv Pujan Singh Mrs. Sumitra Singh 17 Aug, 1987 Indian Male Hindi, English Present Address : 825, SEC-2, VASUNDHARA, GHAZIABAD U.P. Mob: +919958527413 Permanent Address : B 34/146A-5-1A Sarainandan, Dashmi, Varanasi, U.P. Contact No. +918115400834 I hereby declare that whatever furnished above is true & correct to the best of my knowledge and belief. Date: ANUPAM SINGH
Copyright © 2024 DOKUMEN.SITE Inc.