Accenture Delivery Suite.doc



Comments



Description

Accenture Delivery Suite1. Accenture Delivery suite has which of the following advantages, (Multiple Options)  ADS provides a base for application development in SAP, Oracle and SIEBEL technologies too,  ADS enables Multi-site delivery challenges achievable,  ADS gives support for Management only,  Cost is reduced since it encourages Component reusability,  ADS is a primary channel to achieve “CMMI”. 2. Which of the following portal is accessed by Accenture people across all Delivery centers? a) Global Web portal, b) WIREFRAME, c) Engagement Dashboard, d) Global Delivery Dashboard, e) Defects tracking sheet. 3. Which one of the following is used to execute the methodology from both the process and documentation standpoint? a) ADM, b) ADT, c) ADMetrics, b) Prepare a design. e) SIR. c) Build/Development phase. e) All the above. 4. e) Just before deployment to enhance the quality by removing defects. b) System concept development. Rational Purity Plus is used in following phase of SDLC. e) Testing & Deployment Methods . ADM contains which of the following methods a) Management methods. 6. d) Planning Workforce. a) Prepare for Testing. d) Testing phase to purify errors and defects.d) ADA. Identify the processes that involves Project Manager. 5. c) Development methods. b) Strategy and planning methods. d) Operations Methods. c) Project Initiation. f) None of the above. a) Analysis. Only a.b and c 2. b and c. None of the above. Which one of the following process is specific for Accenture IDC? a) V. e) Internal Audit control. d) Quality Management System. b. a. b) Accenture Delivery Suite.1. 7.Model. Only e. c and d. c) Quality Management System & Supplier management. 3. . 4. 5. Project.specific reports. Analyze – Business Analyst. d. Analyze. Operational reports.Project Manager. Build – Developer. Test – Tester. c. Defects tracking sheet. Design – Application Designer. Deploy – Client. Analyze – Business Analyst. Metrics Reports. b. e. All the above excluding ‘a’ and ‘b’. f.Project Lead. Deploy. c) Plan – Business Architect. Requirement Traceability Matrix. Build – Developer. Test – Tester. 9. d) The roles for Plan. Test – Test Lead. (Phase – Key Role) a) Plan – Business Architect. A common web portal for all Delivery central across the Globe has which of the following reports? a. Design. Build. Build. Test.8. Design. Analyze. b) Plan – Project Manager. and Deploy phases are Pre-defined whereas the responsibilities are assigned by corresponding supervisors. Deploy – Client and PM.Development lead. Select the correct option from the following. Design – Designer.Project Manager. . Predict the Correct definition for “Deliverables”. Deliverables are the Final Product that is to be delivered to the client. Build Development Environment.10. . Deliverables are the Proof of Work what an individual or a team has performed in a particular stage of Application development. b. Build Technical Architecture. 11. Build Application transition. d. e. Deliverables are the outcome of each and every phases in Application Development. c. None of the above. b. a. The following Diagram represents. d. Build Application Architecture. a. c. Deliverables are as likes as Proof of concepts as we use in Prototype models. 13. e. sign – off. Sign-off. Test Application. prepare work plan. Prepare Test Cases. Prepare Test cases. b. Create test plan. Develop test approach. a. Build technical architecture. None of the above. Create work plan. Document the Test results. create test data. d. Execute Test. Develop test approach. Identify correct set of Test Deliverables. Create test plan. Develop Test scripts. c. Execute Test. d. Create Work plan.12. Test Training and performance support. b. Prepare the Test Cycle Schedule. Execute test scripts. sign – off. Sign – off. Test Service Support. The Following Figure represents. Execute test scripts. Develop test approach. a. c. . The duration of the project is 3 weeks and it’s rated quantitatively as small Project. (e) 13. . (3) 7. You are assigned to a project. (b) and (d) 2. (c) 5. (f) 9. (b) 4. False. For a small project do you think the TechSupport Team will be accessible to you? F 15. State True or False. (c) 10. (d) 3. 15. (e) 6.14. (a) 14. False. Causal Analysis Resolution technique identifies the problem and fixes it. (c) 11. but it is not preventing from the error. F Answers Key: 1. (c) 12. State “True or False” for the following scenario. (c) 8.
Copyright © 2024 DOKUMEN.SITE Inc.