ABB Recent Projects 2009.10 (E)

March 30, 2018 | Author: kvvic | Category: Hydroelectricity, Electric Generator, Watt, Automation, Hydropower


Comments



Description

© ABB Group July 2009 Excitation. AC/DC-supply. Automation. Governors. erection and commissioning PMG MV. Entire Electrical Balance of Plant of the HPPs. Remote control. Automation. MicroSCADA. LV.6 MVA) Koivukoski (4 MW) Pyhännänkoski ( 6 MW) Svartisen HPP (1x350 & 1x250 MW) Trångfors HPP (1 x 73 MW) Project Country / Location China Italy Employer Inner Mongolia Electricity Corp. Protection systems. Protection systems.doc Page 1 of 17 . DC systems. Excitation systems. Governors. : Ref.: 10. MV. erection and commissioning for the new 250MW unit.ON Vattenkraft Sverige AB 2010 Recent Projects 2009. rev. Remote control. LV. MicroSCADA. Installation Speed Governor System Speed Governor System Computer supervisory & control system.2009) Project Name (Capacity) Huheho PS HPP (4 x 300 MW) Airole & Bevera HPPs (2 x 7 + 2 x 4 MW) Ämmäkoski (3 MW) Albano HPP (1 x 15 MW) Bocac HPP (2 x 50 MW) Dong Nai 4 HPP (2 x 170 MW) Eidsfoss kraftverk (3 x 2 MVA) Haapakoski (0. remote control. Remote control. Protection systems. Protection systems.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. TirrenoPower Scope of Works Computer supervisory & control system Complete refurbishment for Green Cetrificate. AC/DC-supply. switchgear. Excitation.10. Governors. Automation. Installation. Installation Control and protection. Protection system* Control and protection. Commissioning Start-Up 2011 2010 Finland Italy Bosnia Erzegovina Vietnam Norway Finland Finland Finland Norway KaVo Edison Elnos EVN Vang Energiverk Koskienergia KaVo Kainuun Energia Statkraft Energi AS 2010 2010 2010 2010 2010 2010 2010 2010 2010 Sweden E. 2 Automation Control System. Installation MV. DC systems.Customer : Project : Quotation-No. Consortium Agreement with the Turbine's Manufacturer. Nr. Governors. Automation. MicroSCADA. new control system for the existing 350MW unit MV. remote control. DC systems. Remote control. DC systems. Excitation. LV. AC/DC-supply. Tronder Power Limited EVN Endesa EVN E. Excitation systems.doc Page 2 of 17 .ON Vattenkraft Sverige AB Skafså kraftverk Vattenfall Vattenkraft AB 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 Recent Projects 2009.2 MW) Grundfors HPP (2 x 45 MW) Vietnam Austria Sweden Vietnam Philippines Uganda Vietnam Italy Vietnam Sweden Norway Sweden EVN Verbund AHP E. Remote Control. remote control. Protection system* MV.2009) Project Country / Location Norway Employer Statkraft Energi AS Scope of Works Control and protection. Commissioning Computer supervisory & control system. Commissioning Start-Up 2009 Project Name (Capacity) Adamselv HPP (2 x 27 MW) An Khe HPP (2 x 80 MW) Aschach HPP (4 x 71. Installation. Governors.10. Protection systems.8 MW) Bålforsen HPP (2 x 44 MW) Ban Ve HPP (2 x 16 MW) Binga (4 x 37 MVA) Bugoye HPP (2 x 6. Automation. DC systems. Protection system* Control and protection System Computer supervisory & control system. switchgear. rev. Governors.ON Vattenkraft Sverige AB EVN SN Aboitiz Power-Venguet. Commissioning Control. Protection system* Complete Electrical Balance of Plant. Remote control. Installation.5 MW) Buon Tua Srah HPP (2 x 43 MW) Canetra HPP (1 x 7 MW) Dong Nai 3 HPP (2 x 90 MW) Flåsjö HPP (1 x 20 MW) Gausbu kraftverk (7. erection and commissioning. automation and protection Computer supervisory & control system. Inc. automation and protection Complete Electrical Balance of Plant. remote control erection and commissioning Operator Stations.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. : Ref.Customer : Project : Quotation-No. Some mechanical work at generator and turbine Computer supervisory & control system. Installation.: 10. Protection system* Electrical system Control. Automation. AC/DC-supply. Excitation Computer supervisory & control system. DC systems. Governors. New control system for the existing 350MW Unit Control and protection System Electrical System Electrical System Start-Up 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 Project Name (Capacity) Järkvissle HPP (2 x 40 MW) Kvarnfallet HPP (1 x 19 MW) Lakshola kraftverk (31MW) Mosbakka kraftverk (5 MW) Peschiera HPP (1 x 7 MW) Sallilankoski (2 MW) Srepok3 HPP (2 x 110 MW) Stifone HPP (1 x 7 MW) Svabo kraftverk (4MVA) Svartisen HPP (1 x 350 & 1 x 250 MW) Triponzo HPP (1 x 7 MW) Wallseee-Mitterk. Remote control. Protection systems.: 10. Installation. HPP (6 x 35 MW) Ybbs-Persenbeug HPP (6 x 39.doc Page 3 of 17 . AC/DC-supply. Excitation systems. remote control. Commissioning MV. remote control. erection and commissioning for the new 250MW Unit. : Ref. erection and commissioning Control and protection System Control. rev.2009) Project Country / Location Sweden Sweden Norway Norway Italy Finland Vietnam Italy Norway Norway Employer Vattenfall Vattenkraft AB E. remote control erection and commissioning Control and protection. Commissioning Control Control and protection.4 MW) Italy Austria Austria Endesa Verbund AHP Verbund AHP 2009 2009 2009 Recent Projects 2009.ON Vattenkraft Sverige AB Elkem Energy AS Mosbakka Kraft AS Endesa Sallilan Energia EVN Endesa Mo Ind park Statkraft Energi AS Scope of Works Control. switchgear.10. Remote Control. Installation. Protection. Governors.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. Protection system* Control and protection System Control.Customer : Project : Quotation-No. Control and protection.5 MW) Degnone HPP (1 x 2 MW) Fadalto HPP (1 x 210 MW) Feldsee HPP (1 x 70 MW) Granö HPP (2 x 5. AC.4 MW) GuiGang HPP (4 x 30 MW Bulb) Hirvikoski HPP (1 x 9 MW) Jufudu HPP (3 x 90 MW) Kjosfoss HPP (2 x 2 MW) Recent Projects 2009. one new 1-phase 16 2/3 Hz generator. erection and commissioning Start-Up 2008/2009 2008/2009 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 Project Name (Capacity) Atatürk HPP (8 x 300 + 1 x 6 MW) Karakaya HPP (6 x 300 MW) Campellio HPP (3 x 2 MW) Crevola Toce HPP (1 x 32 MW) Cua Dat HPP (2 x 49. JSC Enel Frame Agreement Enel Frame Agreement Kelag E.: 10. DC systems. Excitation systems. one new 3-phase 50 Hz generator.and DC-supply. 1-phase and 3-phase switchgear. : Ref. turbine governors. Remote control.Customer : Project : Quotation-No. Jernbaneverket Bane Energi Employer Scope of Works Control & Protection. Governors.doc Page 4 of 17 .: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003.10. Installation.ON Vattenkraft Sverige AB Guigang Navigation Project Branch Bureau Vattenfall Oy Yunnan Datang Lixianjian Hydro Development Corp. Switchgear MV. turbine governors. electrical systems Control system Control system Computer supervisory & control system Control system Control system SFC. electrical systems Control & Protection.2009) Project Country / Location Turkey Turkey Italy Italy Vietnam Italy Italy Austria Sweden China Finland China Norway EÜAS EÜAS Enel Frame Agreement Enel Frame Agreement Cua Dat Hydro Power. Protection systems. Automation. rev. 1-phase and 3-phase transformers. Commissioning Computer supervisory & control system updating for Advant OCS Control Computer supervisory & control system Rehabilitation of two turbines. 1 Automatic Common Control System and Auxiliary Devices. erection and commissioning MV. 4 Protection and Synchronisation Systems. rev. Scada. Entire Electrical Balance of Plants Upgrade control system with new PLC. AC. synchronization.2009) Project Country / Location Austria Italy Norway Finland Italy Italy VIW Enel Frame Agreement TEV Kraft AS PVO-Vesivoima Oy Enel Frame Agreement Endesa Employer Control. Nr. Installation Control system Nr. switchgear.5 MW) Maalismaa HPP (2 x 22 MW) Pian della Rocca HPP (3 x 8 MW) Preci HPP (2 x 6 MW) Presenzano HPP (1 x 250 MW) Rosone HPP (4 x 50 MW) Italy Italy Enel Frame Agreement Iride Energia 2008 2008 Salto de Aguacate HPP (2 x 29 MW) Salto de Jiuguey HPP (2 x 55 MW) San Fiorano HPP (4 x 150 MW) Dominican Republic Dominican Republic Italy Empresa de Generación Hidroeléctrica Dominicana. Nr. remote control.: 10. 4 Speed Regulation Systems. installation and commissioning Upgrade control system with new PLC. Remote control. LV. Protection systems. 4 Excitation Systems. Scada. Excitation systems Unitrol . synchronization. installation and commissioning Control system Scope of Works Start-Up 2008 2008 2008 2008 2008 2008 Project Name (Capacity) Kops 2 HPP (3 x 150 MVA) La Penna HPP (1 x 25 MW) Leirfossene HPP (1 x 30 & 1 x 16. Governors. : Ref. DC systems.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. 2 Excitation Systems.10. Complete Sub-Station 220KV. Entire Electrical Balance of Plant Control system Nr. Nr. Automation.doc Page 5 of 17 . EGEHID Empresa de Generación Hidroeléctrica Dominicana. Complete Sub-Station 150KV. HV Systems Control system Control and protection. 2 Protection and Synchronisation Systems.and DC-supply. 2 Speed Regulation Systems. Nr. MicroSCADA. Nr. EGEHID Enel Frame Agreement 2008 2008 2008 Recent Projects 2009.Customer : Project : Quotation-No. 1 Automatic Common Control System and Auxiliary Devices. Nr. Governors. Protection systems. Installation. Nr. Installation. 1 Excitation Systems.: 10. Scada. Nr. Protection systems.doc Austria Sweden Sweden Italy Italy EAG Fortum Generation AB E. : Ref. remote control erection and commissioning Computer supervisory & control system.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. Protection system* Control system Control system Vattenfall Vattenkraft AB Nr. DC systems. Revamping of the ElectroHydraulic Devices. Excitation systems. Nr. Excitation systems. Governors. Automation.Customer : Project : Quotation-No.ON Vattenkraft Sverige AB Salini Costruttori Alstom Power 2007 2007 2007 2007 2007 Page 6 of 17 . 1 Protection and Synchronisation Systems. PGIM. Consortium Agreement with the Turbine's Manufacturer. 1 Speed Regulation Systems. rev. DC systems. Automation. LV.10.2 MW) Song Ba Ha HPP (2 x 110 MW) Taloro HPP (3 x 80 MW) Verampio HPP (2 x 25 MW) Vietas HPP (2 x 160 MW) Albi & Magisano HPP (2 x 40 MW) EVN Enel Frame Agreement Enel Frame Agreement Vattenfall Vattenkraft AB Endesa Arthurwerk HPP (1 x 6 MW) Avestaforsen HPP (1 x 24 MW) Bodum HPP ( 1 x 12 MW) Bumbuna Falls HPP (2 x 17 MW) Cotilia HPP (2 x 30 MW) Recent Projects 2009. 1 Automatic Common Control System and Auxiliary Devices. Remote control. LV. Commissioning MV. Remote control. Control+Electrical System MV. Line Protection for the Sub-Station 220KV. Commissioning Control system Control system Start-Up 2008 2008 2008 2008 2008 2008 2008 2007 Project Name (Capacity) Santu Miali HPP (1 x34 MW) Sigillo HPP (1 x 6 MW) Skree kraftverk (7.2009) Project Country / Location Italy Italy Norway Vietnam Italy Italy Sweden Italy Employer Ente Flumendosa Endesa Skafså kraftverk Scope of Works Control system & Speed Governor Control system Control. 3 MW) La Remolina HPP (1 x 200 MW) Le Piane HPP (2 x 5 MW) Ludrigno HPP (5 x 10 MW) Norway Finland Spain Italy Italy Helgelandskraft AS Helsingin Energia Oy Enel Viesgo Enel Frame Agreement Enel Frame Agreement 2007 2007 2007 2007 2007 Recent Projects 2009. transformer. control and protection.Customer : Project : Quotation-No. AC.and DC-supply. switchgear. Scada. switchgear. Installation Control system Control System Control system Scope of Works Start-Up 2007 2007 2007 2007 2007 2007 2007 2007 Project Name (Capacity) Creva HPP (3 x 11 MW) Dale II HPP (1 x 30 MW) Dietro La Torre HPP (2 x 1 MW) Domnarvet HPP (2 x 11 MW) Dossi HPP (6 x 10 MW) Funna HPP (1 x 22 MW) Gerlos II HPP (1 x 125 MW) Inga 2. electrical balance of plant Control System Operator Stations Control system 132 kV switchgear.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. erection and commissioning Electrical system Nr. rev. Nr. 1 Speed Regulation Systems. 1 Automatic Common Control System and Auxiliary Devices. ACand DC-supply. Protection systems. 1 Excitation Systems.3 HPP (1 x 250 MW) Kaldåga HPP (1 x 17 MW) Klåsarö HPP (2 x 2. 1 Protection and Synchronisation Systems.doc Page 7 of 17 .2009) Project Country / Location Italy Norway Italy Sweden Italy Norway Austria Italy Employer Enel Frame Agreement BKK Enel Frame Agreement Fortum Generation AB Enel Frame Agreement Nord-Trøndelag Elektrisitetsverk FKF Verbund AHP Franco Tosi Meccanica Control System Generator. : Ref. protection. remote control communication. remote control communication. Control and protection. Excitation systems Unitrol.10.: 10. Nr. electrical and mechanical erection and commissioning Automation. Nr. Governors. control. Excitation systems. E.ON Vattenkraft Sverige AB S. Commissioning Complete Turn-Key of Nr.ON Vattenkraft Sverige AB Energia Plassier Endesa Employer Scope of Works Control system and Speed Regulation Governor electrical system MV. Automation. Endesa E. DC systems. 4 Groups Turbine-Generator.1 Automatic Control System.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. plant control. 2 Step-Up Transformers.H. : Ref. E-Bop of the HPP. switchgear. Control system Protection. Nr. Installation. electrical balance of plant Upgrade of Control System and Speed Regulation Control. Protection systems. 3 Motor-Pump with Soft Starter (one of them with speed-regulation).: 10.2009) Project Country / Location Italy China Sweden Romania Italy Italy India Italy Sweden Italy Italy Endesa Huaneng Lancangjiang Hydro Development Corp. Bistrita Endesa Enel Frame Agreement Narmada Hydro Development Corporation Ltd. rev. electrical and mechanical erection and commissioning Control & protection & measurement for the 3 units. Installation. Nr.10. Control and protection. 1 Automation Control System. Commissioning Control. Governors. Nr.5 MW) Thac Ba HPP (3 x 40 MW) Norway Vietnam Statkraft Energi AS EVN 2007 2007 Recent Projects 2009. PGIM. LV. Consortium Agreement with the Turbine's Manufacturer. AC. Governors. 2 Automatic Control Systems Nr. Remote Control.5 MW) Savuto PS (3 x 2 MW) Svelgen 2 HPP (2 x 13. Electrical systems Nr. remote control. Consortium Agreement with the Penstock Supplier.doc Page 8 of 17 .and DC-supply. bay & BB control and protection.Customer : Project : Quotation-No. cables and networks Start-Up 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 Project Name (Capacity) Magisano (1 x 40 MW) ManWan Extension HPP(1 x 300 MW) Matfors HPP (1 x 21MW) Movileni HPP (4 x 7 MW) Narni HPP (2 x 30 MW) Niardo HPP (2 x 1 MW) Omkareshwar HPP (8 x 65 MW) Orichella (2 x 80 MW) Pengfors HPP (3 x 19 MW) Pontey I&II HPP (4x0. Remote control. transformer. generator. Ltd.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. Transformer. Protection. 2 Protection and Synchronisation Systems. Consortium Agreement with the Turbine's Manufacturer Turbine.5 MW) Ermenek HPP (2 x 160 MVA) Recent Projects 2009. 1 Automatic Common Control System and Auxiliary Devices.doc Norway Spain Spain Spain Spain Italy China Norway Italy Brazil Norway Turkey Agder Energi Produksjon AS Various Unelco Alstom Endesa Maira Energia Jiangsu Pumped Storage Power Co. rev. erection and commissioning Excitation systems Protection systems Protection systems Protection systems Nr. 2 Step-Up Transformers. Nr.Customer : Project : Quotation-No. SFC Control. electrical balance of plant Control System DCS HMI for generation control center + communication links Generator. Scada. 2 Speed Regulation Systems. 2 Generators. switchgear.and DC-supply. Sunnhordland Kraftlag AS Enel Frame Agreement COPEL BKK Produksjon AS Alstom Power 2007 2003/2007 2003/2007 2003/2007 2003/2007 2007 2007 2006 2006 2006 2006 2006 Page 9 of 17 . Control. Nr. Nr.10. E-Bop of the HPP Control and protection. 1 Automation Control System. AC. erection and commissioning HV Systems Start-Up 2007 Project Name (Capacity) Timpagrande HPP (2 x 80 MW) Tryland HPP (1 x 5. control and protection. remote control. 2 Excitation Systems. 66 & 300kV switchgear.2009) Project Country / Location Italy Endesa Employer Scope of Works Nr. protection. : Ref. Electrical Balance of Plant. Revamping of the ElectroHydraulic Devices. Nr. Nr.8 MW) Various HPP (217 Units) Various HPP (13 Units) Various HPP (8 Units) Various HPP (27 Units) Villa di Chiavenna HPP (2 x 6 MW) Yixing PSP (4 x 250 MW) Blåfalli Vik HPP (1 x 230 MW) Cimena HPP (2 x 22 MW) Copel HPP ( x MW) Dale II HPP (1 x 31. complete electrical balance of plant.: 10. Installation Turbine. protection. DC Systems HV switchyard. Protection systems. Control System + Electrical System Control MV. DC systems. Governors. Generator. Excitation systems Unitrol F. Electrical Balance of Plant.2009) Project Country / Location Norway Austria Sweden Finland Finland Austria Pakistan Finland Norway Italy Norway Italy Italy Austria Employer Opplandskraft Salzburg AG Holmens Kraft AB Vattenfall Oy UPM-Kymmene Oyj Pöls AG WAPDA PVO-Vesivoima Oy Agder Energi Produksjon AS Enel Frame Agreement Statkraft Enel Frame Agreement Enel Frame Agreement EAG Scope of Works Control. rev.5 MW) Khan Khar HPP (2 x 34 & 1 x 4 MW) Kierikki HPP (2 x 22 MW) Kvinesdal HPP (1 x 1. electrical balance of plant Control+Electrical System Operator Stations MV. Remote control. Protection. Main transformer 40MVA. Automation. complete electrical balance of plan Control System Control system Control+Electrical System Turbinenregler Start-Up 2006 2006 2006 2006 2006 (2005)/2006 2006 2006 2006 2006 2006 2006 2006 2006 Project Name (Capacity) Framruste HPP (1 x 85 MW) Gamp HPP (2 x 5 MW) Harrsele HPP (3 x 75 MW) Hirvikoski HPP (1 x 9 MW) Kaltimo HPP (2 x 18 MW) Katzling HPP (2 x 2. generators. Governors. DC systems. Control.3 MW) Nazzano HPP (3 x 6 MW) Osbu HPP (1 x 25 MW) Paisco HPP (1 x 10 MW) Pallanzeno HPP (3 x 10 MW) Plankenau HPP (2 x 3.10. : Ref.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. LV.doc Page 10 of 17 .85 MW) Recent Projects 2009. MicroSCADA.Customer : Project : Quotation-No. Transformer. MicroSCADA. erection and commissioning Control System Control and protection. LV.: 10. MV. Automation. Remote control. 220 kV switchgear.6 MW) Smokovo HPP (2 x 5 MW) Wiesthal HPP (2 x 5 MW) Acquoria HPP (1 x 15 MW) Baoshan Houqiao HPP (3 x 18 MW) Calicano HPP (2 x 306 MW) Calice HPP (2 x 11 MW) Chievo HPP (2 x 39 MW) Clyde and Roxburgh (12 x 53. : Ref. Electrical Balance of Plant Control.Customer : Project : Quotation-No.10. Ltd ENEL Produzione Enel Frame Agreement ENEL Produzione Contact Energy Istmus Hydro Control System Control System..: 10. protection. 22 kV switchgear and commissioning Control System. control. transformers. Excitation Control Control System Control Control. electrical BoP. Speed Governor.3 MW) Conception HPP (2 x 5 MW) Recent Projects 2009.2009) Project Country / Location Italy Italy Costa Rica Norway Norway Greece Austria Italy China Italy Italy Italy New Zealand Panama Employer Enel Frame Agreement Endesa Hidroenergía del General/ SARET Haugaland Kraft AS Sørfold Kraftlag A/L PPC Salzburg AG Enel Frame Agreement Yunnan Baoshan Binglang RHDP Co.electrical balance of plant Generator. protection. turbine governor Scope of Works Start-Up 2006 2006 2006 2006 2006 2006 2006 2005 2005 2005 2005 2005 2005 2005 Project Name (Capacity) Ponte Felice HPP (3 x 5 MW) Ponte Sargano HPP (2 x 5 MW) Rio General HPP (2 x 23 MW) Rødne HPP (1 x 9 MW) Røyrvatn HPP (2 x 2. protection Control and governor retrofit Control. Protection. AVR. electrical balance of plant Control. protection Control System Control. protection.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. rev. Protection.doc Page 11 of 17 . AG ENEL Power Hydro Tasmania EW Grabs EDELCA Sichuan Zagunao Hydropower Development Co.. protection. water management Control.: 10. water management Control Complete governor incl. rev. plant control. Corp. cables and networks Start-Up 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 Project Name (Capacity) Davos HPP (2 * 0.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. Reversible Turbine Automation. LV Control System Control (new HIS on existing process control). electronic governor & hydraulic systems Control. Communication upgrade Control Control Control. : Ref. Ltd Yunnan Baoshan Binlangjiang Hydro Developm.2009) Project Country / Location Switzerland Italy Nicaragua Italy Switzerland Italy Australia Switzerland Venezuela China China Sweden Austria Sweden Employer Elektrizitätswerk Davos AG (EWD) ENEL Produzione ATDER Enel Frame Agreement Spoerry & Co. electrical balance of plant Electrical system Control & protection & measurement for the 3 units. Fortum Verbund AHP Statkraft Scope of Works Control.Customer : Project : Quotation-No.doc Page 12 of 17 .7 MW) Edolo HPP (4 x 150 MW) El Bote (42 MW) Farfa I HPP (1 x 15 MW) Flums HPP (8 MW) Gallicano HPP (2 x 30 MW) Gordon HPP (2 x 160 MW) Grabs HPP (2 MW) Guri HPP (20 x 500 MW) Hongye HPP (3 x 30 MW) Houqiao HPP (3 x 16 MW) Langstrommen HPP (2 x 32 MW) Leoben HPP (2 x 5 MW) Malgomaj/Volgsjofors HPP (3 x 10 MW) Recent Projects 2009. Scada. replacement of hydraulic system with servomotors and digital governor Nr. Protection. 4 Automatic Control Systems.10. Protection. 1st step Control. water management system.: 10.doc Page 13 of 17 . Protection. turbine governor Scope of Works Start-Up 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 (2004)/2005 2005 Project Name (Capacity) Matese HPP (1 x 15 MW) Montelungo HPP (2 x 22 MW) Montemaggiore HPP (2 x 30 MW) Mühlbach HPP (1 x 2 MW) Nembia HPP (2 x 7 MW) Obermatt HPP (2 x 12. load distribution. additional order on previous contract) Control System Control.Customer : Project : Quotation-No.5 MW) Rovesca HPP (1 x 40 MVA) Recent Projects 2009. Electrical Balance of Plant. protection Control. turbine governor Control+Electrical System Turbinenregler Control System Control.g.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. Rehabilitation of Mechanical Balance of Plant.1 MW) Permantokoski HPP (1 x 16 MW) Pescara HPP (2 x 13 MVA) Roseires HPP (6 x 35 MW) Rott HPP (2 x 2. : Ref.2009) Project Country / Location Italy Italy Italy Austria Italy Switzerland Norway Italy Mozambique Finland Italy Sudan Austria Italy Employer Enel Frame Agreement ENEL Produzione Franco Tosi EAG Enel Frame Agreement EW Obermatt ewl Kraftwerke AG Vannkraft Øst AS ENEL ARA-Sul Kemijoki Oy ENEL Power NEC Salzburg AG Franco Tosi Control System Control. Electrical balance of Plant. rev. excitation. Excitation Control Electrical and mechanical components (e. erection and commissioning Control system Control.10. 2 x 4 MW) Øyberget HPP (1 x 10 / 29 / 69 MW) Pedesina HPP (1 x 15 MW) Pequenos Libombos HPP (1 x 2. Protection. electronic governor & hydraulic systems Control.2009) Project Country / Location Italy Italy Italy Italy Switzerland Austria Austria Sweden Italy Norway Italy Australia Bosnia Herzegowina Norway Employer Enel Frame Agreement Enel Frame Agreement Enel Frame Agreement Enel Frame Agreement EW Altdorf Verbund AHP EAG Vattenfall Enel Frame Agreement Statkraft Energi Enel Frame Agreement Hydro Tasmania HET Tussa Energi Control System Control System Control System Control System Control Transformers Control+Electrical System. protection. : Ref.: 10.63 MW) Stalon HPP (1 x 132 MW) Suviana HPP (1 x 15 MW) Svartisen HPP (1 x 230 MW) Talamona HPP (1 x 15 MW) Tasmania HPP (2 x 160 MW) Trebinje HPP (3 x 66. Cipriano HPP (2 x 8 MW) S.Customer : Project : Quotation-No.7MW) Tussa HPP (2 x 30 MW) Recent Projects 2009. Pancrazio HPP (1 x 34 MW) Salarno HPP (3 x 3 MW) Sardegnana HPP (1 x 15 MW) Schächental HPP (1 x 3 MW) Schwarzach HPP (3 x 35 MVA) Spannberg 1 HPP (2 x 0.doc Page 14 of 17 . rev.10. electrical and mechanical BoP Control Scope of Works Start-Up 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 Project Name (Capacity) S.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. Turbinenregler Control for the unit Control System Control Control System & Speed Governor Complete governor retrofit. plant and water catchment monitoring Control System Control. electrical BoP.5 MW) Cheongsong PSP (2 x 306 MW) Dongxiguan HPP (4 x 45 MW) Recent Projects 2009. ERE Otoprodüktör A. Protection systems.S. Scope of Works Control and electrical balance of plant Control System Control. : Ref. switchgear Cascade Control Center System Start-Up 2005 2005 2005 2005 2005 2005 2005 2005 2005 2004 2004 2004 2004 2004 Project Name (Capacity) Utanen HPP (3 x 18 MW) Vaccarizzo HPP (1 x 7 MW) Val Giuf HPP (1. protection Control.doc Page 15 of 17 . protection. protection. Corp.10.25 MW) Ajutian HPP (3 x 35 MW) Birkapali HPP (1 x 66 MW) Campliccioli HPP (1 x 6. Enel Frame Agreement KOWEPCO Sichuan Huaneng Corp. excitation & synchronization equipment Control system Control. rev. Excitation systems.Customer : Project : Quotation-No. Remote control. SFC.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003.2009) Project Country / Location Finland Italy Switzerland Italy Sweden Italy Austria Turkey Italy China Turkey Italy South Korea China Employer Fortum Power and Heat Enel Frame Agreement Energia Alpina Enel Frame Agreement Sydkraft Vattenkraft AB Enel Frame Agreement Salzburg AG Ayen Energy Turkey ENEL Supahe Hydro Dev. Governors. excitation.5 MW) Vena Martello HPP (2 x 10 MW) Volgsjöfors HPP (2 x 10 MW) Volturno HPP (4 x 6 MW) Wiestal HPP (2 x 14 MW) Yamula HPP (2 x 50 MW) Zogno HPP (4 x 1. DC systems.: 10. substation Speed Governor System Plant automation. Commissioning Control System Control System Control and protection system. Installation. 1 x 130 MW) Stalon HPP (1 x 120 MW) Traunfall (1 x 10 MVA) Wagrain HPP & Weir (2 x 11 MW) Recent Projects 2009. Installation Control. commissioning Electrical and control systems Control+Electrical System. Protection systems. Remote control. NEC Elkem Energi AS Vattenfall Vattenkraft AB EAG EAG Scope of Works Plant automation.Customer : Project : Quotation-No. Governors. Remote Control. cascade control Control and protection Turbine Governors.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003. substation. joint control.10. rev.5 MW) Långströmmen HPP (2 x 20 MW) Malgomaj HPP (1 x 10 MW) Offensee I HPP (3 x 1. Commissioning Control+Electrical System. parts Control. protection. Turbinenregler Speed Governor System Control. Commissioning Control. electrical BoP. turbine governor. Installation. instrumentation upgrade. fieldbus. switchgear. Excitation systems. Installation.2 MW) Pescara HPP (2 x 7 MW) Qingju HPP (3 x 30 MW) Roseires HPP (6 x 35 MW) Siso HPP (1 x 94. Corp.: 10. protection. Turbinenregler Start-Up 2004 2004 2004 2004 2004 2004 (2003/2004 2004 2004 2004 2004 2004 2004 2004 Project Name (Capacity) El Canada (2 x 26 MW) Guadalupe HPP (3 plants) Kaprun HPP (4 x 55 MW) Kolsi HPP (1 x 14. mech. Governor. protection Control. : Ref. DC systems. power line Control system retrofit. protection. Excitation system Unitrol F. remote control Control.doc Page 16 of 17 .2009) Project Country / Location Guatemala Colombia Austria Finland Sweden Sweden Austria Italy China Sudan Norway Sweden Austria Austria Employer GE Hydro EPM KW Kaprun Graninge Oy Fortum Generation AB Sydkraft Vattenkraft AB EAG Enel Frame Agreement Sichuan Huaneng Jialigliang Hydro Dev. abb.doc Page 17 of 17 . Installation Scope of Works Start-Up 2004 2004 2003 2003 2003 2003 2003 2003 2003 2003 2003 2003 Project Name (Capacity) Wallseee-Mitterk. joint control. 3 plants) Hongjiang HPP (4 x 45 MW) Itabepi HPP (3 x 150 MW) Kvarnsveden HPP (1 x 28 & 1 x 30 MW) Orichella HPP (U1/2) (2 x 80 MW) Qing Ju HPP (4 x 44 MW) Tyrvää HPP (2 x 8 MW) (Besides these projects ABB’s Power Systems division is active and has references in other renewables. MicroSCADA. wind and WTE projects as well as in thermal PPs (coal.) Recent Projects 2009.Customer : Project : Quotation-No.: 10. gas. remote control from central control room at La Estrella. Iberdrola Fortum Generation AB ENDESA Huaneng Jialingjiang Hydro co.2009) Project Country / Location Austria Austria Bhutan India Panama Colombia China Brazil Sweden Italy China Finland Employer Verbund AHP Verbund AHP Alstom Power NHPC/SNC Lavalin AES Panama EPM Wuling Electric Corp. AGC Control. Automation. : Ref.4 MW) Baso Chhu 2 HPP (2 x 7. CC. LV.Ltd UPM Kymmene Oyj DC Supply System 220V DC Supply System 220V Control System Control. protection Control system Operator Stations Control system Control system MV. electrical BoP Control. HPP (6 x 35 MW) Ybbs-Persenbeug HPP (6 x 39. DC systems. protection.10. rev. Excitation systems Unitrol F. Please visit us on www. communication (PLC) Unit control. Governors.com. protection. Remote control. Protection systems. such as solar.: Hydro’09 ABB in HYDROPOWER Recent Project References (start-up => 2003.5 MW) Chamera II (3 x 100 MW) Esti HPP (2 x 75 MW) Guadalupe HPP (11 x 48 MW. …) and in the field of water treatment and pumping stations.
Copyright © 2024 DOKUMEN.SITE Inc.