01400

June 5, 2018 | Author: Jeffrey Carlo Viduya Agliam | Category: Specification (Technical Standard), Concrete, Engineering, Building Engineering, Building Technology


Comments



Description

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01400 - QUALITY CONTROL PART 1 - GENERAL 1.01 DESCRIPTION This Section covers providing all WORK as per SAUDI ARAMCO Standard, SAES-M-100 and SAUDI ARAMCO Engineering Procedure, SAEP-1023 and all other applicable Engineering material Standards, CONTRACTOR’s QA/QC requirements. A. B. Related WORK: CONTRACTOR shall be responsible for establishing and executing a quality control program. WORK Specified In This Section: 1. Testing and Inspection shall be include, but not be limited to: a. b. c. d. e. f. g. h. i. j. k. 2. C. All sampling, testing of cement, water and aggregates. Design of concrete mixes. Company Representative's inspections and tests. Manufacturer's representatives on-site inspections. Compaction test. Reinforcing steel tests. Systems tests (Roof, Electrical, HVAC, Plumbing, etc.). Asphalt tests. Structural Steel Tests. Precast Concrete Tests. Concrete Strength Tests. Layout and measurements. Testing All testing, including requests, reports, etc., are the responsibility of the CONTRACTOR, or an approved agency, employed by the CONTRACTOR. Company Representative reserves the right to verify the tests with SAUDI ARAMCO testing laboratory or independent agency. SECTION 01400 CONSTRUCTION SPECIFICATIONS DOC SABG GIRLS’ ELEMENTARY SCHOOL AND BOYS’ INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF 089/ 090 A 2050 BE-315756 1 of 4 0 cure. Reports: Two (2) copies shall be furnished to Company Representative summarizing the results of each test and inspection. Notification: Company Representative and if applicable.03 GENERAL REQUIREMENTS A. shall be notified 48 hours in advance of any WORK requiring testing or inspection.02 INSPECTION AND INSPECTORS Company Representative or other persons or firms appointed by SAUDI ARAMCO for this purpose will periodically inspect the WORK and the CONTRACTOR shall provide facilities and access to the WORK at all times as required to facilitate this inspection. Non-conformance: Where a test or inspection reveals non-conformance or failure to meet requirements. store. Any such material not identifiable by Company Representative shall be rejected and removed from storage location or the Site. Standards: Sampling. E. and other related information. all job-made samples. as required by SAUDI ARAMCO Engineering Procedure SAEP-1023. Company Representative shall immediately be notified. verbally and subsequently by a written report or letter. Each report shall clearly distinguish the type of test. B. 1. SAUDI ARAMCO testing laboratory or agency. the material tested and whether an original (first) test or a retest. F. preparation of samples and testing shall conform to applicable ASTM methods. unless otherwise specified. D. etc.1. Cooperation: Testing Laboratory shall prepare.04 SCHEDULE OF TESTS WORK Earthwork Asphalt Concrete Paving Reinforcement Cement Aggregates Concrete Mix Concrete Strength Type of Test or Inspection Compaction per Section-02221 Per Section-02513 Per Section-03200 As required by Section-03300 As required by Section-03330 Per Section-03300 Slump Test per Section-03300 SECTION 01400 CONSTRUCTION SPECIFICATIONS DOC SABG GIRLS’ ELEMENTARY SCHOOL AND BOYS’ INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF 089/ 090 A 2050 BE-315756 2 of 4 0 . Identification: Materials passing test shall be marked or tagged by the Testing Laboratory and shall thereafter be kept separate and stored so as to facilitate identification.. location. 1. C. Concrete forms and reinforcing steel. 13. 7. Any other items specifically requested by Company Representative. Asphalt concrete paving. 12. Backfill. Notify 48 hours in advance to assure inspection prior to covering up or closing in of the WORK involved. 9. SECTION 01400 B. 3.05 Per Section-03300 Per Section-05100 Per Section-07256 Per Section-07531 Per Division 15 Per Division 16 Per Division 18 INSPECTION BY COMPANY REPRESENTATIVE A. prior to concrete placement. CONTRACTOR shall notify Company Representative for inspection and testing of various parts of the WORK as called for in applicable Sections of the Specifications. All concrete pouring. 6. Required Inspection (see applicable Sections of Specifications for details): 1. Floor surface prior to tile and carpet WORK. CONSTRUCTION SPECIFICATIONS DOC SABG GIRLS’ ELEMENTARY SCHOOL AND BOYS’ INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF 089/ 090 A 2050 BE-315756 3 of 4 0 . Layout of Building Foundation excavation before forms are started. locations of outlets and fixtures.Concrete Batching Structural Steel Sprayed Fireproofing Roof Plumbing Electrical System Air Conditioning 1. Finish Site grading. Prior to enclosure of any walls. 8. 11. Installation of damp-proofing membranes and vapor barriers. Roof surface prior to insulation and roof water proofing WORK. Steel and wall framing prior to enclosure. 5. 2. 4. Inspection Notification: In addition to tests and inspections called for in this Section. 10. 06 LAYOUT AND MEASUREMENTS A. END OF SECTION SECTION 01400 CONSTRUCTION SPECIFICATIONS DOC SABG GIRLS’ ELEMENTARY SCHOOL AND BOYS’ INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF 089/ 090 A 2050 BE-315756 4 of 4 0 .1. B. Verify dimensions before layout and request clarification of discrepancies or be responsible for correction. Verify all measurements prior to ordering of fabricated items.
Copyright © 2024 DOKUMEN.SITE Inc.